Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 72

Files6

Search terms highlighted
Eversource rate increase is on 195 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
34 pages match
36 pages match
40 pages match
  1. Page 20 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 20 of 136 Bcf of LNG and 0.1 Bcf of LPG storage, with a total vaporization capacity of 0.14 Bcf per day. Yankee Gas owns a 1.2 Bcf LNG facility, which also has the ability to liquefy and vaporize up to 0.1 Bcf per day. This facility is used primarily to assist Yankee Gas in meeting its supplier-of-lastresort obligations and also enables it to provide economic supply and make economic refill of natural gas, typically during periods of low demand. Rates NSTAR Gas and EGMA are subject to regulation by the DPU and Yankee Gas is subject to regulation by the PURA, both of which, among other things, have jurisdiction over rates, certain dispositions of property and plant, mergers and consolidations, issuances of long-term securities, standards of service and construction and operation of facilities. Retail natural gas delivery and supply rates are established by the DPU and the PURA and are comprised of: • A distribution charge consisting of a fixed customer charge and a demand and/or energy charge that collects the costs of building, maintaining, and expanding the natural gas infrastructure to deliver natural gas supply to its customers. This also includes collection of ongoing operating costs. • A seasonal cost of gas adjustment clause (CGAC) at NSTAR Gas and EGMA that collects natural gas supply costs, pipeline and storage capacity costs, costs related to charge-offs of uncollected energy costs and working capital related costs. The CGAC is reset semi-annually with any difference being recovered from, or refunded to, customers during the following corresponding season. In addition, NSTAR Gas and EGMA file interim changes to the CGAC factor when the actual costs of natural gas supply vary from projections by more than five percent. • A Purchased Gas Adjustment (PGA) clause at Yankee Gas that collects the costs of the procurement of natural gas for its firm and seasonal customers. The PGA is evaluated monthly. Differences between actual natural gas costs and collection amounts from September 1st through August 31st of each PGA year are deferred and then recovered from, or refunded to, customers during the following PGA year. Carrying charges on outstanding balances are calculated using Yankee Gas' weighted average cost of capital in accordance with the directives of the PURA. • A local distribution adjustment clause (LDAC) at NSTAR Gas and EGMA that collects all energy efficiency and related program costs, environmental costs, pension and PBOP related costs, attorney general consultant costs, credits related to the Tax Cuts and Jobs Act of 2017, gas system enhancement program (GSEP) costs, costs associated with low income customers, and costs associated with a geothermal pilot program. The LDAC is reset annually with any difference being recovered from, or refunded to, customers during the following period and provides for the recovery of certain costs applicable to both sales and transportation customers. • A Conservation Adjustment Mechanism (CAM) at Yankee Gas, which allows 100 percent recovery of conservation costs through this mechanism including program incentives to promote energy efficiency. A reconciliation of CAM revenues to expenses is performed annually with any difference being recovered from, or refunded to, customers with carrying charges during the following year. • A Gas System Improvement (GSI) reconciliation mechanism at Yankee Gas, which collects the costs of certain Distribution Integrity Management Program (DIMP) and core capital plant in service above and beyond the level that is recovered through the distribution charge. The GSI is adjusted and reconciled annually, with any differences refunded to, or recovered from, customers. • A System Expansion Rate (SER) reconciliation mechanism at Yankee Gas, which compares distribution system expansion investment costs and revenues from system expansion customers with the level projected in current distribution customer rates. This reconciliation is performed annually and customer rates are adjusted accordingly. • A Revenue Decoupling Mechanism (RDM) at NSTAR Gas and EGMA that reconciles annual base distribution rate recovery amounts recovered from customers to the pre-established level of baseline distribution delivery service revenue requirement approved by the DPU. The pre-established level of baseline distribution delivery service revenue requirement is also subject to adjustment in accordance with provisions of the November 2020 NSTAR Gas distribution rate case and the October 2020 EGMA rate settlement agreement. • A RDM at Yankee Gas that reconciles annual base distribution rate recovery amounts recovered from customers to the pre-established level of baseline distribution delivery service revenue requirement approved by the PURA. The pre-established level of baseline distribution delivery service revenue requirement is also subject to adjustment in accordance with provisions of the 2018 rate case settlement agreement. Distribution Rate Cases: NSTAR Gas: NSTAR Gas distribution rates were established in an October 2020 DPU-approved rate case, with rates effective November 1, 2020. The DPU also approved a 10-year PBR plan through November 1, 2030, which includes inflation-based adjustments to annual base distribution amounts effective annually beginning November 1, 2021. For further information, see "Regulatory Developments and Rate Matters Massachusetts" in the accompanying Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations. EGMA: EGMA’s distribution rates were established in a DPU-approved October 7, 2020 rate settlement agreement, with rate increases on November 1, 2021 and November 1, 2022, and two rate base resets during an eight-year rate plan, occurring on November 1, 2024 and November 1, 2027. Notwithstanding the two distribution rate increases, the two rate base reset provisions, and potential adjustments for qualifying exogenous events, EGMA agreed not to file for an increase or redesign of distribution base rates effective prior to November 1, 2028. 8
  2. Page 21 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 21 of 136 Yankee Gas: Yankee Gas distribution rates were established in a December 2018 PURA-approved rate case settlement agreement, with rates effective November 15, 2018. PURA also approved step adjustments effective January 1, 2020 and January 1, 2021. Service Quality Metrics: NSTAR Gas and EGMA are subject to SQ metrics that measure safety, reliability and customer service and each could be required to pay to customers a SQ charge of up to 2.5 percent of annual distribution revenues for failing to meet such metrics. NSTAR Gas and EGMA will not be required to pay any SQ charges relating to their 2023 performance. Natural Gas Replacement Massachusetts: Pursuant to Massachusetts legislation, in October of each year, NSTAR Gas and EGMA file GSEP Plans with the DPU for the following construction year. The GSEP Program is designed to accelerate the replacement of certain natural gas distribution facilities in the system to less than 25 years. The GSEP includes a tariff that provides NSTAR Gas and EGMA an opportunity to collect the costs for the program on an annual basis through a reconciling factor. On April 30th each year, the DPU approves the GSEP rate recovery factor that goes into effect on May 1st. In October 2020, the DPU opened Docket “DPU 20-80 The Future of Gas” to examine the role of Massachusetts natural gas local distribution companies (LDCs) in helping to meet the state’s 2050 climate goals. In December 2023, the DPU issued an order for this docket. The DPU will consider and, in some cases, require new processes and analysis for traditional natural gas investments, which may require significant changes to the LDC planning process and business models. The DPU intends to put policies and structures in place that would protect customers as Massachusetts works to decarbonize the building sector, which may involve subsequent dockets and regulatory proceedings and potentially recasting the role of LDCs in Massachusetts. The DPU preserved customer choice for energy needs and encouraged further development of decarbonized alternatives, such as the networked geothermal systems that NSTAR Gas is piloting in Framingham, Massachusetts. At