Interrogatory responses
Answers to questions 72
Files6
RRU-072_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download RRU-072_Final.pdfRead the text of RRU-072_Final.pdf
RRU-072 Attachment 1.pdf
PDF · 4.0 MB · 120 pagesText searchable
Download RRU-072 Attachment 1.pdfRead the text of RRU-072 Attachment 1.pdf
RRU-072 Attachment 2.pdf
PDF · 4.1 MB · 128 pagesText searchable
Download RRU-072 Attachment 2.pdfRead the text of RRU-072 Attachment 2.pdf
RRU-072 Attachment 3.pdf
PDF · 5.8 MB · 136 pagesText searchable
Download RRU-072 Attachment 3.pdfRead the text of RRU-072 Attachment 3.pdf
RRU-072 Attachment 4.pdf
PDF · 17 MB · 144 pagesText searchable
Download RRU-072 Attachment 4.pdfRead the text of RRU-072 Attachment 4.pdf
RRU-072 Attachment 5.pdf
PDF · 3.8 MB · 144 pagesText searchable
Download RRU-072 Attachment 5.pdfRead the text of RRU-072 Attachment 5.pdf
Text of RRU-072 Attachment 3.pdf
Extracted from the file · 136 pages · 685,965 characters
Text of RRU-072 Attachment 4.pdf
Extracted from the file · 144 pages · 700,795 characters
Page 49 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 49 of 144 Business Development and Capital Expenditures Our consolidated capital expenditures, including amounts incurred but not paid, cost of removal, AFUDC, and the capitalized and deferred portions of pension and PBOP income/expense (all of which are non-cash factors), totaled $4.61 billion in 2025, $4.64 billion in 2024, and $4.59 billion in 2023. These amounts included $240.2 million in 2025, $260.5 million in 2024, and $214.4 million in 2023 related to information technology and facilities upgrades and enhancements, primarily at Eversource Service and The Rocky River Realty Company. Electric Transmission Business: Our consolidated electric transmission business capital expenditures decreased by $118.8 million in 2025, as compared to 2024. A summary of electric transmission capital expenditures by company is as follows: For the Years Ended December 31, 2025 (Millions of Dollars) CL&P NSTAR Electric 2024 $ 398.6 522.9 $ 1,209.0 PSNH 450.0 502.0 $ 1,327.8 287.5 Total Electric Transmission 2023 $ $ 470.4 567.4 $ 1,447.8 375.8 410.0 Our transmission projects are designed to improve the reliability of the electric grid, meet customer demand for power, and strengthen the electric grid's resilience against extreme weather and other safety and security threats. In Connecticut, Massachusetts and New Hampshire, our transmission projects include transmission line upgrades, the installation of new transmission interconnection facilities, substations and lines, and transmission substation enhancements. Greater Cambridge Energy Program: The Greater Cambridge Energy Program will construct Eversource’s first underground transmission substation in Cambridge, Massachusetts, along with associated transmission and distribution lines. The project will address the increased electric demand in the region, enhance the resiliency of the transmission system, and ensure a flexible grid to reliably serve customers. The flexibility to transmit and distribute mixed energy sources will support the decarbonization and electrification goals of both the City of Cambridge and the state of Massachusetts. The new 115/13.8-kV, 35,000 square foot substation will be located in an underground vault and includes three distribution power transformers supplying thirty-six distribution circuits. The project also includes five underground duct banks housing eight new 115-kV transmission lines. The Massachusetts Energy Facilities Siting Board approved the project on June 28, 2024. Environmental permits are acquired to support ongoing construction activities. Additional required permits for transmission line trenchless crossings, including a license from the MA DEP, are expected to be approved by the end of 2026. The initial in-service date for the project is June 2029, which includes two 115-kV transmission lines and the transmission portion of the substation. The first distribution circuits and substation distribution will be placed in-service by the end of 2029. The remaining transmission and distribution circuits will be placed in-service throughout 2030 and into 2031. The total estimated project cost is approximately $1.84 billion, with $1.38 billion allocated for transmission and $460 million for distribution. As of December 31, 2025, $200.9 million has been spent on the project, with $154.7 million for transmission and $46.2 million for distribution. Distribution Business: A summary of distribution capital expenditures is as follows: For the Years Ended December 31, CL&P (Millions of Dollars) NSTAR Electric PSNH Total Electric Natural Gas Water Total 2025 Basic Business $ Aging Infrastructure $ 132.5 Load Growth and Other Total Distribution 300.8 558.1 $ 403.6 115.8 118.0 $ 92.1 228.3 976.9 $ 628.2 60.1 201.0 $ 731.6 404.2 42.9 $ 549.1 $ 1,190.0 $ 270.2 $ 2,009.3 $ $ 298.8 $ 471.7 $ 136.2 $ 906.7 $ 19.4 $ 152.5 0.8 975.5 $ 226.9 $ 1,197.3 1,512.3 447.9 172.7 $ 21.8 $ 3,157.5 2024 Basic Business Aging Infrastructure 161.3 Load Growth and Other Total Distribution 365.8 110.6 65.4 194.3 592.5 66.4 $ 570.7 $ 1,031.8 $ $ 280.3 $ 376.6 $ 743.6 371.3 140.5 52.3 268.0 $ 1,870.5 $ 91.1 $ 748.0 $ 0.8 1,022.8 $ 208.2 $ 1,155.4 1,476.6 424.4 163.1 $ 18.5 $ 3,056.4 2023 Basic Business Aging Infrastructure 260.7 Load Growth and Other Total Distribution 310.0 138.0 $ 679.0 86.4 191.3 $ 877.9 657.1 37.2 $ 214.7 719.5 366.5 $ 1,771.6 142.3 70.1 $ 997.8 0.9 $ 161.7 974.7 1,518.9 437.5 $ 2,931.1 For the electric distribution business, basic business includes the purchase of meters, tools, vehicles, information technology, transformer replacements, equipment facilities, and the relocation of plant. Aging infrastructure relates to reliability and the replacement of overhead lines, plant substations, underground cable replacement, and equipment failures. Load growth and other includes requests for new business and capacity additions on distribution lines and substation additions and expansions. We are also focused on making strategic AI investments currently in outage discovery, maintenance management and data analytics to better maintain our system and provide value to our customers. 35Page 50 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 50 of 144 For the natural gas distribution business, basic business addresses daily operational needs including meters, pipe relocations due to public works projects, vehicles, and tools. Aging infrastructure projects seek to improve the reliability of the system through enhancements related to cast iron and bare steel replacement of main and services, corrosion mediation, and station upgrades. Load growth and other reflects growth in existing service territories including new developments, installation of services, and expansion. For the water distribution business, basic business addresses daily operational needs including periodic meter replacement, water main relocation, facility maintenance, and tools. Aging infrastructure relates to reliability and the replacement of water mains, regulators, storage tanks, pumping stations, wellfields, reservoirs, and treatment facilities. Load growth and other reflects growth in our service territory, including improvements of acquisitions, installation of new services, and interconnections of systems. Aquarion Sale Status and Regulatory Denial: In December 2024, Eversource obtained approval from its Board of Trustees to sell the Aquarion water distribution business. On January 27, 2025, Eversource entered into a definitive agreement to sell Aquarion to the Aquarion Water Authority (AWA), a quasi-public corporation and political subdivision of the State of Connecticut and a standalone, newly created water authority alongside the South Central Connecticut Regional Water Authority. In June 2024, a Connecticut law chartered AWA and enabled it to acquire, own and operate Aquarion as a not-for-profit water authority. Subject to certain closing adjustments, the aggregate enterprise value of the sale is approximately $2.4 billion in cash, which included approximately $1.6 billion for the equity and $800 million of net debt that will either be extinguished at closing or transferred to the buyer. The sale requires approval by PURA and the DPU, as well as other approvals pursuant to the Hart-Scott-Rodino Antitrust Improvements Act, for which the relevant waiting period has expired, as well as other customary closing conditions. Regulatory approvals in New Hampshire and Maine were received. Eversource plans to use the net proceeds from sale to pay down parent company debt. In the fourth quarter of 2024, upon classifying the assets and liabilities as held for sale, Eversource concluded that the likely sale of Aquarion at a loss resulted in the requirement to test water distribution goodwill for impairment. Eversource performed an impairment test by comparing the fair value of the business