Interrogatory responses
Answers to questions 72
Files6
RRU-072_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download RRU-072_Final.pdfRead the text of RRU-072_Final.pdf
RRU-072 Attachment 1.pdf
PDF · 4.0 MB · 120 pagesText searchable
Download RRU-072 Attachment 1.pdfRead the text of RRU-072 Attachment 1.pdf
RRU-072 Attachment 2.pdf
PDF · 4.1 MB · 128 pagesText searchable
Download RRU-072 Attachment 2.pdfRead the text of RRU-072 Attachment 2.pdf
RRU-072 Attachment 3.pdf
PDF · 5.8 MB · 136 pagesText searchable
Download RRU-072 Attachment 3.pdfRead the text of RRU-072 Attachment 3.pdf
RRU-072 Attachment 4.pdf
PDF · 17 MB · 144 pagesText searchable
Download RRU-072 Attachment 4.pdfRead the text of RRU-072 Attachment 4.pdf
RRU-072 Attachment 5.pdf
PDF · 3.8 MB · 144 pagesText searchable
Download RRU-072 Attachment 5.pdfRead the text of RRU-072 Attachment 5.pdf
Page 102 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 102 of 136 Performance Shares: Eversource granted performance shares under the annual long-term incentive programs that vest based upon the extent to which Company goals are achieved at the end of three-year performance measurement periods. Performance shares are paid in shares, after the performance measurement period. A summary of performance share transactions is as follows: Performance Shares (Units) Weighted Average Grant-Date Fair Value Outstanding as of December 31, 2022 547,290 $ 87.49 Granted 278,983 $ 83.39 Shares Issued (125,677) $ 90.49 Forfeited (36,172) $ 85.13 Outstanding as of December 31, 2023 664,424 85.33 $ The weighted average grant-date fair value of performance shares granted for the years ended December 31, 2023, 2022 and 2021 was $83.39, $83.34 and $76.08, respectively. As of December 31, 2023 and 2022, the number and weighted average grant-date fair value of unvested performance shares was 485,480 and $85.20 per share, and 457,069 and $88.43 per share, respectively. During 2023, there were 214,742 performance shares at a weighted average grant-date fair value of $89.70 per share that vested during the year and were either paid or deferred. As of December 31, 2023, 178,944 performance shares were fully vested and deferred. Compensation Expense: The total compensation expense and associated future income tax benefits recognized by Eversource, CL&P, NSTAR Electric and PSNH for share-based compensation awards were as follows: Eversource For the Years Ended December 31, 2023 (Millions of Dollars) Compensation Expense 2022 $ 27.8 Future Income Tax Benefit 2021 $ 33.4 7.3 $ 28.2 8.7 7.3 For the Years Ended December 31, CL&P (Millions of Dollars) Compensation Expense $ Future Income Tax Benefit 8.7 2023 2022 2021 NSTAR Electric NSTAR Electric NSTAR Electric $ PSNH 8.7 2.3 $ CL&P 3.0 2.3 $ 10.0 0.8 $ PSNH 10.7 2.6 $ CL&P 3.6 2.8 $ 0.9 8.8 $ PSNH 9.0 2.3 $ 3.0 2.3 0.8 As of December 31, 2023, there was $31.3 million of total unrecognized compensation expense related to nonvested share-based awards for Eversource, including $5.8 million for CL&P, $8.6 million for NSTAR Electric, and $1.9 million for PSNH. This cost is expected to be recognized ratably over a weighted-average period of 1.81 years for Eversource, CL&P, NSTAR Electric and PSNH. An income tax rate of 26 percent was used to estimate the tax effect on total share-based payments determined under the fair-value based method for all awards. The Company issues treasury shares to settle fully vested RSUs and performance shares under the Company's incentive plans. For the year ended December 31, 2023, a tax deficiency associated with the distribution of stock compensation awards increased income tax expense by $0.5 million, which decreased cash flows from operating activities on the statements of cash flows. For the years ended December 31, 2022 and 2021, excess tax benefits associated with the distribution of stock compensation awards reduced income tax expense by $2.1 million and $4.0 million, respectively, which increased cash flows from operating activities on the statements of cash flows. D. Other Retirement Benefits Eversource provides retirement and other benefits for certain current and past company officers. These benefits are accounted for on an accrual basis and expensed over a period equal to the service lives of the employees. The actuarially-determined liability for these benefits is included in Other Current and Long-Term Liabilities on the balance sheets. The related expense, which includes the allocation of expense associated with Eversource's service company officers that support CL&P, NSTAR Electric and PSNH, is included in Operations and Maintenance Expense on the income statements. The liability and expense amounts are as follows: As of and For the Years Ended December 31, Eversource (Millions of Dollars) 2023 Actuarially-Determined Liability $ 2022 32.6 Other Retirement Benefits Expense (1) 2021 $ 43.4 2.6 $ 42.8 10.9 2.2 As of and For the Years Ended December 31, CL&P (Millions of Dollars) Actuarially-Determined Liability Other Retirement Benefits Expense (1) (1) $ 0.2 0.8 2023 2022 2021 NSTAR Electric NSTAR Electric NSTAR Electric $ — 0.8 PSNH $ 1.1 CL&P $ 0.4 0.2 4.0 $ 0.1 3.7 PSNH $ 1.3 1.3 CL&P $ 0.2 0.7 $ 0.1 0.7 PSNH $ 1.5 0.3 Other Retirement Benefits Expense in 2022 includes a one-time special retirement benefit payable of $9.2 million, which was paid in 2023. 