Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Words on different pages
  1. Page 18 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 18 of 864 The chlordane concentration in samples B24/MW6 0-2 fbg and B55 0-2 fbg (near the northeast corner of the barn) are above the RDEC. The pesticide releases at B24/MW6 and B55 were delineated vertically by samples B24A 2-4 fbg and B25 2-4 fbg and laterally by samples B57 0-2 fbg and B56 2-4 fbg. Remediation is required near B24/MW6 and B55 and the pesticide contamination is sufficiently delineated vertically and laterally in most directions to proceed with remediation. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil except for elevated concentrations of arsenic, barium, cadmium, chromium, lead, mercury, nickel and/or zinc in L1985-9, L1985-10MW, B26, B48 and B51. Where tested, these samples did not contain detectable pesticides. Leachable metals in the tested samples are compliant with the GA PMC except as described below. Total arsenic in sample B29 6-8.5 fbg exceeds the RDEC and I/C DEC and leachable arsenic and lead exceed the GA PMC. The metals exceedances in B29 were delineated vertically by soil sample B29 9-11 fbg and laterally by soil samples B50 6-8 fbg, B51 6-7.5 fbg, B49 4-6 fbg and B49 6-8 fbg. Remediation is required near the boring and the contamination is sufficiently delineated vertically and laterally to proceed with remediation. The leachable lead concentration in soil sample B44 2-4 fbg exceeds the GA PMC. The exceedance is delineated vertically by B44 4-6 fbg and partially delineated laterally by B28 6-8 fbg. Additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. The ETPH, VOC, PAH, pesticide and metals contaminants co-occur in backfill material that is within the footprint of the barn. The contamination is attributed to the presence of demolished building materials including ash, and may also contain materials that were stored in the basement prior to the fire. The contaminated material requiring remediation is likely irregular and may occur throughout the entire barn footprint. COCs were not detected in groundwater samples collected in May 2021, September 2023 and May 2024 from L1985-10MW located within the barn/warehouse footprint. Evidence of a surficial pesticide release in the vicinity of the outdoor storage area near the northwest corner of the barn was identified based on surficial soil samples tested from B31, B42 and B43. Surficial samples collected from B31, B42 and B43 that contained total pesticides above the GA PMC were tested for leachable pesticides with the results below the GWPC, demonstrating compliance with the PMC. The pesticide release to surficial soil by B31, B42 and B43 has been sufficiently delineated and no further evaluation is warranted. In addition, a deeper soil sample collected from 12 to 14 fbg at B42 contained total pesticides below applicable criteria. The contamination in the deeper sample may be due to releases near B31, B42 and B43 or from a release associated with an unknown source or off-site source located upgradient of the former outdoor storage area. Samples collected at B28 6 to 8 fbg and below the water table at B28 16 to18 fbg and B44 16-18 fbg, located outside of the barn foundation and downgradient of the release area at B31, B42 and B43, contained total pesticides in some cases, above the GA PMC. Leachable pesticides in the samples were below the GWPC, demonstrating compliance with the PMC. The contamination at B28 and B44 may be related to pesticide storage at or near the two borings if the outdoor storage area encompassed the area immediately west of the building. The contamination in samples collected below the water table may be due to releases in the storage area or to an unknown source or off-site source located upgradient of these borings that resulted in down gradient, soil-adsorbed contamination below the water table. Based on the current data, remediation is not required, however additional investigations are warranted. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 10 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  2. Page 19 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 19 of 864 Based on conditions observed in six borings completed in the reported area of the UST, the UST is no longer present and was apparently removed from the ground. Evidence of a release in the vicinity of the UST was not observed based on surficial and deeper samples analyzed from B24/MW6, B24A, B25, B55, B56 and B57. In addition, groundwater collected from B24/MW6 did not contain detectable levels of ETPH, VOCs or PAHs. Lowlevel PAH detections in surficial soil at B24/MW6, B55 and B57 are likely related to runoff from adjacent paved surfaces containing PAHs leached from asphalt pavement. Sufficient investigation associated with the UST has been completed and remediation is not required. 