to its carrying value and recorded a goodwill impairment of $297 million, as the estimated fair value of the business based on the anticipated sale was less than the carrying value. The fair value included future cash outflows of approximately $140 million of estimated income taxes as a result of the transaction. The goodwill impairment charge was presented separately within Operating Income on the Eversource statement of income for the year ended December 31, 2024. On November 19, 2025, PURA denied the application to approve the sale, finding that the transaction did not meet managerial suitability and responsibility requirements due to concerns with governance and oversight structure over Aquarion and its consumer advocate. On December 2, 2025, the denial was appealed to the Connecticut Superior Court. On January 15, 2026, the Court issued its decision, sustaining the appeal and remanding back to PURA, finding that PURA acted illegally in denying the application as those disputed governance elements were mandated under Connecticut law. The Court upheld that operational aspects of the consumer advocate were within PURA’s statutory authority and regulatory discretion. A final decision is expected by PURA on March 25, 2026. Based on PURA’s November 19, 2025 denial of the sale and the uncertainty of the ultimate outcome, the Aquarion water distribution business no longer met the criteria to be classified as held for sale and its assets and liabilities were reclassified as held and used on the balance sheet as of December 31, 2025. The reclassification to held and used did not result in an adjustment to Aquarion’s carrying values. Projected Capital Expenditures: A summary of the projected capital expenditures for the regulated companies' electric transmission and for the total electric distribution and natural gas distribution for 2026 through 2030, including information technology and facilities upgrades and enhancements on behalf of the regulated companies, is as follows: Years 2026 (Millions of Dollars) CL&P Transmission NSTAR Electric Transmission $ PSNH Transmission 2027 520 574 $ 2028 358 727 $ 2029 349 852 $ 2030 241 1,181 $ 2026 - 2030 Total 130 1,381 $ 1,598 4,715 181 275 291 85 97 929 Total Electric Transmission 1,275 1,360 1,492 1,507 1,608 7,242 Electric Distribution Natural Gas Distribution 2,291 1,247 2,278 1,320 2,180 1,404 2,197 1,456 2,296 1,376 11,242 6,803 Total Electric and Natural Gas Distribution 3,538 3,598 3,584 3,653 3,672 18,045 259 217 276 219 256 Information Technology and All Other Total $ 5,072 $ 5,175 $ 5,352 $ 5,379 $ 5,536 1,227 $ Additionally, investments for the water distribution business are expected to total approximately $1.3 billion from 2026 through 2030. Actual capital expenditures could vary from the projected amounts for the companies and years above. 36 26,514Page 51 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 51 of 144 FERC Regulatory Matters FERC ROE Complaints: Four separate complaints were filed at the FERC by combinations of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties (collectively, the Complainants). In each of the first three complaints, filed on October 1, 2011, December 27, 2012, and July 31, 2014, respectively, the Complainants challenged the NETOs' base ROE of 11.14 percent that had been utilized since 2005 and sought an order to reduce it prospectively from the date of the final FERC order and for the separate 15-month complaint periods. In the fourth complaint, filed April 29, 2016, the Complainants challenged the NETOs' base ROE billed of 10.57 percent and the maximum ROE for transmission incentive (incentive cap) of 11.74 percent, asserting that these ROEs were unjust and unreasonable. The ROE originally billed during the period October 1, 2011 (beginning of the first complaint period) through October 15, 2014 consisted of a base ROE of 11.14 percent and incentives up to 13.1 percent. On October 16, 2014, FERC issued Opinion No. 531-A and set the base ROE at 10.57 percent and the incentive cap at 11.74 percent for the first complaint period. This was also effective for all prospective billings to customers beginning October 16, 2014. This FERC order was vacated on April 14, 2017 by the U.S. Court of Appeals for the D.C. Circuit (the Court). All amounts associated with the first complaint period have been refunded. Eversource has recorded a reserve of $39.1 million (pre-tax and excluding interest) for the second complaint period as of both December 31, 2025 and 2024. This reserve represents the difference between the billed rates during the second complaint period and a 10.57 percent base ROE and 11.74 percent incentive cap. The reserve consisted of $21.4 million for CL&P, $14.6 million for NSTAR Electric and $3.1 million for PSNH as of both December 31, 2025 and 2024. On October 16, 2018, FERC issued an order on all four complaints describing how it intends to address the issues that were remanded by the Court. FERC proposed a new framework to determine (1) whether an existing ROE is unjust and unreasonable and, if so, (2) how to calculate a replacement ROE. Initial briefs were filed by the NETOs, Complainants and FERC Trial Staff on January 11, 2019 and reply briefs were filed on March 8, 2019. The NETOs' brief was supportive of the overall ROE methodology determined in the October 16, 2018 order provided the FERC does not change the proposed methodology or alter its implementation in a manner that has a material impact on the results. The FERC order included illustrative calculations for the first complaint using FERC's proposed frameworks with financial data from that complaint. Those illustrative calculations indicated that for the first complaint period, the preliminary just and reasonable base ROE for the NETOs, which FERC concludes are of average financial risk, is 10.41 percent and the preliminary incentive cap on total ROE is 13.08 percent. If the results of the illustrative calculations were included in a final FERC order for each of the complaint periods, then a 10.41 percent base ROE and a 13.08 percent incentive cap would not have a significant impact on our financial statements for all of the complaint periods. These preliminary calculations are not binding and do not represent what we believe to be the most likely outcome of a final FERC order. On November 21, 2019, FERC issued Opinion No. 569 affecting the two pending transmission ROE complaints against the Midcontinent ISO (MISO) transmission owners, in which FERC adopted a new methodology for determining base ROEs. Various parties sought rehearing. On December 23, 2019, the NETOs filed supplementary materials in the NETOs' four pending cases to respond to this new methodology because of the uncertainty of the applicability to the NETOs' cases. On May 21, 2020, the FERC issued its order in Opinion No. 569-A on the rehearing of the MISO transmission owners' cases, in which FERC again changed its methodology for determining the MISO transmission owners' base ROEs. On November 19, 2020, the FERC issued Opinion No. 569-B denying rehearing of Opinion No. 569-A and reaffirmed the methodology previously adopted in Opinion No. 569-A. The new methodology differs significantly from the methodology proposed by FERC in its October 16, 2018 order to determine the NETOs' base ROEs in their four pending cases. FERC Opinion Nos. 569-A and 569-B were appealed to the Court. On August 9, 2022, the Court issued its decision vacating MISO ROE FERC Opinion Nos. 569, 569-A and 569-B and remanded to FERC to reopen the proceedings. The Court found that FERC’s development of the new return methodology was arbitrary and capricious due to FERC’s failure to offer a reasonable explanation for its decision to reintroduce the risk-premium financial model in its new methodology for calculating a just and reasonable return. On October 17, 2024, FERC issued an order on the remand of the MISO ROE proceedings. The order addressed the Court’s decision that the reintroduction of the risk-premium financial model in the ROE methodology was arbitrary and capricious by removing the risk-premium financial model from the ROE methodology. The removal of the risk-premium financial model was the only revision to FERC’s ROE methodology and resulted in a two-model approach utilizing the two-step discounted cash flow model and the capital asset pricing model. MISO transmission owners were directed to provide refunds for the period November 12, 2013 to February 11, 2015 (the first MISO ROE complaint refund period) and for the period from September 28, 2016 (the date of FERC’s order on the first MISO ROE complaint) to October 17, 2024 by December 1, 2025. The order also stated that FERC does not preclude the use of the risk-premium financial model in future proceedings if the parties can demonstrate that FERC’s stated concerns around the inclusion of the model have been addressed. On March 25, 2025, FERC issued an order addressing arguments raised on rehearing, sustaining the result, and denying rehearing. On November 13, 2024, the NETOs filed a supplemental brief in their four pending ROE proceedings to explain to FERC that it cannot apply the reasoning and methodologies of the MISO ROE case to the NETOs’ cases due to the entirely different set of facts in the MISO and NETOs ROE proceedings. Doing so would violate the substance of the Court’s April 14, 2017 order and would violate the legal standard required by the Federal Power Act. On February 4, 2025, the MISO transmission owners submitted a petition for review with the Court requesting review of the October 17, 2024 MISO ROE order on remand and a December 19, 2024 notice of denial of rehearing. The petition requests review of FERC’s decision to retroactively backdate the MISO transmission owners’ base ROE to the date of an earlier order that FERC abandoned when it issued Order No. 569, treat an underlying unlawful complaint as if it were legitimate, and order eight years of interest as part of the directed refunds. On August 21, 2025, the NETOs submitted a brief in support of the MISO transmission owners with the Court. Final briefs in the Court proceeding were submitted on January 26, 2026 and oral argument is scheduled for March 17, 2026. 