Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 76, 80

Files10

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
1 page match
Words on different pages

Text of RRU-076 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

1 page match

Text of RRU-080 Attachment 1.pdf

Extracted from the file · 1 page · 991 characters

Text of RRU-080 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-080 Attachment 2.pdf

Extracted from the file · 1 page · 1,721 characters

Text of RRU-080 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-080 Attachment 3 Page 1 of 1 Connecticut Light and Power - Distribution Accumulated Provision for Deferred Income Taxes Reconcilation As of July 1, 2027 2027-2028 Activity Tax Depreciation Section 263A Costs Repairs Federal Rate change Total 2027-2028 Activity 1,251,181 12,208 Ties to WP C-3.41 page 3 of 3 (Line 41) 7,106 Ties to WP C-3.41 page 3 of 3 (Line 42) 4,971 Ties to WP C-3.41 page 3 of 3 (Line 43) 58 24,343 As of June 30, 2028 1,275,524 Rate Year 1 Year Average 1,263,353

Text of RRU-080 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 76, 80 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)