Text of RRU-072 Attachment 3.pdf

Extracted from the file · 136 pages · 685,965 characters

41 pages match
  1. Page 109 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 109 of 144 B. Long-Term Contractual Arrangements Estimated Future Annual Costs: The estimated future annual costs of significant executed, non-cancelable, long-term contractual arrangements in effect as of December 31, 2024 are as follows: Eversource 2025 (Millions of Dollars) Renewable Energy Purchase Contracts $ 2026 771.8 $ 2027 865.2 $ 2028 919.9 $ 2029 918.0 $ Thereafter 785.5 $ 6,289.9 Total $ 10,550.3 Natural Gas Procurement 532.6 486.1 364.6 308.1 294.9 1,004.4 Capacity and Purchased Power 75.2 2.9 2.7 2.7 2.3 2.3 88.1 Peaker CfDs 28.3 27.7 23.1 23.3 24.1 84.6 211.1 Transmission Support Commitments Total 17.1 $ 1,425.0 18.8 $ 1,400.7 20.0 $ 1,330.3 20.9 $ 1,273.0 21.8 $ 1,128.6 2,990.7 22.6 $ 7,403.8 121.2 $ 13,961.4 CL&P 2025 (Millions of Dollars) Renewable Energy Purchase Contracts $ 2026 651.0 $ 2027 671.9 $ 2028 723.7 $ 2029 724.5 $ Thereafter 588.4 $ 3,473.6 Total $ 6,833.1 Capacity 72.4 0.1 — — — — 72.5 Peaker CfDs 28.3 27.7 23.1 23.3 24.1 84.6 211.1 Transmission Support Commitments Total 6.8 $ 758.5 7.4 $ 707.1 7.9 $ 754.7 8.3 $ 756.1 8.6 $ 621.1 8.9 $ 3,567.1 47.9 $ 7,164.6 NSTAR Electric 2025 (Millions of Dollars) Renewable Energy Purchase Contracts $ 2026 120.8 $ 2027 193.3 $ 2028 196.2 $ 2029 193.5 $ Thereafter 197.1 $ 2,816.3 Purchased Power 2.8 2.8 2.7 2.7 2.3 2.3 Transmission Support Commitments 6.7 7.4 7.9 8.2 8.6 8.9 Total $ 130.3 $ 203.5 $ 206.8 $ 204.4 $ 208.0 $ 2,827.5 Total $ 3,717.2 15.6 47.7 $ 3,780.5 PSNH 2025 (Millions of Dollars) Transmission Support Commitments $ 2026 3.6 $ 2027 4.0 $ 2028 4.2 $ 2029 4.4 $ Thereafter 4.6 $ 4.8 Total $ 25.6 The contractual obligations table above does not include CL&P's, NSTAR Electric's or PSNH's standard/basic service contracts for the purchase of energy supply, the amounts of which vary with customers' energy needs. Renewable Energy Purchase Contracts: Renewable energy purchase contracts include non-cancellable commitments under contracts of CL&P and NSTAR Electric for the purchase of energy and capacity from renewable energy facilities. Such contracts extend through 2046 for CL&P and 2045 for NSTAR Electric. In 2024, the NHPUC approved the termination of a PPA for the purchase of capacity, renewable energy and RECs from a New Hampshire generation plant and there are no remaining long-term renewable energy purchase contracts at PSNH. Renewable energy purchase contracts include long-term commitments of NSTAR Electric pertaining to the Vineyard Wind LLC contract awarded under the Massachusetts Clean Energy 83C procurement solicitation. NSTAR Electric, along with other Massachusetts distribution companies, entered into 20-year contracts to purchase electricity generated by this 800 megawatt offshore wind project. Construction on the Vineyard Wind project commenced in 2022. Estimated energy costs under this contract are expected to begin when the facilities are in service in 2025 and range between $100 million and $200 million per year under NSTAR Electric’s 20-year contract, totaling approximately $2.6 billion. As required by 2018 regulation, CL&P and UI each entered into PURA-approved ten-year contracts in 2019 to purchase a combined total of approximately 9 million MWh annually from the Millstone Nuclear Power Station generation facility, which represents a combined amount of approximately 50 percent of the facility's output (approximately 40 percent by CL&P). Also as required by 2018 regulation, CL&P and UI each entered into PURA-approved eight-year contracts in 2019 to purchase a combined amount of approximately 18 percent of the Seabrook Nuclear Power Plant’s output (approximately 15 percent by CL&P) beginning January 1, 2022. The total estimated remaining future cost of the Millstone Nuclear Power Station and Seabrook Nuclear Power Plant energy purchase contracts are $2.6 billion and are reflected in the table above. As required by law, CL&P cannot use this power to satisfy its customers’ supply obligations. CL&P sells the energy purchased under these contracts into the market and uses the proceeds from these energy sales to offset the contract costs. As the net costs under these contracts are recovered from customers in future rates, the contracts do not have an impact on the net income of CL&P. These contracts do not meet the definition of a derivative, and accordingly, the costs of these contracts are being accounted for as incurred. The contractual obligations table above does not include long-term commitments signed by CL&P and NSTAR Electric, as required by the PURA and the DPU, respectively, for the purchase of renewable energy and related products that are contingent on the future construction of energy facilities, such as the long-term commitments of NSTAR Electric pertaining to the Massachusetts Clean Energy 83D contract entered into in 2018. Natural Gas Procurement: Eversource's natural gas distribution businesses have long-term contracts for the purchase, transportation and storage of natural gas as part of its portfolio of supplies, which extend through 2045. 97