4.1.5 REC 4 - Release from Snow Removal Equipment Snow removal equipment is at times stored in the eastern end of the northern parking lot. During a site visit, Stantec observed oily staining on pavement in this area. One stain appeared wet from a recent equipment leak and was observed intersecting a crack in the pavement. Boring L1985-5MW, B12, B13 and B14 were used to evaluate the REC. COCs for REC 4 include VOCs, ETPH, and PAHs. A constituent of petroleum products, m,p-xylene, was detected below remedial criteria in a surficial soil collected from L1985-5MW; VOCs were not detected in surficial samples from B12, B13, and B14. Low-level ETPH and/or PAH contamination was detected in surficial soil at B12 and B13 at concentrations below remedial criteria. The release of fuel associated with snow removal equipment storage in this area apparently resulted in residual contamination below remedial criteria. The nature, extent and degree of VOC, ETPH and PAH contamination at this REC have been evaluated and all concentrations are below the RDEC and GA PMC, therefore additional evaluation or remediation is not warranted. COCs were not detected in groundwater collected in May 2021, September 2023 and May 2024 from L19855MW with the exception of ETPH in groundwater collected in May 2021. Although not a COC, nickel was detected in groundwater collected in May 2024. ETPH and nickel concentrations were below applicable criteria and groundwater collected in May 2021 was turbid which may have resulted in the apparent ETPH contamination due to soil-adsorbed contaminants in the sample. Samples collected in September 2023 and May 2024 from these wells were not turbid and ETPH was not detected. The nickel contamination may represent a transient condition, since the metal was detected on only one occasion. Additional groundwater monitoring will be required to evaluate compliance. 4.1.6 AOC 2 - Agricultural Use AOC 8 - Former Barns in the Central and Southeastern Portions of the Site The western and central portions of the Site were used for tobacco cultivation from before 1943 through the 1990s. In addition, three barns were located at the Site, one of which was located near the southern property line and reportedly used for chemical storage (see REC 3). The other barns are assumed to have been used for tobacco drying and were located in the southern portion of the stormwater detention basin and near the central portion of the current building. Borings L1985-3MW, L1985-6MW, L1985-7, and L1985-15, B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B6 through B9, B11, B12, B17 through B20, B20A, B32, B33, B59, B60 and B61 were used to evaluate the AOCs. Borings L1985-3MW, B3/MW3, B4/MW4 and B5/MW5 are downgradient of the former barn located in the central portion of the current building and B19, B20, B20A, B59, B60 and B61 are specific to the southeastern barn. The remainder of the samples are applicable to AOC 2. Samples used to characterize the Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 11 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  3. Page 20 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 20 of 864 area near the southern barn (REC 3) and the suspected dumping area (AOC 4) are discussed in Sections 4.1.4 and 4.1.8, respectively. COCs identified for AOCs 2 and 8 include VOCs, ETPH, SVOCs or PAHs (AOC 8); and, pesticides, herbicides and RCRA 8 metals plus copper, nickel, and zinc (AOCs 2 and 8). Pesticides (primarily DDD, DDE, DDT, dieldrin and/or chlordane) were detected above the GA PMC in surficial soil from borings L1985-7, L1985-15, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B9, B11, B12, B17, B18, B19, B20, B33, B59, B60 and B61 and in 2-4 foot-interval samples from B60 and B61. Lower levels of pesticides, below criteria, were detected in other surficial and deeper samples. Samples containing the highest concentrations of pesticides were tested for leachable pesticides which were not detected or were below the GWPC, demonstrating compliance with the GA PMC. Chlordane was detected at AOC 8 in B20 0-2 fbg at a concentration above the RDEC and below the I/C DEC. The release is delineated vertically by sample B20A 2-4 fbg and laterally by samples B59 0-2 fbg, B60 0-2 fbg and B61 0-2 fbg. Remediation is warranted to attain compliance with the RDEC. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil except for elevated concentrations of specific metals at the following AOC 2 borings: L1985-7 (nickel), B17 (copper, nickel and zinc) and B18 (copper, lead and zinc). Total and leachable metals concentrations at these locations are compliant with the RDEC and GA PMC. Herbicides were not detected in samples applicable to AOCs 2 and 8. In some cases, pesticides and elevated metals co-occur in surficial soil throughout the Site. The concentrations are consistent with historical application of pesticides. Sufficient investigation has been completed associated with AOC 2 and remediation is not required. ETPH and VOCs were not detected in samples collected at AOC 8. