Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy19 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files19

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
Words on different pages
1 page match
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-019 Page 1 of 1 Date Filed: October 08, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 37. Provide documentation on how the Company reached the conclusion on vegetation growth and trimming efficiency based on 1-2 years’ time for contact. Response: Please refer to Exhibit CLP-VMP-1, at page 36, line 8, through page 37, line 7. This section of the testimony discusses the changes in the proposed Scheduled Maintenance Trim (“SMT”) budget and cost efficiencies that could be achieved by transitioning Scheduled Maintenance Trimming (“SMT”) to full circuit trimming rather than targeted condition-based trimming, which is based on the comparison of cycle trimming costs and condition-based trimming costs derived from the analysis of terrestrial LiDAR collection. Please also refer to Exhibit CLP-VMP-2, on page 34, for the demonstration of cycle-based, condition-based, and selective condition-based trimming mileage and costs for years one through eight, and on page 15, for a description of condition-based and cycle approaches that the Company utilized. Condition-based and selective condition-based trimming scenarios use risk levels 5 (highest risk) to 0 (lowest risk). Risk levels 5 through 1 are stratified within portions of the established Utility Protection Zone and correspond to the Company’s Standard Maintenance Trimming specification. In this context, it is more operationally and financially efficient to trim all risk levels under a full circuit trimming program in Year 1, rather than trimming lower risk levels (e.g. risk levels 2 and 1) at a higher cost in Year 2 through Year 3.

Text of RSR-020_Final.pdf

Extracted from the file · 1 page · 933 characters

Words on different pagesRead the text of RSR-020_Final.pdf

Text of RSR-022_Final.pdf

Extracted from the file · 1 page · 1,562 characters

Words on different pagesRead the text of RSR-022_Final.pdf

Text of RSR-023_Final.pdf

Extracted from the file · 1 page · 1,335 characters

Words on different pagesRead the text of RSR-023_Final.pdf

Text of RSR-024_Final.pdf

Extracted from the file · 1 page · 1,159 characters

Words on different pagesRead the text of RSR-024_Final.pdf

Text of RSR-024 Attachment 1.pdf

Extracted from the file · 7 pages · 12,824 characters

Text of RSR-025_Final.pdf

Extracted from the file · 1 page · 902 characters

Words on different pagesRead the text of RSR-025_Final.pdf

Text of RSR-026_Final.pdf

Extracted from the file · 1 page · 884 characters

Words on different pagesRead the text of RSR-026_Final.pdf

Text of RSR-027_Final.pdf

Extracted from the file · 2 pages · 5,208 characters

Words on different pagesRead the text of RSR-027_Final.pdf

Text of RSR-028_Final.pdf

Extracted from the file · 2 pages · 4,250 characters

Words on different pagesRead the text of RSR-028_Final.pdf

Text of RSR-029_Final.pdf

Extracted from the file · 1 page · 1,147 characters

Words on different pagesRead the text of RSR-029_Final.pdf

Text of RSR-029 Attachment 1.pdf

Extracted from the file · 1 page · 4,661 characters

Text of RSR-029 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-030_Final.pdf

Extracted from the file · 1 page · 2,474 characters

Words on different pagesRead the text of RSR-030_Final.pdf

Text of RSR-030 Attachment 1.pdf

Extracted from the file · 189 pages · 554,513 characters

Text of RSR-030 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)