Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 65

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy15 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files15

Search terms highlighted
Eversource rate increase is on 87 pages across 10 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
12 pages match

Text of RRU-065 Attachment 03.pdf

Extracted from the file · 100 pages · 148,919 characters

Text of RRU-065 Attachment 04.pdf

Extracted from the file · 99 pages · 143,898 characters

Text of RRU-065 Attachment 05.pdf

Extracted from the file · 93 pages · 133,357 characters

Text of RRU-065 Attachment 06.pdf

Extracted from the file · 94 pages · 151,245 characters

Text of RRU-065 Attachment 07.pdf

Extracted from the file · 56 pages · 85,637 characters

Text of RRU-065 Attachment 08.pdf

Extracted from the file · 54 pages · 97,205 characters

3 pages match
  1. Page 8 of 59Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 8 of 59 4 Eversource Energy Postretirement Welfare Plans Comments on results 1.2 The actuarial gains/(losses) due to demographic experience, including any assumption changes, and investment return different from assumed during the prior year were $177,243,256 and $(197,427,688) respectively. Change in net periodic cost and funded position The net periodic cost declined from $(79,031,748) in fiscal 2022 to $(57,628,634) in fiscal 2023 and the funded position improved from $259,715,084 to $297,256,321. Significant reasons for these changes include the following: • The actual return on the fair value of plan assets since the prior measurement date was less than the expected return on plan assets, which caused the funded status to deteriorate and increased the net periodic cost • The single equivalent discount rate used to measure APBO increased 228 basis points compared to the prior year, which increased the net periodic cost and improved the funded position. 1.3 Basis for valuation Appendices A and B summarize the assumptions, methods and models used in the valuation. Appendices C, D, and E summarize our understanding of the principal provisions of the plans being valued. These appendices include a summary of any changes since the prior valuation. Unless otherwise described below under Subsequent Events, assumptions were selected based on information known as of the measurement date. Subsequent events None. Additional information None. © 2023 WTW. Proprietary and confidential. For WTW and WTW client use only wtwco.com
  2. Page 9 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 9 of 59 Eversource Energy Postretirement Welfare Plans 5 Actuarial certification This valuation has been conducted in accordance with generally accepted actuarial principles and practices. However, please note the information described below regarding this valuation. Reliances In preparing the results presented in this report, we have relied on information regarding plan provisions, participants, assets, and sponsor accounting policies and methods provided by the Company and other persons or organizations designated by the Company. See the Sources of Data and Other Information section of Appendix A for further details. We have relied on all the data and information provided as complete and accurate. We have reviewed this information for overall reasonableness and consistency, but have neither audited nor independently verified this information. Based on discussions with and concurrence by the plan sponsor, assumptions or estimates may have been made if data were not available. We are not aware of any errors or omissions in the data that would have a significant effect on the results of our calculations. The results presented in this report are directly dependent upon the accuracy and completeness of the underlying data and information. Any material inaccuracy in the data, assets, plan provisions or other information provided to us may have produced results that are not suitable for the purposes of this report and such inaccuracies, as corrected by the Company, may produce materially different results that could require that a revised report be issued. Measurement of benefit obligations, plan assets and balance sheet adjustments Census date/measurement date The measurement date is January 1, 2023. The benefit obligations were measured as of January 1, 2023 and are based on participant data as of the census date, January 1, 2023. Plan assets and balance sheet adjustments Information about the fair value of plan assets at December 31, 2022 was reviewed for reasonableness and consistency, but no audit was performed. Accumulated other comprehensive (income)/loss amounts shown in the report are shown prior to adjustment for tax effects. Any tax effects in AOCI should be determined by the Company in consultation with its tax advisors and independent accountants. August 2023 wtwco.com