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil. Low-level PAH contamination (below criteria) is present in surficial soil at B1/MW1 and as described in Section 4.1.9, may be due to placement of contaminated backfill during construction of the building or to leaching of PAHs from asphalt pavement. Remediation or additional evaluation of the contamination is not warranted. One of more PAHs were detected in B20 0-2 fbg, B59 0-2 fbg, B60 0-2 fbg and B61 0-2 and 2-4 fbg. The concentrations in B61 0-2 fbg are above the RDEC. The contamination does not appear to be due to storage of chemicals inside the former barn since the same PAHs, with similar ratios, were detected in samples collected in the northwestern portion of the stormwater detention basin, approximately 200 ft. from the former barn location, and in the suspected dumping area (AOC 4), approximately 150 ft. west of the former barn. The PAHs in all three locations are likely related to impacts from stormwater containing PAHs leached from asphalt parking areas and the roadway. COCs were not detected in groundwater collected from wells B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5 L1985-3MW and L1985-6MW in May 2021, September 2023 and/or May 2024 with the exception of the following: • Pesticides (dieldrin, heptachlor epoxide) and chromium were detected in the sample collected from L1985-3MW in May 2024 with dieldrin above the GWPC. • SVOCs (benzyl alcohol, 2-methyl phenol and 3+4 methyl phenol) were detected in the sample collected from L1985-3MW in September 2023 below applicable criteria. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 12 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  4. Page 21 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 21 of 864 The pesticide, chromium and SVOC contamination may represent transient conditions, since they were detected on one occasion. Additional groundwater monitoring will be required to evaluate compliance. 4.1.7 AOC 3: Exterior Oil-Filled Transformers Several pad-mounted oil-filled electrical transformers are present at the Site. One transformer is located near the northwestern corner of the building, one near the southeastern corner of the building (west of the loading docks), one in the northeastern corner of the site, and transformers and/or electrical equipment are located near the northwestern corner of the stormwater detention basin. A spill of less than 1 gallon of oil was documented at one of the transformers, which was reportedly contained and removed. Soil samples collected from borings L1985-12, -13, -14 and B15, B16, B33 and B34 were used to evaluate the AOC. COCs identified for AOC 3 are ETPH and PCBs. PCBs were not detected in surficial samples collected from the borings. Low-level ETPH contamination was detected in surficial soil at L1985-12 (northwestern corner of the building), L1985-13 (southeastern corner of the building), and L-1985-14 (northeastern corner of the site); concentrations are below remedial criteria. ETPH was not detected in surficial soil collected near transformers in the northeastern corner of the site (B15 and B16) or near the northwestern corner of the stormwater detention basin B33 and B34). The low levels of ETPH near the transformers may be related to residual contamination from normal equipment maintenance activities. The nature, extent and degree of ETPH contamination near the transformers have been sufficiently evaluated, and concentrations are below the RDEC and GA PMC, therefore additional evaluation or remediation is not warranted. 4.1.8 AOC 4 – Suspected Dumping Area Historical dumping was identified throughout the Site as indicated in a 2000 Phase I ESA reviewed by Stantec during its completion of the 2021 Phase I ESA. In 2021, Stantec observed a sign near the southeastern corner of the Site that read “No Dumping”. Small amounts of trash were observed in this area indicating the dumping had occurred. COCs identified for AOC 4 include VOCs, ETPH, SVOCs, PCBs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel and zinc. Soil samples collected from borings L1985-11, B21, B22, B23/MW7, B62, B63 and B64 were used to evaluate this AOC. VOCs were not detected in surficial samples collected from the borings. Surficial soil samples collected from L1985-11, B21, B22, B23/MW7, B62, B63 and B64 contained PAHs, ETPH, and/or pesticides at concentrations below applicable RSR criteria, and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exceptions: • PAHs concentrations in B21 and B64 are above the RDEC and GA PMC; leachable PAHs were not detected in sample B21 demonstrating compliance with the PMC. Total arsenic and lead were elevated in B21, but below criteria. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 13 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  5. Page 22 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 22 of 864 • • Leachable lead in B23/MW7 exceeds the GA PMC and an elevated level of total mercury was present, below criteria. Pesticides were present in B21, B22, B23/MW7, B62, B63 and B64 at concentrations above the GA PMC; leachable pesticides were below the GWPC demonstrating compliance with the PMC with the exception of dieldrin in B23/MW7 and B64. The dieldrin concentration in B64 exceeds the RDEC. COCs were not detected in groundwater collected in September 2023 and May 2024 from B23/MW7. The PAH, metals and/or pesticide releases in B21, B23/MW7, B63 and B64 were delineated vertically by soil samples collected from 2-4 fbg. Remediation is required near the borings and the releases have been sufficiently delineated to proceed with remediation. 4.1.9 AOC 5 – Former JDS Uniphase Site Operations The Site was developed with the current site building circa 2000 and occupied by JDS until 2004 when the building was occupied by Eversource for use as office space and a call/data center. JDS manufactured fiber optic components. Areas where JDS may have used and managed chemicals included two production areas, a clean room, and loading dock area at locations shown on Figure 5. JDS was a SQG of hazardous waste, including ignitable waste, corrosive acids, corrosive bases, spent halogenated and non-halogenated solvents, bisphenol (epoxy adhesive), chromium, silver, lead, alcohols, acetone, chlorobenzene and toluene. Chemicals used in JDS processes include degreasers, silver-containing solutions, potassium iodine gold etch, acids and caustics. Phase III and Supplemental investigations included borings and monitoring wells located along the downgradient southern and eastern sides of the building (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5 and L1985-3MW), borings completed in the southeastern portion of the building in the JDS clean room (B35 through B39), and soil vapor samples collected throughout JDS production and clean room areas and the loading dock (SV-1 through SV-18). COCs identified for AOC 5 include VOCs, ETPH, SVOCs, alcohols, and RCRA 8 metals plus copper, nickel, and zinc. In addition, 1,4-dioxane and PFAS are COCs since former manufacturing of fiber optic components may have used or generated wastes containing these emerging contaminants. Surficial and water table soil samples collected from B1/MW1 through B5/MW5 did not contain detectable VOCs, ETPH, SVOCs or alcohols and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exceptions: • Low levels of PAHs in surficial, or near-surface, samples from B1/MW1, B4/MW and B5/MW, below criteria. The apparent PAH contamination in soil at the above locations near the building may be due to placement of contaminated soil as backfill during construction of the building or to leaching of PAHs from pavement (at B1/MW1). These detections are not attributed to JDS operations inside the building. Remediation or additional evaluation of the apparent contamination is not warranted. Groundwater collected from the wells did not contain detectable concentrations of VOCs, ETPH, SVOCs, PFAS, alcohols or metals with the following exceptions: • Barium was detected in the majority of samples, at concentrations within the range which occurs naturally in groundwater. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  6. Page 23 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 23 of 864 • • PFAS compounds were detected in all of the samples at concentrations ranging 8.5 ng/L to 55 ng/L. The highest concentrations were detected in L1985 -3MW and B4/MW4, located near the southeastern corner of the building downgradient of the largest Production Area, the Clean Room and the loading area. Note that these concentrations are the sum of compounds (perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)) which have established soil remediation criteria and an established GWPC of 70 ng/L. The reported concentration sums were below the GWPC. In addition, there were two or three other PFAS compounds detected which do not have established groundwater criteria. Perfluorodecanesulfonic acid (PFDS) was not detected in groundwater samples despite its presence in one soil sample (discussed below). Note that other groundwater remedial criteria (SWPC, RVC or I/C VC) for PFAS have not been established which, when established, would apply to the Site. The SVOCs 2-methyl phenol, 3+4 methyl phenol and benzyl alcohol were detected previously in groundwater collected from L1985-3MW, located near the loading docks, at concentrations below applicable RSR criteria, where established. The presence of these compounds may be associated with former JDS operations at the site. SVOCs were not detected in the most recent round of groundwater samples. Soil samples collected inside the building did not contain detectable concentrations of VOCs, 1,4-dioxane, ETPH, SVOCs, PFAS or alcohols and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exception: • • PFDS was detected at 0.11 µg/kg in B36 0.5-1.5 fbg; PFAS were not detected in a deeper sample from the boring or in borings northeast and south-southwest of the boring. The location of the boring is shown on Figure 5. Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Remedial criteria for PFDS have not been established. The nature, extent and degree of PFAS contamination in soil has been sufficiently evaluated and remediation is not required based on the existing data. Sub-slab soil vapor samples were collected from vapor points and tested for VOCs, including 1,4-dioxane, to indicate where potential soil or groundwater source areas may be present associated with the former JDS operations. Nine VOC compounds, including 1,4-dioxane, acetone, MEK, ethanol, isopropyl alcohol, ethylbenzene, xylenes (m,p- and o-), and PCE) were detected in soil vapor collected from one or more of the sub-slab vapor points (SSVPs) in November 2023 (during the heating season), whereas only acetone and ethanol were detected in vapor collected during the cooling season in August 2024 . The concentrations detected during the sampling are below residential and industrial/commercial soil vapor volatilization criteria, where established. Since the results of testing during the two sampling events are vastly different, a third round of sampling is planned during the 2024/2025 heating season to determine whether detections reported in November 2023 are representative. 4.1.10 AOC 9: Potential Off-Site Sources The undeveloped land west, and upgradient, of the Site (1995 Blue Hills Avenue Extension) was formerly used for agricultural purposes (i.e., tobacco cultivation). Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  7. Page 24 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 24 of 864 COCs identified for AOC 9 include VOCs, ETPH, PAHs, pesticides, herbicides and RCRA 8 metals plus copper, nickel, and zinc. Boring L1985-6MW, as well as soil samples collected below the water table from borings located in the southwestern portion of the Site (B28 16-18 fbg and B44 16-18 fbg), were used to evaluate this AOC. COCs were not detected in soil sample L1985-6MW 12-14 fbg collected below the water table. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil. Pesticides were detected in soil collected below the water table at B28 and B44 above the GWPC, however leachable pesticides were below the GWPC, demonstrating compliance with the PMC. The contamination may be due to releases in the REC 3 storage area or to an off-site source located upgradient of these borings that resulted in downgradient, soil-adsorbed contamination below the water table. Based on the current data, remediation is not required, however additional investigations are warranted. The pesticides (DDE, DDT and heptachlor epoxide) were detected at concentrations below RSR criteria in groundwater collected on two occasions from L1985-6MW. The well is the most upgradient well, located northwest of the site building and downgradient of the adjacent parcel that was formerly used for agricultural purposes. The presence of pesticides in L1985-6MW is likely associated with agricultural use of the adjacent property, and/or other properties located upgradient of the Site since these pesticides have not been detected in groundwater samples collected from other on-site wells. 4.1.11 Site-Wide Groundwater Quality Depths to groundwater measured in May 2021 at L1985-3MW, -5MW, -6MW and -10MW ranged from approximately 10.6 to 17.3 fbg. Depths to groundwater measured on September 21, 2023 at Phase II/III wells ranged from approximately 8.9 to 15.6 fbg. Depths to groundwater measured on May 13, 2024 at the wells ranged from approximately 7.3 to 14.0 fbg. Depths measured in May 2024 were approximately three feet shallower compared to May 2021 and the May 2024 data may represent the seasonal high water table. Depth to groundwater during the seasonal low water table, typically September or October, is unknown since the depths to water measured in May 2021 (typical high water time period) were significantly lower than measured in September 2023. Groundwater flow on all three occasions was toward the southeast. Groundwater samples collected in September 2023 and/or May 2024 from the site-wide monitoring wells were analyzed for one or more AOC-specific COCs, including