Interrogatory responses
Answers to questions 72
Files6
RRU-072_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download RRU-072_Final.pdfRead the text of RRU-072_Final.pdf
RRU-072 Attachment 1.pdf
PDF · 4.0 MB · 120 pagesText searchable
Download RRU-072 Attachment 1.pdfRead the text of RRU-072 Attachment 1.pdf
RRU-072 Attachment 2.pdf
PDF · 4.1 MB · 128 pagesText searchable
Download RRU-072 Attachment 2.pdfRead the text of RRU-072 Attachment 2.pdf
RRU-072 Attachment 3.pdf
PDF · 5.8 MB · 136 pagesText searchable
Download RRU-072 Attachment 3.pdfRead the text of RRU-072 Attachment 3.pdf
RRU-072 Attachment 4.pdf
PDF · 17 MB · 144 pagesText searchable
Download RRU-072 Attachment 4.pdfRead the text of RRU-072 Attachment 4.pdf
RRU-072 Attachment 5.pdf
PDF · 3.8 MB · 144 pagesText searchable
Download RRU-072 Attachment 5.pdfRead the text of RRU-072 Attachment 5.pdf
Text of RRU-072 Attachment 3.pdf
Extracted from the file · 136 pages · 685,965 characters
Page 52 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 52 of 144 costs have no impact on earnings. Increases or decreases in energy supply retail rates result in corresponding fluctuations in both energy supply procurement revenues and purchased power or purchased natural gas expenses on the statements of income. The electric and natural gas distribution companies also recover certain other costs from customers in retail rates on a fully reconciling basis through regulatory commission-approved cost tracking mechanisms and therefore, recovery of these costs has no impact on earnings. Costs recovered through cost tracking mechanisms include, among others, state mandated energy purchase agreements and other energy-related costs, electric retail transmission charges, energy efficiency program costs, electric restructuring and stranded cost recovery revenues (including securitized RRB charges), certain capital tracking mechanisms for infrastructure improvements, and additionally for the Massachusetts utilities, pension and PBOP benefits, net metering for distributed generation, and solar-related programs. The reconciliation filings compare the total actual costs allowed to revenue requirements related to these services and the difference between the costs incurred (or the rate recovery allowed) and the actual costs allowed is deferred and included, to be either recovered or refunded, in future customer rates. These cost tracking mechanisms also include certain incentives earned, return on capital tracking mechanisms, and carrying charges that are billed in rates to customers, which do impact earnings. Connecticut: CL&P Performance Based Rate Making: On May 26, 2021, in accordance with an October 2020 Connecticut law, PURA opened a proceeding to begin to evaluate and eventually implement performance-based regulation (PBR) for electric distribution companies. PURA is conducting the proceeding in two phases. On January 25, 2023, PURA staff issued a proposal outlining a suggested portfolio of PBR elements for further exploration and potential implementation in the second phase of the proceeding. On April 26, 2023, PURA issued a final decision on the first phase and identified various objectives to guide PBR development and evaluate adoption of a PBR framework. The decision commenced Phase 2 by initiating three reopener dockets focused on revenue adjustment mechanisms, performance metrics and integrated distribution system planning with final decisions expected in 2025. On November 16, 2023, PURA issued a straw proposal in the first reopener that focused on revenue adjustment mechanisms. The proposal outlines potential additions and reforms to the current revenue adjustment mechanisms, such as multi-year rate plans, earnings sharing mechanisms and the revenue decoupling mechanism. On March 14, 2024, PURA issued a straw proposal in the second reopener docket which concentrates on performance mechanisms in a PBR framework. The proposal suggests the development of performance incentive mechanisms, reported metrics and scorecards. These straw proposals are not authoritative and additional technical sessions, hearings and testimony will continue prior to a final decision, which will not be applied until the time of CL&P’s next distribution rate case. PURA is expected to issue updated straw proposals in the first and second reopener dockets in the first quarter of 2025. We continue to monitor developments in this proceeding, and at this time, we cannot predict the ultimate outcome of this proceeding and the resulting impact to CL&P. CL&P Storm Filings: On March 28, 2024, PURA established a prudency review proceeding for the purpose of receiving and reviewing evidence of the costs reported by CL&P in response to catastrophic storms and pre-staging events totaling approximately $634 million that occurred between January 1, 2018 and December 31, 2021. PURA established a partial procedural schedule with hearings scheduled in the third quarter of 2025. On December 31, 2024, CL&P filed a supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for nine additional catastrophic storms and two additional pre-staging events for the period January 1, 2022 through January 31, 2023 totaling approximately $173 million. Although we cannot predict the ultimate outcome of this matter, we continue to believe these deferred storm restoration costs were prudently incurred and are probable of recovery. CL&P RAM Filing: On April 17, 2024, PURA issued an interim decision in CL&P’s Rate Adjustment Mechanisms (RAM) filing and approved rates for six RAM components, with rates effective July 1, 2024 through April 30, 2025. The rate approvals include the recovery of NBFMCC and SBC net underrecoveries as of December 31, 2023 of $264.9 million and $86.2 million, respectively, and the recovery of expected net costs of $388.5 million for the NBFMCC and $254.4 million for the SBC for the period July 1, 2024 through April 30, 2025. The NBFMCC rate adjustment is primarily driven by long-term nuclear power purchase agreements required by state policy (Millstone and Seabrook) and the SBC rate adjustment is primarily driven by costs associated with accounts receivable hardship customer protection and the new low-income discount rate effective December 2023. On August 14, 2024, PURA issued a final decision that approved a further adjustment to the NBFMCC rate to include the recovery of incurred and deferred electric vehicle program costs from 2021 through May 31, 2024 of $44.4 million and expected electric vehicle program costs from June 1, 2024 through December 31, 2024 of $24.3 million. The $44.4 million, plus $5.4 million in carrying costs, will be recovered over a 20-month period of September 1, 2024 through April 30, 2026, and the $24.3 million will be recovered over an eight-month period of September 1, 2024 through April 30, 2025. In addition, PURA approved an incremental $3.5 million of 2024 Innovative Energy Solutions program costs and $1.5 million of Connecticut Green Bank program costs over an eight-month period of September 1, 2024 through April 30, 2025. These amounts are included in the “Public Benefits” portion of the customer bills in Connecticut. CL&P Advanced Metering Infrastructure Filing: On January 3, 2024, PURA issued a final decision regarding CL&P’s Advanced Metering Infrastructure (AMI) investment and implementation plan, which CL&P estimated at $766.4 million for capital costs and operating expenses. In CL&P’s view, the final decision does not provide a reasonable path for cost recovery and delays implementation by at least a year during the pendency of the cost recovery proceeding. In addition, in CL&P’s view, the final decision modifies the prudence standard for recovery of costs expended on the project, improperly linking recovery to outcomes not known at the outset of the project. On January 18, 2024, CL&P submitted a motion for reconsideration to PURA, asking that the agency modify these aspects of the decision, which PURA subsequently denied on February 14, 2024. On March 6, 2024, CL&P filed written comments citing four major problems associated with PURA’s guidelines for recovery of the costs of AMI implementation, which if not addressed, represent obstacles to AMI implementation in Connecticut. On April 16, 2024, PURA issued a procedural order directing Eversource and inviting all parties and intervenors to submit pre-filed testimony pertaining to AMI by May 14, 2024, and rebuttal testimony by May 29, 2024. CL&P witnesses filed testimony, including an updated estimate of $855 million for capital costs and operating expenses, and then subsequently participated in the AMI cost recovery hearing on June 6, 2024. 