  2. Page 110 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 110 of 144 Capacity and Purchased Power: These contracts include capacity CfDs with generation facilities at CL&P through 2026, and a purchase obligation for electricity which extends through 2031 for NSTAR Electric. CL&P's portion of the costs and benefits under these capacity contracts are recovered from, or refunded to, CL&P's customers. Peaker CfDs: CL&P, along with UI, has three peaker CfDs for a total of approximately 500 MW of peaking capacity through 2042. CL&P has a sharing agreement with UI, whereby CL&P is responsible for 80 percent and UI for 20 percent of the net costs or benefits of these CfDs. The Peaker CfDs pay the generation facility owner the difference between capacity, forward reserve and energy market revenues and a cost-of-service payment stream for 30 years. The ultimate cost or benefit to CL&P under these contracts will depend on the costs of plant operation and the prices that the projects receive for capacity and other products in the ISO-NE markets. CL&P's portion of the amounts paid or received under the Peaker CfDs are recovered from, or refunded to, CL&P's customers. Transmission Support Commitments: Along with other New England utilities, CL&P, NSTAR Electric and PSNH have entered into agreements to support the costs of, and receive rights to use, transmission and terminal facilities that import electricity from the Hydro-Québec system in Canada. CL&P, NSTAR Electric and PSNH are obligated to pay, over a 20-year period ending in 2040, their proportionate shares of the annual operation and maintenance expenses and capital costs of those facilities. The total costs incurred under these agreements were as follows: Eversource For the Years Ended December 31, 2024 (Millions of Dollars) Renewable Energy Purchase Contracts $ 2023 591.4 $ 2022 581.4 $ 678.1 Natural Gas Procurement 695.0 695.8 1,042.8 Capacity and Purchased Power 70.5 69.0 61.6 Peaker CfDs 23.1 20.1 13.4 Transmission Support Commitments 16.7 14.2 12.7 For the Years Ended December 31, CL&P (Millions of Dollars) Renewable Energy Purchase Contracts 2024 NSTAR Electric $ 529.0 $ 62.4 PSNH $ 2023 NSTAR Electric CL&P — $ 474.1 $ 60.0 PSNH $ 47.3 2022 NSTAR Electric CL&P $ 513.2 $ 90.8 PSNH $ 74.1 Capacity and Purchased Power 67.6 2.9 — 65.5 2.9 0.6 57.7 3.0 Peaker CfDs 23.1 — — 20.1 — — 13.4 — 0.9 — Transmission Support Commitments 6.6 6.6 3.5 5.6 5.6 3.0 5.0 5.0 2.7 C. Spent Nuclear Fuel Obligations - Yankee Companies CL&P, NSTAR Electric and PSNH have plant closure and fuel storage cost obligations to the Yankee Companies, which have each completed the physical decommissioning of their respective nuclear power facilities and are now engaged in the long-term storage of their spent fuel. The Yankee Companies fund these costs through litigation proceeds received from the DOE and, to the extent necessary, through wholesale, FERCapproved rates charged under power purchase agreements with several New England utilities, including CL&P, NSTAR Electric and PSNH. CL&P, NSTAR Electric and PSNH, in turn recover these costs from their customers through state regulatory commission-approved retail rates. The Yankee Companies collect amounts that management believes are adequate to recover the remaining plant closure and fuel storage cost estimates for the respective plants. Management believes CL&P and NSTAR Electric will recover their shares of these obligations from their customers. PSNH has recovered its total share of these costs from its customers. Spent Nuclear Fuel Litigation: The Yankee Companies have filed complaints against the DOE in the Court of Federal Claims seeking monetary damages resulting from the DOE's failure to accept delivery of, and provide for a permanent facility to store, spent nuclear fuel pursuant to the terms of the 1983 spent fuel and highlevel waste disposal contracts between the Yankee Companies and the DOE. The court previously awarded the Yankee Companies damages for Phases I, II, III and IV of litigation resulting from the DOE's failure to meet its contractual obligations. These Phases covered damages incurred in the years 1998 through 2016, and the awarded damages have been received by the Yankee Companies with certain amounts of the damages refunded to their customers. DOE Phase V Damages - On March 25, 2021, each of the Yankee Companies filed a fifth set of lawsuits against the DOE in the Court of Federal Claims resulting from the DOE's failure to begin accepting spent nuclear fuel for disposal covering the years from 2017 to 2020. The Yankee Companies filed claims seeking monetary damages totaling $120.4 million for CYAPC, YAEC and MYAPC. Pursuant to a June 2, 2022 court order, the Yankee Companies were subsequently permitted to include monetary damages relating to the year 2021 in the DOE Phase V complaint. The Yankee Companies submitted a supplemental filing to include these costs of $33.1 million on June 8, 2022. In September 2024, the parties reached an agreement in principle to settle the Phase V complaint totaling $145 million for CYAPC, YAEC, and MYAPC. The settlement was approved on November 19, 2024 and the Department of Justice filed a Notice of Appeal on January 17, 2025 on an issue outside the scope of the settlement. Oral arguments are expected to be scheduled in the second half of 2025. D. Guarantees and Indemnifications In the normal course of business, Eversource parent provides credit assurances on behalf of its subsidiaries, including CL&P, NSTAR Electric and PSNH, in the form of guarantees. Management does not anticipate a material impact to net income or cash flows as a result of these various guarantees and indemnifications. 98