this time, Eversource cannot predict the ultimate outcome of this proceeding, as the Company and other LDCs are seeking formal clarity from the DPU to fully understand the resulting impact to their natural gas businesses and the associated timing of any impacts. The Company does not believe there is any indication of an inability to recover costs or risk of impairment of our natural gas assets at this time. Connecticut: Yankee Gas' December 2018 PURA-approved rate case settlement agreement included an accelerated pipeline replacement cost recovery program. The GSI rate recovers accelerated pipeline replacement as well as other capital investment through an annual reconciliation. Yankee Gas files its GSI reconciliation annually on March 1st for rates effective April 1st. In September 2021, PURA undertook a review of Connecticut natural gas companies’ infrastructure system expansion plan (SEP) to determine if the SEP continues to be in the best interest of the state’s comprehensive energy strategy. On April 27, 2022, PURA issued an order for the immediate winding down of the SEP by (1) ending the enrollment of new customers in the SEP program and permitting only a specific group of potential customers who have executed a services agreement with a natural gas company on or before a specified date (subsequently approved as August 16, 2022) to qualify for incentives under the current SEP; (2) directing all surplus non-firm margin to be deferred as a regulatory liability and applied to rate base in a future rate proceeding; and (3) directing the natural gas companies to cease all outbound and passive marketing regarding the SEP. On July 15, 2022, Yankee Gas appealed the portion of this order pertaining to the deferral of non-firm margin as a reduction to future rate base. On October 24, 2023, Yankee Gas informed the Connecticut Superior Court that the parties mutually agreed to resolve the appeal through a stipulation, which clarified that PURA will decide in Yankee Gas’s next gas rate case the ratemaking treatment of the deferred non-firm margin. Yankee Gas evaluated the prospective impact of this proceeding and does not believe the impact will be material to its future financial position, results of operations and cash flows. Sources and Availability of Natural Gas Supply NSTAR Gas and EGMA maintain flexible resource portfolios consisting of natural gas supply contracts, transportation contracts on interstate pipelines, market area storage and peaking services. NSTAR Gas and EGMA purchase transportation, storage, and balancing services from Tennessee Gas Pipeline Company and Algonquin Gas Transmission Company, as well as other upstream pipelines that transport natural gas from major natural gas producing regions in the U.S., including the Gulf Coast, Mid-continent region, and Appalachian Shale (as well as Ontario, Canada specific to EGMA), which supply to the final delivery points in the NSTAR Gas and EGMA service areas. NSTAR Gas purchases all of its natural gas supply under a firm, competitively bid annual portfolio management contract. EGMA purchases the majority of its natural gas supply under a number of firm, competitively bid annual portfolio management contracts, and manages a portion of its own portfolio. In addition to the firm transportation and natural gas storage supplies discussed above, NSTAR Gas and EGMA utilize on-system LNG facilities (and also LPG facilities for EGMA) to meet winter peaking demands. These LNG facilities are located within NSTAR Gas' and EGMA’s distribution systems and are used to liquefy pipeline natural gas and/or receive liquefied natural gas or liquefied petroleum gas to be stored during the warmer months for vaporization and use during the heating season. During the summer injection season, excess pipeline capacity and supplies are used to deliver and store natural gas in market area underground storage facilities located in Maryland and Pennsylvania. Stored natural gas is withdrawn during the winter season to supplement flowing pipeline supplies in order to meet firm heating demand. NSTAR Gas has firm underground storage contracts and total storage capacity entitlements of approximately 6.6 Bcf, and 3.5 Bcf LNG storage is provided by Hopkinton LNG Corp. in facilities located in two different locations in Massachusetts. EGMA has firm underground storage contracts and total storage capacity entitlements of approximately 8.6 Bcf, and 1.9 Bcf LNG and LPG storage is provided by Hopkinton LNG Corp. in facilities located at seven different locations in Massachusetts. PURA requires Yankee Gas to meet the needs of its firm customers under all weather conditions. Specifically, Yankee Gas must structure its supply portfolio to meet firm customer needs under a design day scenario (defined as the coldest day in 30 years) and under a design year scenario (defined as the average of the four coldest years in the last 30 years). Yankee Gas also maintains a flexible resource portfolio consisting of natural gas supply contracts, transportation contracts on interstate pipelines, off-system storage and its on-system 1.2 Bcf LNG storage facility in Connecticut to meet consumption needs during the coldest days of winter. Yankee Gas obtains its interstate capacity from the three interstate pipelines that directly serve Connecticut: the Algonquin, Tennessee and Iroquois Pipelines, which connect to other upstream pipelines that 9
  3. Page 22 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 22 of 136 transport natural gas from major natural gas producing regions, including the Gulf Coast, Mid-continent, Canadian regions and Appalachian Shale supplies. Based on information currently available regarding projected growth in demand and estimates of availability of future supplies of pipeline natural gas, each of NSTAR Gas, EGMA and Yankee Gas believes that in order to meet the long-term firm customer requirements in a reliable manner, a combination of pipeline, storage, and non-pipeline solutions will be necessary. WATER DISTRIBUTION SEGMENT Aquarion Company (Aquarion) operates five separate regulated water utilities in Connecticut (Aquarion Water Company of Connecticut, or AWCCT, and The Torrington Water Company), Massachusetts (Aquarion Water Company of Massachusetts, or AWC-MA), and New Hampshire (Aquarion Water Company of New Hampshire, or AWC-NH, and Abenaki Water Company). These regulated companies provide water services to approximately 241,000 residential, commercial, industrial, municipal and fire protection and other customers, in 72 towns and cities in Connecticut, Massachusetts and New Hampshire. As of December 31, 2023, approximately 92 percent of Aquarion’s customers were based in Connecticut. Rates Aquarion's water utilities are subject to regulation by the PURA, the DPU and the NHPUC in Connecticut, Massachusetts and New Hampshire, respectively. These regulatory agencies have jurisdiction over, among other things, rates, certain dispositions of property and plant, mergers and consolidations, issuances of long-term securities, standards of service and construction and operation of facilities. Aquarion’s general rate structure consists of various rate and service classifications covering residential, commercial, industrial, and municipal and fire protection services. The rates established by the PURA, DPU and NHPUC are comprised of the following: • A base rate, which is comprised of fixed charges based on meter/fire connection sizes, as well as volumetric charges based on the amount of water sold. Together these charges are designed to recover the full cost of service resulting from a general rate proceeding. • In Connecticut, a revenue adjustment mechanism (RAM) that reconciles earned revenues, with certain allowed adjustments, on an annual basis, to the revenue requirement approved by PURA. • In Connecticut and New Hampshire, a water infrastructure conservation adjustment (WICA) charge, and in Massachusetts, an annual main replacement adjustment mechanism (MRAM) charge, which is applied between rate case proceedings and seeks recovery of allowed costs associated with eligible infrastructure improvement projects placed in-service. The WICA is updated semi-annually in Connecticut and annually in New Hampshire. In Connecticut, an annual WICA reconciliation mechanism reconciles earned WICA revenue to the approved WICA revenue with any differences refunded to, or recovered from, customers. Sources and Availability of Water Supply Our water utilities obtain their water supplies from owned surface