40Page 53 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 53 of 144 On October 17, 2024, PURA issued a proposed final decision on recovery of the costs for AMI implementation. Written exceptions to the proposed final decision were filed on October 31, 2024, and oral arguments were presented on November 7, 2024. CL&P’s written exceptions focused on three main aspects of the proposed decision, which include (1) clarifying the prudence standard to be used in evaluating AMI investments, (2) timing of prudency reviews, and (3) cost recovery related to incremental O&M expenses. On December 4, 2024, PURA issued a final decision on the recovery of costs for AMI implementation. On December 9, 2024, CL&P filed a petition for reconsideration because PURA had not fully resolved the issues CL&P raised in its October 31, 2024 written exceptions. On January 3, 2025, PURA stated it will evaluate the merits of CL&P’s petition for reconsideration. Under state law, PURA is expected to issue its decision within 90 days of January 3, 2025. Yankee Gas Distribution Rate Case: On November 12, 2024, Yankee Gas filed an application with PURA to amend its existing distribution rates for effect on November 1, 2025. Yankee Gas’s rate application requested approval of a distribution rate increase of $209 million, which included a base distribution rate increase of $274 million, partially offset by a reduction of $65 million in the combined Gas System Improvements and System Expansion Reconciliation rates. In addition, Yankee Gas requested approval to implement a rate credit of $37.4 million to offset the PGA rate for non-firm margin credits over one year beginning November 1, 2025. As part of the rate case, Yankee Gas proposed to implement a multiyear performance-based rate making plan with a four-year initial term from November 1, 2025 to October 31, 2029 that would adjust rates annually and includes performance metrics. A final decision by PURA is expected in October 2025. Aquarion Water Company of Connecticut Distribution Rate Case: On August 29, 2022, Aquarion Water Company of Connecticut (AWC-CT) filed an application with PURA to amend its existing rate schedules to address an operating revenue deficiency. AWC-CT’s rate application requested approval of rate increases of $27.5 million, an additional $13.6 million, and an additional $8.8 million, effective March 15, 2023, 2024, and 2025, respectively. On March 15, 2023, PURA issued a final decision that rejected this request. In this decision, PURA ordered a decrease to total authorized revenues of $4.0 million effective March 15, 2023. The decision allows an authorized regulatory ROE of 8.70 percent. On March 30, 2023, AWC-CT filed an appeal on the decision and requested a stay of the decision with the State of Connecticut Superior Court. On April 5, 2023, the Court temporarily granted AWC-CT’s request to stay and on May 25, 2023 granted a permanent stay of certain orders affecting base rates, which would keep existing rates in place until the appeal is completed. The stay included the condition that AWC-CT place any revenue received from customers above the rates and amounts authorized in the March 15, 2023 decision in a separate, interest bearing account until further order. On March 25, 2024, the State of Connecticut Superior Court issued a decision on the appeal which dismissed nine, remanded back to PURA two, and partially remanded one of AWC-CT’s twelve claims of error in its appeal. On March 28, 2024, AWC-CT filed an appeal of the Connecticut Superior Court decision to the Connecticut Appellate Court, and that appeal was subsequently transferred to the Connecticut Supreme Court for review. A ruling on the appeal is pending. On April 18, 2024, PURA initiated a docket to address the matters on remand. On July 31, 2024, PURA issued a final decision in this docket and increased AWC-CT’s approved revenue requirement by $0.1 million above the amount authorized in the March 15, 2023 decision. Rates went into effect on July 31, 2024. On September 13, 2024, AWC-CT filed an appeal of PURA’s July 31, 2024 final decision to the Connecticut Superior Court. A ruling on the appeal is pending. As a result of the State of Connecticut Superior Court’s March 2024 decision on the appeal, AWC-CT recorded the impacts of the PURA rate case decision from the effective date of the order on March 15, 2023 through December 31, 2024. The impacts primarily include a reduction to depreciation expense to reflect lower depreciation rates ordered by PURA in its final decision, partially offset by lower authorized revenues. These adjustments resulted in an after-tax benefit of $11.6 million in 2024. Massachusetts: NSTAR Electric Distribution Rates: NSTAR Electric’s PBR mechanism allows for an annual adjustment to base distribution rates for inflation, exogenous events and future capital additions based on a historical five-year average of total capital additions. On September 16, 2024, NSTAR Electric submitted its annual PBR Adjustment filing for a $55.8 million increase to base distribution rates, for effect on January 1, 2025. The requested base distribution rate increase is comprised of a $35.3 million inflation-based adjustment and a $20.5 million adjustment for capital additions based on the difference between the historical five-year average of total capital additions and the base capital revenue requirement. On December 23, 2024, the DPU approved this filing. NSTAR Electric CIP Filing: On December 30, 2022, the DPU approved a provisional system planning tariff for the recovery of costs associated with a capital investment project (CIP) proposal submitted by NSTAR Electric for one of six geographic study areas in its service territory in accordance with DPU’s directives. The DPU established a new, provisional framework for planning and funding upgrades to the electric power system to foster development and interconnection of distributed energy facilities. Under the DPU program, NSTAR Electric has filed infrastructure upgrade proposals to be built within a four-year construction timeframe that allocate the costs of interconnection upgrades between the interconnecting distributed generation facility and distribution customers based on a technical analysis of capacity benefits. Payments made by the distributed generation facility will be applied against the total capital investment made by NSTAR Electric and NSTAR Electric will earn a return on the net investment. The amount allocated to distribution customers will be recovered through a reconciling mechanism, the Provisional System Planning Tariff. The DPU approved the first of these provisional system planning projects, the Marion-Fairhaven group study area, which will enable 141 MW of distributed energy resources (DER) to be interconnected at a total estimated cost of $120 million. Of the total $120 million, $66 million will be allocated to distribution customers, once the enabled distributed energy facilities capacity is fully subscribed by distributed energy facilities interconnecting customers. Additionally, NSTAR Electric will proceed with construction of approximately $54 million of transmission upgrades necessary to improve local reliability and integrate distribution energy resources in the Marion-Fairhaven area and recover the amount through local transmission rates. 