  3. Page 111 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 111 of 144 Guarantees issued on behalf of unconsolidated entities, including equity method ownership interests, for which Eversource parent is the guarantor, are recorded at fair value as a liability on the balance sheet at the inception of the guarantee. The fair value of guarantees issued on behalf of unconsolidated entities are recorded within Other Long-Term Liabilities on the balance sheet, and were $1.2 million and $4.4 million as of December 31, 2024 and 2023, respectively. Eversource regularly reviews performance risk under these guarantee arrangements, and believes the likelihood of payments being required under the guarantees is remote. In the event it becomes probable that Eversource parent will be required to perform under the guarantee, the amount of probable payment will be recorded. On September 30, 2024, Eversource completed the sale of its 50 percent ownership share in the South Fork Wind and Revolution Wind projects to GIP. Under the agreement with GIP, Eversource’s existing and certain additional credit support obligations for Revolution Wind are expected to roll off as the project completes construction. On July 9, 2024, Eversource completed the sale of its 50 percent ownership share of Sunrise Wind to Ørsted. Under the agreement with Ørsted, Eversource’s existing credit support obligations for Sunrise Wind were either terminated or indemnified by Ørsted as a result of the sale. The following table summarizes Eversource parent's exposure to guarantees and indemnifications of its subsidiaries and affiliates to external parties, and primarily relates to its previously-owned offshore wind investments: As of December 31, 2024 Company (Obligor) Description Maximum Exposure (in millions) Revolution Wind, LLC and TurbineCo, LLC Offshore wind construction-related purchase agreements with third-party contractors (1) Eversource Investment LLC, Eversource Investment Service Company LLC and South Fork Class B Member, LLC Offshore wind funding and indemnification obligations (2) Eversource Investment LLC Letters of Credit (3) 5.3 Eversource TEI LLC South Fork Wind Tax Equity (4) 50.0 South Fork Wind, LLC Power Purchase Agreement Security (5) 7.1 Various Eversource subsidiaries Surety bonds (6) 30.7 $ 357.0 277.5 (1) Eversource parent issued guarantees on behalf of its previously 50 percent-owned affiliate, Revolution Wind, LLC, and on behalf of TurbineCo, LLC (successor in interest to North East Offshore, LLC (NEO)), under which Eversource parent agreed to guarantee each entity’s performance of obligations under certain construction-related purchase agreements with third-party contractors, in an aggregate amount not to exceed $935.6 million. Eversource parent’s obligations under the guarantees expire upon the earlier of (i) dates ranging between December 2024 and November 2027 and (ii) full performance of the guaranteed obligations. (2) Eversource parent issued guarantees on behalf of its wholly-owned subsidiary Eversource Investment LLC (EI), which held Eversource's previous investments in offshore wind-related equity method investments until sale, and on behalf of its previously 50 percent-owned affiliate, South Fork Class B Member, LLC, whereby Eversource parent will guarantee each entity’s performance of certain funding obligations of the South Fork and Revolution Wind projects. Eversource parent also guaranteed certain indemnification obligations of EI associated with third party credit support for EI’s investment in NEO. On September 30, 2024, Eversource parent issued a guaranty on behalf of its wholly-owned subsidiary, Eversource Investment Service Company LLC, whereby Eversource parent will guarantee Eversource Investment Service Company LLC’s performance of certain indemnification obligations during the onshore construction phase of the Revolution Wind project, in an amount not to exceed $100.0 million. These guarantees will not exceed $1.62 billion and expire upon the full performance of the guaranteed obligations. (3) Eversource parent entered into a guarantee on behalf of EI, under which Eversource parent would guarantee EI's obligations under a letter of credit facility with a financial institution that EI may request in an aggregate amount of up to approximately $25 million. As of December 31, 2024, EI has issued two letters of credit on behalf of South Fork Wind, LLC and one letter of credit on behalf of Revolution Wind, LLC totaling $5.3 million. The guarantee will remain in effect until full performance of the guaranteed obligations. On January 24, 2025, the $1.0 million letter of credit issued on behalf of Revolution Wind, LLC was terminated. (4) Eversource parent issued a guarantee on behalf of its wholly-owned subsidiary, Eversource TEI LLC, whereby Eversource parent will guarantee Eversource TEI LLC’s performance of certain obligations, in an amount not to exceed $50.0 million, in connection with any remaining obligations under the LLC agreement. Eversource parent’s obligations expire upon the full performance of the guaranteed obligations. (5) Eversource parent issued a guarantee on behalf of its previously 50 percent-owned affiliate, South Fork Wind, LLC, whereby Eversource parent will guarantee South Fork Wind, LLC's performance of certain obligations, in an amount not to exceed $7.1 million, under a Power Purchase Agreement between the Long Island Power Authority and South Fork Wind, LLC (the Agreement). The guarantee expires upon the later of (i) the end of the Agreement term, January 2044, with the option to extend to January 2049 and (ii) full performance of the guaranteed obligations. (6) Surety bonds expire in 2025. Expiration dates reflect termination dates, the majority of which will be renewed or extended. Certain surety bonds contain credit ratings triggers that would require Eversource parent to post collateral in the event that the unsecured debt credit ratings of Eversource parent are downgraded. On September 30, 2024, Eversource entered into an agreement with GIP and Ørsted to contingently provide future credit support up to a maximum of $850 million in guarantees, if required, to support third party tax equity financing for Revolution Wind. 99