90Page 103 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 103 of 136 12. INCOME TAXES The components of income tax expense are as follows: Eversource (Millions of Dollars) For the Years Ended December 31, 2022 2023 2021 Current Income Taxes: Federal $ 75.8 State $ 95.8 $ 21.5 0.6 13.6 (21.6) 76.4 109.4 (0.1) Federal (0.9) 198.8 199.7 State 86.3 148.0 147.4 Total Deferred 85.4 346.8 347.1 Investment Tax Credits, Net (2.1) (2.6) Total Current Deferred Income Taxes, Net: Income Tax Expense $ 2023 NSTAR Electric CL&P (Millions of Dollars) 159.7 $ 453.6 (2.8) $ 344.2 For the Years Ended December 31, 2022 NSTAR Electric CL&P PSNH PSNH 2021 NSTAR Electric CL&P PSNH Current Income Taxes: Federal $ (10.8) $ 50.7 (2.3) 7.8 (20.0) 20.1 8.7 5.9 (7.0) 6.2 10.8 (13.1) 58.5 (60.0) 126.3 63.7 35.5 8.0 58.5 53.9 Federal 130.3 50.1 81.2 17.2 35.6 5.9 76.3 16.3 (14.9) State 53.7 46.1 37.8 28.2 42.4 9.9 47.6 41.2 0.4 184.0 96.2 119.0 45.4 78.0 15.8 123.9 57.5 (14.5) State Total Current $ (40.0) $ 106.2 $ 55.0 $ 29.6 $ 15.0 $ 52.3 $ 43.1 Deferred Income Taxes, Net: Total Deferred Investment Tax Credits, Net Income Tax Expense — $ 170.9 (1.7) $ 153.0 — $ 59.0 (0.5) $ 171.2 (1.7) $ 140.0 — $ (0.6) 51.3 $ 131.3 A reconciliation between income tax expense and the expected tax expense at the statutory rate is as follows: Eversource (Millions of Dollars, except percentages) (Loss)/Income Before Income Tax Expense For the Years Ended December 31, 2022 2023 $ Statutory Federal Income Tax Expense at 21% (275.0) $ 1,866.0 $ 2021 1,572.3 (57.7) 391.9 330.2 Depreciation (25.8) (17.1) (18.1) Investment Tax Credit Amortization (2.1) (2.6) (2.8) State Income Taxes, Net of Federal Impact (11.4) 75.9 54.4 Tax Effect of Differences: Dividends on ESOP (5.3) (5.1) (5.1) Tax Asset Valuation Allowance/Reserve Adjustments 295.8 51.6 44.6 Tax Deficiency/(Excess Stock Benefit) EDIT Amortization Other, Net Income Tax Expense . Effective Tax Rate 0.5 (2.1) (4.0) (51.5) (49.1) (69.1) 17.2 $ 159.7 (58.1)% 91 10.2 $ 453.6 24.3 % 14.1 $ 344.2 21.9 % (1.7) $ 114.3 — $ 39.4Page 104 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 104 of 136 For the Years Ended December 31, 2022 NSTAR CL&P Electric PSNH (Millions of Dollars, except percentages) CL&P 2023 NSTAR Electric CL&P 2021 NSTAR Electric Income Before Income Tax Expense $ 689.6 $ 697.5 $ 254.7 $ 704.1 $ 632.4 $ 222.9 $ 533.0 $ 590.9 $ 189.8 144.9 146.5 53.5 147.9 132.8 46.8 111.9 124.1 39.9 (5.6) (8.8) (1.0) (3.7) (4.2) 0.9 (6.4) (3.4) (0.2) — (1.7) — (0.5) (1.7) — (0.6) (1.7) — (10.7) 42.5 14.1 (6.6) 40.3 12.5 (4.6) 37.5 8.9 Statutory Federal Income Tax Expense at 21% PSNH PSNH Tax Effect of Differences: Depreciation Investment Tax Credit Amortization State Income Taxes, Net of Federal Impact Tax Asset Valuation Allowance/Reserve Adjustments Tax Deficiency/(Excess Stock Benefit) EDIT Amortization Other, Net Income Tax Expense Effective Tax Rate 51.3 — — 44.7 — — 36.7 — — 0.2 0.2 0.1 (0.7) (0.8) (0.3) (1.5) (1.4) (0.5) (10.5) (28.4) (6.8) (9.2) (29.2) (7.7) (9.8) (43.2) (10.5) 1.3 2.7 (0.9) (0.7) 2.8 (0.9) 5.6 2.4 1.8 $ 170.9 $ 153.0 $ 59.0 $ 171.2 $ 140.0 $ 51.3 $ 131.3 $ 114.3 $ 39.4 24.8 % 21.9 % 23.2 % 24.3 % 22.1 % 23.0 % 24.6 % 19.3 % 20.8 % Eversource, CL&P, NSTAR Electric and PSNH file a consolidated federal income tax return and unitary, combined and separate state income tax returns. These entities are also parties to a tax allocation agreement under which taxable subsidiaries do not pay any more taxes than they would have otherwise paid had they filed a separate company tax return, and subsidiaries generating tax losses, if any, are paid for their losses when utilized. Deferred tax assets and liabilities are recognized for the future tax effects of temporary differences between the carrying amounts and the tax basis of assets and liabilities. The tax effect of temporary differences is accounted for in accordance with the rate-making treatment of the applicable regulatory commissions and relevant accounting authoritative literature. The tax effects of temporary differences that give rise to the net accumulated deferred income tax obligations are as follows: As of December 31, 2023 (Millions of Dollars) Eversource 2022 NSTAR Electric CL&P PSNH Eversource NSTAR Electric CL&P PSNH Deferred Tax Assets: Employee Benefits $ 244.5 $ 29.9 $ 66.8 $ 13.0 $ 228.9 $ 25.3 $ 57.4 $ 11.6 Derivative Liabilities 33.0 33.0 — — 53.8 53.8 — — Regulatory Deferrals - Liabilities 452.0 94.4 291.5 23.8 529.5 146.6 285.7 42.1 Allowance for Uncollectible Accounts 143.8 79.6 21.5 3.9 125.5 60.5 20.7 7.9 Tax Effect - Tax Regulatory Liabilities 739.0 320.7 227.1 95.5 762.9 324.6 241.8 97.8 Net Operating Loss Carryforwards 13.8 — — — 16.7 — — — Purchase Accounting Adjustment 56.7 — — — 62.0 — — — Equity Method Wind Investments 584.9 — — — — — — — Other 200.1 125.3 25.0 23.4 176.6 109.5 20.5 21.3 2,467.8 682.9 631.9 159.6 1,955.9 720.3 626.1 180.7 328.1 80.6 — — 82.8 63.3 — Total Deferred Tax Assets Less: Valuation Allowance (1) Net Deferred Tax Assets $ 2,139.7 $ Deferred Tax Liabilities: Accelerated Depreciation and Other Plant-Related Differences $ 5,103.3 95.0 Property Tax Accruals 602.3 $ 631.9 $ 159.6 $ 1,873.1 $ $ 1,703.4 $ 1,728.6 $ 566.5 $ 4,793.7 42.0 39.8 6.3 95.3 657.0 $ — 626.1 $ 180.7 $ 1,602.0 $ 1,643.7 $ 523.8 40.7 41.3 6.7 Regulatory Amounts: Regulatory Deferrals - Assets 1,512.3 470.0 474.5 250.3 1,251.9 406.4 407.9 165.2 Tax Effect - Tax Regulatory Assets Goodwill-related Regulatory Asset - 1999 Merger 284.0 191.9 10.5 8.3 271.7 185.6 10.7 7.9 72.2 — 61.9 — 76.8 — 65.9 — Employee Benefits 282.0 38.8 146.7 16.8 305.5 45.0 140.8 18.7 Derivative Assets 6.4 6.4 — — 10.5 10.5 — — Other 88.2 9.9 19.5 2.9 135.6 6.8 16.7 21.2 $ 7,443.4 $ 2,462.4 $ 2,481.5 851.1 $ 6,941.0 $ 2,297.0 $ 2,327.0 Total Deferred Tax Liabilities (1) $ $ As of December 31, 2023, the Eversource Valuation Allowance of $328.1 million includes $224.0 million related to the impairment of Eversource’s offshore wind investments. 92 743.5Page 105 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 105 of 136 2022 Federal Legislation: On August 16, 2022, the Inflation Reduction Act of 2022 (IRA) was signed into law. This is a broad package of legislation that includes incentives and support for clean energy resource development. Most notable for Eversource, the investment tax credit (ITC) on offshore wind projects increases from 30 percent to 40 percent if certain requirements for labor and domestic content are met. The act also re-establishes the production tax credit for solar and wind energy projects, gives increased credit for projects in certain communities, and sets credits for qualifying clean energy generation and energy storage projects. The tax provisions of the IRA provide additional incentives for offshore wind projects and could reduce retail electricity costs for our customers related to those clean energy investments. The IRA includes other tax provisions focused on implementing a 15 percent minimum tax on adjusted financial statement income and a one percent excise tax on corporate share repurchases. The Department of Treasury and the Internal