water sources (reservoirs) and groundwater supplies (wells) with a total supply yield of approximately 135 million gallons per day, as well as water purchased from other water suppliers. Approximately 98 percent of our annual production is self-supplied and processed at ten surface water treatment plants and numerous well stations, which are all located in Connecticut, Massachusetts, and New Hampshire. The capacities of Aquarion’s sources of supply, and water treatment, pumping and distribution facilities, are considered sufficient to meet the present requirements of Aquarion’s customers under normal conditions. On occasion, drought declarations are issued for portions of Aquarion’s service territories in response to extended periods of dry weather conditions. OFFSHORE WIND BUSINESS Eversource’s offshore wind business includes 50 percent ownership interests in wind partnerships, which collectively hold the Revolution Wind, South Fork Wind and Sunrise Wind projects, and a tax equity investment in South Fork Wind. The offshore wind projects are being developed and constructed through joint and equal partnerships with Ørsted. Revolution Wind is a 704 MW offshore wind power project located approximately 15 miles south of the Rhode Island coast, and South Fork Wind is a 130 MW offshore wind power project located approximately 35 miles east of Long Island. Sunrise Wind is a 924 MW offshore wind facility located 35 miles east of Montauk Point, Long Island. The completion dates for these projects are subject to federal permitting through BOEM, engineering, state siting and permitting in New York, Rhode Island and Massachusetts and construction schedules. We are in the process of selling our existing 50 percent interests in the three jointly-owned offshore wind projects. In connection with the sales process, we have recorded impairments to the carrying value of the offshore wind investments to reflect the investments at estimated fair value. For more information on these projects, the sales process, and the impairment evaluations, see "Business Development and Capital Expenditures – Offshore Wind Business" in the accompanying Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations. 10
  4. Page 23 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 23 of 136 CAPITAL EXPENDITURES For information on capital expenditures and projects during 2023, as well as projected capital expenditures by business, see "Business Development and Capital Expenditures" in the accompanying Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations. FINANCING For information regarding short-term and long-term debt agreements, see "Liquidity" in the accompanying Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations, and Note 8, "Short-Term Debt," and Note 9, "Long-Term Debt," of the Combined Notes to Financial Statements. NUCLEAR FUEL STORAGE CL&P, NSTAR Electric, PSNH, and several other New England electric utilities are stockholders in three inactive regional nuclear generation companies, CYAPC, MYAPC and YAEC (collectively, the Yankee Companies). The Yankee Companies have completed the physical decommissioning of their respective nuclear power facilities and are now engaged in the long-term storage of their spent nuclear fuel. The Yankee Companies fund these costs through litigation proceeds received from the DOE and, to the extent necessary, through wholesale, FERC-approved rates charged under power purchase agreements with several New England utilities, including CL&P, NSTAR Electric and PSNH. CL&P, NSTAR Electric and PSNH, in turn recover these costs from their customers through state regulatory commission-approved retail rates. The Yankee Companies collect amounts that we believe are adequate to recover the remaining plant closure and fuel storage cost estimates for the respective plants. We believe CL&P and NSTAR Electric will recover their shares of these obligations from their customers. PSNH has recovered its total share of these costs from its customers. We consolidate the assets and obligations of CYAPC and YAEC on our consolidated balance sheet because our ownership and voting interests are greater than 50 percent of each of these companies. OTHER REGULATORY AND ENVIRONMENTAL MATTERS General We are regulated by various federal and state agencies, including FERC, the SEC, and various state and/or local regulatory authorities with jurisdiction over the industry and the service areas in which each of our companies operates, including the PURA, which has jurisdiction over CL&P, Yankee Gas, and Aquarion, the DPU, which has jurisdiction over NSTAR Electric, NSTAR Gas, EGMA and Aquarion, and the NHPUC, which has jurisdiction over PSNH and Aquarion. Renewable Portfolio Standards Each of the states in which we do business has Renewable Portfolio Standards (RPS) requirements, which generally require fixed percentages of our energy supply to come from renewable energy sources such as solar, wind, hydropower, landfill gas, fuel cells and other similar sources. Connecticut's RPS statute requires increasing percentages of the electricity sold to retail customers to have direct ties to renewable sources. In 2023, the total RPS obligation was 35.0 percent and will ultimately reach 48.0 percent in 2030. CL&P is permitted to recover any costs incurred in complying with RPS from its customers through its generation service charge rate. Massachusetts' RPS program requires electricity suppliers to meet renewable energy standards. For 2023, the RPS and Clean Energy Standard (CES) requirements were 59.2 percent, and will ultimately reach 63.1 percent in 2025. Massachusetts electric suppliers were also required to meet Alternative Energy Portfolio Standards (APS) of 5.75 percent and Clean Peak Energy Standards (CPS) of 6.0 percent in 2023. Those requirements will reach 6.25 and 9.00 percent in 2025, respectively. NSTAR Electric is permitted to recover any costs incurred in complying with these requirements from its customers through rates. NSTAR Electric also owns renewable solar power facilities. The RECs generated from NSTAR Electric's solar power facilities are sold to other energy suppliers, and the proceeds from these sales are credited back to customers. New Hampshire's RPS provision requires increasing percentages of the electricity sold to retail customers to have direct ties to renewable sources. In 2023, the total RPS obligation was 23.4 percent and it will ultimately reach 25.2 percent in 2025. The costs of the RECs are recovered by PSNH through rates charged to customers. Environmental Regulation and Matters We are subject to various federal, state and local environmental legislation and regulation with respect to water quality, air quality, natural/working lands (wetlands, resource areas, habitat), hazardous materials and other environmental matters. Our environmental policy includes formal procedures and a task-scheduling system in place to help ensure environmental compliance. The Board’s Governance, Environmental and Social Responsibility Committee also provides oversight of climate issues, environmental matters and compliance. We also identify and address potential environmental risks through our Enterprise Risk Management (ERM) program in addition to rigorous audits of our facilities, vendors, and processes. Additionally, projects may not be constructed or significantly modified without a review of the environmental impact of the proposed construction or modification by the applicable federal or state agencies. Many of our construction projects require the submission of comprehensive permitting 11