  4. Page 112 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 112 of 144 E. FERC ROE Complaints Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, FERC issued Opinion No. 531-A and set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded, which totaled $38.9 million (pre-tax and excluding interest) at Eversource and reflected both the base ROE and incentive cap prescribed by the FERC order. The refund consisted of $22.4 million for CL&P, $13.7 million for NSTAR Electric and $2.8 million for PSNH. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of both December 31, 2024 and 2023. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of both December 31, 2024 and 2023. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, for the NETOs, which FERC concludes are of average financial risk, the preliminary just and reasonable base ROE is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. On November 21, 2019, FERC issued Opinion No. 569 affecting the two pending transmission ROE complaints against the Midcontinent ISO (MISO) transmission owners, in which FERC adopted a new methodology for determining base ROEs. Various parties sought rehearing. On December 23, 2019, the NETOs filed supplementary materials in the NETOs' four pending cases to respond to this new methodology because of the uncertainty of the applicability to the NETOs' cases. On May 21, 2020, the FERC issued its order in Opinion No. 569-A on the rehearing of the MISO transmission owners' cases, in which FERC again changed its methodology for determining the MISO transmission owners' base ROEs. On November 19, 2020, the FERC issued Opinion No. 569-B denying rehearing of Opinion No. 569-A and reaffirmed the methodology previously adopted in Opinion No. 569-A. The new methodology differs significantly from the methodology proposed by FERC in its October 16, 2018 order to determine the NETOs' base ROEs in their four pending cases. FERC Opinion Nos. 569-A and 569-B were appealed to the Court. On August 9, 2022, the Court issued its decision vacating MISO ROE FERC Opinion Nos. 569, 569-A and 569-B and remanded to FERC to reopen the proceedings. The Court found that FERC’s development of the new return methodology was arbitrary and capricious due to FERC’s failure to offer a reasonable explanation for its decision to reintroduce the risk-premium financial model in its new methodology for calculating a just and reasonable return. On October 17, 2024, FERC issued an order on the remand of the MISO ROE proceedings. The order addressed the Court’s decision that the reintroduction of the risk-premium financial model in the ROE methodology was arbitrary and capricious by removing the risk-premium financial model from the ROE methodology. The removal of the risk-premium financial model was the only revision to FERC’s ROE methodology and resulted in a two-model approach utilizing the two-step discounted cash flow model and the capital asset pricing model. MISO was directed to provide refunds for the period November 12, 2013 to February 11, 2015 (the first MISO ROE complaint refund period) and for the period from September 28, 2016 (the date of FERC’s order on the first MISO ROE complaint) to October 17, 2024 by December 1, 2025. The order also stated that FERC does not preclude the use of the risk-premium financial model in future proceedings if the parties can demonstrate that FERC’s stated concerns around the inclusion of the model have been addressed. On November 13, 2024, the NETOs filed a supplemental brief in their four pending ROE proceedings to explain to FERC that it cannot apply the reasoning and methodologies of the MISO ROE case to the NETOs’ cases due to the entirely different set of facts in the MISO and NETOs ROE proceedings. Doing so would violate the substance of the Court’s April 14, 2017 order and would violate the legal standard required by the Federal Power Act. On February 4, 2025, the MISO transmission owners submitted a petition for review with the Court requesting review of the October 17, 2024 MISO ROE order on remand and a December 19, 2024 notice of denial of rehearing. The petition requests review of FERC’s decision to retroactively backdate the MISO transmission owners’ base ROE to the date of an earlier order that FERC abandoned when it issued Order No. 569, treat an underlying unlawful complaint as if it were legitimate, and order eight years of interest as part of the directed refunds. 100