Revenue Service issued some guidance during 2023; however, they are expected to issue additional needed guidance with respect to the application of the newly enacted IRA provisions in the future. We will continue to monitor and evaluate impacts on our consolidated financial statements. We currently do not expect the alternative minimum tax change to have a material impact on our earnings, financial condition or cash flows. Carryforwards: The following table provides the amounts and expiration dates of state tax credit and loss carryforwards and federal tax credit and net operating loss carryforwards: As of December 31, 2023 (Millions of Dollars) Eversource State Net Operating Loss $ State Tax Credit State Charitable Contribution 243.4 CL&P $ 2022 NSTAR Electric — $ PSNH — $ Expiration Range Eversource $ 288.1 CL&P $ — NSTAR Electric $ — PSNH $ Expiration Range — 2023 - 2041 — 2022 - 2041 228.5 157.5 — — 2023 - 2028 204.5 137.7 — — 2022 - 2027 7.9 — — — 2023 - 2027 20.1 — — — 2022 - 2026 In 2023, the Company increased its valuation allowance reserve for state credits by $21.3 million ($17.3 million for CL&P), net of tax, to reflect an update for expiring tax credits. In 2022, the Company increased its valuation allowance reserve for state credits by $21.3 million ($18.8 million for CL&P), net of tax, to reflect an update for expiring tax credits. For 2023, state credit and state loss carryforwards have been partially reserved by a valuation allowance of $104.1 million (net of tax) and for 2022, state credit and state loss carryforwards were partially reserved by a valuation allowance of $82.8 million (net of tax). Unrecognized Tax Benefits: A reconciliation of the activity in unrecognized tax benefits, all of which would impact the effective tax rate if recognized, is as follows: Eversource (Millions of Dollars) Balance as of January 1, 2021 $ CL&P 61.8 $ 25.8 Gross Increases - Current Year 11.3 3.8 Gross Decreases - Prior Year (0.3) (0.6) Lapse of Statute of Limitations (7.0) (2.8) Balance as of December 31, 2021 65.8 26.2 Gross Increases - Current Year 11.5 3.5 Gross Decreases - Prior Year (2.4) (0.9) Lapse of Statute of Limitations (7.8) (3.3) Balance as of December 31, 2022 67.1 25.5 Gross Increases - Current Year 23.4 4.0 Gross Increases - Prior Year 0.1 0.1 Gross Decreases - Prior Year (0.1) — Lapse of Statute of Limitations (9.2) (3.8) Balance as of December 31, 2023 $ 81.3 $ 25.8 Interest and Penalties: Interest on uncertain tax positions is recorded and generally classified as a component of Other Interest Expense on the statements of income. However, when resolution of uncertainties results in the Company receiving interest income, any related interest benefit is recorded in Other Income, Net on the statements of income. No penalties have been recorded. The amount of interest expense recognized on uncertain tax positions was $0.3 million for the year ended December 31, 2023. There was no interest expense/(income) recognized on uncertain tax positions for the years ended December 31, 2022 or 2021. Accrued interest payable was $0.4 million and $0.1 million as of December 31, 2023 and 2022, respectively. Tax Positions: During 2023 and 2022, Eversource did not resolve any of its uncertain tax positions. Open Tax Years: The following table summarizes Eversource, CL&P, NSTAR Electric, and PSNH's tax years that remain subject to examination by major tax jurisdictions as of December 31, 2023: Description Federal Tax Years 2023 Connecticut 2020 - 2023 Massachusetts 2020 - 2023 New Hampshire 2020 - 2023 93Page 106 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 106 of 136 Eversource does not estimate to have an earnings impact related to unrecognized tax benefits during the next twelve months. 13. COMMITMENTS AND CONTINGENCIES A. Environmental Matters Eversource, CL&P, NSTAR Electric and PSNH are subject to environmental laws and regulations intended to mitigate or remove the effect of past operations and improve or maintain the quality of the environment. These laws and regulations require the removal or the remedy of the effect on the environment of the disposal or release of certain specified hazardous substances at current and former operating sites. Eversource, CL&P, NSTAR Electric and PSNH have an active environmental auditing and training program and each believes it is substantially in compliance with all enacted laws and regulations. Environmental reserves are accrued when assessments indicate it is probable that a liability has been incurred and an amount can be reasonably estimated. The approach used estimates the liability based on the most likely action plan from a variety of available remediation options, including no action required or several different remedies ranging from establishing institutional controls to full site remediation and monitoring. These liabilities are estimated on an undiscounted basis and do not assume that the amounts are recoverable from insurance companies or other third parties. The environmental reserves include sites at different stages of discovery and remediation and do not include any unasserted claims. These reserve estimates are subjective in nature as they take into consideration several different remediation options at each specific site. The reliability and precision of these estimates can be affected by several factors, including new information concerning either the level of contamination at the site, the extent of Eversource's, CL&P's, NSTAR Electric's and PSNH's responsibility for remediation or the extent of remediation required, recently enacted laws and regulations or changes in cost estimates due to certain economic factors. It is possible that new information or future developments could require a reassessment of the potential exposure to required environmental remediation. As this information becomes available, management will continue to assess the potential exposure and adjust the reserves accordingly. The amounts recorded as environmental reserves are included in Other Current Liabilities and Other Long-Term Liabilities on the balance sheets and represent management's best estimate of the liability for environmental costs, and take into consideration site assessment, remediation and long-term