37Page 52 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 52 of 144 Given the significant uncertainty regarding the applicability of the FERC order in the MISO transmission owners’ two complaint cases to the NETOs’ pending four complaint cases due to the complex differences between the cases, Eversource concluded that there is no reasonable basis for a change to the reserve or recognized ROEs for any of the complaints or subsequent periods at this time and Eversource cannot reasonably estimate any potential range of loss for any of the four complaint proceedings at this time. The resolution of these proceedings could have a material impact on the financial condition, results of operations, and cash flows. Eversource, CL&P, NSTAR Electric and PSNH currently record revenues at the 10.57 percent base ROE and incentive cap at 11.74 percent established in the October 16, 2014 FERC order. A change of 10 basis points to the base ROE used to establish the reserves would impact Eversource’s after-tax earnings by an average of approximately $3 million for each of the four 15-month complaint periods. Prospectively from the date of a final FERC order implementing a new base ROE, based off of estimated 2025 rate base, a change of 10 basis points to the base ROE would impact Eversource’s future annual after-tax earnings by approximately $7 million per year, and will increase slightly over time as we continue to invest in our transmission infrastructure. Transmission Rates and Other Transmission Rates-Related Proceedings: CL&P, NSTAR Electric and PSNH transmission rates are calculated in accordance with a FERC-approved formula ratemaking framework and each utility is required to file an annual update on or before July 31st with resulting rates effective January 1st the following year. The formula rate framework provides for an annual reconciliation of the prior calendar year actual costs incurred related to our transmission facilities, including an allowed ROE, plus forecasted information through the next rate period. The annual update process includes formula rate protocols that provide disclosure of cost inputs, an opportunity for informal discovery procedures and a challenge process, which provides transparency to stakeholders. From time to time, various matters are pending before FERC relating to transmission rates, incentives, interconnections and transmission planning. Depending on the outcome, any of these matters could materially impact our results of operations and financial condition. At this time, Eversource cannot predict the ultimate outcome of the matters currently pending before FERC, and the resulting impact on its transmission incentives or planning. Regulatory Developments and Rate Matters Electric, Natural Gas and Water Utility Retail Tariff Rates: Each Eversource utility subsidiary is subject to the regulatory jurisdiction of the state in which it operates: CL&P, Yankee Gas and Aquarion operate in Connecticut and are subject to PURA regulation; NSTAR Electric, NSTAR Gas, EGMA and Aquarion operate in Massachusetts and are subject to DPU regulation; and PSNH and Aquarion operate in New Hampshire and are subject to NHPUC regulation. The regulated companies' distribution rates are set by their respective state regulatory commissions, and their tariffs include mechanisms for periodically adjusting their rates for the recovery of specific incurred costs. Base Distribution Rates: In Connecticut, PURA is required to conduct a review and investigation of the financial and operating records of each electric, natural gas and water utility serving more than seventy-five thousand customers within four years of its last general rate hearing. PURA can elect to convene a general rate hearing at an interval of less than four years unless prohibited from doing so by an agency decision or other law. In Massachusetts, electric distribution companies are required to file distribution rate schedules every five years, and natural gas local distribution companies to file distribution rate schedules every 10 years, and those companies are limited to one settlement agreement in any 10-year period. Aquarion is not required to initiate a rate review with the DPU. In New Hampshire, PSNH is not required to initiate a rate review with the NHPUC on any set timeframe, and the NHPUC has no obligation to hear any rate matter that it has investigated within a period of two years, though it may elect to do so at its discretion. Rate Reconciling Mechanisms: The Eversource electric distribution companies obtain and resell power to retail customers who choose not to buy energy from a competitive energy supplier. CL&P, NSTAR Electric and PSNH enter into full requirements energy supply procurement contracts for its customers that choose to purchase power from the electric distribution company (standard offer, basic service or default energy service, respectively). The natural gas distribution companies procure natural gas for firm and seasonal customers. These energy supply and natural gas supply procurement costs are recovered from customers in supply rates that are approved by the respective state regulatory commission. The rates are reset periodically (every six months for electric residential customers) and are fully reconciled to their costs. New energy supply rates for residential customers are established effective July 1st at CL&P and NSTAR Electric and effective August 1st at PSNH. Each electric and natural gas distribution company fully recovers its energy supply costs through approved regulatory rate mechanisms on a timely basis and, therefore, such costs have no impact on earnings. Increases or decreases in energy supply retail rates result in corresponding fluctuations in both energy supply procurement revenues and purchased power or purchased natural gas expenses on the statements of income. The electric and natural gas distribution companies also recover certain other costs from customers in retail rates on a fully reconciling basis through regulatory commission-approved cost tracking mechanisms and therefore, recovery of these costs has no impact on earnings. Costs recovered through cost tracking mechanisms include, among others, state mandated energy purchase agreements and other energy-related costs, electric retail transmission charges, energy efficiency program costs, electric restructuring and stranded cost recovery revenues (including securitized RRB charges), certain capital tracking mechanisms for infrastructure improvements, and additionally for the Massachusetts utilities, pension and PBOP benefits, net metering for distributed generation, and solar-related programs. The reconciliation filings compare the total actual costs allowed to revenue requirements related to these services and the difference between the costs incurred (or the rate recovery allowed) and the actual costs allowed is deferred and included, to be either recovered or refunded, in future customer rates. These cost tracking mechanisms also include certain incentives earned, return on capital tracking mechanisms, and carrying charges that are billed in rates to customers, which do impact earnings. 