41Page 54 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 54 of 144 On June 4, 2024, the DPU approved four of the remaining five CIPs that were originally submitted by NSTAR Electric. These included the Plainfield-Blandford CIP, which will enable 40 MW of DER to be interconnected at a total estimated distribution investment of $37 million, the Dartmouth-Westport CIP which enables 60 MW of DER for a total distribution investment of $58 million, the Plymouth CIP which enables 380 MW of DER for a total distribution investment of $152 million and the Cape Cod CIP which enables 296 MW of DER for a total distribution investment of $170 million. Of the total $417 million for these four recently approved CIPs, $183 million will be allocated to distribution customers, once the enabled distributed energy facilities capacity is fully subscribed by distributed energy facilities interconnecting customers. Additionally, NSTAR Electric will proceed with construction of approximately $64 million of transmission upgrades necessary to improve local reliability and integrate distribution energy resources in the four CIP areas and recover the amount through local transmission rates. On January 27, 2025, NSTAR Electric filed a petition with the DPU to withdraw the sixth CIP project, Freetown, that was originally submitted. NSTAR Electric’s Electric Sector Modernization Plan (ESMP) Filing: On January 29, 2024, in accordance with Massachusetts state law, NSTAR Electric filed its ESMP with the DPU. The law required each electric distribution company to develop and file a comprehensive distribution system plan to proactively upgrade the distribution system (and, where applicable, the associated transmission system) to: (i) improve grid reliability, communications and resiliency; (ii) enable increased, timely adoption of renewable energy and distributed energy resources; (iii) promote energy storage and electrification technologies necessary to decarbonize the environment and economy; (iv) prepare for future climatedriven impacts on the transmission and distribution systems; (v) accommodate increased transportation electrification, increased building electrification and other potential future demands on distribution and, where applicable, the transmission system; and (vi) minimize or mitigate impacts on Massachusetts ratepayers, thereby helping the state realize its statewide greenhouse gas emissions limits and sublimits under the law. NSTAR Electric’s plan meets these requirements by providing a comprehensive view of all the investments required to build a safer, more reliable, more resilient electric distribution system to enable an affordable, equitable clean energy transition taking into account the needs of environmental justice communities. For the five-year period from 2025 through 2029, the proposed incremental distribution capital investment is $608 million and the incremental distribution expense amount is $211 million. On August 29, 2024, the DPU approved the overall ESMP for a five-year period commencing July 1, 2025. On November 21, 2024, the DPU opened a second phase of the proceeding to consider a short-term ESMP-focused cost recovery mechanism and metrics. In issuing the notice of proceeding, the DPU limited the review of investment in this docket and excluded NSTAR Electric’s ESMP proposals regarding the EV Phase II extension, low and moderate income solar and the new CIPs. These investments will be reviewed in separate proceedings. This reduced the amount of company-proposed incremental capital investment to $295 million and the incremental expense to $44 million related to resiliency and grid modernization. NSTAR Electric filed its proposed tariff and testimony on December 18, 2024, and is currently in the discovery process, which will be followed by hearings and briefing with completion of the proceeding and final orders expected prior to the start of the plan in July 2025. NSTAR Gas Distribution Rates: NSTAR Gas’ PBR mechanism allows for an annual adjustment to base distribution rates for inflation and exogenous events. On September 16, 2024, NSTAR Gas submitted its annual PBR Adjustment filing for a $12.7 million increase to base distribution rates for effect on November 1, 2024. On October 30, 2024, the DPU approved this filing. EGMA Distribution Rates: On November 4, 2024, EGMA submitted a revised filing for its first rate base reset for rates to be effective November 1, 2024, in accordance with an October 7, 2020 EGMA Rate Settlement Agreement approved by the DPU. The compliance filing was ordered by the DPU on October 31, 2024. The rate base reset occurring on November 1, 2024 adjusted distribution rates to account for capital additions (including the roll-in of GSEP capital additions), depreciation expense, property taxes, and return on rate base for capital additions placed into service through December 31, 2023. The total revenue requirement calculated for the first rate base reset is an increase to base distribution rates of $147.8 million, of which $34.0 million is associated with GSEP investments through December 31, 2023. Under the terms of the Rate Settlement Agreement, EGMA applied a cap on the revenue change effective November 1, 2024, and the amount in excess of the cap will be deferred for recovery through the Local Distribution Adjustment Clause (LDAC) on May 1, 2025, including carrying charges. After adjusting for the cap, the increase to base distribution rates is $85.6 million effective November 1, 2024 (of which $8.8 million is offset by a reduction in the GSEP revenue requirement and GSEP rate also taking effect on November 1, 2024 for a net distribution rate change on November 1, 2024 of $76.8 million). Base distribution rates will be increased effective November 1, 2025 to incorporate the $62.2 million remaining revenue requirement. On November 7, 2024, the DPU approved this filing. Future of Gas Docket: In October 2020, the DPU opened Docket “DPU 20-80 The Future of Gas” to examine the role of Massachusetts natural gas local distribution companies (LDCs) in helping to meet the state’s 2050 climate goals. In December 2023, the DPU issued an order for this docket. The DPU will consider and, in some cases, require new processes and analysis for traditional natural gas investments, which may require significant changes to the LDC planning process and business models. The DPU intends to put policies and structures in place that would protect customers as Massachusetts works to decarbonize the building sector, which may involve subsequent dockets and regulatory proceedings and potentially recasting the role of LDCs in Massachusetts. The DPU preserved customer choice for energy needs and encouraged further development of decarbonized alternatives, such as the networked geothermal systems that NSTAR Gas is piloting in Framingham, Massachusetts. On December 29, 2023, Eversource and other LDCs sought formal clarity from the DPU to fully understand the resulting impact to their natural gas businesses and the associated timing of any impacts. On April 2, 2024, the DPU issued an order responding to the request for clarification indicating that the LDCs shall implement the inclusion of a Non-Gas Pipeline Alternatives (NPA) analysis on all project authorizations effective immediately. Existing NPA analysis processes will be used until such time a formal stakeholder-based NPA analysis framework is established and approved by the DPU. Eversource, along with the other LDCs, have engaged a consultant to inform the development of the required NPA framework by conducting a stakeholder engagement process as mandated by the order. Another component of the order is the submission of climate compliance plans every five years beginning April 1, 2025. The climate compliance plan filings will include the NPA frameworks, along with energy transitions plans including details on the management of embedded infrastructure investments and cost recovery. Eversource along with the LDCs, have also contracted a consultant to model and investigate statewide cost recovery scenarios including under accelerated depreciation rates. 