monitoring costs. The environmental reserves also take into account recurring costs of managing hazardous substances and pollutants, mandated expenditures to remediate contaminated sites and any other infrequent and non-recurring clean-up costs. A reconciliation of the activity in the environmental reserves is as follows: Eversource (Millions of Dollars) Balance as of January 1, 2022 $ Additions 115.4 CL&P $ 12.6 NSTAR Electric 13.9 $ 3.3 PSNH $ 6.3 0.9 0.4 0.5 Payments/Reductions (5.4) (0.9) (0.3) (0.7) Balance as of December 31, 2022 122.6 13.9 3.4 6.1 Additions 16.8 2.6 2.5 1.7 Payments/Reductions (11.2) (2.7) (0.5) (0.2) Balance as of December 31, 2023 $ 128.2 $ 13.8 $ 5.4 $ 7.6 The number of environmental sites for which remediation or long-term monitoring, preliminary site work or site assessment is being performed are as follows: Eversource CL&P NSTAR Electric PSNH 2023 65 16 12 8 2022 59 13 10 8 The increase in the reserve balance was due primarily to the addition of one environmental site at NSTAR Gas, two additional sites at NSTAR Electric, three additional sites at CL&P, and changes in cost estimates at certain MGP sites at our natural gas companies and PSNH for which additional remediation will be required. Included in the number of sites and reserve amounts above are former MGP sites that were operated several decades ago and manufactured natural gas from coal and other processes, which resulted in certain by-products remaining in the environment that may pose a potential risk to human health and the environment, for which Eversource may have potential liability. The reserve balances related to these former MGP sites were $117.1 million and $112.6 million as of December 31, 2023 and 2022, respectively, and related primarily to the natural gas business segment. As of December 31, 2023, for 19 environmental sites (11 for CL&P and 1 for NSTAR Electric) that are included in the Company's reserve for environmental costs, management cannot reasonably estimate the exposure to loss in excess of the reserve, or range of loss, as these sites are under investigation and/or there is significant uncertainty as to what remedial actions, if any, the Company may be required to undertake. As of December 31, 2023, $39.9 million (including $12.6 million for CL&P and $0.3 million for NSTAR Electric) had been accrued as a liability for these sites. As of December 31, 2023, for 7 environmental sites (1 for CL&P) that are included in the Company's reserve for environmental costs, the information known and the nature of the remediation options allow for the Company to estimate the range of losses for environmental costs. As of December 31, 2023, $29.4 million (including $0.4 million for CL&P) has been accrued as a liability for these sites, which represents the low end of the range of the liabilities for environmental costs. Management believes that additional losses of up to approximately $17.7 million ($0.5 million at CL&P) may be incurred in executing current remediation plans for these sites. 94Page 107 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 107 of 136 As of December 31, 2023, for the remaining 39 environmental sites (including 4 for CL&P, 11 for NSTAR Electric and 8 for PSNH) that are included in the Company's reserve for environmental costs, the $58.9 million accrual (including $0.8 million for CL&P, $5.1 million for NSTAR Electric and $7.6 million for PSNH) represents management's best estimate of the probable liability and no additional loss is estimable at this time. PSNH, NSTAR Gas, EGMA and Yankee Gas have rate recovery mechanisms for MGP related environmental costs, therefore, changes in their respective environmental reserves do not impact Net Income. CL&P is allowed to defer certain environmental costs for future recovery. NSTAR Electric does not have a separate environmental cost recovery regulatory mechanism. B. Long-Term Contractual Arrangements Estimated Future Annual Costs: The estimated future annual costs of significant executed, non-cancelable, long-term contractual arrangements in effect as of December 31, 2023 are as follows: Eversource (Millions of Dollars) Renewable Energy Purchase Contracts 2024 $ 2025 769.4 $ 2026 863.0 Natural Gas Procurement 423.2 402.3 Purchased Power and Capacity 86.7 Peaker CfDs 17.2 Transmission Support Commitments 19.3 Total $ CL&P (Millions of Dollars) Renewable Energy Purchase Contracts 1,315.8 $ 2024 $ $ $ $ 2028 897.6 $ Thereafter 893.1 317.8 264.8 236.0 75.2 2.9 2.7 14.1 12.8 9.1 22.2 27.4 31.1 1,376.8 $ 2025 618.8 2027 867.9 1,228.8 $ 2026 628.3 $ 1,205.3 $ 2027 628.0 $ $ $ Total $ 9,659.8 1,211.8 2,855.9 2.7 4.5 174.7 6.8 43.7 103.7 31.1 31.1 1,169.7 $ 2028 631.2 5,368.8 6,659.9 162.2 $ Thereafter 632.2 $ 2,087.8 12,956.3 Total $ 5,226.3 Purchased Power and Capacity 83.8 72.4 0.1 — — — 156.3 Peaker CfDs 17.2 14.1 12.8 9.1 6.8 43.7 103.7 Transmission Support Commitments 7.6 8.8 10.8 12.3 12.3 12.3 Total $ NSTAR Electric (Millions of Dollars) Renewable Energy Purchase Contracts 727.4 $ 2024 $ 723.6 $ 2025 123.0 $ 651.7 $ 2026 202.9 $ 652.6 $ 2027 206.5 $ 651.3 $ 2028 209.3 $ 2,143.8 Thereafter 205.1 $ 2,983.5 Purchased Power and Capacity 2.9 2.8 2.8 2.7 2.7 4.5 Transmission Support Commitments 7.6 8.7 10.8 12.3 12.3 12.3 Total $ PSNH (Millions of Dollars) Renewable Energy Purchase Contracts $ 2024 $ Transmission Support Commitments Total 133.5 $ 2025 27.6 $ 4.1 $ 214.4 31.7 220.1 2026 31.8 $ 36.5 $ 5.8 $ 224.3 $ 2027 33.4 4.7 $ $ 39.2 $ 6.5 $ 220.1 $ 2028 57.1 63.6 3,000.3 $ 62.3 297.5 304.0 3,930.3 18.4 64.0 $ 4,012.7 Total $ 503.2 $ 537.3 6.5 $ 5,550.4 Total $ Thereafter 55.8 6.5 $ 64.1 $ 34.1 The contractual obligations table above does not include CL&P's, NSTAR Electric's or PSNH's standard/basic service contracts for the purchase of energy supply, the amounts of which vary with customers' energy needs. Renewable Energy Purchase Contracts: Renewable energy purchase contracts include non-cancellable commitments under contracts of CL&P, NSTAR Electric and PSNH for the purchase of energy and capacity from renewable energy facilities. Such contracts extend through 2044 for CL&P and NSTAR Electric and 2033 for PSNH. Renewable Energy and Purchase Contracts includes long-term commitments of NSTAR