Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Words on different pages
  1. Page 23 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 23 of 864 • • PFAS compounds were detected in all of the samples at concentrations ranging 8.5 ng/L to 55 ng/L. The highest concentrations were detected in L1985 -3MW and B4/MW4, located near the southeastern corner of the building downgradient of the largest Production Area, the Clean Room and the loading area. Note that these concentrations are the sum of compounds (perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)) which have established soil remediation criteria and an established GWPC of 70 ng/L. The reported concentration sums were below the GWPC. In addition, there were two or three other PFAS compounds detected which do not have established groundwater criteria. Perfluorodecanesulfonic acid (PFDS) was not detected in groundwater samples despite its presence in one soil sample (discussed below). Note that other groundwater remedial criteria (SWPC, RVC or I/C VC) for PFAS have not been established which, when established, would apply to the Site. The SVOCs 2-methyl phenol, 3+4 methyl phenol and benzyl alcohol were detected previously in groundwater collected from L1985-3MW, located near the loading docks, at concentrations below applicable RSR criteria, where established. The presence of these compounds may be associated with former JDS operations at the site. SVOCs were not detected in the most recent round of groundwater samples. Soil samples collected inside the building did not contain detectable concentrations of VOCs, 1,4-dioxane, ETPH, SVOCs, PFAS or alcohols and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exception: • • PFDS was detected at 0.11 µg/kg in B36 0.5-1.5 fbg; PFAS were not detected in a deeper sample from the boring or in borings northeast and south-southwest of the boring. The location of the boring is shown on Figure 5. Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Remedial criteria for PFDS have not been established. The nature, extent and degree of PFAS contamination in soil has been sufficiently evaluated and remediation is not required based on the existing data. Sub-slab soil vapor samples were collected from vapor points and tested for VOCs, including 1,4-dioxane, to indicate where potential soil or groundwater source areas may be present associated with the former JDS operations. Nine VOC compounds, including 1,4-dioxane, acetone, MEK, ethanol, isopropyl alcohol, ethylbenzene, xylenes (m,p- and o-), and PCE) were detected in soil vapor collected from one or more of the sub-slab vapor points (SSVPs) in November 2023 (during the heating season), whereas only acetone and ethanol were detected in vapor collected during the cooling season in August 2024 . The concentrations detected during the sampling are below residential and industrial/commercial soil vapor volatilization criteria, where established. Since the results of testing during the two sampling events are vastly different, a third round of sampling is planned during the 2024/2025 heating season to determine whether detections reported in November 2023 are representative. 4.1.10 AOC 9: Potential Off-Site Sources The undeveloped land west, and upgradient, of the Site (1995 Blue Hills Avenue Extension) was formerly used for agricultural purposes (i.e., tobacco cultivation). Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  2. Page 24 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 24 of 864 COCs identified for AOC 9 include VOCs, ETPH, PAHs, pesticides, herbicides and RCRA 8 metals plus copper, nickel, and zinc. Boring L1985-6MW, as well as soil samples collected below the water table from borings located in the southwestern portion of the Site (B28 16-18 fbg and B44 16-18 fbg), were used to evaluate this AOC. COCs were not detected in soil sample L1985-6MW 12-14 fbg collected below the water table. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil. Pesticides were detected in soil collected below the water table at B28 and B44 above the GWPC, however leachable pesticides were below the GWPC, demonstrating compliance with the PMC. The contamination may be due to releases in the REC 3 storage area or to an off-site source located upgradient of these borings that resulted in downgradient, soil-adsorbed contamination below the water table. Based on the current data, remediation is not required, however additional investigations are warranted. The pesticides (DDE, DDT and heptachlor epoxide) were detected at concentrations below RSR criteria in groundwater collected on two occasions from L1985-6MW. The well is the most upgradient well, located northwest of the site building and downgradient of the adjacent parcel that was formerly used for agricultural purposes. The presence of pesticides in L1985-6MW is likely associated with agricultural use of the adjacent property, and/or other properties located upgradient of the Site since these pesticides have not been detected in groundwater samples collected from other on-site wells. 