38Page 53 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 53 of 144 Connecticut: CL&P Performance Based Rate Making: On May 26, 2021, in accordance with an October 2020 Connecticut law, PURA opened a proceeding to begin to evaluate and eventually implement performance-based regulation (PBR) for electric distribution companies. PURA is conducting the proceeding in two phases. On April 26, 2023, PURA issued a final decision on the first phase and identified various objectives to guide PBR development and evaluate adoption of a PBR framework. The decision commenced Phase 2 by initiating three reopener dockets focused on revenue adjustment mechanisms, performance metrics, and integrated distribution system planning. On November 16, 2023, PURA issued a straw proposal in the first reopener that focused on revenue adjustment mechanisms. The proposal outlined potential additions and reforms to the current revenue adjustment mechanisms, such as multi-year rate plans, earnings sharing mechanisms and the revenue decoupling mechanism. On March 14, 2024, PURA issued a straw proposal in the second reopener docket that concentrated on performance mechanisms in a PBR framework. The proposal suggested the development of performance incentive mechanisms, reported metrics and scorecards. On February 27, 2025, PURA issued revised straw proposals for both the first and second reopener dockets, resulting in some edits to the previous proposals based on participant feedback. On April 4, 2025, PURA issued a straw proposal in the third reopener docket that focused on the establishment of integrated distribution system planning under a PBR framework. On July 14, 2025, PURA issued proposed final decisions in the first two reopener dockets. The proposed final decision in the first reopener docket adopted a PBR framework inclusive of a multi-year rate plan with an attrition relief mechanism that uses a revenue-cap formula approach to adjust revenues based on a variety of factors including inflation, a productivity factor, a customer dividend percentage, an exogenous cost factor and a capital funding mechanism, as well as an earnings sharing mechanism and a revenue decoupling mechanism for implementation in CL&P’s next distribution rate case. The multi-year rate plan has a stay out period of four years, but certain situations, such as deteriorating financial condition, exceeding authorized return, falling interest rates, or excess storm costs, could trigger the initiation of a new rate amendment proceeding during the multi-year rate plan. The proposed final decision in the second reopener docket established reporting parameters, including the commencement of scorecards and reported metrics and the development of company specific performance incentive mechanisms. Results of scorecards and reported metrics are proposed to be reported annually to PURA, beginning March 1, 2026. Company specific performance incentive mechanisms will be implemented in CL&P’s next rate case proceeding. On August 8, 2025, PURA issued a proposed final decision in the third reopener docket, adopting the contents and reporting process for an integrated distribution system plan (IDSP) under a PBR framework. The IDSP report will document the grid planning process for available distribution system capacity and system needs, including the development, operation, and evolution of the electrical distribution grid. The IDSP report will include CL&P’s planned investments over a four-year plan period and long-term capital investment strategy, and will be utilized by PURA in determining the amount of allowable capital additions within a multi-year rate plan included in the calculation of the capital funding mechanism adopted in the first reopener docket. The draft decision requires CL&P to submit a comprehensive IDSP filing every four years in alignment with the submittal of a rate amendment application and to also submit an annual IDSP filing to report on IDSP investments throughout the four-year period. Final decisions on the three reopener dockets have not yet been scheduled. We continue to monitor developments in this proceeding, and at this time, we cannot predict the ultimate outcome of this proceeding and the resulting impact to CL&P. CL&P Storm Filings: On March 28, 2024, PURA established a prudency review proceeding for the purpose of receiving and reviewing evidence of the costs reported by CL&P in response to catastrophic storms and pre-staging events totaling approximately $634 million that occurred between January 1, 2018 and December 31, 2021. On December 31, 2024, CL&P filed a supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for nine additional catastrophic storms and two additional pre-staging events for the period January 1, 2022 through January 31, 2023 totaling approximately $173 million. On July 10, 2025, CL&P filed a second supplement to its March 2024 prudency review application to request that PURA evaluate the prudence of its costs for ten additional catastrophic storms for the period February 1, 2023 through December 31, 2023 totaling approximately $171 million. On July 25, 2025, CL&P filed a third supplement in this application to include carrying charges calculated at the weighted average cost of capital on the deferred storm costs totaling $246 million, which reflects CL&P’s actual financing costs on the unpaid storm costs from the date the deferred storm costs first began to accrue through May 2025. These carrying charges have not been deferred on the balance sheet. On December 13, 2025, PURA opened a new proceeding for the prudency determination of CL&P’s 2018 to 2023 storm costs either by a settled or litigated process and a separate future docket will be needed to consider CL&P’s application to issue rate reduction bonds for the securitization of approved storm costs. A final decision is expected on or about July 29, 2026. Although we cannot predict the ultimate outcome of these storm proceedings, we continue to believe these deferred storm restoration costs were prudently incurred and are probable of recovery. CL&P RAM Filing: On March 28, 2025, PURA issued an interim decision in CL&P’s Rate Adjustment Mechanisms (RAM) filing and approved rates for six RAM components, with rates effective May 1, 2025 through April 30, 2026. The rates include recovery of over- or under-collection balances as of December 31, 2024, actual costs from the prior year, and adjustments to incorporate certain known and measurable cost changes not reflected in prior year costs that CL&P will incur in 2025. On August 13, 2025, PURA issued a final decision that approved a further adjustment to the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) and System Benefits Charge (SBC) rates based on a July 1, 2025 Connecticut law that authorized the State of Connecticut to issue new general obligation bonds to reduce certain hardship costs and electric vehicle program costs recovered from customers. Proceeds from the general obligation bond funding of $107.8 million will be provided back to customers through a reduction to the NBFMCC and SBC rates. The updated NBFMCC and SBC rates are effective September 1, 2025 through April 30, 2026. These rates are included in the “Public Benefits” portion of the customer bills in Connecticut. On September 19, 2025, CL&P received $107.8 million in general obligation bond proceeds from the State of Connecticut, which represent reimbursement of incurred costs that were previously recognized as regulatory assets on CL&P’s balance sheets. The proceeds received for the reimbursement of hardship costs and for electric vehicle charging program costs were credited against the SBC and NBFMCC regulatory deferrals 39Page 54 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 54 of 144 on CL&P’s balance sheet as of December 31, 2025. The proceeds from the state bond funding are presented as a cash inflow in Regulatory Recoveries within operating activities on CL&P’s statement of cash flows. CL&P Advanced Metering Infrastructure Filing: On January 3, 2024, PURA issued a final decision regarding CL&P’s Advanced Metering Infrastructure (AMI) investment and implementation plan. In CL&P’s view, the final decision did not provide a reasonable path for cost recovery and would delay implementation. In addition, in CL&P’s view, the final decision modifies the prudence standard for recovery of costs expended on the project, improperly linking recovery to outcomes not known at the outset of the project. On January 18, 2024, CL&P submitted a motion for reconsideration to PURA, asking that the agency modify these aspects of the decision, which PURA subsequently denied on February 14, 2024. On March 6, 2024, CL&P filed written comments citing four major problems associated with PURA’s guidelines for recovery of the costs of AMI implementation, which if not addressed, represent obstacles to AMI implementation in Connecticut. On April 16, 2024, PURA issued a procedural order directing Eversource and inviting all parties and intervenors to submit pre-filed testimony pertaining to AMI. CL&P witnesses filed testimony, including an updated estimate of $855 million for capital costs and operating expenses, and then subsequently participated in the AMI cost recovery hearing on June 6, 2024. On October 17, 2024, PURA issued a proposed final decision on recovery of the costs for AMI implementation. On