Electric pertaining to the Vineyard Wind LLC contract awarded under the Massachusetts Clean Energy 83C procurement solicitation. NSTAR Electric, along with other Massachusetts distribution companies, entered into 20-year contracts to purchase electricity generated by this 800 megawatt offshore wind project. Construction on the Vineyard Wind project commenced in 2022. Estimated energy costs under this contract are expected to begin when the facilities are in service in 2024 and range between $100 million and $200 million per year under NSTAR Electric’s 20-year contract, totaling approximately $2.6 billion. As required by 2018 regulation, CL&P and UI each entered into PURA-approved ten-year contracts in 2019 to purchase a combined total of approximately 9 million MWh annually from the Millstone Nuclear Power Station generation facility, which represents a combined amount of approximately 50 percent of the facility's output (approximately 40 percent by CL&P). Also as required by 2018 regulation, CL&P and UI each entered into PURA-approved eight-year contracts in 2019 to purchase a combined amount of approximately 18 percent of the Seabrook Nuclear Power Plant’s output (approximately 15 percent by CL&P) beginning January 1, 2022. The total estimated remaining future cost of the Millstone Nuclear Power Station and Seabrook Nuclear Power Plant energy purchase contracts are $2.4 billion and are reflected in the table above. CL&P sells the energy purchased under these contracts into the market and uses the proceeds from these energy sales to offset the contract costs. As the net costs under these contracts are recovered from customers in future rates, the contracts do not have an impact on the net income of CL&P. These contracts do not meet the definition of a derivative, and accordingly, the costs of these contracts are being accounted for as incurred. 95Page 108 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 108 of 136 The contractual obligations table above does not include long-term commitments signed by CL&P and NSTAR Electric, as required by the PURA and the DPU, respectively, for the purchase of renewable energy and related products that are contingent on the future construction of energy facilities, such as the long-term commitments of NSTAR Electric pertaining to the Massachusetts Clean Energy 83D contract entered into in 2018. Natural Gas Procurement: Eversource's natural gas distribution businesses have long-term contracts for the purchase, transportation and storage of natural gas as part of its portfolio of supplies, which extend through 2045. Purchased Power and Capacity: These contracts include capacity CfDs with generation facilities at CL&P through 2026, and various IPP contracts or purchase obligations for electricity which extend through 2024 for CL&P and 2031 for NSTAR Electric. CL&P's portion of the costs and benefits under these capacity contracts are recovered from, or refunded to, CL&P's customers. Peaker CfDs: CL&P, along with UI, has three peaker CfDs for a total of approximately 500 MW of peaking capacity through 2042. CL&P has a sharing agreement with UI, whereby CL&P is responsible for 80 percent and UI for 20 percent of the net costs or benefits of these CfDs. The Peaker CfDs pay the generation facility owner the difference between capacity, forward reserve and energy market revenues and a cost-of-service payment stream for 30 years. The ultimate cost or benefit to CL&P under these contracts will depend on the costs of plant operation and the prices that the projects receive for capacity and other products in the ISO-NE markets. CL&P's portion of the amounts paid or received under the Peaker CfDs are recovered from, or refunded to, CL&P's customers. Transmission Support Commitments: Along with other New England utilities, CL&P, NSTAR Electric and PSNH have entered into agreements to support the costs of, and receive rights to use, transmission and terminal facilities that import electricity from the Hydro-Québec system in Canada. CL&P, NSTAR Electric and PSNH are obligated to pay, over a 20-year period ending in 2040, their proportionate shares of the annual operation and maintenance expenses and capital costs of those facilities. The total costs incurred under these agreements were as follows: Eversource (Millions of Dollars) For the Years Ended December 31, 2022 2023 Renewable Energy Purchase Contracts $ 581.4 $ 678.1 2021 $ 609.2 Natural Gas Procurement 695.8 1,042.8 712.7 Purchased Power and Capacity 69.0 61.6 56.4 Peaker CfDs 20.1 13.4 24.3 Transmission Support Commitments 14.2 12.7 15.4 CL&P (Millions of Dollars) Renewable Energy Purchase Contracts 2023 NSTAR Electric $ 474.1 $ 60.0 For the Years Ended December 31, 2022 NSTAR CL&P Electric PSNH PSNH $ 47.3 $ 513.2 $ 90.8 $ 74.1 2021 NSTAR Electric CL&P $ 457.1 $ 84.7 PSNH $ 67.4 Purchased Power and Capacity 65.5 2.9 0.6 57.7 3.0 0.9 53.1 3.0 Peaker CfDs 20.1 — — 13.4 — — 24.3 — 0.3 — Transmission Support Commitments 5.6 5.6 3.0 5.0 5.0 2.7 6.1 6.0 3.3 C. Spent Nuclear Fuel Obligations - Yankee Companies CL&P, NSTAR Electric and PSNH have plant closure and fuel storage cost obligations to the Yankee Companies, which have each completed the physical decommissioning of their respective nuclear power facilities and are now engaged in the long-term storage of their spent fuel. The Yankee Companies fund these costs through litigation proceeds received from the DOE and, to the extent necessary, through wholesale, FERCapproved rates charged under power purchase agreements with several New England utilities, including CL&P, NSTAR Electric and PSNH. CL&P, NSTAR Electric and PSNH, in turn recover these costs from their customers through state regulatory commission-approved retail rates. The Yankee Companies collect amounts that management believes are adequate to recover the remaining plant closure and fuel storage cost estimates for the respective plants. Management believes CL&P and NSTAR Electric will recover their shares of these obligations from their customers. PSNH has recovered its total share of these costs from its customers. Spent Nuclear Fuel Litigation: The Yankee Companies have filed complaints against the DOE in the Court of Federal Claims seeking monetary damages resulting