  5. Page 24 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 24 of 136 applications to various local, state and federal agencies. The permits we receive outline various best management practices and restoration requirements to address construction period-impacts. We have recorded a liability for what we believe, based upon currently available information, is our reasonably estimable environmental investigation, remediation, and/or natural resource damages costs for waste disposal sites for which we have probable liability. Under federal and state law, government agencies and private parties can attempt to impose liability on us for recovery of investigation and remediation costs at contaminated sites. As of December 31, 2023, the liability recorded for our reasonably estimable and probable environmental remediation costs for known sites needing investigation and/or remediation, exclusive of recoveries from insurance or from third parties, was $128.2 million, representing 65 sites. These costs could be significantly higher if additional remediation becomes necessary or when additional information as to the extent of contamination becomes available. The most significant liabilities currently relate to future clean-up costs at former MGP facilities. These facilities were owned and operated by our predecessor companies from the mid-1800's to mid-1900's. By-products from the manufacture of natural gas using coal resulted in fuel oils, hydrocarbons, coal tar, purifier wastes, metals and other waste products that may pose a potential risk to human health and the environment. We currently have partial or full ownership responsibilities at former MGP sites that have a reserve balance of $117.1 million of the total $128.2 million as of December 31, 2023. MGP costs are recoverable through rates charged to our customers. When planning environmental investigations and remediation of impacted properties, we work closely with the municipalities and environmental regulators to ensure that our remediation plans adhere to applicable regulations while protecting human health and the environment. In many cases, these remediation projects are designed to address opportunities for beneficial reuse of the property. Global Climate Change and Greenhouse Gas Emission Issues Eversource assesses the regulatory, physical and transitional impacts related to climate change to develop mitigation strategies including evaluating the impacts of more severe weather events, financial risks, changing customer behaviors, and opportunities to reduce emissions in our operations and for the region through clean energy and emerging technologies investments. Regulatory Impacts of Climate Change: Global climate change continues to receive increasing focus from the federal and state governments. The Biden administration has communicated a strong focus on addressing climate change by setting a U.S. target of reducing greenhouse gas (GHG) emissions by 50 percent by 2030, compared to 2005 levels, and achieving net-zero emissions by 2050 economy-wide. The plan calls for aggressive measures focused on clean transportation, clean energy and climate investments targeted at environmental justice communities. In support of this plan, federal funding and incentive programs for clean transportation and energy offer opportunities for Eversource to invest in projects that have the ability to reduce emissions in the region while benefiting our communities and shareholders. Similarly, some of the states in which we operate have aggressive climate goals and implementation plans. In Connecticut, legislation includes a target to achieve zero-carbon electricity by 2040. In response to the 2021 Massachusetts climate legislation calling for increased electrification of the transportation and building sectors, in 2023, Eversource developed an Electric Sector Modernization Plan (ESMP) detailing steps the Company will take over the next five and ten years to help ensure reliability and resiliency while supporting a clean energy future. Similarly, the Massachusetts “Future of Gas” docket (DPU 20-80) looks to identify ways for natural gas local distribution companies to support the state’s net zero by 2050 climate goal. These state regulations and related policies may introduce risks and opportunities to our businesses if demands for energy or heating change. Eversource continually evaluates the evolving regulatory landscape concerning climate change, which could potentially lead to additional requirements and additional rules and regulations that could impact how we operate our businesses. Potential future environmental statutes and regulations, such as additional greenhouse gas reduction regulations to address global climate change, could impose significant additional costs and there can be no assurance that regulators will approve the recovery of those costs. Physical and Transitional Impacts of Climate Change: Eversource assesses the physical impacts of climate change that are event-driven or due to longer-term shifts in climate patterns, as well as transitional impacts related to a shift to a lower-carbon economy and changes to address mitigation and adaptation requirements. To address physical and transitional impacts related to climate change, maintain resiliency across our system, and enable potential opportunities for our business, we are pursuing the following actions: • • • • • • Improving our system resiliency in response to climate change through vegetation management, pole and wire strengthening, flood proofing, and other system hardening measures; Implementing a grid modernization plan that will enhance our electric distribution infrastructure to improve resiliency and reliability and increase opportunities to facilitate integration of distributed energy resources and electric vehicle infrastructure; Focusing on improving the efficiency of our electric and natural gas distribution systems, preparing for increased opportunities that clean energy advancements create, and providing customers with ways to optimize their energy efficiency; Investigating emerging technologies such as energy storage and automation programs that improve reliability; Implementing programs to address risks that may impact water availability and water quality; and Evaluating opportunities for our natural gas system and exploring alternative, less carbon-intense, technologies like renewable natural gas and geothermal for heating. Physical risks from climate change may be acute due to increased severity of extreme weather events or chronic due to changes in precipitation patterns and extreme variability in weather patterns, rising mean temperatures and/or rising sea levels, and shifting weather conditions, such as changes in precipitation, extreme heat, more frequent and severe storms, droughts, wildfires and floods. These risks may result in customers’ energy and water usage increasing or decreasing depending on the duration and magnitude of the changes, degradation of water quality and our ability to reliably deliver our services to customers. Severe weather may cause outages, potential disruption of operations, and property damage to our assets. 12
  6. Page 25 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 25 of 136 Our actions to improve system reliability and resiliency allow our business to operate under changing conditions and meet customer expectations. System improvements are designed to withstand severe weather impacts and include installing new and stronger infrastructure like poles, wires and related system equipment, as well as enhanced year-round tree trimming. We are reinforcing existing critical facilities to withstand storm surges and all future substations are being “flood hardened” to better protect our system against storm surges associated with the increasing risk of severe weather. We created our comprehensive emergency preparedness and response plans in partnership with state and community leaders so that when a storm occurs, we can provide customers and municipalities with timely and accurate information, while safely and promptly restoring power. Additionally, we collaborate with other utility providers and industry partners across the country to better understand storm hazards and develop solutions to improve our system reliability. Eversource has made a corporate commitment to reduce Scope 1 and 2 GHG emissions from our operations and reach carbon neutrality by 2030. In December 2023, we submitted an application to the Science Based Target initiative (SBTi) seeking validation of a broader GHG target, which will expand our emission reduction efforts and include indirect Scope 3 sources. Greenhouse gas emissions from our operations consist primarily of line loss (emissions associated with the energy lost when power is transmitted and distributed across the electric system), methane leaks from our natural gas distribution system, operating our facilities and vehicle fleet, and sulfur hexafluoride (SF6) leaks from electric equipment. To measure our influences on climate change, we quantify and publicly report our operational carbon footprint through a third-party verified GHG emission inventory on an annual basis. Our initiatives to reduce GHG emissions across our company include improving energy efficiency and expanding the use of renewable energy at our buildings, utilizing alternative fuels and introducing more hybrid vehicles into the company fleet, reducing fugitive emissions of methane and SF6 