VOCs, 1,4-dioxane, ETPH, SVOCs, herbicides, pesticides, alcohols, glycols, PFAS and RCRA 8 metals plus copper, nickel and zinc, Contaminants were not detected in groundwater with the exceptions described above, specific to individual AOCs and RECs. Other results are discussed below. ETPH was detected in groundwater collected in May 2021 from L1985-5MW and L1985-6MW, and copper, lead, and nickel were detected in groundwater collected from L1985-6MW. All concentrations are below the GWPC and SWPC with the exception of ETPH in L1985-6MW, which exceeded the GWPC, SWPC, RVC and the I/C VC. Based on groundwater sampling logs provided in the Phase II report, samples collected from L19855MW and -6MW were turbid which may have resulted in the apparent groundwater contamination due to soiladsorbed contaminants in samples. Samples collected in September 2023 and May 2024 from these wells were not turbid, and ETPH and elevated levels of metals were not detected with the exception of nickel in L1985-5MW, detected at a concentration below the GWPC and SWPC during May 2024. The well is located near the northeastern corner of the building and groundwater beneath the northeastern portion of the building may flow toward the well. Barium was detected in groundwater collected in 2021, 2023 and 2024 from several wells at concentrations below applicable RSR criteria and within the range of naturally-occurring concentrations present in Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  8. Page 25 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 25 of 864 uncontaminated groundwater. The data do not represent the presence of a barium source area or groundwater contamination, and additional investigation of barium that is present in several groundwater samples is not warranted. 4.2 Non-Aqueous Phase Liquid Remediation Standards Removal of non-aqueous phase liquids (NAPL) from soil and groundwater are required by the RSRs to the maximum extent practicable defined as the greatest degree of remediation that can be achieved using sound engineering and hydrologic practices without taking cost into consideration. NAPL was not observed in soil samples collected from borings completed at the Site and in groundwater collected from monitoring wells at the Site during previous investigations. 5.0 REMEDIAL ACTION OPTIONS The potential remedial approaches for release areas that require remediation include excavation and off-site disposal of soil containing ETPH, pesticides, metals and/or PAHs, use of RSR exemptions, variances or alternative criteria, and administrative controls. 5.1 Option 1: Soil Excavation Option 1 includes excavation/removal and off-site disposal or reuse of soil that does not meet the RDEC and GA PMC as shown on Table 2A. The extents of the proposed excavation areas are shown on Figure 6A and the estimated extent of excavations, contaminants that exceed criteria, approximate excavation depths and volume of soil in each of the RECs and AOCs requiring remediation are presented below. RECs and AOCs (Sample and Depth Interval) AOC 6 (B10 0.3-1 fbg) AOC 4 (B21 0-2 fbg) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Approx. Depth (ft.) Approx. Volume (cu. yd.) ETPH (RDEC) 130 1 (0-1 fbg) 5 1,200 2 (0-2 fbg) 90 1,000 2 (0-2 fbg) 80 800 2 (0-2 fbg) 60 180 REC 3 (B24/MW6 0-2 fbg and B55 0-2 fbg) PAHs (RDEC) Leachable Lead (Pb) and/or Leachable Pesticides (dieldrin) (GA PMC) PAHs (RDEC/GA PMC*) Pesticides (dieldrin) (RDEC), Leachable Pesticides (dieldrin) (GA PMC) Pesticides (chlordane) (RDEC) PAHs (RDEC/GA PMC*) Pesticides (chlordane) (RDEC) REC 3 (B56 2-4 fbg and B56 4-6 fbg) PAHs (RDEC and GA PMC*) 800 6 (0-6 fbg) REC 3 (B26 5-7.5 ft.) ETPH (RDEC) 9300 8 (0 to 7.5 fbg) AOC 4 (B23/MW7 0-2 fbg) AOC 4 (B64 0-2 fbg) AOC 8 (B20 0-2 fbg) AOC 8 (B61 0-2 fbg) Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  9. Page 26 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 26 of 864 RECs and AOCs (Sample and Depth Interval) REC 3 (B29 6-8.5 ft.) REC 3 (B27 2-4 ft.) REC 3 (B44 2-4 ft.) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Arsenic (As) (RDEC) Leachable As and Pb (GA PMC) PAHs (RDEC) Leachable Pb (GA PMC) Approx. Depth (ft.) 9 (0 to 8.5 fbg) 4 (0 to 4 fbg) 400 4 (0 to 4 fbg) Total Approx. Volume (cu. yd.) 2,800 (assumes excavation to 8 fbg) 60 3,300 *Assumes leachable PAH concentrations in untested samples are similar to concentrations in samples tested which indicate compliance with the GWPC. Confirmatory sampling/testing will be required for leachable PAHs as well as other COCs. The advantages of this option include a permanent remedy in a short time period that allows for the fullest range of site redevelopment options without any use or activity limitations. Disadvantages include relatively high costs associated with soil removal and disposal when