  5. Page 113 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 113 of 144 Given the significant uncertainty regarding the applicability of the FERC order in the MISO transmission owners’ two complaint cases to the NETOs’ pending four complaint cases due to the complex differences between the cases, Eversource concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaints or subsequent periods at this time and Eversource cannot reasonably estimate any potential range of loss for any of the four complaint proceedings at this time. The resolution of these proceedings could have a material impact on the financial condition, results of operations, and cash flows. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. F. Litigation and Legal Proceedings Eversource, including CL&P, NSTAR Electric and PSNH, are involved in legal, tax and regulatory proceedings regarding matters arising in the ordinary course of business, which involve management's assessment to determine the probability of whether a loss will occur and, if probable, its best estimate of probable loss. The Company records and discloses losses when these losses are probable and reasonably estimable, and discloses matters when losses are probable but not estimable or when losses are reasonably possible. Legal costs related to the defense of loss contingencies are expensed as incurred. 14. LEASES Eversource, including CL&P, NSTAR Electric and PSNH, has entered into lease agreements as a lessee for the use of land, office space, service centers, vehicles, information technology, and equipment. These lease agreements are classified as either finance or operating leases and the liability and right-of-use asset are recognized on the balance sheet at lease commencement. Leases with an initial term of 12 months or less are not recorded on the balance sheet and are recognized as lease expense on a straight-line basis over the lease term. Eversource determines whether or not a contract contains a lease based on whether or not it provides Eversource with the use of a specifically identified asset for a period of time, as well as both the right to direct the use of that asset and receive the significant economic benefits of the asset. Eversource has elected the practical expedient to not separate non-lease components from lease components and instead to account for both as a single lease component, with the exception of the information technology asset class where the lease and non-lease components are separated. The provisions of Eversource, CL&P, NSTAR Electric and PSNH lease agreements contain renewal options. The renewal options range from one year to twenty years. The renewal period is included in the measurement of the lease liability if it is reasonably certain that Eversource will exercise these renewal options. For leases entered into or modified after the January 1, 2019 implementation date of the leases standard under Topic 842, the discount rate utilized for classification and measurement purposes as of the inception date of the lease is based on each company's collateralized incremental interest rate to borrow over a comparable term for an individual lease because the rate implicit in the lease is not determinable. CL&P and PSNH entered into certain contracts for the purchase of energy that qualify as leases. These contracts do not have minimum lease payments and therefore are not recognized as a lease liability on the balance sheet and are not reflected in the future minimum lease payments table below. Expense related to these contracts is included as variable lease cost in the table below. The expense and long-term obligation for these contracts are also included in Note 13B, "Commitments and Contingencies - Long-Term Contractual Arrangements," to the financial statements. In 2024, these contracts at PSNH were terminated. The components of lease cost, prior to amounts capitalized, are as follows: Eversource For the Years Ended December 31, 2024 (Millions of Dollars) 2023 2022 Finance Lease Cost: Amortization of Right-of-use-Assets $ Interest on Lease Liabilities 6.4 $ 2.7 4.8 $ 8.3 2.0 2.0 Total Finance Lease Cost 9.1 6.8 10.3 Operating Lease Cost 15.2 11.4 11.6 Variable Lease Cost 18.3 69.2 78.1 87.4 100.0 Total Lease Cost $ 42.6 $ 101
  6. Page 114 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 114 of 144 For the Years Ended December 31, CL&P (Millions of Dollars) Finance Lease Cost: Amortization of Right-ofuse-Assets $ Interest on Lease Liabilities 1.7 2024 2023 2022 NSTAR Electric NSTAR Electric NSTAR Electric $ 0.2 PSNH $ CL&P — $ — $ PSNH 0.2 $ CL&P — $ — $ PSNH 0.2 $ 0.1 0.8 0.6 — — 0.6 — — 0.6 — 2.5 0.8 — — 0.8 — — 0.8 0.1 Operating Lease Cost 2.6 5.3 1.8 0.7 3.0 0.4 0.3 2.3 0.1 Variable Lease Cost 18.9 — (0.6) 21.9 — 47.3 25.6 — 52.5 Total Finance Lease Cost Total Lease Cost $ 24.0 $ 6.1 $ 1.2 $ 22.6 $ 3.8 $ 47.7 $ 25.9 $ 3.1 $ 52.7 Operating lease cost, net of the capitalized portion, is included in Operations and Maintenance (or Purchased Power, Purchased Natural Gas and Transmission expense for transmission leases) on the statements of income. Amortization of finance lease assets is included in Depreciation on the statements of income. Interest expense on finance leases is included in Interest Expense on the statements of income. Supplemental balance sheet information related to leases is as follows: (Millions of Dollars) Eversource As of December 31, 2024 NSTAR Electric CL&P Other Long-Term Assets $ 56.1 $ 7.7 $ 29.4 $ Other Current Liabilities Other Long-Term Liabilities $ 10.4 $ 2.2 $ 3.7 $ Balance Sheet Classification Eversource As of December 31, 2023 NSTAR Electric CL&P 3.3 $ 53.5 $ 2.2 $ 27.7 $ 4.7 1.7 $ 9.5 $ 0.8 $ 2.2 $ 1.5 PSNH PSNH Operating Leases: Right-of-use-Assets, Net Operating Lease Liabilities Current Portion Long-Term Total Operating Lease Liabilities 45.7 5.5 25.7 1.6 44.0 1.4 25.5 3.2 $ 56.1 $ 7.7 $ 29.4 $ 3.3 $ 53.5 $ 2.2 $ 27.7 $ 4.7 $ 61.9 $ 16.6 $ 2.8 $ — $ 68.6 $ 18.3 $ 3.0 $ — $ 5.6 $ 1.5 $ — $ — $ 5.4 $ 1.4 $ — $ — Finance Leases: Right-of-use-Assets, Net Property, Plant and Equipment, Net Finance Lease Liabilities Current Portion Long-Term Other Current Liabilities Other Long-Term Liabilities Total Finance Lease Liabilities 62.1 $ 67.7 15.6 $ 17.1 4.9 $ 4.9 — $ — 67.3 $ 72.7 16.9 $ 18.3 4.9 $ 4.9 — $ — The finance