4.1.11 Site-Wide Groundwater Quality Depths to groundwater measured in May 2021 at L1985-3MW, -5MW, -6MW and -10MW ranged from approximately 10.6 to 17.3 fbg. Depths to groundwater measured on September 21, 2023 at Phase II/III wells ranged from approximately 8.9 to 15.6 fbg. Depths to groundwater measured on May 13, 2024 at the wells ranged from approximately 7.3 to 14.0 fbg. Depths measured in May 2024 were approximately three feet shallower compared to May 2021 and the May 2024 data may represent the seasonal high water table. Depth to groundwater during the seasonal low water table, typically September or October, is unknown since the depths to water measured in May 2021 (typical high water time period) were significantly lower than measured in September 2023. Groundwater flow on all three occasions was toward the southeast. Groundwater samples collected in September 2023 and/or May 2024 from the site-wide monitoring wells were analyzed for one or more AOC-specific COCs, including VOCs, 1,4-dioxane, ETPH, SVOCs, herbicides, pesticides, alcohols, glycols, PFAS and RCRA 8 metals plus copper, nickel and zinc, Contaminants were not detected in groundwater with the exceptions described above, specific to individual AOCs and RECs. Other results are discussed below. ETPH was detected in groundwater collected in May 2021 from L1985-5MW and L1985-6MW, and copper, lead, and nickel were detected in groundwater collected from L1985-6MW. All concentrations are below the GWPC and SWPC with the exception of ETPH in L1985-6MW, which exceeded the GWPC, SWPC, RVC and the I/C VC. Based on groundwater sampling logs provided in the Phase II report, samples collected from L19855MW and -6MW were turbid which may have resulted in the apparent groundwater contamination due to soiladsorbed contaminants in samples. Samples collected in September 2023 and May 2024 from these wells were not turbid, and ETPH and elevated levels of metals were not detected with the exception of nickel in L1985-5MW, detected at a concentration below the GWPC and SWPC during May 2024. The well is located near the northeastern corner of the building and groundwater beneath the northeastern portion of the building may flow toward the well. Barium was detected in groundwater collected in 2021, 2023 and 2024 from several wells at concentrations below applicable RSR criteria and within the range of naturally-occurring concentrations present in Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  3. Page 25 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 25 of 864 uncontaminated groundwater. The data do not represent the presence of a barium source area or groundwater contamination, and additional investigation of barium that is present in several groundwater samples is not warranted. 4.2 Non-Aqueous Phase Liquid Remediation Standards Removal of non-aqueous phase liquids (NAPL) from soil and groundwater are required by the RSRs to the maximum extent practicable defined as the greatest degree of remediation that can be achieved using sound engineering and hydrologic practices without taking cost into consideration. NAPL was not observed in soil samples collected from borings completed at the Site and in groundwater collected from monitoring wells at the Site during previous investigations. 5.0 REMEDIAL ACTION OPTIONS The potential remedial approaches for release areas that require remediation include excavation and off-site disposal of soil containing ETPH, pesticides, metals and/or PAHs, use of RSR exemptions, variances or alternative criteria, and administrative controls. 5.1 Option 1: Soil Excavation Option 1 includes excavation/removal and off-site disposal or reuse of soil that does not meet the RDEC and GA PMC as shown on Table 2A. The extents of the proposed excavation areas are shown on Figure 6A and the estimated extent of excavations, contaminants that exceed criteria, approximate excavation depths and volume of soil in each of the RECs and AOCs requiring remediation are presented below. RECs and AOCs (Sample and Depth Interval) AOC 6 (B10 0.3-1 fbg) AOC 4 (B21 0-2 fbg) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Approx. Depth (ft.) Approx. Volume (cu. yd.) ETPH (RDEC) 130 1 (0-1 fbg) 5 1,200 2 (0-2 fbg) 90 1,000 2 (0-2 fbg) 80 800 2 (0-2 fbg) 60 180 REC 3 (B24/MW6 0-2 fbg and B55 0-2 fbg) PAHs (RDEC) Leachable Lead (Pb) and/or Leachable Pesticides (dieldrin) (GA PMC) PAHs (RDEC/GA PMC*) Pesticides (dieldrin) (RDEC), Leachable Pesticides (dieldrin) (GA PMC) Pesticides (chlordane) (RDEC) PAHs (RDEC/GA PMC*) Pesticides (chlordane) (RDEC) REC 3 (B56 2-4 fbg and B56 4-6 fbg) PAHs (RDEC and GA PMC*) 800 6 (0-6 fbg) REC 3 (B26 5-7.5 ft.) ETPH (RDEC) 9300 8 (0 to 7.5 fbg) AOC 4 (B23/MW7 0-2 fbg) AOC 4 (B64 0-2 fbg) AOC 8 (B20 0-2 fbg) AOC 8 (B61 0-2 fbg) Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  4. Page 26 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 26 of 864 RECs and AOCs (Sample and Depth Interval) REC 3 (B29 6-8.5 ft.) REC 3 (B27 2-4 ft.) REC 3 (B44 2-4 ft.) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Arsenic (As) (RDEC) Leachable As and Pb (GA PMC) PAHs (RDEC) Leachable Pb (GA PMC) Approx. Depth (ft.) 9 (0 to 8.5 fbg) 4 (0 to 4 fbg) 400 4 (0 to 4 fbg) Total Approx. Volume (cu. yd.) 2,800 (assumes excavation to 8 fbg) 60 3,300 *Assumes leachable PAH concentrations in untested samples are similar to concentrations in samples tested which indicate compliance with the GWPC. Confirmatory sampling/testing will be required for leachable PAHs as well as other COCs. The advantages of this option include a permanent remedy in a short time period that allows for the fullest range of site redevelopment options without any use or activity limitations. Disadvantages include relatively high costs associated with soil removal and disposal when compared to the other scenarios described below. The estimated opinion-of-cost (+40/-20%) for this option ranges from $922,000 to $1,614,000. This estimate does not include landscape, surface or underground utility restoration costs (if necessary). A copy of the estimated opinion-of-cost for Option 1 is included in Appendix D. 5.2 Option 2: Soil Excavation and Use of Alternative Release-Specific PMC Option 2 includes excavation/removal and off-site disposal or reuse of impacted soil that does not meet the RDEC and GA PMC with exception of one of the soil areas that exceeds the GA PMC for lead, specifically at REC 3 near B44 (approximately 60 cu. yd.). Use of an LEP-calculated release-specific PMC allows comparison of total lead results to the alternative PMC. In accordance with RSR Section 22a-133k-2(d)(4), ZUVIC calculated an alternate PMC for lead of 234 mg/kg, as shown in Appendix B. Comparison of the alternate PMC to the total lead results from B44 2-4 fbg demonstrates that the soil meets the criterion. Note that soil collected at AOC 4 from B23/MW7 0-2 fbg and REC 3 from B29 6-8.5 fbg contain total lead below the alternate PMC, however there are other constituents in these samples (dieldrin or arsenic) that exceed criteria and excavation of soil will therefore be required under this option. Contaminant concentrations in these samples exceed alternative PMC calculated for total dieldrin and arsenic. Use of the alternative PMC is subject to the following conditions: • • Compliance groundwater monitoring is required in accordance with 22a-133-3(h) with results below applicable groundwater criteria (GWPC and SWPC). Notification to the Commissioner of the CTDEEP for the use of the optional criteria and submittal of the calculations in accordance with 22a-133k(g). Approval for use of alternative PMC is not required. The extents of the proposed excavation areas for option 2 are shown on Figure 6B and the estimated extent of proposed excavation, contaminants that exceed criteria, approximate excavation depths and volume of soil in each of the RECs and AOCs requiring remediation are presented below. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  5. Page 27 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 27 of 864 RECs and AOCs (Sample and Depth Interval) AOC 6 (B10 0.3-1 ft.) AOC 4 (B21 0-2 fbg) AOC 4 (B23/MW7 0-2 fbg) AOC 4 (B64 0-2 fbg) AOC 8 (B20 0-2 fbg) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Approx. Depth (ft.) Approx. Volume (cu. yd.) ETPH (RDEC) PAHs (RDEC) Leachable Pesticides (Dieldrin) (GA PMC) PAHs (RDEC/GA PMC*) Pesticides (Dieldrin) (RDEC), Leachable Pesticides (Dieldrin) (GA PMC) Pesticides (Chlordane) (RDEC) 130 1 (0-1 fbg) 5 1,200 2 (0-2 fbg) 90 1,000 2 (0-2 fbg) 80 AOC 8 (B61 0-2 fbg) PAHs (RDEC/GA PMC*) REC 3 (B24/MW6 0-2 fbg and B55 0-2 fbg) Pesticides (Chlordane) (RDEC) 800 2 (0-2 fbg) 60 REC 3 (B56 2-4 fbg and B56 4-6 fbg) PAHs (RDEC and GA PMC*) 800 6 (0-6 fbg) 180 REC 3 (B26 5-7.5 ft.) ETPH (RDEC) Arsenic (As) (RDEC) Leachable As (GA PMC) PAHs (RDEC) REC 3 (B29 6-8.5 ft.) REC 3 (B27 2-4 ft.) 8 (0 to 7.5 fbg) 9300 9 (0 to 8.5 fbg) 4 (0 to 4 fbg) Total 2,800 (assumes excavation to 8 fbg) 3,250 *Assumes leachable PAH concentrations in untested samples are similar to concentrations in samples tested which indicate compliance with the GWPC. Confirmatory sampling/testing will be required for leachable PAHs as well as other COCs. The advantages of this scenario include a reduction in the volume of contaminated soil to be excavated compared with Option 1, a relatively short remediation time period that allows for the fullest range of site redevelopment options without any use or activity limitations. Disadvantages of the scenario are similar to Option 1 and is contingent upon groundwater meeting remedial criteria. Use of the provision will require installation of a release-specific monitoring well at B44. Note that installation of a monitoring well near B44 and demonstration of groundwater compliance is required under all of the remedial options. The estimated opinion-of-cost (+40/-20%) for this option ranges from $900,000 to $1,575,000 . This estimate does not include landscape, surface or underground utility restoration costs (if