October 31, 2024, CL&P filed written exceptions focused on three main aspects of the proposed decision, which included (1) clarifying the prudence standard to be used in evaluating AMI investments, (2) timing of prudency reviews, and (3) cost recovery related to incremental O&M expenses. On December 4, 2024, PURA issued a final decision on the recovery of costs for AMI implementation. On December 9, 2024, CL&P filed a petition for reconsideration because PURA had not fully resolved the issues CL&P raised in its October 31, 2024 written exceptions. On November 25, 2025, PURA issued correspondence in connection with CL&P’s October 31, 2025 annual AMI compliance filing asserting that it was no longer evaluating the merits of CL&P’s petition for reconsideration, that PURA approval is not required for CL&P to deploy AMI, and that CL&P may invest in AMI at any time and seek cost recovery under the AMI tariff after meeting established filing criteria. On December 19, 2025, CL&P filed a motion responding to the legal issues raised in PURA’s correspondence and requested that PURA reopen the prior proceeding for the purpose of lawfully acting upon CL&P’s December 9, 2024 petition for reconsideration and resolving the open questions on AMI cost recovery. Yankee Gas Distribution Rate Case: On November 12, 2024, Yankee Gas filed an application with PURA to amend its existing distribution rates for effect on November 1, 2025. Yankee Gas had subsequently amended its rate application to request approval of a distribution rate increase of $193 million. On September 22, 2025, PURA issued a proposed final (draft) decision in Yankee Gas’s distribution rate case that included a distribution rate increase of $55.6 million, effective November 1, 2025. On November 5, 2025, PURA issued a final decision in the Yankee Gas distribution rate case that included a distribution rate increase of $82.2 million and a total distribution revenue requirement of $802.2 million, effective November 1, 2025. The approved revenue requirement includes a previously recorded rate credit of $37.4 million plus carrying charges for non-firm margin credits over three years beginning November 1, 2025. Excluding the rate credit, the distribution rate increase totaled $95.7 million. The final decision also established an authorized net regulatory ROE of 9.32 percent, adopting a 9.48 percent ROE net of certain reductions totaling 16 basis points, and a 53 percent common equity ratio for Yankee Gas’ capital structure. PURA declined to approve the multi-year performance-based rate making plan that would adjust rates annually as proposed by Yankee Gas. PURA also implemented an annual cap on contemporaneous cost recovery of aging infrastructure replacement spending in the Distribution Integrity Management Program (DIMP) rate tracking mechanism of $139.9 million, in which spending above the annual cap will be deferred for recovery until the next distribution rate case. The final decision resulted in a net pre-tax loss to earnings of $8.5 million in the fourth quarter of 2025, primarily for the write off of certain capitalized employee compensation costs that were disallowed from rate base. Yankee Gas filed motions to request PURA reconsider the disallowances of these capitalized costs, certain computational errors, and other issues identified in its final decision. On December 15, 2025, PURA issued a notice of reconsideration to reconsider the final decision. A final decision on the reconsideration is expected from PURA by March 15, 2026. Aquarion Water Company of Connecticut Distribution 2022 Rate Case: On August 29, 2022, Aquarion Water Company of Connecticut (AWCCT) filed an application with PURA to amend its existing rate schedules to address an operating revenue deficiency. AWC-CT’s rate application requested approval of rate increases of $27.5 million, an additional $13.6 million, and an additional $8.8 million, effective March 15, 2023, 2024, and 2025, respectively. On March 15, 2023, PURA issued a final decision that rejected this request. In this decision, PURA ordered a decrease to total authorized revenues of $4.0 million effective March 15, 2023. The decision allows an authorized regulatory ROE of 8.70 percent. On March 30, 2023, AWC-CT filed an appeal on the decision. On March 25, 2024, the State of Connecticut Superior Court issued a decision on the appeal which dismissed nine, remanded back to PURA two, and partially remanded one of AWC-CT’s twelve claims of error in its appeal. On April 18, 2024, PURA initiated a docket to address the matters on remand. On July 31, 2024, PURA issued a final decision in this docket and increased AWC-CT’s approved revenue requirement by $0.1 million above the amount authorized in the March 15, 2023 decision. Rates went into effect on July 31, 2024. On September 13, 2024, AWC-CT filed an appeal of PURA’s July 31, 2024 final decision to the Connecticut Superior Court. On December 9, 2025, the Connecticut Superior Court remanded the disallowance of approximately $0.4 million of rate case expenses back to PURA. PURA’s decision on the remand is pending. On March 28, 2024, AWC-CT filed an appeal of the March 25, 2024 Connecticut Superior Court decision to the Connecticut Appellate Court, and that appeal was subsequently transferred to the Connecticut Supreme Court. On July 9, 2025, the Connecticut Supreme Court issued a decision that overturned PURA’s disallowance of $1.5 million in water conservation program expenses, but affirmed the remaining portions of PURA’s decision that were challenged on appeal. The Connecticut Supreme Court decision also validated AWC-CT’s argument that the correct legal standard PURA must use in determining whether costs can be recovered through customer rates is the longstanding prudence standard, which evaluates the prudence of management decision-making as of the time the utility made the decision to incur costs; PURA cannot use improper hindsight analysis to evaluate prudence. On December 10, 2025, PURA revised its July 31, 2024 decision and increased AWC-CT’s approved revenue requirement by $0.3 million reflecting recovery of the $1.5 million conservation program expenses over six years. 40Page 55 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 55 of 144 Massachusetts: NSTAR Electric Distribution Rates: NSTAR Electric’s PBR mechanism allows for an annual adjustment to base distribution rates for inflation, exogenous events and future capital additions based on a historical five-year average of total capital additions. On September 15, 2025, NSTAR Electric submitted its annual PBR Adjustment filing for a $55.1 million increase to base distribution rates and a total base distribution revenue requirement of $1.34 billion for effect on January 1, 2026. The requested base distribution rate increase is comprised of a $25.2 million inflationbased adjustment and a $29.9 million K-bar adjustment for capital additions based on the difference between the historical five-year average of total capital additions and the base capital revenue requirement. On December 30, 2025, the DPU approved this filing. NSTAR Electric’s Electric Sector Modernization Plan (ESMP) Filing: On August 29, 2024, the DPU approved the overall ESMP as a strategic plan for a five-year period commencing July 1, 2025 through June 30, 2030. The initial five-year plan proposed incremental distribution capital investments of $608 million and incremental distribution expense of $211 million. On November 21, 2024, the DPU opened a second phase of the proceeding (Phase II) to consider a short-term ESMP-focused cost recovery mechanism and metrics. The DPU limited the review of investment in this docket and excluded NSTAR Electric’s ESMP capital proposals regarding the EV Phase II extension and the new capital investment projects, and expense for the funding of low and moderate income solar. These investments will be reviewed in separate proceedings. This reduced the amount of company-proposed incremental capital investment to $295 million and the incremental expense to $44 million related to resiliency and grid modernization for a total spending cap of $339 million. NSTAR Electric filed its proposed tariff and testimony on December 18, 2024. On June 13, 2025, the DPU issued an order in the Phase II proceeding on the interim cost recovery mechanism for the ESMP, which approved the interim cost recovery mechanism with certain modifications. In the order, the DPU emphasized its attempt to balance affordability and the goals of advancing Massachusetts’ clean energy goals through proactive investments to support electrification and distributed generation. NSTAR Electric received approval for its proposed grid modernization and resiliency investments and incremental expense for a total spending cap of $139 million, reflecting an ordered reduction in capital spending on undergrounding for resiliency. In compliance with the Phase II order, a