compared to the other scenarios described below. The estimated opinion-of-cost (+40/-20%) for this option ranges from $922,000 to $1,614,000. This estimate does not include landscape, surface or underground utility restoration costs (if necessary). A copy of the estimated opinion-of-cost for Option 1 is included in Appendix D. 5.2 Option 2: Soil Excavation and Use of Alternative Release-Specific PMC Option 2 includes excavation/removal and off-site disposal or reuse of impacted soil that does not meet the RDEC and GA PMC with exception of one of the soil areas that exceeds the GA PMC for lead, specifically at REC 3 near B44 (approximately 60 cu. yd.). Use of an LEP-calculated release-specific PMC allows comparison of total lead results to the alternative PMC. In accordance with RSR Section 22a-133k-2(d)(4), ZUVIC calculated an alternate PMC for lead of 234 mg/kg, as shown in Appendix B. Comparison of the alternate PMC to the total lead results from B44 2-4 fbg demonstrates that the soil meets the criterion. Note that soil collected at AOC 4 from B23/MW7 0-2 fbg and REC 3 from B29 6-8.5 fbg contain total lead below the alternate PMC, however there are other constituents in these samples (dieldrin or arsenic) that exceed criteria and excavation of soil will therefore be required under this option. Contaminant concentrations in these samples exceed alternative PMC calculated for total dieldrin and arsenic. Use of the alternative PMC is subject to the following conditions: • • Compliance groundwater monitoring is required in accordance with 22a-133-3(h) with results below applicable groundwater criteria (GWPC and SWPC). Notification to the Commissioner of the CTDEEP for the use of the optional criteria and submittal of the calculations in accordance with 22a-133k(g). Approval for use of alternative PMC is not required. The extents of the proposed excavation areas for option 2 are shown on Figure 6B and the estimated extent of proposed excavation, contaminants that exceed criteria, approximate excavation depths and volume of soil in each of the RECs and AOCs requiring remediation are presented below. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  10. Page 27 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 27 of 864 RECs and AOCs (Sample and Depth Interval) AOC 6 (B10 0.3-1 ft.) AOC 4 (B21 0-2 fbg) AOC 4 (B23/MW7 0-2 fbg) AOC 4 (B64 0-2 fbg) AOC 8 (B20 0-2 fbg) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Approx. Depth (ft.) Approx. Volume (cu. yd.) ETPH (RDEC) PAHs (RDEC) Leachable Pesticides (Dieldrin) (GA PMC) PAHs (RDEC/GA PMC*) Pesticides (Dieldrin) (RDEC), Leachable Pesticides (Dieldrin) (GA PMC) Pesticides (Chlordane) (RDEC) 130 1 (0-1 fbg) 5 1,200 2 (0-2 fbg) 90 1,000 2 (0-2 fbg) 80 AOC 8 (B61 0-2 fbg) PAHs (RDEC/GA PMC*) REC 3 (B24/MW6 0-2 fbg and B55 0-2 fbg) Pesticides (Chlordane) (RDEC) 800 2 (0-2 fbg) 60 REC 3 (B56 2-4 fbg and B56 4-6 fbg) PAHs (RDEC and GA PMC*) 800 6 (0-6 fbg) 180 REC 3 (B26 5-7.5 ft.) ETPH (RDEC) Arsenic (As) (RDEC) Leachable As (GA PMC) PAHs (RDEC) REC 3 (B29 6-8.5 ft.) REC 3 (B27 2-4 ft.) 8 (0 to 7.5 fbg) 9300 9 (0 to 8.5 fbg) 4 (0 to 4 fbg) Total 2,800 (assumes excavation to 8 fbg) 3,250 *Assumes leachable PAH concentrations in untested samples are similar to concentrations in samples tested which indicate compliance with the GWPC. Confirmatory sampling/testing will be required for leachable PAHs as well as other COCs. The advantages of this scenario include a reduction in the volume of contaminated soil to be excavated compared with Option 1, a relatively short remediation time period that allows for the fullest range of site redevelopment options without any use or activity limitations. Disadvantages of the scenario are similar to Option 1 and is contingent upon groundwater meeting remedial criteria. Use of the provision will require installation of a release-specific monitoring well at B44. Note that installation of a monitoring well near B44 and demonstration of groundwater compliance is required under all of the remedial options. The estimated opinion-of-cost (+40/-20%) for this option ranges from $900,000 to $1,575,000 . This estimate does not include landscape, surface or underground utility restoration costs (if necessary). A copy of the estimated opinion-of-cost for Option 2 is included in Appendix D. 5.3 Option 3: Soil Excavation and Industrial/Commercial Use Restriction This option includes excavation of soil exceeding the I/C DEC and GA PMC, incorporation of Option 2 for demonstrating compliance for lead at B44 (use of alternative PMC) and recordation of an EUR limiting site use to industrial/commercial. In addition, this option involves submitting a request to the CTDEEP for use of Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 19 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)