necessary). A copy of the estimated opinion-of-cost for Option 2 is included in Appendix D. 5.3 Option 3: Soil Excavation and Industrial/Commercial Use Restriction This option includes excavation of soil exceeding the I/C DEC and GA PMC, incorporation of Option 2 for demonstrating compliance for lead at B44 (use of alternative PMC) and recordation of an EUR limiting site use to industrial/commercial. In addition, this option involves submitting a request to the CTDEEP for use of Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 19 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  6. Page 28 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 28 of 864 additional and alternative criteria for PAHs (AAC-PAHs) approvable for sites with an EUR permitting only industrial/commercial use. Comparison of the AAC-PAH and default criteria shows criteria for four PAH compounds are higher, and one compound is lower, on the AAC-PAH list. The AAC-PAH list must be used “in whole”, that is all of the criteria on the list must be used. Table 2B provides a comparison of the list to concentrations in soil and the list is included in Appendix C. Concentrations of contaminants in all samples are compliant with the AAC-PAH list. This scenario includes excavation/removal and off-site disposal or reuse of arsenic- and pesticide-impacted soil that does exceed the I/C DEC and/or the GA PMC at AOCs/RECs shown in the table below. The extents of the proposed excavation areas for Option 3 are shown on Figure 6C. RECs and AOCs (Sample and Depth Interval) AOC 4 (B23/MW7 02 fbg) AOC 4 (B64 0-2 fbg) REC 3 (B29 6-8.5 ft.) Contaminants and Criteria Exceeded Approx. Extent (sq. ft.) Approx. Depth (ft.) Approx. Volume (cu. yd.) Leachable Pesticides (dieldrin) (GA PMC) Leachable Pesticides (dieldrin) (GA PMC) 1,200 2 (0-2 fbg) 90 Arsenic (As) (RDEC) Leachable As and Pb (GA PMC) 1,400 9 (0 to 8.5 fbg) Total 470 (assumes excavation to 9 fbg) 560 The advantages of this Option include a reduction in volume of contaminated soil to be excavated compared to Options 1 and 2. Disadvantages of the Option include site use limitations prohibiting future residential use of the property (including day care centers, schools, playgrounds and outdoor recreational areas), preparation and recordation of an EUR, annual EUR inspections to verify use of the site for as long as the EUR remains in effect. The estimated opinion-of-cost (+40/-20%) for this option ranges from $320,000 to $560,000. This estimate does not include costs for the required annual EUR inspections that will be required for the lifetime that the EUR is in place, nor costs for landscape and surface or underground utility restoration (if necessary). A copy of the estimated opinion-of-cost for Option 3 is included in Appendix D. 5.4 Groundwater Remediation The existing data do not indicate any need for active remediation of groundwater. The presumptive remedy for any groundwater that exceeds criteria following soil remediation is monitored natural attenuation. Compliance with groundwater criteria will be demonstrated following completion of remedial excavations. 6.0 REMEDIATION OBJECTIVES Mitigation of contaminated soil which exceeds remedial criteria is required at the areas, or portions thereof, described below: • • • • REC 3 – Former Barn/Warehouse, West of former Barn/Warehouse and Northeast of the former Barn/Warehouse AOC 4 – Dumping area located in the southeastern portion of the Site AOC 6 - Emergency generator AST southwest of the building AOC 8 – Former tobacco barn located in the southeastern portion of the Site Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 20 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  7. Page 29 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 29 of 864 The remedial goals and objectives set forth in this RAP include: • • • • 7.0 Remediation must include financially viable methods that have demonstrated success in protecting public health and the environment. Since the Site is in CT PTP, the CT RSRs apply to the Site. Therefore, soil quality must comply with the RDEC and the GA PMC, and groundwater quality must comply with the GWPC, SWPC and RVC. Compliance with background concentrations in groundwater is not required as described in Section 4.1.2. Remediation activities should be performed in such a way as to not significantly disturb the current and future use of the Site. Remediation and post-remediation activities must be completed within the timeframes agreed to by the property owner and specified in the CT PTP and the project schedule submitted to the CTDEEP. REMEDIAL ACTION IMPLEMENTATION Remedial Option 3 (excavation of soil exceeding the GA PMC and the I/C DEC and industrial/commercial use restriction) is the option chosen by Eversource. The specific tasks described below will be completed in advance of remediation. 