revised tariff was filed June 23, 2025, and the revised ESMP spending cap for the first term of July 1, 2025 through June 30, 2030, which included companyproposed incremental capital investment of $95 million and incremental expense of $44 million, was filed June 30, 2025. The DPU is conducting another phase of this proceeding to establish a long-term cost recovery mechanism, which is expected to be through base distribution rates. NSTAR Gas Distribution Rates: NSTAR Gas’ PBR mechanism allows for an annual adjustment to base distribution rates for inflation and exogenous events. On June 16, 2025, NSTAR Gas submitted its annual PBR Adjustment filing for rates to be effective on November 1, 2025. On September 11, 2025, NSTAR Gas updated its filing to request approval of a $162.6 million increase to base distribution rates and a total base distribution revenue requirement of $447.7 million. The base distribution rate increase is comprised of a $10.3 million inflation-based adjustment and, in accordance with the DPU’s final decision in the 2020 NSTAR Gas rate case, a $152.3 million rate-base reset to incorporate capital additions for the period 2021 through 2024, which includes the transfer of GSEP revenues totaling $107.3 million into base rates, as well as other non-GSEP plant additions totaling $45.0 million. On October 29, 2025, the DPU issued a decision determining that NSTAR Gas was not eligible to increase its distribution rates for the rate base reset because it did not achieve certain performance metrics under its PBR plan, and did not allow the base rate increase of $45.0 million for the incorporation of non-GSEP plant additions into base rates. The decision stated that those investments could be considered for inclusion in base distribution rates in NSTAR Gas’s next base rate proceeding. The DPU did allow NSTAR Gas to transfer its GSEP revenues through 2024 of $107.3 million for recovery through base distribution rates effective November 1, 2025. The DPU approved the base distribution rate increase of $10.3 million for the inflation-based adjustment. The DPU also approved NSTAR Gas’ mitigation proposal, in which NSTAR Gas paused recovery of the Gas System Enhancement Adjustment Factor (GSEAF) and reduced the current GSEAF to zero on November 1, 2025 in order to align this decrease with the base rate increase and to mitigate November 1, 2025 bill impacts to customers. NSTAR Gas will begin to recover the remaining 2025 GSEP revenue requirement on May 1, 2026 over 18 months. On November 4, 2025, NSTAR Gas filed a motion requesting the DPU to reconsider its decision denying the rate base reset citing legal concerns and arguing that the decision will ultimately result in higher costs for customers. NSTAR Gas also notified the DPU of its intention to file a base distribution rate case. On December 30, 2025, NSTAR Gas and the Massachusetts Office of the Attorney General reached a joint settlement agreement that allowed for the reinstatement of the rate base reset of $45.0 million increase to base distribution rates effective January 1, 2026, for NSTAR Gas to not petition for a rate case with new rates effective December 1, 2026, and for continuation of NSTAR Gas’ PBR program through November 1, 2030. The settlement agreement also required NSTAR Gas to provide a credit to customers of $10.2 million over a ten-month period beginning January 2026 as penalty for its failure to meet three performance metrics as required for eligibility for the rate base reset, pay a $2 million concession to the Office of the Attorney General to fund customer energy assistance programs, waive recovery of certain carrying charges, delay recovery of $53 million of capital pipeline investments until the next rate case, and provide bill stabilization credit deferrals. The DPU approved the settlement agreement on January 16, 2026. The settlement agreement resulted in a pre-tax charge to earnings of $12.2 million in the fourth quarter of 2025. NSTAR Electric and EGMA Settlement: On November 3, 2025, EGMA, NSTAR Electric, and the Massachusetts Office of the Attorney General reached a joint settlement agreement that resolved outstanding issues in multiple open Pension Adjustment Mechanism (PAM) dockets and open Resiliency Tree Work (RTW) dockets at NSTAR Electric and allows recovery of transaction and integration costs related to Eversource’s acquisition of EGMA. Certain PAM and RTW collections are being refunded to NSTAR Electric’s customers over a one-year period beginning January 1, 2026 and the transaction and integration costs of $82.3 million will be collected from EGMA customers over a ten-year period from the time of the next EGMA rate case. The settlement agreement was approved by the DPU on December 1, 2025. The settlement resulted in a net pretax benefit to earnings of $64.8 million on the Eversource income statement in the fourth quarter of 2025 ($82.3 million benefit at Eversource Parent and Other Companies for the allowed recovery of previously expensed acquisition-related and integration costs and $17.5 million charge at NSTAR Electric) and a net increase to regulatory assets on the Eversource balance sheet. 41Page 56 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 56 of 144 Massachusetts 2026 Winter Bill Relief Program: In February 2026, NSTAR Electric, NSTAR Gas and EGMA implemented a winter electric and natural gas bill relief program as required by the DPU. Under this program, in February and March 2026, residential electric customers in Massachusetts will receive an aggregate bill reduction of approximately 25 percent and residential natural gas customers will receive an aggregate bill reduction of approximately 10 percent, a portion of which will be funded by the Commonwealth of Massachusetts. The remaining bill credits will be deferred for recovery from electric customers between April and December 2026 and from natural gas customers between May and October 2026, subject to DPU approval. No carrying charges will be collected. The bill relief program results in delayed collections from customers, impacting the timing of cash flows. Proceeds of $84.1 million were received by NSTAR Electric in January 2026 and will reduce regulatory assets recorded on its balance sheet in the first quarter of 2026. New Hampshire: PSNH Distribution Rate Case: On June 11, 2024, PSNH filed an application with the NHPUC for approval of a temporary annual base distribution rate increase. On July 31, 2024, the NHPUC approved a settlement agreement that was reached by PSNH, New Hampshire Department of Energy, and the Office of the Consumer Advocate to implement a temporary annual base distribution rate increase of $61.2 million effective August 1, 2024. Temporary rates were in effect until permanent rates were approved and took effect August 1, 2025. Also on June 11, 2024, PSNH filed an application with the NHPUC to request an increase in permanent base distribution rates of $181.9 million, which is inclusive of the temporary rate increase. Throughout the course of the proceeding, PSNH amended the requested revenue requirement to account for developments in the case, and arrived at a final proposed rate increase of $103 million, which primarily reflects the removal of deferred storm costs that will be addressed in a separate proceeding. On July 25, 2025, the NHPUC issued its decision on permanent rates and approved a permanent rate increase of $100.7 million, effective August 1, 2025, inclusive of the temporary rate increase referenced above. The total base distribution revenue requirement effective August 1, 2025 is $519 million. The order also established an authorized regulatory ROE of 9.5 percent with a 50 percent common equity ratio for PSNH’s capital structure. This revenue requirement also contains an alternative regulation revenue requirement adjustment. This adjustment was part of the NHPUC’s alternative regulatory framework that the NHPUC adopted as an alternative to PSNH’s proposed performance-based regulation plan. The alternative regulatory framework authorizes formulaic annual revenue adjustments on August 1st of 2026, 2027 and 2028. PSNH is required to file its next base distribution rate case for effect in June 2029 and committed not to file its next distribution rate case until 2029. The alternative regulatory framework calculates the annual revenue adjustment using a productivity factor and an adjustment for inflation to provide PSNH with increased revenue for operations. The framework also contains an exogenous events recovery mechanism for certain unforeseen events out of PSNH’s control and exceeding a specified threshold, a performance metric, and an earnings sharing mechanism where PSNH would have to return 75 percent of all revenue back to customers that exceeds 25 basis points more than the authorized ROE of 9.5 percent. Consistent with PSNH’s proposal, lost base revenues for both net metering and energy