Interrogatory responses

Answers to questions 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy19 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files19

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
Words on different pages
1 page match

Text of RSR-019_Final.pdf

Extracted from the file · 1 page · 1,861 characters

Words on different pagesRead the text of RSR-019_Final.pdf

Text of RSR-020_Final.pdf

Extracted from the file · 1 page · 933 characters

Words on different pagesRead the text of RSR-020_Final.pdf

Text of RSR-022_Final.pdf

Extracted from the file · 1 page · 1,562 characters

Words on different pagesRead the text of RSR-022_Final.pdf

Text of RSR-023_Final.pdf

Extracted from the file · 1 page · 1,335 characters

Words on different pagesRead the text of RSR-023_Final.pdf

Text of RSR-024_Final.pdf

Extracted from the file · 1 page · 1,159 characters

Words on different pagesRead the text of RSR-024_Final.pdf

Text of RSR-024 Attachment 1.pdf

Extracted from the file · 7 pages · 12,824 characters

Text of RSR-025_Final.pdf

Extracted from the file · 1 page · 902 characters

Words on different pagesRead the text of RSR-025_Final.pdf

Text of RSR-026_Final.pdf

Extracted from the file · 1 page · 884 characters

Words on different pagesRead the text of RSR-026_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-027 Page 1 of 2 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 47. Has the Company attempted to estimate how the new trimming program would improve SAIDI scores? Explain. Response: The System Average Interruption Duration Index (“SAIDI”) reflects both the number of customers interrupted and the duration of those interruptions. The impact of a vegetation-related outage varies based on the location and nature of the event, the extent of equipment damage, the availability of information identifying the outage and its location, and the field conditions and work required to safely restore service. Weather, access limitations, and the number of concurrent outages also affect restoration duration. The proposed Vegetation Management Plan (“VMP”) is intended to reduce vegetation-related outages; however, these event-specific factors limit the Company’s ability to translate the proposed program into quantified improvements in SAIDI. The Company’s Reliability Tree Work (“RTW”) program is designed to allow the Company to address the locations on scheduled circuits where overhang and Enhanced Tree Trimming (“ETT”) clearances were not previously achieved on the portion of those circuits that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were addressed through the ETT program over 20 years ago. RTW will encompass trimming of overhanging branches, as overhanging branches that break and fall on the power lines account for approximately 24% of the tree-related outages on the system. By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated. The program will also strive to remove all overhang and trees in close proximity, although the Company remains constrained by tree owner consent and tree warden limitations. Please refer to Exhibit CLP-VMP-1 on page 30-31, summarized on page 19 of Exhibit CLP-VMP2, where the Company proposes the RTW program. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-027 Page 2 of 2 Please refer to pages 49-51 of Exhibit CLP-VMP-1 which is also summarized on page 11 of Exhibit CLP-VMP-2. The Company selected 21 circuit zones with high System Average Interruption Duration Index (SAIDI) for targeted vegetation management in 2023. The table and summary table on page 50 of Exhibit CLP-VMP-1 below shows pre- and post-treatment customer reliability (CMI and CI) for circuit zones that received targeted vegetation management. This targeted vegetation management included seeking to remove within 10 feet of the outermost conductor and all overhanging vegetation. On average, the segments where targeted vegetation management was performed experienced a 94% reliability improvement demonstrating a benefit for these circuits associated with removal of overhang, trees that are too close to the distribution system, and removal of high-risk trees. The University of Connecticut 2022 Study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks (please refer to Exhibit CLP-VMP-4), demonstrated that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” The reliability improvements were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “when compared with previous studies in the effectiveness of vegetation management activities, this analysis provides a better understanding of how more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” Please refer to Exhibit CLP-TSP-3 where the company estimates approximately 3% reliability improvement resulting from the proposed VMP, and to Exhibit CLP-TSP-4, where the Company illustrates the impact of enhanced vegetation management and an estimated 35% SAIDI improvement on zones that currently have bare wire conductor and have had on average more than one (1) interruption per year in the examined period (2020-2023).

Text of RSR-028_Final.pdf

Extracted from the file · 2 pages · 4,250 characters

Words on different pagesRead the text of RSR-028_Final.pdf

Text of RSR-029_Final.pdf

Extracted from the file · 1 page · 1,147 characters

Words on different pagesRead the text of RSR-029_Final.pdf

Text of RSR-029 Attachment 1.pdf

Extracted from the file · 1 page · 4,661 characters

Text of RSR-029 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-030_Final.pdf

Extracted from the file · 1 page · 2,474 characters

Words on different pagesRead the text of RSR-030_Final.pdf

Text of RSR-030 Attachment 1.pdf

Extracted from the file · 189 pages · 554,513 characters

Text of RSR-030 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)