lease payments that NSTAR Electric will make over the next twelve months are entirely interest-related, due to escalating payments. As such, none of the finance lease payments over the next twelve months will reduce the finance lease liability. As of December 31, 2024, the operating lease balances attributable to the Aquarion water distribution business have been reclassified to Assets Held for Sale on the Eversource balance sheet. As of December 31, 2023, these balances were recorded within Other Long-Term Assets on the Eversource balance sheet. For further information, see Note 24, “Assets Held for Sale.” Other information related to leases is as follows: As of December 31, 2024 Eversource 2023 NSTAR Electric CL&P PSNH Eversource NSTAR Electric CL&P PSNH Weighted-Average Remaining Lease Term (Years): Operating Leases 9 4 12 9 4 13 Finance Leases 12 8 17 — 2 13 9 18 — 3 Operating Leases 4.1 % 5.2 % 4.2 % 5.2 % 4.0 % 5.2 % 4.2 % 5.2 % Finance Leases 3.3 % 5.3 % 2.9 % —% 3.3 % 5.3 % 2.9 % —% Weighted-Average Discount Rate (Percentage): 102
  7. Page 115 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 115 of 144 Eversource (Millions of Dollars) CL&P NSTAR Electric PSNH For the Year Ended December 31, 2024 Cash Paid for Amounts Included in the Measurement of Lease Liabilities: Operating Cash Flows from Operating Leases $ 14.5 $ 2.5 $ 4.9 $ 1.8 Operating Cash Flows from Finance Leases 2.6 0.7 0.7 — Financing Cash Flows from Finance Leases 5.2 1.2 — — Right-of-use-Assets Obtained in Exchange for New Operating Lease Liabilities 15.3 7.8 5.7 0.3 Right-of-use-Assets Obtained in Exchange for New Finance Lease Liabilities 0.3 — — — Supplemental Non-Cash Information on Lease Liabilities: Eversource (Millions of Dollars) CL&P NSTAR Electric PSNH For the Year Ended December 31, 2023 Cash Paid for Amounts Included in the Measurement of Lease Liabilities: Operating Cash Flows from Operating Leases $ 10.5 $ 0.7 $ 2.5 $ 0.4 Operating Cash Flows from Finance Leases 2.0 — 0.6 — Financing Cash Flows from Finance Leases 3.9 — — — Supplemental Non-Cash Information on Lease Liabilities: Right-of-use-Assets Obtained in Exchange for New Operating Lease Liabilities 12.8 0.6 7.0 5.0 Right-of-use-Assets Obtained in Exchange for New Finance Lease Liabilities 18.5 18.3 — — Eversource (Millions of Dollars) CL&P NSTAR Electric PSNH For the Year Ended December 31, 2022 Cash Paid for Amounts Included in the Measurement of Lease Liabilities: Operating Cash Flows from Operating Leases $ 11.3 $ 0.3 $ 2.1 $ 0.1 Operating Cash Flows from Finance Leases 2.0 — 0.6 — Financing Cash Flows from Finance Leases 3.9 — — 0.1 Right-of-use-Assets Obtained in Exchange for New Operating Lease Liabilities 18.9 2.4 — — Right-of-use-Assets Obtained in Exchange for New Finance Lease Liabilities 3.5 — — — Supplemental Non-Cash Information on Lease Liabilities: As of December 31, 2024, there are no lease agreements for Eversource, CL&P, NSTAR Electric or PSNH which have been executed but have yet to commence and have not been recorded as right-of-use assets. Future minimum lease payments, excluding variable costs, under long-term leases, as of December 31, 2024 are as follows: Operating Leases (Millions of Dollars) Eversource Finance Leases NSTAR Electric CL&P PSNH Eversource CL&P NSTAR Electric Year Ending December 31, 2025 4.9 $ 1.9 2.3 $ 0.7 2026 11.0 2.3 4.9 1.5 7.9 2.4 0.7 2027 7.0 1.8 2.9 0.1 7.9 2.5 0.7 2028 6.6 1.8 2.6 — 7.3 2.6 0.7 2029 4.5 — 2.5 — 7.3 2.6 0.7 Thereafter 26.2 — 22.2 — 50.5 8.9 10.2 Future lease payments 67.8 8.5 40.0 3.5 89.2 21.3 13.7 Less amount representing interest 11.7 0.8 10.6 0.2 21.5 4.2 8.8 29.4 $ 3.3 17.1 $ 4.9 Present value of future minimum lease payments $ $ 12.5 56.1 $ $ 2.6 7.7 103 $ $ $ $ 8.3 67.7 $ $
  8. Page 116 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 116 of 144 15. FAIR VALUE OF FINANCIAL INSTRUMENTS The following methods and assumptions were used to estimate the fair value of each of the following financial instruments: Preferred Stock, Long-Term Debt and Rate Reduction Bonds: The fair value of CL&P's and NSTAR Electric's preferred stock is based upon pricing models that incorporate interest rates and other market factors, valuations or trades of similar securities and cash flow projections. The fair value of long-term debt and RRB debt securities is based upon pricing models that incorporate quoted market prices for those issues or similar issues adjusted for market conditions, credit ratings of the respective companies and treasury benchmark yields. The fair values provided in the table below are classified as Level 2 within the fair value hierarchy. Carrying amounts and estimated fair values are as follows: Eversource Carrying Fair Amount Value CL&P Carrying Fair Amount Value NSTAR Electric Carrying Fair Amount Value PSNH Carrying Fair Amount Value Preferred Stock Not Subject to Mandatory Redemption $ $ $ $ Long-Term Debt 26,704.8 24,791.4 5,111.1 4,705.8 5,094.9 4,759.4 1,732.1 1,529.7 367.3 352.1 — — — — 367.3 352.1 (Millions of Dollars) As of December 31, 2024: Rate Reduction Bonds 155.6 $ 123.8 116.2 $ 90.3 43.0 $ 33.5 — $ — As of December 31, 2023: Preferred Stock Not Subject to Mandatory Redemption $ Long-Term Debt 24,413.5 22,855.2 4,814.4 4,572.0 4,496.9 4,273.7 1,431.6 1,292.6 410.5 395.0 — — — — 410.5 395.0 Rate Reduction Bonds 155.6 $ 122.2 $ 116.2 $ 90.4 $ 43.0 $ 31.8 $ — $ — Derivative Instruments and Marketable Securities: Derivative instruments and investments in marketable securities are carried at fair value. For further information, see Note 4, "Derivative Instruments," and Note 5, "Marketable Securities," to the financial statements. See Note 1H, "Summary of Significant Accounting Policies – Fair Value Measurements," for the fair value measurement policy and the fair value hierarchy. 