by replacing leak-prone natural gas pipes, improving maintenance of SF6 electrical equipment, and piloting innovative technologies, such as alternative SF6 electrical equipment. Our business is also exposed to climate-related transitional risks, such as policy, legal and reputational impacts, and technology and market changes as we enable broad decarbonization of the electrical and building sectors in support of regional policies and targets. We actively support local, state and federal emission reduction goals to address climate change and pursue climate-related opportunities that enable continued business success while serving the needs of our customers. Our clean energy investments help reduce regional emissions while improving shareholder value. Meanwhile, our energy efficiency solutions and electric vehicle infrastructure investments allow our customers to make choices that minimize climate-related impacts. Additionally, as our business transitions to support a low carbon economy, human capital needs will also change with the potential to impact our workforce. As new technologies are implemented, we will need to recruit, develop and possibly retrain employees to meet the need for new skill sets. Electric and Magnetic Fields For more than forty years, published reports have discussed the possibility of adverse health effects from electric and magnetic fields (EMF) associated with electric transmission and distribution facilities, including appliances, and wiring in buildings and homes. Some epidemiology studies have reported a possible statistical association between adverse health effects and exposure with EMF. The association identified in some of these studies remain unexplained and inconclusive. Numerous scientific review panels, considering all significant EMF epidemiology and laboratory studies, have concluded that the available body of scientific information does not support a conclusion that EMF affects human health at levels expected in the vicinity. In accordance with recommendations of various regulatory bodies and public health organizations, we use design principles that help reduce potential EMF exposures associated with new transmission lines. HUMAN CAPITAL Eversource is committed to delivering reliable energy and superior customer service; expanding energy options for our region; environmental stewardship; a safe, diverse and fairly compensated workforce; and community service and leadership. Our employees are critical to achieving this mission and we recognize the importance of attracting, retaining and developing our employees. Leaders at all levels strive to create a workplace where our employees are engaged, empowered, advocate for the customer, work collaboratively, raise ideas for improvement and focus on delivering superior customer experience. We build employee engagement through continuous communication, developing talent, fostering teamwork and creating a diverse, equitable and inclusive workplace. We have established metrics and annual goals on our corporate scorecard, including safety performance, talent diversity and employee engagement, that drive accountability for progress across all areas of the business. As of December 31, 2023, Eversource Energy employed a total of 10,171 employees, excluding temporary employees, of which 1,529 were employed by CL&P, 2,044 were employed by NSTAR Electric, and 830 were employed by PSNH. In addition, 4,007 were employed by Eversource Service, Eversource's service company, that provides support services to all Eversource operating companies. Approximately 49 percent of our employees are members of the International Brotherhood of Electrical Workers, the Utility Workers Union of America or The United Steelworkers, and are covered by various collective bargaining agreements. Safety. At Eversource, our commitment to “Safety First and Always” is a principle and a mindset present in every job and every task, whether in the field, office or at home. A priority at Eversource is continuous improvement and safety is at the forefront as we continue to build a strong safety culture, embrace new technologies, and learn with our industry and community partners to improve safety performance. We provide safety training and perform field safety job observations of both internal and contractor crews with a focus on high-energy hazards. We use metrics such as Eversource Corporate Days Away Restricted Time (DART) and High Energy Field Observations, among others, to monitor safety performance. Our DART safety performance was 0.81 in 2023, measured by days away, restricted or transferred per 100 workers, using the DART-OSHA method of measurement. Diversity, Equity & Inclusion. Our commitment to Diversity, Equity & Inclusion (DEI) is critical to building a diverse, empowered and engaged team that delivers superior service safely to our customers. A diverse workforce and inclusive culture contribute to our success and sustainability 13
  7. Page 26 of 136

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 26 of 136 by driving innovation and creating trusted relationships with our employees, customers, suppliers, and community partners. We continue to identify and support many programs and agencies that address disparities in our communities and beyond. We also remain committed to developing a workforce that fully reflects the diversity of the people and communities we serve. Our hiring practices emphasize inclusion, and we encourage employees to embrace different people, perspectives, and experiences in our workplace and within our communities. Additionally, our leadership behaviors underscore the importance of creating inclusive teams, where employees’ voices and contributions are essential to delivering superior customer service. Eversource continues to develop a diverse workforce and has DEI goals and initiatives for diversity in leadership promotions and new hires, diverse external hires, number of diverse applicants for jobs, key talent, workforce representation including female employees, diverse employees, and veteran hires, leadership engagement, community support and supplier spending. Eversource drives accountability for DEI progress throughout the company and executive compensation is linked to meeting these goals. We sustained our successful drive to increase workforce diversity in 2023 with 55.9% of our external hires being women and/or people of color and 48.1% percent of new hires and promotions into leadership roles being women and/or people of color. Eversource’s executive leadership team promotes and supports DEI by building and leading diverse, inclusive work teams with high engagement. Leaders are committed to growing a pipeline of diverse talent, leveraging multiple perspectives to improve customer service, using diverse suppliers, and engaging with multicultural organizations in our communities. Our DEI council, business resource groups, and cross-functional proequity advisory team, which developed equity guidelines and began to implement justice and equity training to all employees starting in 2022 and continuing into 2024, provide our leaders with valuable feedback on the impact of our DEI and environmental justice efforts. Eversource's Board of Trustees is committed to diversity, equity and inclusion and receives regular monthly progress updates. The Corporate Governance, Environmental and Social Responsibility Committee of the Board of Trustees is responsible for the oversight of environmental, human capital management and social responsibility strategies, programs and policies. The Board of Trustees seeks diversity in gender, race, ethnicity and personal background when considering Trustee candidates. Compensation, Health and Wellness Benefits. Eversource is committed to the health, safety and wellness of our employees. We provide competitive compensation and comprehensive benefit packages, including healthcare, life insurance, sick time and disability plans, death benefits, retirement plans (defined benefit pension plans or 401k Plan), an Employee Stock Purchase Plan, health savings and flexible spending accounts, paid time off, employee assistance programs, and tuition assistance, among many others. Eversource also provides wellness programs and benefits to encourage employees and their families to adopt and maintain healthy lifestyle habits. Eversource has established flexible work guidelines and offers hybrid work arrangements to employees in applicable positions. Talent Development, Training Programs and Education Opportunities. Strategic