42Page 55 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 55 of 144 The DPU also indicated that NSTAR Gas and EGMA are not required to provide climate compliance performance metrics in the next PBR filing, however would be expected to propose metrics at the latest in the next base distribution rate proceeding. GHG emissions reporting was not changed from the order, however, effective November of 2024, reporting requirements have changed per the MA DEP and these requirements implement registration and GHG emissions reporting requirements for companies selling and distributing heating fuels to homes and businesses in Massachusetts, including suppliers of natural gas, fuel oil, and propane, and implement a reporting requirement for fuel storage facilities. Eversource does not believe there is any indication of an inability to recover costs or risk of impairment of NSTAR Gas’ and EGMA’s natural gas assets at this time. New Hampshire: PSNH Distribution Rate Case: On June 11, 2024, PSNH filed an application with the NHPUC for approval of a temporary annual base distribution rate increase. On July 31, 2024, the NHPUC approved a settlement agreement that was reached by PSNH, New Hampshire Department of Energy, and the Office of the Consumer Advocate to implement a temporary annual base distribution rate increase of $61.2 million effective August 1, 2024. Also on June 11, 2024, PSNH filed an application with the NHPUC to request an increase in permanent base distribution rates of $181.9 million, which is inclusive of the temporary rate increase, and proposed to take effect August 1, 2025. The temporary rates are subject to reconciliation based on the outcome of the permanent rate case back to the date when temporary rates took effect. The permanent rate increase request includes $247 million in unrecovered storm costs to be recovered over a five-year period. As part of the rate case, PSNH proposed to implement a performance-based rate making plan that would adjust rates annually over a four-year term, with a commitment to not file another rate case for at least four years. The plan includes a revenue-cap formula adjusted for inflation, a supplemental capital adjustment formula to support PSNH’s planned capital infrastructure improvements, an exogenous events recovery mechanism, performance metrics and an earnings sharing mechanism, among others. If the NHPUC approves the performance-based rate making plan as proposed, the previously established RRA and PPAM rate reconciling mechanisms and lost base revenues will be eliminated. The NHPUC is permitted up to twelve months to investigate the proposed rates and issue a final order. A decision by the NHPUC on permanent rates is expected by August 1, 2025. Legislative and Policy Matters Federal: On April 10, 2024, the U.S. Environmental Protection Agency announced the final regulation setting drinking water standards for six per- and polyfluoroalkyl substances (PFAS) compounds. The regulation requires compliance under a phased approach in which systems will need to complete the initial monitoring requirements for each PFAS within three years, and when warranted, take steps to assure compliance within five years. Beginning in 2027, systems will need to report results of initial monitoring and regular monitoring and issue public notifications for any monitoring and reporting violations. Starting in 2029, systems must comply with all maximum contaminant levels (MCL) and provide public notification for MCL violations. Eversource is currently evaluating the impacts to comply with the regulation for its water business. Critical Accounting Policies The preparation of financial statements in conformity with GAAP requires management to make estimates, assumptions and, at times, difficult, subjective or complex judgments. Changes in these estimates, assumptions and judgments, in and of themselves, could materially impact our financial position, results of operations or cash flows. Our management discusses with the Audit Committee of our Board of Trustees significant matters relating to critical accounting policies. Our critical accounting policies are discussed below. See the combined notes to our financial statements for further information concerning the accounting policies, estimates and assumptions used in the preparation of our financial statements. Regulatory Accounting: Our regulated companies are subject to rate regulation that is based on cost recovery and meets the criteria for application of accounting guidance for rate-regulated operations, which considers the effect of regulation on the timing of the recognition of certain revenues and expenses. The regulated companies' financial statements reflect the effects of the rate-making process. The rates charged to the customers of our regulated companies are designed to collect each company's costs to provide service, plus a return on investment. We believe that the operations of each of our regulated companies currently satisfy the criteria for application of regulatory accounting. If events or circumstances should change in a future period so that those criteria are no longer satisfied, we would be required to eliminate any associated regulatory assets and liabilities and the impact would be recognized in the statement of income and may result in a material adverse effect on results of operations and financial condition. The application of accounting guidance for rate-regulated enterprises results in recording regulatory assets and liabilities. Regulatory assets represent the deferral of incurred costs that are probable of future recovery in customer rates. Regulatory assets are amortized as the incurred costs are recovered through customer rates. In some cases, we record regulatory assets before approval for recovery has been received from the applicable regulatory commission. We must use judgment to conclude that costs deferred as regulatory assets are probable of future recovery. We base our conclusion on certain factors, including, but not limited to, regulatory precedent. Regulatory liabilities represent either revenues received from customers to fund expected costs that have not yet been incurred or probable future refunds to customers. We make judgments regarding the future outcome of regulatory proceedings that involve potential future refund to customers and record liabilities for these loss contingencies when probable and reasonably estimable based upon available information. Regulatory liabilities are recorded at the best estimate, or at a low end of the range of possible loss. The amount recorded may differ from when the uncertainty is resolved. Such differences could have a significant impact on our financial statements. 43Page 56 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 56 of 144 We continually assess whether the regulatory assets and liabilities continue to meet the criteria for probable future recovery or refund. This assessment includes consideration of recent orders issued by regulatory commissions, the passage of new legislation, historical regulatory treatment for similar costs in each of our jurisdictions, discussions with legal counsel, the status of any appeals of regulatory decisions, and changes in applicable regulatory and political environments. We believe that we will continue to be able to defer and recover prudently incurred costs, including additional storm costs, based on the legal and regulatory framework. We use judgment when recording regulatory assets and liabilities; however, regulatory commissions can reach different conclusions about the recovery of costs, and those conclusions could have a material impact on our financial statements. The ultimate outcome of regulatory rate proceedings could have a significant effect on our ability to recover costs or earn an adequate return. Established rates are also often subject to subsequent prudency reviews by state regulators, whereby various portions of rates could be adjusted, subject to refund or disallowed. Storm restoration and pre-staging costs are subject to prudency reviews from our regulators. We have $2.10 billion of deferred storm costs that either have yet to be filed with the applicable regulatory commission, are pending regulatory approval, or are subject to prudency review as of December 31, 2024. Tropical Storm Isaias in August 2020 resulted in deferred storm restoration costs of approximately $232 million at CL&P as of December 31, 2024. While it is possible that some amount of the Tropical Storm Isaias costs may be disallowed by PURA, any such amount cannot be estimated at this time. We believe that our storm restoration costs were prudently incurred, meet the criteria for cost recovery and are probable of recovery. We believe it is probable that each of our regulated companies will recover its respective investments in long-lived assets and the regulatory assets that have