  3. Page 10 of 59Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 10 of 59 6 Eversource Energy Postretirement Welfare Plans Assumptions and methods under U.S. GAAP As required by U.S. GAAP, the actuarial assumptions and methods employed in the development of the benefit cost and other financial reporting have been selected by the Company. WTW has evaluated the assumptions used and believes that they do not significantly conflict with what would be reasonable, except for the expected return on plan assets selected as of January 1, 2023. WTW was unable to evaluate the expected long-term rate of return on plan assets assumption because of the complexity of the plan sponsor’s investment policy. In addition, we believe that the combined effect of assumptions, other than the assumptions selected by another party that we have been unable to assess for reasonableness, is expected to have no significant bias. See Appendix A for a description of each significant assumption used and our rationale for concluding that it does not significantly conflict with what would be reasonable. U.S. GAAP requires that each significant assumption "individually represent the best estimate of the plan's future experience solely with respect to that assumption." The results shown in this report have been developed based on actuarial assumptions that, to the extent evaluated by WTW, we believe do not significantly conflict with what would be reasonable. Other actuarial assumptions could also be considered to not significantly conflict with what would be reasonable. Thus, reasonable results differing from those presented in this report could have been developed by selecting different reasonable assumptions. A summary of the assumptions, methods and sources of data and other information used is provided in Appendix A. Note that any subsequent changes in methods or assumptions for the January 1, 2023 measurement date will change the results shown in this report. Certain models (as described in ASOP No. 56) were used in preparing the information presented herein. Further information on these models can be found in Appendix A. Nature of actuarial calculations The results shown in this report are estimates based on data that may be imperfect and on assumptions about future events that cannot be predicted with any certainty. The effects of certain plan provisions may be approximated, or determined to be insignificant and therefore not valued. Reasonable efforts were made in preparing this valuation to confirm that items that are significant in the context of the actuarial liabilities or costs are treated appropriately, and are not excluded or included inappropriately. Any rounding (or lack thereof) used for displaying numbers in this report is not intended to imply a degree of precision, which is not a characteristic of actuarial calculations. If overall future plan experience produces higher benefit payments or lower investment returns than assumed, the relative level of plan costs reported in this valuation will likely increase in future valuations (and vice versa). Future actuarial measurements may differ significantly from the current measurements presented in this report due to many factors, including: plan experience differing from that anticipated by the economic or demographic assumptions, changes in economic or demographic assumptions, increases or decreases expected as part of the natural operation of the methodology used for the measurements (such as the end of an amortization period), and changes in plan provisions or applicable law. Due to the limited scope of our assignment, we did not perform an analysis of the potential range of such future measurements. Retiree group benefits models necessarily rely on the use of approximations and © 2023 WTW. Proprietary and confidential. For WTW and WTW client use only wtwco.com
  4. Page 11 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 11 of 59 Eversource Energy Postretirement Welfare Plans 7 estimates, and are sensitive to changes in these approximations and estimates. Small variations in these approximations and estimates may lead to significant changes in actuarial measurements. See Basis for Valuation in Section 1 above for a discussion of any material events that have occurred after the valuation date that are not reflected in this valuation. Limitations on use This report is provided subject to the terms set out herein and in our engagement letter dated December 21, 2022 and any accompanying or referenced terms and conditions. The information contained in this report was prepared for the internal use of the Company and its independent accountants in connection with our actuarial valuation of the other postretirement benefit plan as described in Purposes of Valuation above. It is not intended for and may not be used for other purposes, and we accept no responsibility or liability in this regard. The Company may distribute this actuarial valuation report to the appropriate authorities who have the legal right to require the Company to provide them this report, in which case the Company will use best efforts to notify WTW in advance of this distribution. Further distribution to, or use by, other parties of all or part of this report is expressly prohibited without WTW’s prior written consent. WTW accepts no responsibility for any consequences arising from any other party relying on this report or any advice relating to its contents. Professional qualifications The undersigned are members of the Society of Actuaries and meet the “Qualification Standards for Actuaries Issuing Statements of Actuarial Opinion in the United States” relating to other postretirement benefit plans. Our objectivity is not impaired by any relationship between the plan sponsor and our employer, Willis Towers Watson US LLC. Carl Larouche, FSA, EA Director, Retirement August 18, 2023 Curt Morgan, FSA, EA Senior Director, Retirement August 18, 2023 August 2023 wtwco.com Kathleen Brophy, ASA, EA Senior Associate, Retirement August 18, 2023
  5. Page 12 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 12 of 59 8 Eversource Energy Postretirement Welfare Plans This page is intentionally blank © 2023 WTW. Proprietary and confidential. For WTW and WTW client use only wtwco.com