workforce plans are developed every year as part of the annual business planning process to address immediate and long-range needs and to ensure that Eversource acquires, develops and retains diverse, capable talent. Eversource supports and develops its employees through training and development programs that build and strengthen employees’ leadership and skill set. Employee development programs are aligned to our strategic workforce plan to support succession within all levels of the organization. Continuous professional development is important to support our employees’ ongoing success. These professional development programs include leadership effectiveness programs designed to develop new and current supervisors; a talent management process to identify high potential and emerging talent and ensure their development; multiple early career development programs in Engineering, Transmission and Operations; educational and professional development opportunities for employees who are recent college graduates; tuition assistance program; paid internships and co-ops; and workforce development programs focused on building a talent pipeline for our technical craft roles. We leverage educational partnerships in critical trade and technical areas and have developed proactive sourcing strategies to attract experienced workers in highly technical roles in engineering, electric and gas operations, and energy efficiency. As part of this process, Eversource identifies critical roles and develops succession plans to ensure we have a capable supply of talent for the future. Community & Social Impact. Eversource and our employees support many nonprofit organizations and programs that make a positive difference in the lives of our customers and the communities that we serve. The Eversource Foundation provides grants to charitable organizations that help to make broad, meaningful, and sustainable change, with a focus on environmental justice and historically marginalized communities. Our employees also lend their time and talents to volunteer with charitable organizations that address local high-priority concerns and needs. Our goal at Eversource is to lend a hand to organizations that really make a difference in the communities where we live and work. See Item 11, Executive Compensation, included in this Annual Report on Form 10-K, as well as our 2022 Sustainability Report and our 2022 Diversity, Equity and Inclusion Report located on our website, for more detailed information regarding our human capital programs and initiatives. Nothing on our website, including our Sustainability Report, our Diversity, Equity and Inclusion Report, or sections thereof, shall be deemed incorporated by reference into this Annual Report. INTERNET INFORMATION Our website address is www.eversource.com. We make available through our website a link to the SEC's EDGAR website (http://www.sec.gov/edgar/searchedgar/companysearch.html), at which site Eversource's, CL&P's, NSTAR Electric's and PSNH's combined Annual Reports on Form 10-K, combined Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and any amendments to those reports may be reviewed. Information contained on the Company's website or that can be accessed through the website is not incorporated into and does not constitute a part of this Annual Report on Form 10-K. Printed copies of these reports may be obtained free of charge by writing to our Investor Relations Department at Eversource Energy, 107 Selden Street, Berlin, CT 06037. 14
  8. Page 27 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 27 of 136 Item 1A. Risk Factors In addition to the matters set forth under "Safe Harbor Statement Under the Private Securities Litigation Reform Act of 1995" included immediately prior to Item 1, Business, above, we are subject to a variety of material risks. Our susceptibility to certain risks, including those discussed in detail below, could exacerbate other risks. These risk factors should be considered carefully in evaluating our risk profile. There may be additional risks and uncertainties (either currently unknown or not currently believed to be material) that could adversely affect our financial position, results of operations, and cash flows. Cybersecurity Threats and Attacks: Cyberattacks, including acts of war or terrorism, targeted directly on or indirectly affecting our systems or the systems of third parties on which we rely, could severely impair operations, negatively impact our business, lead to the disclosure of confidential information and adversely affect our reputation. Cyberattacks that seek to exploit potential vulnerabilities in the utility industry and seek to disrupt electric, natural gas and water transmission and distribution systems are increasing in sophistication, magnitude and frequency. Various geo-political conflicts and acts of war around the world continue to result in increased cyberattacks against critical infrastructure. A successful cyberattack on the information technology systems that control our transmission, distribution, natural gas and water systems or other assets could impair or prevent us from managing these systems and facilities, operating our systems effectively, or properly managing our data, networks and programs. The breach of certain information technology systems could adversely affect our ability to correctly record, process and report financial information. A major cyber incident could result in significant expenses to investigate and to repair system damage or security breaches and could lead to litigation, fines, other remedial action, heightened regulatory scrutiny and damage to our reputation. We have instituted safeguards to protect our information technology systems and assets. We deploy substantial technologies to system and application security, encryption and other measures to protect our computer systems and infrastructure from unauthorized access or misuse. Specifically, regarding vulnerabilities, we patch systems where patches are available to deploy, and have technologies that detect exploits of vulnerabilities and proactively block the exploit when it happens. We also interface with numerous external entities to improve our cybersecurity situational awareness. The FERC, through the North American Electric Reliability Corporation (NERC), requires certain safeguards to be implemented to deter cyberattacks. These safeguards may not always be effective due to the evolving nature of cyberattacks. We maintain cyber insurance to cover damages, potential ransom and defense costs related to breaches of networks or operational technology, but it may be insufficient in limits and coverage exclusions to cover all losses. Any such cyberattacks could result in loss of service to customers and a significant decrease in revenues, which could have a material adverse impact on our financial position, results of operations and cash flows. For further information, see Item 1C, Cybersecurity included in this Annual Report on Form 10-K. The unauthorized access to, and the misappropriation of, confidential and proprietary Company, customer, employee, financial or system operating information could adversely affect our business operations and adversely impact our reputation. In the regular course of business, we, and our third-party suppliers, rely on information technology to maintain sensitive Company, customer, employee, financial and system operating information. We are required by various federal and state laws to safeguard this information. Cyber intrusions, security breaches, theft or loss of this information by cybercrime or otherwise could lead to the release of critical operating information or confidential Company, customer or employee information, which could adversely affect our business operations or adversely impact our reputation, and could result in significant costs, fines and litigation. We employ system controls to prevent the dissemination of certain confidential information and periodically train employees on phishing risks. We maintain cyber insurance to cover damages, potential ransom and defense costs arising from unauthorized disclosure of, or failure to protect, private information, as well as costs for notification to, or for credit monitoring of, customers, employees and other persons in the event of a breach of private information. This insurance covers amounts paid to address a network attack or the disclosure of personal information, and costs of a qualified forensics firm to determine the cause, source and extent of a