16. ACCUMULATED OTHER COMPREHENSIVE INCOME/(LOSS) The changes in accumulated other comprehensive income/(loss) by component, net of tax, are as follows: Eversource (Millions of Dollars) For the Year Ended December 31, 2024 Qualified Defined Cash Flow Benefit Hedging Plans Total Instruments Qualified Cash Flow Hedging Instruments Balance as of January 1st $ $ (0.4) $ (33.3) $ (33.7) For the Year Ended December 31, 2023 Unrealized Defined Losses Benefit on Marketable Plans Securities (0.4) $ (1.2) $ (37.8) $ Total (39.4) OCI Before Reclassifications — (2.5) (2.5) — — (8.8) (8.8) Amounts Reclassified from AOCI — 9.7 9.7 — 1.2 13.3 14.5 — 1.2 (0.4) $ — Net OCI Balance as of December 31st — $ (0.4) 7.2 $ (26.1) 7.2 $ (26.5) $ 4.5 $ (33.3) 5.7 $ (33.7) Defined benefit plan OCI amounts before reclassifications relate to actuarial gains and losses that arose during the year and were recognized in AOCI. The unamortized actuarial gains and losses and prior service costs on the defined benefit plans are amortized from AOCI into Other Income, Net over the average future employee service period, and are reflected in amounts reclassified from AOCI. The related tax effects of the defined benefit plan OCI amounts before reclassifications recognized in AOCI were net deferred tax assets of $0.4 million, $4.9 million and $1.3 million in 2024, 2023 and 2022, respectively. 104
  9. Page 117 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 117 of 144 The following table sets forth the amounts reclassified from AOCI by component and the impacted line item on the statements of income: Eversource (Millions of Dollars) Amounts Reclassified from AOCI For the Years Ended December 31, 2023 2024 Statements of Income Line Item Impacted 2022 Unrealized Loss on Marketable Securities — (1.6) — Other Income, Net Tax Effect — 0.4 — Income Tax Expense Unrealized Loss on Marketable Securities, Net of Tax — (1.2) — Amortization of Actuarial Losses (6.8) (7.0) (9.0) Other Income, Net (1) Amortization of Prior Service Cost (0.3) (0.3) (0.3) Other Income, Net (1) (4.3) (12.4) — Other Income, Net (1) (11.4) (19.7) (9.3) Defined Benefit Plan Costs: Settlement Losses Total Defined Benefit Plan Costs Tax Effect 1.7 6.4 2.3 Defined Benefit Plan Costs, Net of Tax (9.7) (13.3) (7.0) Total Amounts Reclassified from AOCI, Net of Tax (1) $ (9.7) $ (14.5) $ Income Tax Expense (7.0) These amounts are included in the computation of net periodic Pension, SERP and PBOP costs. See Note 1L, "Summary of Significant Accounting Policies – Other Income, Net" and Note 11A, "Employee Benefits – Pension Benefits and Postretirement Benefits Other Than Pension," for further information. 17. DIVIDEND RESTRICTIONS Eversource parent's ability to pay dividends may be affected by certain state statutes, the ability of its subsidiaries to pay common dividends and the leverage restriction tied to its consolidated total indebtedness to total capitalization ratio requirement in its revolving credit agreements. Pursuant to the joint revolving credit agreement of Eversource, CL&P, PSNH, NSTAR Gas, Yankee Gas, EGMA and Aquarion Water Company of Connecticut, and to the NSTAR Electric revolving credit agreement, Eversource is required to maintain consolidated total indebtedness to total capitalization ratio of no greater than 70 percent at the end of each fiscal quarter and each other company is required to maintain consolidated total indebtedness to total capitalization ratio of no greater than 65 percent at the end of each fiscal quarter. As of December 31, 2024, all companies were in compliance with such covenant and in compliance with all such provisions of the revolving credit agreements that may restrict the payment of dividends as of December 31, 2024. The Retained Earnings balances subject to dividend restrictions were $3.93 billion for Eversource, $2.82 billion for CL&P, $3.13 billion for NSTAR Electric and $808.7 million for PSNH as of December 31, 2024. CL&P, NSTAR Electric and PSNH are subject to Section 305 of the Federal Power Act that makes it unlawful for a public utility to make or pay a dividend from any funds "properly included in its capital account." Management believes that this Federal Power Act restriction, as applied to CL&P, NSTAR Electric and PSNH, would not be construed or applied by the FERC to prohibit the payment of dividends from retained earnings for lawful and legitimate business purposes. In addition, certain state statutes may impose additional limitations on such companies and, including but not limited to, on NSTAR Gas, Yankee Gas, EGMA, and Aquarion’s operating companies. Such state law restrictions do not restrict the payment of dividends from retained earnings or net income. 