Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 76, 80

Files10

Text of RRU-080_Final.pdf

Extracted from the file · 3 pages · 6,061 characters

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-080 Attachment 1 Page 1 of 1 The Connecticut Light and Power Company d/b/a Eversource Energy Proforma Adjustment (A) (B) Temporary Differences Description Deferred Income Taxes: Uncollectibles Capital Add Deferral - Asset Capital Tracker Deferral Electric Vehicle Program Regulatory Deferral - Miscellaneous Subtotal * $ 1,543 (12,456) 20,971 38,231 (2,756) 45,533 (C) CT SIT @ 0.0825 (D) FIT @ 0.21 127 (1,028) 1,730 3,154 (227) $ 3,756 297 (2,400) 4,041 7,366 (531) 8,773 Deferred Income Tax - Outside System Outside System Adjustment Fed Rate Change Amortization Deferred Income Tax - Outside System Total Deferred Income Taxes $ (E) Total Taxes $ 424 (3,428) 5,771 10,520 (758) 12,529 (4,275) 5,575 1,300 (4,275) 5,575 1,300 $ * Ties to Exhibit CLP REVREQ-2 (Schedules A,B,C,D) WP C-3.41 page 2 of 3 column (C) line 72 (519) $ 14,348 $ 13,829

Text of RRU-080 Attachment 1.xlsx

Extracted from the file

Text of RRU-080 Attachment 2.pdf

Extracted from the file

Text of RRU-080 Attachment 2.xlsx

Extracted from the file

Text of RRU-080 Attachment 3.pdf

Extracted from the file

Text of RRU-080 Attachment 3.xlsx

Extracted from the file

As listed on the current system

Question(s) Answered 76, 80 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)