network attack or to investigate, examine and analyze our network to find the cause, source and extent of a data breach, but it may be insufficient to cover all losses. While we have implemented measures designed to prevent network attacks and mitigate their effects should they occur, these measures may not be effective due to the continually evolving nature of efforts to access confidential information. Offshore Wind Business Risk: Our financial position and future results could be materially adversely affected if we are unable to sell our 50 percent interests in three offshore wind projects on the timelines, terms and pricing we expect, if we and the counterparties are unable to satisfy all closing conditions and consummate the purchase and sale transactions with respect to our offshore wind assets, if Sunrise Wind does not win in the OREC contract solicitation process, if we are unable to qualify for investment tax credits related to these projects, if we experience variability in the projected construction costs of the offshore wind projects, if there is a deterioration of market conditions in the offshore wind industry, and if the projects do not commence operation as scheduled or within budget or are not completed. Our offshore wind business includes 50 percent ownership interests in three jointly-owned offshore wind projects being developed and constructed. The development and construction of these offshore wind electric generation facilities involves numerous significant risks including meeting construction schedules, federal, state and local permitting and regulatory approval processes, scheduling or permitting delays, cost overruns, higher interest rates, tax strategies and changes to federal tax laws impacting the offshore wind partnership’s ability to monetize tax attributes, new legislation impacting the industry, the cancellation of any projects, and actions of our strategic partner. Operational risks of these offshore wind electric generation facilities include maintaining continuing interconnection arrangements, power purchase agreements, or other 15
  9. Page 28 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 28 of 136 market mechanisms, as well as interconnecting utility and Regional Transmission Organizations rules, policies, procedures and FERC tariffs that permit future offshore wind project operations, and capacity factors once projects are placed in operation. These risks could impact our offshore wind partnership’s ability to generate returns from its offshore wind projects and result in lower investment returns. We have entered into agreements to sell our interest in the three offshore wind projects, however we may be unable to complete the sales of these projects on the timelines and for the sales value we expect. If the ultimate sales value of our interest in these projects is lower than expected, or we are unable to sell our interests, it could have an adverse effect on our financial condition and results of operations. The sales agreements are subject to certain regulatory approvals as well as other conditions, and we may be unable to satisfy all closing conditions necessary to consummate the purchase and sale transactions. The purchaser of the Revolution Wind and South Fork Wind projects may be unable to reach a partnership agreement with Ørsted, which is a condition of closing that transaction. The sale of the Sunrise Wind project to Ørsted is dependent on the successful outcome of Sunrise Wind’s re-bidding process of its OREC contract in the New York solicitation. If Sunrise Wind were to lose to a competing bid in the New York solicitation, then the existing OREC contract for Sunrise Wind will be cancelled according to the state’s requirements, and Eversource and Ørsted’s joint venture for Sunrise Wind will remain in place. That scenario could adversely impact the ability to sell the Sunrise Wind project in the future, and could result in the project to be abandoned. If the Sunrise Wind project were to be abandoned, there would be cancellation and other abandonment costs incurred, and those costs could be above amounts already assumed in our impairment evaluation and reflected in the current fair value on our balance sheet, which could have an adverse effect on our financial condition and results of operations. Future cash flows resulting from the expected sales are also impacted by the ability to qualify the Revolution Wind project for investment tax credit adders, as included in the Inflation Reduction Act. Evaluating the project’s qualifications to achieve these investment tax credit adders requires significant judgment, and we may be unable to meet these qualifications. Additionally, for Revolution Wind and South Fork Wind, there could be cost overruns on the projects through each project's respective commercial operation date, which would not be recovered in the expected sales price and other potential future payments to maintain transaction economics required of Eversource. Amounts incurred above those that have already been assumed in our impairment evaluation and reflected in the current fair value on our balance sheet would adversely impact our financial position, results of operations and cash flows. These risks could adversely affect the ultimate value of the wind projects and result in an additional, significant impairment in a future period, which could have a material adverse effect on our financial condition and results of operations. Lower-than-expected sales prices, or the inability to sell the wind projects, could also result in liquidity issues, negatively impact certain of our financial metrics and operations plan, or could result in a downgrade in our credit rating, which could increase our cost of borrowing and cost of capital or restrict our ability to access the capital markets. Regulatory, Legislative and Compliance Risks: The actions of regulators and legislators could result in outcomes that may adversely affect our earnings and liquidity. The rates that our electric, natural gas and water companies charge their customers are determined by their state regulatory commissions. These commissions also regulate the companies' accounting, operations, the issuance of certain securities and certain other matters. The FERC regulates the transmission of electric energy, the sale of electric energy at wholesale, accounting, issuance of certain securities and certain other matters, including reliability standards through the NERC. The regulatory process may be adversely affected by the political, regulatory and economic environment in the states in which we operate. Under state and federal law, our electric, natural gas and water companies are entitled to charge rates that are sufficient to allow them an opportunity to recover their prudently incurred operating and capital costs and a reasonable rate of return on invested capital, to attract needed capital and maintain their financial integrity, while also protecting relevant public interests. Our electric, natural gas and water companies are required to engage in regulatory approval proceedings as a part of the process of establishing the terms and rates for their respective services. Each of these companies prepares and submits periodic rate filings with their respective state regulatory commissions for review and approval, which allows for various entities to challenge our current or future rates, structures or mechanisms and could alter or limit the rates we are allowed to charge our customers. These proceedings typically involve multiple parties, including governmental bodies and officials, consumer advocacy groups, and various consumers of energy, who have differing concerns. Any change in rates, including changes in allowed rate of return, are subject to regulatory approval proceedings that can be contentious, lengthy, and subject to appeal. This may lead to uncertainty as to the ultimate result of those proceedings. Established rates are also subject to subsequent prudency reviews by state regulators, whereby various portions of rates could be adjusted, subject to refund or disallowed, including cost recovery mechanisms. The ultimate outcome and timing of regulatory rate proceedings, or challenges to certain provisions in our distribution tariffs could have a significant effect on our ability to recover costs or earn an adequate return. Adverse decisions in our proceedings could adversely affect our financial position, results of operations and cash flows. We continue to experience challenges related to the