efficiency were eliminated effective August 1, 2025. To the extent permanent rates exceed the level of temporary rates, the difference will reconcile back to the date that the temporary rates took effect and the company recovers the difference over a twelve-month term. On August 11, 2025, PSNH filed its recoupment calculation, and on September 10, 2025, the NHPUC issued an order that the recoupment is $9.1 million and will be collected through the RRA regulatory tracking mechanism over a one-year period. As part of the decision, unrecovered storm costs of $247 million were removed from the rate proceeding for consideration in a separate proceeding. Approval of the ultimate amount of storm costs to be recovered is subject to a separate prudency review that was filed in March of 2024 and is being considered by the NHPUC in a separate dedicated docket, which is at this time complete and awaiting the issuance of an order. Approved storm costs in excess of the amount approved in base rates will be recovered through the Regulatory Reconciliation Adjustment (RRA) regulatory tracking mechanism. The NHPUC increased the level of storm costs recovered in base rates from $12 million to $19 million. The impact of the rate case decision resulted in a pre-tax benefit to earnings of $15.6 million at PSNH due primarily to the recoupment and the allowed recovery of other deferrals that will be recovered in the RRA. The majority of this amount was recorded as a reduction to amortization expense on PSNH’s statement of income in 2025. On January 30, 2026, the New Hampshire Department of Energy filed a notice of appeal with the New Hampshire Supreme Court challenging certain aspects of the PSNH distribution rate case. The appeal raises issues regarding the lawfulness of the Company’s alternative regulatory framework, the adequacy of the NHPUC’s findings supporting the approved revenue requirement, and whether the NHPUC sufficiently addressed required regulatory factors in its final order. The Department of Energy contends that additional findings were necessary to support the final determinations. On February 6, 2026, the Office of the Consumer Advocate filed a notice of cross-appeal with the New Hampshire Supreme Court challenging other aspects of the rate case decision. The NHPUC, as the deciding agency, is afforded the highest level of deference by the New Hampshire Supreme Court, and therefore the Department of Energy and the Office of Consumer Advocate will have a very high burden to meet to be successful on appeal. Eversource is currently evaluating the appeals and will respond consistent with applicable legal and regulatory processes. Legislative and Policy Matters Federal: On July 4, 2025, An Act to Provide for Reconciliation Pursuant to Title II of H. Con. Res. 14 (known as the One Big Beautiful Bill Act or OBBBA), a budget and reconciliation package, was signed into law. Among various items, the law includes changes to federal tax policy and modifications to clean energy tax incentives originally enacted under the Inflation Reduction Act of 2022. One of the key provisions notable for Eversource is the restoration of bonus depreciation for its affiliates other than rate-regulated utility companies. The deduction is for qualifying depreciable tangible property acquired and placed in service after January 19, 2025. The OBBBA maintains a federal corporate income tax rate of 21 percent. 42Page 57 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 57 of 144 The OBBBA also includes provisions that remove federal tax credits for renewable energy. The OBBBA phases out the clean electricity production credit and the clean electricity investment tax credit for wind and solar projects that begin construction after July 4, 2026 and are not placed in service before December 31, 2027. Projects that begin construction prior to July 4, 2026 will remain eligible for investment tax credit benefits under the Inflation Reduction Act of 2022. The Company has evaluated the impacts of the OBBBA on our consolidated financial statements. The law will not have an impact on Eversource’s tax equity investment in the South Fork Wind project or the Revolution Wind project for which Eversource has remaining financial obligations. Under the OBBBA, clean energy credits, such as clean electricity investment, can lose eligibility if an entity is owned by, controlled by, or receives material assistance from certain prohibited foreign entities. This foreign ownership would include equity ownership and indirect involvement such as debt holdings and supply-chain relationships. The Company currently does not have any tax credits that qualify under the new OBBBA rules. Connecticut: On July 1, 2025, Connecticut enacted Public Act No. 25-173, An Act Concerning Energy Affordability, Access, and Accountability, (Senate Bill No. 4) (the Act), which aims to reduce electric rates for Connecticut retail customers by up to $300 million over the next two years in the public benefits charges on electric bills for hardship protection measures and electric vehicle program costs through the issuance of state bonds that would fully fund these state-mandated program costs in lieu of collecting these amounts in electric rates. The Act authorizes the State of Connecticut to issue up to $125 million in new general obligation bonds for each fiscal year 2026 and 2027 to reduce costs of hardship protection measures charged to retail customers, of which 67 percent of each issuance will be allocated to CL&P, and $30 million for fiscal year 2026 and $20 million for fiscal year 2027 in new general obligation bonds to fund the electric vehicle charging program, of which 80 percent of each issuance will be allocated to CL&P. Rate reductions were implemented prospectively beginning September 1, 2025 in CL&P’s revenue adjustment mechanism. The Act authorizes the securitization of storm-related expenses for the period January 1, 2018 through January 1, 2025, which covers the majority of deferred storm costs on the CL&P balance sheet, as well as advanced metering infrastructure (AMI) and legacy meter investments, allowing for the recovery of these costs from customers over a longer term to mitigate short-term rate impacts. The Act also seeks to reduce electric rates for retail customers by revising the statutory framework for renewable portfolio standards. The Act also directs PURA’s procurement manager, after consultation with the electric distribution companies, the Consumer Counsel and the Commissioner of DEEP, to file with PURA a proposed amendment to the plan to procure standard electric service that would authorize electric distribution companies to, among other things, make dynamic market purchases to attempt to reduce the average cost and minimize the price volatility of standard electric service. Implementation of the Act’s provisions will require further regulatory proceedings and administrative action. We do not anticipate any significant impact to our operating revenues or earnings as a result of the Act’s enactment. However, we expect PURA to initiate proceedings related to securitization, renewable portfolio standard obligations, and other provisions in the Act, which may impact future rate design and recovery mechanisms. On October 20, 2025, Governor Lamont nominated four new PURA commissioners who, along with an existing commissioner, enable the agency to now operate with the maximum number of commissioners. The four nominees will serve in an interim capacity until they are confirmed by the legislature. PFAS Settlements: Aquarion opted into class-action settlements with the defendants 3M Company, E.I. duPont de Nemours and Company, Tyco Fire Products LP, and BASF Corporation. These settlement agreements were entered to resolve claims of per- and polyfluoroalkyl substances (PFAS) contamination in the drinking water provided by public water systems. In July 2024 and April 2025, Aquarion and other qualifying class members submitted claims to receive settlement awards; these awards were allocated based on the overall number of claimants, PFAS concentrations and flow rates of water sources, and a variety of other factors. The final, total recovery from these settlements is unknown and will be based on the Claims Administrator’s review of the submitted claims and the subsequent allocation procedures. Aquarion anticipates receiving recovery from 3M Company over the next nine years and from E.I. duPont de Nemours and Company over the next two years. The schedule for BASF Corporation and Tyco Fire Products LP are unknown at this time. Aquarion has received $17.8 million of proceeds in 2025. Proceeds from the settlements will be used to fund capital expenditures. Critical Accounting Policies The preparation of financial statements in conformity with GAAP requires management to make estimates, assumptions and, at times, difficult, subjective or complex judgments. Changes in these estimates, assumptions and judgments, in and of themselves, could materially impact our financial position, results of operations or cash flows. Our management discusses with the Audit Committee of our Board of Trustees significant matters relating to critical accounting policies. Our critical accounting policies are discussed below. See the combined notes to our financial statements for further information concerning the accounting policies, estimates and assumptions used in the preparation of our financial statements. Regulatory Accounting: Our regulated companies are subject to rate regulation that is based on cost recovery and meets the criteria for application of accounting guidance for rate-regulated operations, which considers the effect of regulation on the timing of the recognition of certain revenues and expenses. The regulated companies' financial statements reflect the effects of the rate-making process. The rates charged to the customers of our regulated companies are designed to collect each company's costs to provide service, including a return on investment. 