  6. Page 13 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 13 of 59 Eversource Energy Postretirement Welfare Plans 9 Section 2 : PBOP Accounting exhibits PBOP balance sheet asset/(liability) 2.1 All monetary amounts shown in US Dollars Measurement Date 01/01/2023 01/01/2022 (650,291,409) 947,547,730 (847,110,287) 1,106,825,371 297,256,321 259,715,084 297,256,321 0 0 259,715,084 0 0 297,256,321 259,715,084 C Accumulated Other Comprehensive (Income)/Loss 1 Net prior service cost/(credit) 2 Net loss/(gain) (107,449,310) 79,299,596 (129,153,083) 59,115,164 Accumulated other comprehensive (income)/loss4 (28,149,714) (70,037,919) 5.19% 01/01/2023 2.91% 01/01/2022 A Development of Balance Sheet Asset/(Liability)1 1 Accumulated postretirement benefit obligation (APBO) 2 Fair value of plan assets (FVA) 2 3 Net balance sheet asset/(liability) B Current and Noncurrent Classification3 1 Noncurrent asset 2 Current liability 3 Noncurrent liability 4 3 Net balance sheet asset/(liability) D Assumptions and Dates 1 Equivalent single discount rate for benefit obligations 2 Census date 1 2 3 4 Whether any amounts in this table that differ from those disclosed at year-end must be disclosed in subsequent interim financial statements should be determined. Excludes receivable contributions. The current liability (for each underfunded plan) was measured as the discounted value of benefits expected to be paid over the next 12 months in excess of the fair value of the plan’s assets at the measurement date. Amount shown is pre-tax and should be adjusted by plan sponsor for tax effects. August 2023 wtwco.com
  7. Page 14 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 14 of 59 10 Eversource Energy Postretirement Welfare Plans 2.2 PBOP changes in plan obligations and assets All monetary amounts shown in US Dollars Period Beginning A Change in Accumulated Postretirement Benefit Obligation (APBO) 1 APBO at beginning of prior fiscal year 2 Employer service cost 3 Interest cost 4 Actuarial loss/(gain) 5 Plan participants’ contributions 6 Benefits paid from plan assets 7 Benefits paid from Company assets 8 Medicare Part D subsidy 9 Administrative expenses paid 10 Plan amendments 11 Acquisitions/(divestitures) 12 Curtailments 13 Settlements 14 Special/contractual termination benefits 15 Other adjustments 16 APBO at beginning of current fiscal year B Change in Plan Assets 1 Fair value of plan assets at beginning of prior fiscal year 2 Actual return on plan assets 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid 7 Acquisitions/(divestitures) 8 Settlements 9 Other adjustments 10 Fair value of plan assets at beginning of current fiscal year 01/01/2023 01/01/2022 847,110,287 11,532,502 19,085,239 (177,243,256) 552,985 (50,348,654) (397,694) 0 0 0 0 0 0 0 0 916,849,142 13,481,987 16,455,229 (49,955,029) 513,739 (49,841,671) (393,110) 0 0 0 0 0 0 0 0 650,291,409 847,110,287 1,106,825,371 (109,481,972) 0 552,985 (50,348,654) 0 0 0 0 976,024,094 180,129,209 0 513,739 (49,841,671) 0 0 0 0 947,547,730 1,106,825,371 © 2023 WTW. Proprietary and confidential. For WTW and WTW client use only wtwco.com
  8. Page 15 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 15 of 59 Eversource Energy Postretirement Welfare Plans 2.3 11 PBOP summary of net balances All monetary amounts shown in US Dollars A Summary of Prior Service Cost/(Credit) Bases Net Amount at 01/01/2023 Remaining Amortization Period Amortization Amount in 2023 Effect of Curtailments Other Events (118,835) 145,349 (107,475,824) 1.000 5.100 4.985 118,835 (28,500) 21,561,698 0 0 0 0 0 0 21,652,033 0 0 (107,449,310) All monetary amounts shown in US Dollars B Summary of Net Loss/(Gain) (see Appendix A for a description of amortization method) August 2023 wtwco.com Net Amount at 01/01/2023 Remaining Amortization Period Amortization Amount in 2023 Effect of Curtailments Other Events 79,299,596 N/A 0 0 0
  9. Page 16 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 16 of 59 12 Eversource Energy Postretirement Welfare Plans 2.4 PBOP development of plan assets for benefit cost A. 401(h) account All monetary amounts shown in US Dollars Total Reconciliation of Assets 1 Plan assets at 12/31/2021 2 Investment return 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid 297,817,447 (17,412,581) 0 0 (24,476,675) 0 7 Plan assets at 12/31/2022 255,928,191 B. Management / Non-Union VEBAs All monetary amounts shown in US Dollars Non-Union Medical Reconciliation of Assets 1 Plan assets at 12/31/2021 2 Investment return 33,064,576 30,653,691 63,718,267 (3,413,717) (9,234,599) 0 0 0 31,944 0 31,944 (902,574) (912,592) (1,815,167) 0 0 0 26,373,064 26,327,381 52,700,445 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid C. Total (5,820,882) 3 Employer contributions 7 Plan assets at 12/31/2022 NSTAR Management Life Union VEBAs (includes Non-Union Life) All monetary amounts shown in US Dollars Union Medical NUSCO Life (Union & Non-Union) NSTAR Union Life Total Reconciliation of Assets 1 Plan assets at 12/31/2021 2 Investment return 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid 686,172,729 (76,393,446) 0 42,052 (16,381,027) 0 33,389,487 (3,605,283) 0 478,989 (5,822,946) 0 25,727,441 (2,836,062) 0 0 (1,852,839) 0 745,289,657 (82,834,792) 0 521,041 (24,056,813) 0 7 Plan assets at 12/31/2022 593,440,308 24,440,247 21,038,539 638,919,094 © 2023 WTW. Proprietary and confidential. For WTW and WTW client use only wtwco.com
  10. Page 17 of 59