been recorded. If we determine that we can no longer apply the accounting guidance applicable to rate-regulated enterprises, or that we cannot conclude it is probable that costs will be recovered from customers in future rates, the applicable costs would be charged to net income in the period in which the determination is made. Pension, SERP and PBOP: We sponsor Pension, SERP and PBOP Plans to provide retirement benefits to our employees. Plan assets and the benefit obligation are presented on a net basis and we recognize the overfunded or underfunded status of the plans as an asset or liability on the balance sheet. These amounts are remeasured annually using a December 31st measurement date. For each of these plans, several significant assumptions are used to determine the projected benefit obligation, funded status, and net periodic benefit expense/income. These assumptions include the expected long-term rate of return on plan assets, discount rate, compensation/progression rate, cash balance interest crediting rate and mortality and retirement assumptions. We evaluate these assumptions annually and adjust them as necessary. Changes in these assumptions could have a material impact on our financial position, results of operations or cash flows. Expected Long-Term Rate of Return on Plan Assets Assumption: In developing the expected long-term rate of return, we consider historical and expected returns, as well as input from our consultants. Our expected long-term rate of return on assets is based on assumptions regarding target asset allocations and corresponding expected rates of return for each asset class. We routinely review the actual asset allocations and periodically rebalance the investments to the targeted asset allocations. For the year ended December 31, 2024, our expected long-term rate-of-return assumption used to determine our pension and PBOP expense was 8.25 percent for the Eversource Service Pension and PBOP plans. For the forecasted 2025 pension and PBOP expense, an expected long-term rate of return of 8.25 percent for the Eversource Service Pension and PBOP plans will be used reflecting our target asset allocations. Discount Rate Assumptions: Payment obligations related to the Pension, SERP and PBOP Plans are discounted at interest rates applicable to the expected timing of each plan's cash flows. The discount rate that was utilized in determining the pension, SERP and PBOP obligations was based on a yield-curve approach. This approach utilizes a population of bonds with an average rating of AA based on bond ratings by Moody's, S&P and Fitch, and uses bonds with above median yields within that population. As of December 31, 2024, the discount rates used to determine the funded status were within a range of 5.6 percent to 5.7 percent for the Pension and SERP Plans, and 5.7 percent for the PBOP Plans. As of December 31, 2023, the discount rates used were within a range of 4.9 percent to 5.0 percent for the Pension and SERP Plans, and 5.0 percent to 5.2 percent for the PBOP Plans. The increase in the discount rates used to calculate the funded status resulted in a decrease to the Pension and SERP Plans’ projected benefit obligation of $332.9 million and a decrease to the PBOP Plans' projected benefit obligation of $39.8 million as of December 31, 2024. The Company uses the spot rate methodology for the service and interest cost components of Pension, SERP and PBOP expense because it provides a relatively precise measurement by matching projected cash flows to the corresponding spot rates on the yield curve. The discount rates used to estimate the 2024 expense were within a range of 4.7 percent to 5.1 percent for the Pension and SERP Plans, and within a range of 4.9 percent to 5.2 percent for the PBOP Plans. Mortality Assumptions: Assumptions as to mortality of the participants in our Pension, SERP and PBOP Plans are a key estimate in measuring the expected payments a participant may receive over their lifetime and the corresponding plan liability we need to record. The mortality assumption is composed of a base table that represents the current expectation of life expectancy of the population adjusted by an improvement scale that attempts to anticipate future improvements in life expectancy. In 2024, our mortality assumption utilized the Society of Actuaries base mortality tables (Pri-2012), adjusted to reflect Eversource’s own mortality experience, and projected generationally using the MP-2021 improvement scale. Compensation/Progression Rate Assumptions: This assumption reflects the expected long-term salary growth rate, including consideration of the levels of increases built into collective bargaining agreements, and impacts the estimated benefits that Pension and SERP Plan participants will receive in the future. As of December 31, 2024 and 2023, the compensation/progression rates used to determine the Pension and SERP Plan funded status were within a range of 3.5 percent to 4.0 percent. Health Care Cost Assumptions: The Eversource Service PBOP Plan is not subject to health care cost trends. As of December 31, 2024, for the Aquarion PBOP Plan, the health care trend rate used to determine the funded status for pre-65 retirees is 7.5 percent, with an ultimate rate of 5 percent in 2035, and for post-65 retirees, the health care trend rate and ultimate rate is 3.5 percent. 44Page 57 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 57 of 144 Cash Balance Interest Crediting Rate Assumption: The Cash Balance Pension Plan is a new, additional obligation of the existing Pension Plan and the liability will begin to accrue benefits upon the effective date of January 1, 2025. The cash balance interest crediting rate assumption represents the long-term rate by which the Pension Plan’s cash balance accounts are expected to grow. Actual interest on the cash balance accounts is based on the 30-year U.S. Treasury securities rate in effect for September of the preceding year, with a minimum rate of 4 percent. The cash balance interest crediting rate assumption used in determining the forecasted 2025 pension expense was 4.8 percent. Actuarial Gains and Losses: Actuarial gains and losses represent the differences between actuarial assumptions and actual information or updated assumptions. Unamortized actuarial gains or losses arising at the December 31st measurement date are primarily from differences in actual investment performance compared to our expected return and changes in the discount rate assumption. The Eversource Service Pension and PBOP Plans use the corridor approach to determine the amount of gain or loss to amortize into net periodic benefit expense/income. The corridor approach defers all actuarial gains and losses arising at remeasurement and the net unrecognized actuarial gain or loss balance is amortized as a component of expense if, as of the beginning of the year, that net gain or loss exceeds 10 percent of the greater of the market value of the plan’s assets or the projected benefit obligation. The amount of net unrecognized actuarial gain or loss in excess of the 10 percent corridor is amortized to expense over the estimated average future employee service period. For the Eversource Service Pension Plan, the net actuarial gain or loss is amortized as a component of expense over the estimated average future employee service period of eleven years. For the Eversource Service PBOP Plan, the net unrecognized actuarial gain or loss was within the 10 percent corridor and therefore there was no amortization to expense during 2024. A decrease in the discount rate used to determine our pension funded status would increase our projected benefit obligation at December 31st, resulting in a higher unamortized actuarial loss to be recognized in future years’ pension expense, subject to exceeding the 10 percent corridor. A decrease in the discount rate at December 31st would also result in a decrease in the interest cost component and an increase in the service cost component of the subsequent year’s benefit plan expense. The calculated expected return on plan assets is compared to the actual return or loss on plan assets at the end of each year to determine the investment gains or losses to be immediately reflected in unamortized