43Page 58 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-072 Attachment 5 Page 58 of 144 We believe that the operations of each of our regulated companies currently satisfy the criteria for application of regulatory accounting. If events or circumstances should change in a future period so that those criteria are no longer satisfied, we would be required to eliminate any associated regulatory assets and liabilities and the impact would be recognized in the statement of income and may result in a material adverse effect on results of operations and financial condition. The application of accounting guidance for rate-regulated enterprises results in recording regulatory assets and liabilities. Regulatory assets represent the deferral of incurred costs that are probable of future recovery in customer rates. Regulatory assets are amortized as the incurred costs are recovered through customer rates. In some cases, we record regulatory assets before approval for recovery has been received from the applicable regulatory commission. We must use judgment to conclude that costs deferred as regulatory assets are probable of future recovery. We base our conclusion on certain factors, including, but not limited to, regulatory precedent. Regulatory liabilities represent either revenues received from customers to fund expected costs that have not yet been incurred or probable future refunds to customers. We make judgments regarding the future outcome of regulatory proceedings that involve potential future refund to customers and record liabilities for these loss contingencies when probable and reasonably estimable based upon available information. Regulatory liabilities are recorded at the best estimate, or at a low end of the range of possible loss. The amount recorded may differ from when the uncertainty is resolved. Such differences could have a significant impact on our financial statements. We continually assess whether the regulatory assets and liabilities continue to meet the criteria for probable future recovery or refund. This assessment includes consideration of recent orders issued by regulatory commissions, the passage of new legislation, historical regulatory treatment for similar costs in each of our jurisdictions, discussions with legal counsel, the status of any appeals of regulatory decisions, and changes in applicable regulatory and political environments. We believe that we will continue to be able to defer and recover prudently incurred costs, including additional storm costs, based on the legal and regulatory framework. We use judgment when recording regulatory assets and liabilities; however, regulatory commissions can reach different conclusions about the recovery of costs, and those conclusions could have a material impact on our financial statements. The ultimate outcome of regulatory rate proceedings could have a significant effect on our ability to recover costs or earn an adequate return. Established rates are also often subject to subsequent prudency reviews by state regulators, whereby various portions of rates could be adjusted, subject to refund or disallowed. Storm restoration and pre-staging costs are subject to prudency reviews from our regulators. We have $2.06 billion of deferred storm costs that either have yet to be filed with the applicable regulatory commission, are pending regulatory approval, or are subject to prudency review as of December 31, 2025. Tropical Storm Isaias in August 2020 resulted in deferred storm restoration costs of approximately $232 million at CL&P as of December 31, 2025. Although in 2021 PURA found that CL&P’s performance in its preparation for, and response to, Tropical Storm Isaias fell below applicable performance standards in certain instances, CL&P believes it presented in its 2023 storm filing credible evidence demonstrating there is no reasonably close causal connection between the alleged sub-standard performance and the storm costs incurred. While it is possible that some amount of the Tropical Storm Isaias costs may be disallowed by PURA, any such amount cannot be estimated at this time. We believe that our storm restoration costs deferred were prudently incurred, meet the criteria for cost recovery, and are probable of recovery. We believe it is probable that each of our regulated companies will recover its respective investments in long-lived assets and the regulatory assets that have been recorded. If we determine that we can no longer apply the accounting guidance applicable to rate-regulated enterprises, or that we cannot conclude it is probable that costs will be recovered from customers in future rates, the applicable costs would be charged to net income in the period in which the determination is made. Pension, SERP and PBOP: We sponsor Pension, SERP and PBOP Plans to provide retirement benefits to our employees. Plan assets and the benefit obligation are presented on a net basis and we recognize the overfunded or underfunded status of the plans as an asset or liability on the balance sheet. These amounts are remeasured annually using a December 31st measurement date. For each of these plans, several significant assumptions are used to determine the projected benefit obligation, funded status, and net periodic benefit expense/income. These assumptions include the expected long-term rate of return on plan assets, discount rate, compensation/progression rate, cash balance interest crediting rate and mortality and retirement assumptions. We evaluate these assumptions annually and adjust them as necessary. Changes in these assumptions could have a material impact on our financial position, results of operations or cash flows. Expected Long-Term Rate of Return on Plan Assets Assumption: In developing the expected long-term rate of return, we consider historical and expected returns, as well as input from our consultants. Our expected long-term rate of return on assets is based on assumptions regarding target asset allocations and corresponding expected rates of return for each asset class. We routinely review the actual asset allocations and periodically rebalance the investments to the targeted asset allocations. For the year ended December 31, 2025, our expected long-term rate-of-return assumption used to determine our pension and PBOP expense was 8.25 percent for the Eversource Service Pension and PBOP plans. For the forecasted 2026 pension and PBOP expense, an expected long-term rate of return of 8.25 percent for the Eversource Service Pension and PBOP plans will be used reflecting our target asset allocations. Discount Rate Assumptions: Payment obligations related to the Pension, SERP and PBOP Plans are discounted at interest rates applicable to the expected timing of each plan's cash flows. The discount rate that was utilized in determining the pension, SERP and PBOP obligations was based on a yield-curve approach. This approach utilizes a population of bonds with an average rating of AA based on bond ratings by Moody's, S&P and Fitch, and uses bonds with above median yields within that population. As of December 31, 2025, the discount rates used to determine the funded status were within a range of 4.9 percent to 5.5 percent for the Pension and SERP Plans, and 5.4 percent to 5.5 percent for the PBOP Plans. As of December 31, 2024, the discount rates used were within a range of 5.6 percent to 5.7 percent for the Pension and SERP Plans, and 5.7 percent for the PBOP Plans. The decrease in the discount rates used to calculate the funded status resulted in an increase to the Pension and SERP Plans’ projected benefit obligation of $98.2 million and an increase to the PBOP Plans' projected benefit obligation of $11.2 million as of December 31, 2025. 44
As listed on the current system
Question(s) Answered 72 (CL&P dba Eversource Energy) Date Filed: 10/11/2026