from the DOE's failure to accept delivery of, and provide for a permanent facility to store, spent nuclear fuel pursuant to the terms of the 1983 spent fuel and highlevel waste disposal contracts between the Yankee Companies and the DOE. The court previously awarded the Yankee Companies damages for Phases I, II, III and IV of litigation resulting from the DOE's failure to meet its contractual obligations. These Phases covered damages incurred in the years 1998 through 2016, and the awarded damages have been received by the Yankee Companies with certain amounts of the damages refunded to their customers. DOE Phase V Damages - On March 25, 2021, each of the Yankee Companies filed a fifth set of lawsuits against the DOE in the Court of Federal Claims resulting from the DOE's failure to begin accepting spent nuclear fuel for disposal covering the years from 2017 to 2020. The Yankee Companies filed claims seeking monetary damages totaling $120.4 million for CYAPC, YAEC and MYAPC. Pursuant to a June 2, 2022 court order, the Yankee Companies were subsequently permitted to include monetary damages relating to the year 2021 in the DOE Phase V complaint. The Yankee Companies submitted a supplemental filing to include these costs of $33.1 million on June 8, 2022. The DOE Phase V trial is expected to begin in the spring of 2024. 96Page 109 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 109 of 136 D. Guarantees and Indemnifications In the normal course of business, Eversource parent provides credit assurances on behalf of its subsidiaries, including CL&P, NSTAR Electric and PSNH, in the form of guarantees. Management does not anticipate a material impact to net income or cash flows as a result of these various guarantees and indemnifications. Guarantees issued on behalf of unconsolidated entities, including equity method offshore wind investments, for which Eversource parent is the guarantor, are recorded at fair value as a liability on the balance sheet at the inception of the guarantee. The fair value of guarantees issued on behalf of unconsolidated entities are recorded within Other Long-Term Liabilities on the balance sheet, and were $4.4 million and $4.2 million as of December 31, 2023 and 2022, respectively. Eversource regularly reviews performance risk under these guarantee arrangements, and believes the likelihood of payments being required under the guarantees is remote. In the event it becomes probable that Eversource parent will be required to perform under the guarantee, the amount of probable payment will be recorded. The following table summarizes Eversource parent's exposure to guarantees and indemnifications of its subsidiaries and affiliates to external parties, and primarily relates to its offshore wind business: As of December 31, 2023 Company (Obligor) Description Maximum Exposure (in millions) North East Offshore, LLC, Sunrise Wind LLC, Revolution Wind, LLC and South Fork Wind, LLC Eversource Investment LLC and South Fork Class B Member, LLC Offshore wind construction-related purchase agreements with third-party contractors (1) Funding and indemnification obligations of South Fork Wind and North East Offshore, LLC (2) Sunrise Wind LLC OREC capacity production (3) South Fork Wind, LLC Power Purchase Agreement Security (4) 7.1 Eversource Investment LLC Letters of Credit (5) 15.2 Eversource TEI LLC South Fork Wind Tax Equity (6) Various Surety bonds (7) 38.8 Sunrise Wind LLC Surety bonds (8) 20.5 $ 1,941.1 485.9 11.0 — (1) Eversource parent issued guarantees on behalf of its 50 percent-owned affiliates, North East Offshore, LLC (NEO), Sunrise Wind LLC, Revolution Wind, LLC and South Fork Wind, LLC, under which Eversource parent agreed to guarantee each entity’s performance of obligations under certain construction-related purchase agreements with third-party contractors, in an aggregate amount not to exceed $3.03 billion. Eversource parent’s obligations under the guarantees expire upon the earlier of (i) dates ranging between May 2024 and October 2028 and (ii) full performance of the guaranteed obligations. Eversource parent also issued a separate guarantee to Ørsted on behalf of NEO, under which Eversource parent agreed to guarantee 50 percent of NEO’s payment obligations under certain offshore wind project construction-related agreements with Ørsted in an aggregate amount not to exceed $62.5 million and expiring upon full performance of the guaranteed obligation. (2) Eversource parent issued guarantees on behalf of its wholly-owned subsidiary Eversource Investment LLC (EI), which holds Eversource's investments in offshore wind-related equity method investments, and on behalf of its 50 percent-owned affiliate, South Fork Class B Member, LLC, whereby Eversource parent will guarantee each entity’s performance of certain capital expenditure funding obligations during the construction phases of the South Fork Wind project and NEO’s underlying offshore wind projects. Eversource parent also guaranteed certain indemnification obligations of EI associated with third party credit support for EI’s investment in NEO. These guarantees will not exceed $1.52 billion and expire upon the full performance of the guaranteed obligations. (3) Eversource parent issued a guarantee on behalf of its 50 percent-owned affiliate, Sunrise Wind LLC, whereby Eversource parent will guarantee Sunrise Wind LLC's performance of certain obligations, in an amount not to exceed $15.4 million, under the Offshore Wind Renewable Energy Certificate Purchase and Sale Agreement (the Agreement). The Agreement was executed by and between the New York State Energy Research and Development Authority (NYSERDA) and Sunrise Wind LLC. The guarantee expires upon the full performance of the guaranteed obligations. Effective January 1, 2024, the maximum exposure under the guarantee increased from $11.0 million to $15.4 million. (4) Eversource parent issued a guarantee on behalf of its 50 percent-owned affiliate, South Fork Wind, LLC, whereby Eversource parent will guarantee South Fork Wind, LLC's performance of certain obligations, in an amount not to exceed $7.1 million, under a Power Purchase Agreement between the Long Island Power Authority and South Fork Wind, LLC (the Agreement). The guarantee