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 9 Page 17 of 59 Eversource Energy Postretirement Welfare Plans 2.5 13 PBOP summary and comparison of benefit cost and cash flows All monetary amounts shown in US Dollars Fiscal Year Ending 12/31/2023 12/31/2022 A Total Benefit Cost 1 Employer service cost 2 Interest cost 3 Expected return on plan assets 7,578,847 31,926,929 (75,482,377) 11,532,502 19,085,239 (87,945,716) 4 Subtotal (35,976,601) (57,327,975) 5 6 Net prior service cost/(credit) amortization Net loss/(gain) amortization (21,652,033) 0 (21,703,773) 0 7 Subtotal (21,652,033) (21,703,773) 8 9 10 11 12 Net periodic postretirement benefit cost/(income) Curtailment (gain)/loss Settlement (gain)/loss Special/contractual termination benefits Other adjustments (57,628,634) 0 0 0 0 (79,031,748) 0 0 0 0 (57,628,634) (79,031,748) 5.19% 5.37% 5.08% 8.25%/6.45% 2.91% 3.33% 2.29% 8.25%/6.45% 01/01/2023 01/01/2022 C Fair Value of Assets at Beginning of Year 947,547,730 1,106,825,371 D Cash Flows Net of Medicare Part D Subsidy 1 Employer contributions 2 Plan participants’ contributions 3 Benefits paid from Company assets 4 Benefits paid from plan assets Expected 0 0 0 54,038,520 Actual 0 552,985 397,694 50,348,654 E Amortization Period 1 For gain/loss amortization, if applicable 14.78163 14.21741 13 Total benefit cost B Assumptions (See Appendix A for interim measurements, if any) 1 Equivalent single discount rate for benefit obligations 2 Equivalent single discount rate for service cost 3 Equivalent single discount rate for interest cost 4 Expected Long-Term Rate of Return on Plan Assets (401(h) and Union VEBAs / Management VEBAs) 5 Census date August 2023 wtwco.com

Text of RRU-065 Attachment 10.pdf

Extracted from the file · 58 pages · 100,267 characters

Text of RRU-065 Attachment 11.pdf

Extracted from the file · 59 pages · 99,366 characters

Text of RRU-065 Attachment 12.pdf

Extracted from the file · 1 page · 710 characters

Text of RRU-065 Attachment 13.pdf

Extracted from the file · 1 page · 967 characters

Text of RRU-065 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 65 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)