actuarial gains and losses. An underperformance of our pension plan investment returns relative to the expected returns would increase our pension liability at December 31st, resulting in a higher unamortized actuarial loss to be recognized in future years’ pension expense, subject to exceeding the 10 percent corridor, and a lower expected return on assets component of pension expense in future years’ pension expense. Net Periodic Benefit Expense/Income: Pension, SERP and PBOP expense/income is determined by our actuaries and consists of service cost and prior service cost/credit, interest cost based on the discounting of the obligations, amortization of actuarial gains and losses, and the expected return on plan assets. For the Pension and SERP Plans, pre-tax net periodic benefit income was $76.8 million, $108.4 million and $181.6 million for the years ended December 31, 2024, 2023 and 2022, respectively. For the PBOP Plans, pre-tax net periodic benefit income was $64.3 million, $57.3 million and $79.8 million for the years ended December 31, 2024, 2023 and 2022, respectively. The change in pension, SERP and PBOP expense/income arising from the annual remeasurement does not fully impact earnings. Our Massachusetts utilities recover qualified pension and PBOP expenses related to their distribution operations through a rate reconciling mechanism that fully tracks the change in net pension and PBOP expenses each year, therefore the change in their pension and PBOP expense does not impact earnings. Our electric transmission companies' rates provide for an annual true-up of estimated to actual costs, which include pension expenses, therefore the change in their pension expense does not impact earnings. Any differences between the fixed level of PBOP expense included in our formula rate and the PBOP expense calculated in accordance with authoritative accounting guidance is accumulated as a regulatory asset or liability, and is expected, over time, to be recovered from or returned to customers. Additionally, the portion of our pension and PBOP expense that relates to company labor devoted to capital projects is capitalized on the balance sheet instead of being charged to expense. Forecasted Expense/Income and Expected Contributions: We estimate that net periodic benefit income in 2025 for the Pension and SERP Plans will be approximately $93 million and for the PBOP Plans will be approximately $69 million. The increase in pension income from 2024 to 2025 is driven primarily by lower amortization of actuarial losses, partially offset by an increase in the service cost component, both of which were due in part to the impact of the new cash balance pension plan. The increase in PBOP income from 2024 to 2025 is driven primarily by favorable expected return on assets due to a higher asset balance. For the PBOP Plans, there is no amortization of actuarial loss in 2025. Pension, SERP and PBOP expense/income for subsequent years will depend on future investment performance, changes in future discount rates and other assumptions, and various other factors related to the populations participating in the plans. Our policy is to fund the Pension Plans annually in an amount at least equal to the amount that will satisfy all federal funding requirements. Based on the current status of the Pension Plans and federal pension funding requirements, for our Eversource Service Pension Plan there is no minimum funding requirement in 2025 and we do not expect to make pension contributions in 2025. It is our policy to fund the PBOP Plans annually through tax deductible contributions to external trusts. We do not expect to make any contributions to the Eversource Service PBOP Plan in 2025. Sensitivity Analysis: The following table illustrates the hypothetical effect on reported annual net periodic benefit income as a result of a change in the following assumptions by 50 basis points: Pension Plans (excluding SERP Plans) PBOP Plans Decrease in Plan Income Decrease/(Increase) in Plan Income (Millions of Dollars) For the Years Ended December 31, For the Years Ended December 31, Eversource 2024 Lower expected long-term rate of return Lower discount rate Higher compensation rate $ 28.9 27.4 2023 $ 5.9 29.1 24.7 8.1 45 $ 2024 5.0 $ (0.5) N/A 2023 0.2 4.7 N/APage 58 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 58 of 144 Goodwill: Goodwill is recognized on our balance sheet from previous mergers and acquisitions to the extent that the consideration paid exceeded the net fair value of the identified assets and liabilities acquired in each business combination. We are required to test goodwill balances for impairment at least annually by considering the fair values of the reporting units, which requires us to use estimates and judgments. Additionally, we monitor all relevant events and circumstances during the year to determine if an interim impairment test is required. We have selected October 1st of each year as the annual goodwill impairment test date. Goodwill impairment is deemed to exist if the carrying amount of a reporting unit exceeds its estimated fair value. If goodwill were to be impaired, it would be written down in the current period to the extent of the impairment. We have identified our reporting units for purposes of allocating and testing goodwill as Electric Distribution, Electric Transmission, Natural Gas Distribution and Water Distribution. The Electric Distribution and Electric Transmission reporting units include carrying values for the respective components of CL&P, NSTAR Electric and PSNH. The Natural Gas Distribution reporting unit includes the carrying values of NSTAR Gas, Yankee Gas and EGMA. The Water Distribution reporting unit includes the Aquarion water utility businesses. As of December 31, 2024, goodwill was allocated to the reporting units as follows: $2.54 billion to Electric Distribution, $577 million to Electric Transmission, and $451 million to Natural Gas Distribution. Goodwill allocated to Water Distribution of $663 million is classified as held for sale. In assessing goodwill for impairment, an entity is permitted to first assess qualitatively whether it is more likely than not that goodwill impairment exists as of the annual impairment test date. If we perform the qualitative assessment but determine it is more likely than not that a reporting unit’s fair value is less than its carrying amount, we perform a quantitative test to compare the fair value of the reporting unit to its carrying amount, including goodwill. If the carrying amount of the reporting unit exceeds its fair value, we record an impairment loss as a reduction to goodwill and a charge to operating expenses, but the loss recognized would not exceed the total amount of goodwill allocated to the reporting unit. We performed the annual impairment assessment of goodwill as of October 1, 2024 for the Electric Distribution, Electric Transmission, Natural Gas Distribution and Water Distribution reporting units. Our qualitative assessment included an evaluation of multiple factors that impact the fair value of the reporting units, including general, macroeconomic and market conditions, and entity-specific assumptions that affect the future cash flows of the reporting units. Key considerations include discount rates, utility sector market performance and merger transaction multiples, the Company's share price and credit ratings, analyst reports, financial performance, cost and risk factors, internal estimates and projections of future cash flows and net income, long-term strategy, the timing and outcome of rate cases, and recent regulatory and legislative proceedings. In the fourth quarter of 2024, we concluded that the likely sale of Aquarion at a loss resulted in the requirement to perform an interim goodwill impairment test for Water Distribution goodwill. We compared the estimated fair value of the business from the anticipated transaction to its carrying value. Assumptions used in the valuation were the future cash flows from the sale, including the estimated income tax impacts as a result of the transaction. Based on the interim impairment test, we recorded a goodwill impairment of $297 million to write down the carrying value of the water distribution reporting unit