Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy19 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files19

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
Words on different pages
1 page match

Text of RSR-019_Final.pdf

Extracted from the file · 1 page · 1,861 characters

Words on different pagesRead the text of RSR-019_Final.pdf

Text of RSR-020_Final.pdf

Extracted from the file · 1 page · 933 characters

Words on different pagesRead the text of RSR-020_Final.pdf

Text of RSR-022_Final.pdf

Extracted from the file · 1 page · 1,562 characters

Words on different pagesRead the text of RSR-022_Final.pdf

Text of RSR-023_Final.pdf

Extracted from the file · 1 page · 1,335 characters

Words on different pagesRead the text of RSR-023_Final.pdf

Text of RSR-024_Final.pdf

Extracted from the file · 1 page · 1,159 characters

Words on different pagesRead the text of RSR-024_Final.pdf

Text of RSR-024 Attachment 1.pdf

Extracted from the file · 7 pages · 12,824 characters

Text of RSR-025_Final.pdf

Extracted from the file · 1 page · 902 characters

Words on different pagesRead the text of RSR-025_Final.pdf

Text of RSR-026_Final.pdf

Extracted from the file · 1 page · 884 characters

Words on different pagesRead the text of RSR-026_Final.pdf

Text of RSR-027_Final.pdf

Extracted from the file · 2 pages · 5,208 characters

Words on different pagesRead the text of RSR-027_Final.pdf

Text of RSR-028_Final.pdf

Extracted from the file · 2 pages · 4,250 characters

Words on different pagesRead the text of RSR-028_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-029 Page 1 of 1 Date Filed: October 09, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John P. Dipaola-Tromba, John G. Griffin and Leanne M. Landry Request from: Public Utilities Regulatory Authority Question: (NON-CATASTROPHIC STORMS) Ex. CLP-REVREQ-2, Sch. WP C-3.28. In an unlocked Excel spreadsheet with formulas intact, provide a listing of all work orders for Test Year non-catastrophic and pre-staging incremental storm expenses. Each work order should include the following information: a. b. c. d. e. f. g. h. i. the date range covered by the work order; total non-catastrophic and pre-staging costs; total direct labor costs; total payroll-related overhead costs; total outside contractor and vendor costs; food and lodging costs; materials costs; vehicle and lodging costs; and employee expenses/other. Response: Referring to CLP-REVREQ-2, Sch. WP C-3.28. Please refer to RSR-029, Attachment 1, detailing all work orders for Test Year non-catastrophic and pre-staging incremental storm expenses.

Text of RSR-029 Attachment 1.pdf

Extracted from the file · 1 page · 4,661 characters

Text of RSR-029 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-030_Final.pdf

Extracted from the file · 1 page · 2,474 characters

Words on different pagesRead the text of RSR-030_Final.pdf

Text of RSR-030 Attachment 1.pdf

Extracted from the file · 189 pages · 554,513 characters

Text of RSR-030 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 14, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27, 28, 29, 30 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)