7.1 Public Notice of Remediation and Intent to Record an Environmental Use Restriction Public notice of remediation, including the intent to record an EUR, was completed in accordance with CGS Section 22a-133k-1(d). The following notices were completed: • • • • The Town of Windsor Mayor was notified in a letter dated January 17, 2025 The Town of Windsor Health Director was notified in a letter dated January 17, 2025 A notice was published in the Hartford Courant on January 17, 2025 Notices were sent to Site abutters (Eversource at 1975 and 1995 Blue Hills Avenue Ext. Windsor; Griffin Corporate Office Park LLC at 2 Waterside Crossing, Windsor; and GRS Realty LLC, 1 Griffin Road South, Bloomfield) in letters dated January 17, 2025 Copies of the notices are included in Appendix E. 7.2 Required Permits and Approvals Any permits required by the Town of Windsor will be obtained prior to performing the work. The proposed remedial approach will not require any permits or approvals from the CTDEEP. Approval(s) that will be required from the designated soil disposal/reuse facility(ies) will be sought prior to any excavation. 7.3 Health and Safety Requirements Prior to starting any remediation activities, the site-specific Health and Safety Plan (HASP) will be updated to include the remedial actions detailed below. It is anticipated that all fieldwork will be performed in Level D Personal Protective Equipment (PPE). Remediation contractors will be required to contact Call-Before-YouDig to locate underground utilities prior to commencing any excavation and/or boring work. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 21 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  8. Page 30 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 30 of 864 7.4 Commissioner Notice and Approvals Notice will be submitted to the Commissioner of CTDEEP for use of the alternate GA PMC for total lead, RSR Section 22a-133k-2(d)(4). The notification will be completed in accordance with 22a-133k-1(g) and include submittal of the calculations related to determination of the alternative GA PMC. The notice will be completed prior to Verification of the Site. In addition, CTDEEP approval for use of the additional and alternative criteria for PAHs will be sought. 7.5 Preparation for Remediation Prior to the start of remedial activities, grab and composite soil characterization samples will be collected from the proposed remediation areas shown on Figure 6C. The samples will be submitted for analyses for parameters required by soil disposal/reuse facilities. The results of the data will be used to determine facilities that can accept the soil. Waste profiles and manifests/shipping papers will be prepared by the remedial contractor and reviewed by ZUVIC prior to signature by Eversource. 7.6 Remedial Excavation The remedial excavations will be completed with earth-moving equipment with the excavated soils loaded directly into trucks or roll-off containers or stockpiled for future loading and transportation off site. Any stockpiled soils will be placed on poly sheeting and covered by poly sheeting when not in use. Once loaded into trucks or roll-off containers, the soils will be transported to the disposal/reuse facility. The excavations will be guided by field screening of soil with a photoionization detector (PID), visual observations and results of previous testing. Once excavations are complete at each remediation area, confirmation soil samples will be collected and analyzed as discussed in the next section. Any groundwater monitoring wells located in excavation areas will be protected during excavations. Following completion, the excavations will be backfilled with clean fill. 7.7 Confirmatory Soil Sampling Confirmatory soil samples will be collected from the extents of remedial excavations (sidewalls and bases) and tested for COCs applicable to the release area. If the results of testing exceed remedial criteria, additional soil removal will be undertaken followed by additional confirmation sampling. This process will continue until COC concentrations in all confirmatory samples are below criteria. 7.8 Remedial Action Report After remedial actions are complete, a Remedial Action Report (RAR) will be prepared and submitted to Eversource for review prior to submission to CTDEEP. The RAR will document the completed activities including figures showing the extent of the remedial measures, photographs depicting key points of the remediation work, disposal documentation and conclusions regarding the work completed. The RAR will include a summary of all environmental assessments, investigations, remedial activities completed at the Site and a description of compliance. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 22 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  9. Page 31 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 31 of 864 7.9 Compliance Groundwater Monitoring and Reporting Compliance groundwater monitoring will be completed in accordance with the RSRs Section 22a-133k-3(h). A minimum of four groundwater sampling events will be completed which reflect seasonal variability on a quarterly basis, provided that all sampling events used to demonstrate compliance are performed within a two-year timeframe. Compliance groundwater monitoring will be completed once the results of testing demonstrate that groundwater meets applicable RSR criteria for a minimum of four seasonal groundwater sampling events. The compliance groundwater monitoring program will be initiated once remediation is complete. Prior to compliance monitoring, additional groundwater monitoring wells will be installed downgradient of and near release areas, and near upgradient property lines to evaluate the quality of groundwater entering the Site. Groundwater collected from the release area monitoring wells will be sampled and analyzed for contaminants that were released in each area. Groundwater from upgradient property line wells will be tested for pesticides, metals and PFAS. The compliance groundwater monitoring program will also satisfy the requirements for use of the alternate GA PMC calculated for lead. 7.10 Environmental Use Restriction As required for an EUR to limit Site use to industrial/commercial activities, a survey of the property will be completed in accordance with RCSA 22a-133q-4 and documents associated with use of either an Environmental Land Use Restriction (ELUR) or a Notice of Activity and Use Limitation (NAUL) will be prepared and recorded on the land records. Annual inspections will be completed as required by RCSA Section 22a133q-8. In addition, a Factsheet describing the EUR limitations will be posted in a conspicuous location at the Site or maintained in the records of a facility manager in accordance with Section 22a-133q-9. 7.11 Verification Once compliance groundwater monitoring has been completed, compliance with the RSRs has been demonstrated, and the EUR is recorded, Site verification will be completed. The Verification report will include a summary of all environmental assessments, investigations and remedial activities completed at the Site and a description of compliance. The report will be submitted to Eversource for review prior to submission to CTDEEP. Once the Verification has been accepted and approved by the CTDEEP, the monitoring wells will be removed from the Site. 8.0 LIMITATIONS This report has been prepared for the exclusive use of Eversource and its counsel in connection with their evaluation of environmental conditions at the property and obligations under the Connecticut Property Transfer Law. The report is not to be used for any other purpose or by any other party without the written authorization of ZUVIC. The conclusions provided in this report are based on the scope of work conducted and the sources of information used during this investigation. If additional pertinent information becomes available, it should be provided to ZUVIC so that we may modify this report as necessary. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 23 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx
  10. Page 32 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 32 of 864 In preparation of this report, ZUVIC relied on data provided by others and information and representations made available to ZUVIC at the time of this report. To the extent that such information is incomplete or inaccurate, ZUVIC is not responsible. Assessment of the Site and preparation of the Remedial Action Plan, were conducted according to generallyaccepted environmental assessment practices commonly in use at the time the work was completed. No other warranty is expressed or implied. 9.0 REFERENCES “Phase I Environmental Site Assessment, 1985 Blue Hills Avenue Extension, Windsor, CT” prepared by Stantec Consulting Services Inc. (Stantec), dated July 13, 2021 “Phase II Environmental Site Assessment, 1985 Blue Hills Avenue Extension, Windsor, CT” prepared by Stantec, dated July 28, 2021 “2022 Well Receptor Survey, 1985 Blue Hills Avenue Extension, Windsor, CT (REM ID# 14862)” prepared by Stantec, dated June 6, 2022 Connecticut Department of Energy and Environmental Protection (CTDEEP), Remediation Standard Regulations, February 16, 2021. “Phase II/III Environmental Site Assessment, 1985 Blue Hills Avenue Extension, Windsor, CT” prepared by ZUVIC, dated March 2024. “Completion of Investigation, 1985 Blue Hills Avenue Extension, Windsor, CT” prepared by ZUVIC, dated March 21, 2024. “Supplemental Investigation Report, 1985 Blue Hills Avenue Extension, Windsor, CT” prepared by ZUVIC, dated November 2024. “Site Characterization Guidance Document,”, September 2007, Revised December 2010, CTDEP. “Technical Support Document: Recommended Numeric Criteria for Common Additional Polluting Substances and Certain Alternative Criteria Requests,” September 2018, CTDEEP. “Request for Approval of Criteria for Additional Polluting Substances," March 2022, CTDEEP. Remedial Action Plan Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 24 of 24 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\RAP - Exterior\23246-13 RAP Text - 1985 Blue Hills Ave Windsor CT -Text FINAL -Rev1-20-25.docx

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)