regulatory environment in Connecticut with respect to our electric distribution, natural gas, and water businesses. The federal, state and local political and economic environment currently has, and may in the future have, an adverse effect on regulatory decisions with negative consequences for us. These decisions may require us to cancel, reduce, or delay planned development activities or other planned capital expenditures or investments or otherwise incur costs that we may not be able to recover through rates. There can be no assurance that regulators will approve the recovery of all costs incurred by our electric, natural gas and water companies, including costs for construction, operation and maintenance, and storm restoration. The inability to recover a significant amount of operating costs could have an adverse effect on our financial position, results of operations, and cash flows. Changes to rates may occur at times different from when costs are incurred. Additionally, catastrophic events at other utilities could result in our regulators and legislators imposing additional requirements that may lead to additional costs for the companies. In addition to the risk of disallowance of incurred costs, regulators may also impose downward adjustments in a company’s allowed ROE as well as assess penalties and fines. These actions would have an adverse effect on our financial position, results of operations and cash flows. 16
  10. Page 29 of 136Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 3 Page 29 of 136 The FERC has jurisdiction over our transmission costs recovery and our allowed ROEs. If FERC changes its methodology on developing ROEs, there could be a negative impact on our results of operations and cash flows. Additionally, certain outside parties have filed four complaints against transmission-owning electric companies within ISO-NE alleging that our allowed ROEs are unjust and unreasonable. An adverse decision in any of these four complaints could adversely affect our financial position, results of operations and cash flows. The FERC also has jurisdiction over our transmission rate incentives such as the regional transmission organization (RTO) participation ROE incentive adder, CWIP in rate base incentive and the abandoned plant incentive. If the FERC changes its policies regarding these incentives, there could be a negative impact on our financial position, results of operations and cash flows. Additionally, the FERC issued a Supplemental Notice of Proposed Rulemaking (NOPR) on Transmission Incentives that proposes to eliminate the existing RTO ROE incentive adder for utilities that have been participating in an RTO for more than three years. A FERC decision approving this proposal could adversely affect our financial position, results of operations and cash flows. FERC's policy has encouraged competition for transmission projects, even within existing service territories of electric companies, as it looks to expand the transmission system to accommodate state and federal policy goals to utilize more renewable energy resources as well as to enhance reliability and resilience for extreme weather events. Implementation of FERC's goals, including within our service territories, may expose us to competition for construction of transmission projects, additional regulatory considerations, and potential delay with respect to future transmission projects, which may adversely affect our results of operations and lower rate base growth. Changes in tax laws, as well as the potential tax effects of business decisions could negatively impact our business, results of operations, financial condition and cash flows. We are exposed to significant reputational risks, which make us vulnerable to increased regulatory oversight or other sanctions. Because utility companies, including our electric, natural gas and water utility subsidiaries, have large customer bases, they are subject to adverse publicity focused on the reliability of their distribution services and the speed with which they are able to respond to electric outages, natural gas leaks and similar interruptions caused by storm damage or other unanticipated events, including those related to climate change. Adverse publicity of this nature could harm our reputation and the reputation of our subsidiaries; may make state legislatures, utility commissions and other regulatory authorities less likely to view us in a favorable light; and may cause us to be subject to less favorable legislative and regulatory outcomes, legal claims or increased regulatory oversight. Unfavorable regulatory outcomes can include more stringent laws and regulations governing our operations, such as reliability and customer service quality standards or vegetation management requirements, as well as fines, penalties or other sanctions or requirements. Further, we rely upon purchased power and purchased natural gas supply from third parties to meet customers’ energy requirements. Due to a variety of factors, including the inflationary economic environment, geo-political conflicts, and increased customer energy demand, the cost of energy supply in New England remains high. We also may be required to implement rolling blackouts by ISO-NE, the region’s independent grid operator if enough capacity is not available in the area to meet peak demand needs. The significant supply cost increases, as well as any failure to meet customer energy requirements, could negatively impact the satisfaction of our customers and our customers’ ability to pay their utility bills, which could have an adverse impact on our business, reputation, financial position, results of operations and cash flows. Addressing any adverse publicity, regulatory scrutiny or enforcement or other legal proceedings is time consuming and expensive and, regardless of the factual basis for the assertions being made, can have a negative impact on the reputation of our business, on the morale and performance of our employees and on our relationships with respective regulators, customers and counterparties. We are unable to predict future legislative or regulatory changes, initiatives or interpretations or other legal proceedings, and there can be no assurance that we will be able to respond adequately to such actions. The direct and indirect effects of negative publicity, and the demands of responding to and addressing it, may have a material adverse effect on our financial position, results of operations and cash flows. Costs of compliance with environmental laws and regulations, including those related to climate change, may increase and have an adverse effect on our business and results of operations. Our subsidiaries’ operations are subject to extensive and increasing federal, state and local environmental statutes, rules and regulations that govern, among other things, water quality (including treatment of PFAS (Per- and Polyfluoroalkyl Substances) and lead), water discharges, the management of hazardous material and solid waste, and air emissions. Compliance with these requirements requires us to incur significant costs relating to environmental permitting, monitoring, maintenance and upgrading of facilities, remediation, and reporting. For our water business, compliance with proposed water quality regulations, including those for PFAS and lead, could require the construction of facilities and replacement of customer lead service lines, respectively. The costs of compliance with existing legal requirements or legal requirements not yet adopted may increase in the future. Although we have recorded liabilities for known environmental obligations, these costs can be difficult to estimate due to uncertainties about the extent of contamination, remediation alternatives, the remediation levels required by state and federal agencies, and the financial ability of other potentially responsible parties. An increase in such costs, unless promptly recovered, could have an adverse impact on our business and our financial position, results of operations and cash flows. For further information, see Item 1, Business – Other Regulatory and Environmental Matters, included in this Annual Report on Form 10-K. 17

Text of RRU-072 Attachment 4.pdf

Extracted from the file · 144 pages · 700,795 characters

Text of RRU-072 Attachment 5.pdf

Extracted from the file · 144 pages · 714,321 characters

As listed on the current system

Question(s) Answered 72 (CL&P dba Eversource Energy) Date Filed: 10/11/2026

This filing on the current system (opens in a new tab)