to its estimated fair value. We did not identify any events or conditions that make it more likely than not that an impairment may have occurred at our other reporting units. For these remaining reporting units, we believe that the fair value was substantially in excess of carrying value. Adverse regulatory actions, changes in the regulatory and political environment, or changes in significant assumptions could potentially result in future goodwill impairment indicators. Long-Lived Assets: Impairment evaluations of long-lived assets, including property, plant and equipment and other assets, involve a significant degree of estimation and judgment, including identifying circumstances that indicate an impairment may exist. An impairment analysis is required when events or changes in circumstances indicate that the carrying value of a long-lived asset may not be recoverable. Indicators of potential impairment include a deteriorating business climate, unfavorable regulatory action, decline in value that is other than temporary in nature, plans to dispose of a long-lived asset significantly before the end of its useful life, and accumulation of costs that are in excess of amounts allowed for recovery. The review of long-lived assets for impairment utilizes significant assumptions about operating strategies and external developments, including assessment of current and projected market conditions that can impact future cash flows. If indicators are present for a long-lived asset or asset group, a comparison of the undiscounted expected future cash flows to the carrying value is performed. No significant impairments occurred during the year 2024. Equity Method Investments: Investments in affiliates where we have the ability to exercise significant influence, but not control, over an investee are initially recognized as an equity method investment at cost. Any differences between the cost of an investment and the amount of underlying equity in net assets of an investee are considered basis differences and are determined based upon the estimated fair values of the investee's identifiable assets and liabilities. Equity method investments are assessed for impairment when conditions exist as of the balance sheet date that indicate that the fair value of the investment may be less than book value. Eversource continually monitors and evaluates its equity method investments to determine if there are indicators of an other-than-temporary impairment. If the decline in value is considered to be other-than-temporary, the investment is written down to its estimated fair value, which establishes a new cost basis in the investment. Impairment evaluations are based on best information available at the impairment assessment date. Subsequent declines or recoveries after the reporting date are not considered in the impairment recognized. Investments that are other-than-temporarily impaired and written down to their estimated fair value cannot subsequently be written back up for increases in estimated fair value. Impairment evaluations involve a significant degree of judgment and estimation, including identifying circumstances that indicate an impairment may exist at the equity method investment level, selecting discount rates used to determine fair values, and developing an estimate of discounted future cash flows expected from investment operations or the sale of the investment. 46Page 59 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 59 of 144 During 2023, in connection with the process to divest its offshore wind business, Eversource identified indicators for impairment in both the second and fourth quarters of 2023. In each impairment assessment, Eversource evaluated its investments and determined that the carrying value of the equity method offshore wind investments exceeded the fair value of the investments and that the decline was other-than-temporary. The impairment evaluations involved judgments in developing the estimates and timing of future cash flows, including key judgments in determining the most likely outcome of the projects, the likelihood of realization of investment tax credit adders, and the likelihood of future spending amounts and cost overruns, as well as potential cancellation costs and salvage values of Sunrise Wind assets. The assumptions used in the discounted cash flow analyses were subject to inherent uncertainties and subjectivity. The use of different assumptions, estimates, or judgments with respect to the estimation of future cash flows could have materially changed the impairment charges. The impairment charges were non-cash charges and did not impact Eversource’s cash position at the time of the impairment. During 2024, Eversource sold its interest in the North East Offshore and South Fork Class B, Member LLC equity method investments and recognized an aggregate, net after-tax loss on the sale of its offshore wind investments of $524 million. Loss Contingencies: We make judgments regarding the future outcome of contingent events and record liabilities for loss contingencies that are probable and can be reasonably estimated based upon available information. The assessment of loss contingencies involves judgments and assumptions about future events. Our estimates are subject to revision in future periods based on actual costs or new information. The amount recorded may differ from the actual expense incurred when the uncertainty is resolved. Such difference would be a change in estimate and could have a significant impact on the financial statements. Upon the sales of our offshore wind investments in the third quarter of 2024, Eversource recorded a contingent liability of $365 million, reflecting its estimate of the future obligations under the GIP sale terms. Assumptions and key judgments in determining the estimated liability include the expected cost overrun sharing obligation, expected obligation to maintain GIP’s internal rate of return, and obligation for other future costs, as well as the likelihood of realization of investment tax credit adders that were included in the purchase price. The use of different assumptions, estimates, or judgments could materially impact the financial statements. New information or future developments that arise as construction progresses and as cost estimates are reviewed and revised will require a reassessment of the estimated liability for the post-closing adjustment payments. Adverse changes in facts and circumstances could result in additional losses that could be material to the financial statements. Accounting for Environmental Reserves: Environmental reserves are accrued when assessments indicate it is probable that a liability has been incurred and an amount can be reasonably estimated. Increases to estimates of environmental liabilities could have an adverse impact on earnings. We estimate these liabilities based on findings through various phases of the assessment, considering the most likely action plan from a variety of available remediation options (ranging from no action required to full site remediation and long-term monitoring), current site information from our site assessments, remediation estimates from third party engineering and remediation contractors, and our prior experience in remediating contaminated sites. If a most likely action plan cannot yet be determined, we estimate the liability based on the low end of a range of possible action plans. A significant portion of our environmental sites and reserve amounts relate to former MGP sites that were operated several decades ago and manufactured natural gas from coal and other processes, which resulted in certain by-products remaining in the environment that may pose a potential risk to human health and the environment, for which we may have potential liability. Estimates are based on the expected remediation plan. Our estimates are subject to revision in future periods based on actual costs or new information from other sources, including the level of contamination at the site, the extent of our responsibility or the extent of remediation required, recently enacted laws and regulations or a change in cost estimates. Income Taxes: Income tax expense is estimated for each of the jurisdictions in which we operate and