expires upon the later of (i) the end of the Agreement term and (ii) full performance of the guaranteed obligations. (5) Eversource parent entered into a guarantee on behalf of EI, under which Eversource parent would guarantee EI's obligations under a letter of credit facility with a financial institution that EI may request in an aggregate amount of up to approximately $25 million. As of December 31, 2023, EI has issued letters of credit on behalf of South Fork Wind, LLC, Sunrise Wind LLC and Revolution Wind, LLC totaling $15.2 million. In January 2024, EI issued two additional letters of credit on behalf of Sunrise Wind LLC totaling $8.0 million. The guarantee will remain in effect until full performance of the guaranteed obligations. (6) Eversource parent issued a guarantee on behalf of its wholly-owned subsidiary, Eversource TEI LLC, whereby Eversource parent will guarantee Eversource TEI LLC’s performance of certain obligations, in an amount not to exceed $528.4 million, primarily in connection with tax equity funding obligations during the construction phase of the South Fork Wind project. Eversource parent’s obligations expire upon the full performance of the guaranteed obligations. 97Page 110 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 110 of 136 (7) Surety bonds expire in 2024. Expiration dates reflect termination dates, the majority of which will be renewed or extended. Certain surety bonds contain credit ratings triggers that would require Eversource parent to post collateral in the event that the unsecured debt credit ratings of Eversource parent are downgraded. (8) In December 2023, Sunrise Wind LLC issued a surety bond related to future decommissioning obligations of certain onshore transmission assets in the amount of $20.5 million. The surety bond shall remain outstanding until full performance of the obligations. E. FERC ROE Complaints Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, FERC issued Opinion No. 531-A and set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded, which totaled $38.9 million (pre-tax and excluding interest) at Eversource and reflected both the base ROE and incentive cap prescribed by the FERC order. The refund consisted of $22.4 million for CL&P, $13.7 million for NSTAR Electric and $2.8 million for PSNH. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of both December 31, 2023 and 2022. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of both December 31, 2023 and 2022. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, for the NETOs, which FERC concludes are of average financial risk, the preliminary just and reasonable base ROE is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. On November 21, 2019, FERC issued Opinion No. 569 affecting the two pending transmission ROE complaints against the Midcontinent ISO (MISO) transmission owners, in which FERC adopted a new methodology for determining base ROEs. Various parties sought rehearing. On December 23, 2019, the NETOs filed supplementary materials in the NETOs' four pending cases to respond to this new methodology because of the uncertainty of the applicability to the NETOs' cases. On May 21, 2020, the FERC issued its order in Opinion No. 569-A on the rehearing of the MISO transmission owners' cases, in which FERC again changed its methodology for determining the MISO transmission owners' base ROEs. On November 19, 2020, the FERC issued Opinion No. 569-B denying rehearing of Opinion No. 569-A and reaffirmed the methodology previously adopted in Opinion No. 569-A. The new methodology differs significantly from the methodology proposed by FERC in its October 16, 2018 order to determine the NETOs' base ROEs in its four pending cases. FERC Opinion Nos. 569-A and 569-B were appealed to the Court. On August 9, 2022, the Court issued its decision vacating MISO ROE FERC Opinion Nos. 569, 569-A and 569-B and remanded to FERC to reopen the proceedings. The Court found that FERC’s development of the new return methodology was arbitrary and capricious due to FERC’s failure to offer a reasonable explanation for its decision to reintroduce the risk-premium financial model in its new methodology for calculating a just and reasonable return. At this time, Eversource cannot predict how and when FERC will address the Court’s findings on the remand of the MISO FERC opinions or any potential associated impact on the NETOs’ four pending ROE complaint cases. Given the significant uncertainty regarding the applicability of the FERC opinions in the MISO transmission owners’ two complaint cases to the NETOs’ pending four complaint cases, Eversource concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaint periods at this time. As well, Eversource cannot reasonably estimate a range of loss for any of the four complaint proceedings at this time. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. 98Page 111 of 136
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 111 of 136 F. CL&P Regulatory Matters CL&P Tropical Storm Isaias Response Investigation: On April 28, 2021, PURA issued a final decision on CL&P’s compliance with its emergency response plan that concluded CL&P failed to comply with certain storm performance standards and was imprudent in certain instances regarding its preparation for, and response to, Tropical Storm Isaias. Based on its findings, PURA ordered CL&P to adjust its future rates in a pending or future rate proceeding to reflect a monetary penalty in the form of a downward adjustment of 90 basis points in its allowed rate of return on equity (ROE), which is currently 9.25 percent. On July 14, 2021, PURA issued a final decision in a penalty proceeding that included an assessment of $28.6 million, consisting of a $28.4 million civil penalty for non-compliance with storm performance standards to be provided as credits on customer bills and a $0.2 million fine for violations of accident reporting requirements to be paid to the State of Connecticut’s general fund. The $28.4 million performance penalty was credited to customers on electric bills beginning on September 1, 2021 over a one-year period. The $28.4 million is the maximum statutory penalty amount under applicable Connecticut law in effect at the time of Tropical Storm