18. COMMON SHARES The following table sets forth the Eversource parent common shares and the shares of common stock of CL&P, NSTAR Electric and PSNH that were authorized and issued, as well as the respective per share par values: Shares Authorized as of December 31, 2024 and 2023 Par Value Issued as of December 31, 2024 2023 410,000,000 375,724,367 359,984,073 Eversource $ 5 CL&P $ 10 24,500,000 6,035,205 6,035,205 NSTAR Electric $ 1 100,000,000 200 200 PSNH $ 1 100,000,000 301 301 Common Share Issuances: Eversource had an equity distribution agreement pursuant to which it could offer and sell up to $1.2 billion of its common shares from time to time through an “at-the-market” (ATM) equity offering program. Eversource issued and sold its common shares through its sales agents during the term of this agreement. Shares were offered in transactions on the New York Stock Exchange, in the over-thecounter market, through negotiated transactions or otherwise. Sales were made at either market prices prevailing at the time of sale, at prices related to such prevailing market prices or at negotiated prices. In 2024, Eversource issued 15,740,294 common shares, which resulted in proceeds of $989.4 million, net of issuance costs. Eversource used the net proceeds received for general corporate purposes. In 2023, no shares were issued under this agreement. Eversource completed the program in October 2024. Treasury Shares: As of December 31, 2024 and 2023, there were 9,116,315 and 10,443,807 Eversource common shares held as treasury shares, respectively. As of December 31, 2024 and 2023, there were 366,608,052 and 349,540,266 Eversource common shares outstanding, respectively. 105
  10. Page 118 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 118 of 144 Acquisition of The Torrington Water Company: On October 3, 2022, Aquarion acquired The Torrington Water Company (TWC) following the receipt of all required approvals. The acquisition was structured as a stock-for-stock merger and Eversource issued 925,264 treasury shares at closing for a purchase price of $72.1 million. Eversource issues treasury shares to satisfy awards under the Company's incentive plans, shares issued under the dividend reinvestment and share purchase plan, and matching contributions under the Eversource 401k Plan. Eversource also issued treasury shares for its October 2022 water business acquisitions. The issuance of treasury shares represents a non-cash transaction, as the treasury shares were used to fulfill Eversource's obligations that require the issuance of common shares. On May 3, 2023, shareholders voted to increase the authorized common shares from 380,000,000 shares to 410,000,000 shares. 19. PREFERRED STOCK NOT SUBJECT TO MANDATORY REDEMPTION The CL&P and NSTAR Electric preferred stock is not subject to mandatory redemption and is presented as a noncontrolling interest of a subsidiary in Eversource's financial statements. CL&P is authorized to issue up to 9,000,000 shares of preferred stock, par value $50 per share, and NSTAR Electric is authorized to issue 2,890,000 shares of preferred stock, par value $100 per share. Holders of preferred stock of CL&P and NSTAR Electric are entitled to receive cumulative dividends in preference to any payment of dividends on the common stock. Upon liquidation, holders of preferred stock of CL&P and NSTAR Electric are entitled to receive a liquidation preference before any distribution to holders of common stock in an amount equal to the par value of the preferred stock plus accrued and unpaid dividends. If the net assets were to be insufficient to pay the liquidation preference in full, then the net assets would be distributed ratably to all holders of preferred stock. The preferred stock of CL&P and NSTAR Electric is subject to optional redemption by the CL&P and NSTAR Electric Boards of Directors at any time. Details of preferred stock not subject to mandatory redemption are as follows (in millions, except in redemption price and shares): Redemption Price Per Share Series Shares Outstanding as of December 31, 2024 As of December 31, 2023 2024 2023 CL&P $1.90 Series of 1947 $ 52.50 163,912 163,912 $2.00 Series of 1947 $ 54.00 336,088 336,088 $ 8.2 $ $2.04 Series of 1949 $ 52.00 100,000 100,000 5.0 5.0 $2.20 Series of 1949 $ 52.50 200,000 200,000 10.0 10.0 3.90% Series of 1949 $ 50.50 160,000 160,000 8.0 8.0 $2.06 Series E of 1954 $ 51.00 200,000 200,000 10.0 10.0 16.8 8.2 16.8 $2.09 Series F of 1955 $ 51.00 100,000 100,000 5.0 5.0 4.50% Series of 1956 $ 50.75 104,000 104,000 5.2 5.2 4.96% Series of 1958 $ 50.50 100,000 100,000 5.0 5.0 4.50% Series of 1963 $ 50.50 160,000 160,000 8.0 8.0 5.28% Series of 1967 $ 51.43 200,000 200,000 10.0 10.0 $3.24 Series G of 1968 $ 51.84 300,000 300,000 15.0 15.0 6.56% Series of 1968 $ 51.44 200,000 200,000 10.0 2,324,000 2,324,000 $ $ Total CL&P 10.0 116.2 $ 18.0 $ 116.2 NSTAR Electric 4.25% Series of 1956 $ 103.625 180,000 180,000 4.78% Series of 1958 $ 102.80 250,000 250,000 430,000 430,000 Total NSTAR Electric 25.0 $ Fair Value Adjustment due to Merger with NSTAR $ 43.0 $ 155.6 (3.6) Total Eversource - Noncontrolling Interest - Preferred Stock of Subsidiaries 20. 43.0 $ 155.6 18.0 25.0 (3.6) COMMON SHAREHOLDERS' EQUITY AND NONCONTROLLING INTERESTS Dividends on the preferred stock of CL&P and NSTAR Electric totaled $7.5 million for each of the years ended December 31, 2024, 2023 and 2022. These dividends were presented as Net Income Attributable to Noncontrolling Interests on the Eversource statements of income. Noncontrolling Interest – Preferred Stock of Subsidiaries on the Eversource balance sheets totaled $155.6 million as of December 31, 2024 and 2023. On the Eversource balance sheets, Common Shareholders' Equity was fully attributable to Eversource parent and Noncontrolling Interest – Preferred Stock of Subsidiaries was fully attributable to the noncontrolling interest. For the years ended December 31, 2024, 2023 and 2022, there was no change in ownership of the common equity of CL&P and NSTAR Electric. 106

Text of RRU-072 Attachment 5.pdf

Extracted from the file · 144 pages · 714,321 characters

As listed on the current system

Question(s) Answered 72 (CL&P dba Eversource Energy) Date Filed: 10/11/2026