is recorded each quarter using an estimated annualized effective tax rate. This process to record income tax expense involves estimating current and deferred income tax expense or benefit and the impact of temporary differences resulting from differing treatment of items for financial reporting and income tax return reporting purposes. Such differences are the result of timing of the deduction for expenses, as well as any impact of permanent differences, or other items that directly impact income tax expense as a result of regulatory activity (flow-through items). The temporary differences and flow-through items result in deferred tax assets and liabilities that are included in the balance sheets. We also account for uncertainty in income taxes, which applies to all income tax positions previously filed in a tax return and income tax positions expected to be taken in a future tax return that have been reflected on our balance sheets. The determination of whether a tax position meets the recognition threshold under applicable accounting guidance is based on facts and circumstances available to us. The interpretation of tax laws and associated regulations involves uncertainty since tax authorities may interpret the laws differently. Ultimate resolution or clarification of income tax matters may result in favorable or unfavorable impacts to net income and cash flows, and adjustments to tax-related assets and liabilities could be material. Significant management judgment is required in determining the provision for income taxes, primarily due to the uncertainty related to tax positions taken, as well as deferred tax assets and liabilities and valuation allowances. We evaluate the probability of realizing deferred tax assets by reviewing a forecast of future taxable income and our intent and ability to implement tax planning strategies, if necessary, to realize deferred tax assets. We also assess negative evidence, such as the expiration of historical operating loss or tax credit carryforwards, that could indicate the inability to realize the deferred tax assets. Valuation allowances are provided to reduce deferred tax assets to the amount that will more likely than not be realized in future periods. This requires management to make judgments and estimates regarding the amount and timing of the reversal of taxable temporary differences, expected future taxable income, and the impact of tax planning strategies. Actual income taxes could vary from estimated amounts due to the future impacts of various items, including future changes in income tax laws, not realizing expected tax planning strategy amounts, as well as results of audits and examinations of filed tax returns by taxing authorities. 47Page 60 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 60 of 144 Fair Value Measurements: We follow fair value measurement guidance that defines fair value as the price that would be received for the sale of an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (an exit price). We have applied this guidance to our Company's derivative contracts that are not elected or designated as "normal purchases” or “normal sales,” to marketable securities held in trusts, and to our investments in our Pension and PBOP Plans. Fair value measurements are also incorporated into the accounting for goodwill, long-lived assets, equity method investments, AROs, and in the valuation of business combinations and asset acquisitions. The fair value measurement guidance was also applied in estimating the fair value of preferred stock, long-term debt and RRBs. Changes in fair value of our derivative contracts are recorded as Regulatory Assets or Liabilities, as we recover the costs of these contracts in rates charged to customers. These valuations are sensitive to the prices of energy-related products in future years and assumptions made. We use quoted market prices when available to determine the fair value of financial instruments. When quoted prices in active markets for the same or similar instruments are not available, we value derivative contracts using models that incorporate both observable and unobservable inputs. Discounted cash flow valuations incorporate estimates of premiums or discounts, reflecting risk-adjusted profit that would be required by a market participant to arrive at an exit price, using available historical market transaction information. Valuations of derivative contracts also reflect our estimates of nonperformance risk, including credit risk. 48Page 61 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 4 Page 61 of 144 RESULTS OF OPERATIONS – EVERSOURCE ENERGY AND SUBSIDIARIES The following provides the amounts and variances in operating revenues and expense line items in the statements of income for Eversource for the years ended December 31, 2024 and 2023 included in this Annual Report on Form 10-K: For the Years Ended December 31, 2024 (Millions of Dollars) Operating Revenues $ 2023 11,900.8 $ Increase/(Decrease) 11,910.7 $ (9.9) Operating Expenses: Purchased Power, Purchased Natural Gas and Transmission 3,736.1 5,168.2 (1,432.1) Operations and Maintenance 2,012.9 1,895.7 117.2 Depreciation 1,433.5 1,305.8 127.7 Amortization 342.9 (490.1) 833.0 Energy Efficiency Programs 671.8 691.4 (19.6) Taxes Other Than Income Taxes 997.9 940.4 57.5 Loss on Pending Sale of Aquarion 297.0 — 297.0 (19.3) 9,492.1 9,511.4 Operating Income Total Operating Expenses 2,408.7 2,399.3 9.4 Interest Expense 1,111.3 855.4 255.9 Losses on Offshore Wind Investments 464.0 2,167.0 (1,703.0) Other Income, Net 410.5 348.1 62.4 1,243.9 (275.0) 1,518.9 Income/(Loss) Before Income Tax Expense Income Tax Expense 424.7 159.7 265.0 Net Income/(Loss) 819.2 (434.7) 1,253.9 Net Income Attributable to Noncontrolling Interests 7.5 Net Income/(Loss) Attributable to Common Shareholders $ 811.7 7.5 $ — (442.2) $ 1,253.9 Operating Revenues Sales Volumes: A summary of our retail electric GWh sales volumes, our firm natural gas MMcf sales volumes, and our water MG sales volumes, and percentage changes, is as follows: Electric Sales Volumes (GWh) 2024 2023 Firm Natural Gas Sales Volumes (MMcf) Percentage Increase 2024 2023 Water Percentage Increase Sales Volumes (MG) 2024 2023 Percentage Increase Traditional 7,807 7,590 2.9 % — — —% 1,669 1,488 12.2 % Decoupled 43,516 41,978 3.7 % 147,293 142,328 3.5 % 24,308 23,129 5.1 % Total Sales Volumes 51,323 49,568 3.5 % 147,293 142,328 3.5 % 25,977 24,617 5.5 % Weather, fluctuations in energy supply rates, conservation measures (including utility-sponsored energy efficiency programs), and economic conditions affect customer energy usage and water consumption. Industrial sales volumes are less sensitive to temperature variations than residential and commercial sales volumes. In our service territories, weather impacts both electric and water sales volumes during the summer and both electric and natural gas sales volumes during the winter; however, natural gas sales volumes are more sensitive to temperature variations than electric sales volumes. Customer heating or cooling usage may not directly correlate with historical levels or with the level of degree-days that occur. Fluctuations in retail electric sales volumes at PSNH impact earnings ("Traditional" in the table above). For CL&P, NSTAR Electric, NSTAR Gas, EGMA, Yankee Gas, and our Connecticut water distribution business, fluctuations in retail sales volumes do not materially impact earnings due to their respective regulatory commission-approved distribution revenue decoupling mechanisms ("Decoupled" in the table above). These distribution revenues are decoupled from their customer sales volumes, which breaks the relationship between sales volumes and revenues recognized. Operating Revenues: The variance in Operating Revenues by segment in 2024, as compared to 2023, is as follows: Increase/(Decrease) (Millions of Dollars) Electric Distribution $ 93.0 Natural Gas Distribution (117.8) Electric Transmission 205.1 Water Distribution (3.2) Other 64.7 Eliminations Total Operating Revenues (251.7) $ (9.9) 49
Text of RRU-072 Attachment 5.pdf
Extracted from the file · 144 pages · 714,321 characters
As listed on the current system
Question(s) Answered 72 (CL&P dba Eversource Energy) Date Filed: 10/11/2026