Isaias, which is 2.5 percent of CL&P’s annual distribution revenues. The liability for the performance penalty was recorded as a current regulatory liability on CL&P’s balance sheet and as a reduction to Operating Revenues on the year ended December 31, 2021 statement of income. CL&P Settlement Agreement: On October 1, 2021, CL&P entered into a settlement agreement with the DEEP, Office of Consumer Counsel, Office of the Attorney General and the Connecticut Industrial Energy Consumers, resolving certain issues that arose in then-pending regulatory proceedings initiated by PURA. PURA approved the settlement agreement on October 27, 2021. In the settlement agreement, CL&P agreed to provide a total of $65 million of customer credits, which were distributed based on customer sales over a two-month billing period from December 1, 2021 to January 31, 2022. CL&P also agreed to irrevocably set aside $10 million in a customer assistance fund to provide bill payment assistance to certain existing non-hardship and hardship customers carrying arrearages, as approved by PURA, with the objective of disbursing the funds prior to April 30, 2022. Those customers were provided with $10 million of bill forgiveness in the first quarter of 2022. CL&P recorded a current regulatory liability of $75 million on the balance sheet associated with the provisions of the settlement agreement, with a $65 million pretax charge as a reduction to Operating Revenues associated with the customer credits and a $10 million charge to Operations and Maintenance expense associated with the customer assistance fund on the year ended December 31, 2021 statement of income. In exchange for the $75 million of customer credits and assistance, PURA’s interim rate reduction docket was resolved without findings. As a result of the settlement agreement, neither the 90 basis point reduction to CL&P’s return on equity introduced in PURA’s storm-related decision issued April 28, 2021, nor the 45 basis point reduction to CL&P’s return on equity included in PURA’s decision issued September 14, 2021 in the interim rate reduction docket, will be implemented. CL&P also agreed to freeze its current base distribution rates, subject to the customer credits described above, until no earlier than January 1, 2024. The rate freeze applied only to base distribution rates (including storm costs) and not to other rate mechanisms such as the retail rate components, rate reconciling mechanisms, formula rates and any other adjustment mechanisms. The rate freeze also did not apply to any cost recovery mechanism outside of the base distribution rates with regard to grid-modernization initiatives or any other proceedings that were either pending or that could be initiated during the rate freeze period, that could have placed additional obligations on CL&P. The approval of the settlement agreement satisfied the Connecticut statute of rate review requirements that requires electric utilities to file a distribution rate case within four years of the last rate case. As part of the settlement agreement, CL&P agreed to withdraw with prejudice its pending appeals of PURA’s decisions dated April 28, 2021 and July 14, 2021 related to Storm Isaias and agreed to waive its right to file an appeal and seek a judicial stay of the September 14, 2021 decision in the interim rate reduction docket. The settlement agreement assures that CL&P will have the opportunity to petition for and demonstrate the prudency of the storm costs incurred to respond to customer outages associated with Storm Isaias in a future ratemaking proceeding. The cumulative pre-tax impact of the settlement agreement and the Storm Isaias assessment imposed in PURA’s April 28, 2021 and July 14, 2021 decisions totaled $103.6 million, and the after-tax earnings impact was $86.1 million, or $0.25 per share, for the year ended December 31, 2021. G. Litigation and Legal Proceedings Eversource, including CL&P, NSTAR Electric and PSNH, are involved in legal, tax and regulatory proceedings regarding matters arising in the ordinary course of business, which involve management's assessment to determine the probability of whether a loss will occur and, if probable, its best estimate of probable loss. The Company records and discloses losses when these losses are probable and reasonably estimable, and discloses matters when losses are probable but not estimable or when losses are reasonably possible. Legal costs related to the defense of loss contingencies are expensed as incurred. 14. LEASES Eversource, including CL&P, NSTAR Electric and PSNH, has entered into lease agreements as a lessee for the use of land, office space, service centers, vehicles, information technology, and equipment. These lease agreements are classified as either finance or operating leases and the liability and right-of-use asset are recognized on the balance sheet at lease commencement. Leases with an initial term of 12 months or less are not recorded on the balance sheet and are recognized as lease expense on a straight-line basis over the lease term. Eversource determines whether or not a contract contains a lease based on whether or not it provides Eversource with the use of a specifically identified asset for a period of time, as well as both the right to direct the use of that asset and receive the significant economic benefits of the asset. Eversource has elected the practical expedient to not separate non-lease components from lease components and instead to account for both as a single lease component, with the exception of the information technology asset class where the lease and non-lease components are separated. The provisions of Eversource, CL&P, NSTAR Electric and PSNH lease agreements contain renewal options. The renewal options range from one year to twenty years. The renewal period is included in the measurement of the lease liability if it is reasonably certain that Eversource will exercise these renewal options. 99
Text of RRU-072 Attachment 4.pdf
Extracted from the file · 144 pages · 700,795 characters
Text of RRU-072 Attachment 5.pdf
Extracted from the file · 144 pages · 714,321 characters
As listed on the current system
Question(s) Answered 72 (CL&P dba Eversource Energy) Date Filed: 10/11/2026