ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Words on different pages
  1. Page 97 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 97 of 864 o 6.5.3 Elevated concentrations of arsenic, barium, chromium and nickel were present in B47 8-9.5 fbg and B48 4-5 fbg. An elevated concentration of arsenic was present in B51 6-7.5 fbg. Samples B42 0-2 fbg, B48 4-5 fbg, B49 6-8 fbg, B50 6-8 fbg and B51 6-7.5 fbg were tested for one or more leachable metals to evaluate compliance with the GA PMC. Leachable metals were either not detected or were below the GA PMC. AOC 8 – Former Barns in the Central and Southeastern Portions of the Site Four borings were completed at and near the barn in the southeastern portion of the Site (AOC 8) to provide additional coverage where low-level PAH contamination was detected in surficial soil at B20 and to evaluate the nature, extent and degree of pesticide-impacted soil at B20 that exceeded the RDEC. Soil samples collected from B20A, B59, B60 and B61were analyzed for PAHs and/or pesticides. COCs were not detected in samples except as follows: • • • • 6.5.4 Pesticides were detected in sample B20A 2-4 fbg at concentrations below RSR criteria. Pesticides (chlordane, DDD, DDE and/or DDT) were detected in samples B59 0-2 fbg, B60 0-2 fbg and 2-4 fbg, B61 0-2 fbg and 2-4 fbg at concentrations above the GA PMC. The samples were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were not detected or were below the GWPC. One or more PAHs were detected in samples B59 0-2 fbg, B60 0-2 fbg and B61 2-4 fbg at concentrations below RSR criteria. Several PAHs were detected in sample B61 0-2 fbg at concentrations above the RDEC and GA PMC. AOC 4 – Suspected Dumping Area Three borings were completed near the southeastern corner of the Site to evaluate the lateral extent of PAH, pesticide, leachable pesticides and lead contamination detected in borings L1985-11, B21 and B22. Soil samples collected from B62, B63, and B64 were analyzed for one or more of the following: VOCs, PAHs, pesticides, leachable pesticides and leachable lead. COCs were not detected in samples except as follows: • • • • 6.6 Several PAHs were detected in sample B64 0-2 fbg with some concentrations above the RDEC and GA PMC. Several PAHs were detected in samples B62 0-2 fbg, B63 0-2 fbg and B64 2-4 fbg at concentrations below applicable RSR criteria. Pesticides (chlordane, dieldrin, DDT and/or DDE) were detected in samples B62 0-2 fbg and B64 0-2 fbg at concentrations above the GA PMC. Chlordane in B64 0-2 fbg also exceeded the RDEC. The samples were tested for leachable pesticides which were not detected with the exception of dieldrin in B64 0-2 fbg above the GWPC. Leachable lead was not detected and below the GA PMC in samples B62 0-2 fbg, B63 0-2 fbg and B64 0-2 fbg. Groundwater Analytical Results A summary of the results of groundwater sampling and the laboratory analytical reports are presented in Table 3 and Appendix E, respectively. Groundwater samples collected from 11 monitoring wells on the Site (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, B24/MW6, L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) were analyzed for one or more of the following: ETPH, SVOCs or PAHs, VOCs, alcohols, glycols, RCRA 8 metals plus copper, nickel, and zinc, pesticides, 1,4-Dioxane and PFAS. COCs were not detected in samples except as follows: Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 11 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  2. Page 98 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 98 of 864 • • • • • • 6.7 Total barium was detected in seven wells (B3/MW3, B4/MW4, B5/MW5, L1985-3MW, L1985-5MW, L1985-6MW and L1985-10MW) at concentrations below criteria and within the range occurring naturally in uncontaminated groundwater. Total nickel was detected in L1985-5MW at a concentration below the GWPC and SWPC. Total chromium was detected in L1985-3MW above the GWPC. Pesticides dieldrin and heptachlor epoxide were detected in groundwater collected from L1985-3MW with heptachlor epoxide concentration below RSR criteria and dieldrin concentration above the GWPC. PFAS compounds were detected in all of the groundwater samples except B23/MW7. The total of PFAS compounds with regulatory criteria (sum of perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)) ranged from not detected in L1985-6MW to 55 nanograms per liter (ng/L) in B4/MW. All concentrations are below the GWPC of 70 ng/L. SWPC, RVC and I/C VC are not established which, when established, will apply to the Site. In addition, up to four PFAS compounds which do not have established criteria were also detected in the majority of samples, with the total of these compounds ranging from 8.2 to 30 ng/L. Groundwater remedial criteria (GWPC, SWPC, RVC or I/C VC) for these PFAS compounds have not yet been established which, if and when established, will apply to the Site. AOC 5 – Former JDS Uniphase Operations - Sub-Slab Soil Vapor Analytical Results A summary of the sub-slab soil vapor sampling results and the laboratory analytical reports are presented in Table 4 and Appendix F, respectively. Vapor samples were collected from 18 SSVPs and tested for VOCs, including 1,4-dioxane, to evaluate the quality of vapor beneath the building, and to evaluate the presence of a potential source of soil or groundwater contamination beneath the building associated with the former JDS operations (AOC 5). VOCs were not detected in the samples except as follows: • • 6.8 Acetone was detected below the Res SVVC and I/C SVVC in samples SV-8 and SV-12 at concentrations of 18.2 parts per billion-volume (ppbv) and 12.3 ppbv, respectively. Ethanol was detected in all of the vapor samples except for SV-10 at concentrations ranging from approximately 6 to 59 ppbv. Remedial criteria have not been established for this compound. Data Quality Assessment (DQA) and Data Usability Evaluation (DUE) The soil, groundwater, and soil vapor analytical data were generated in accordance with the Connecticut RCPs. The RCP reports are presented in each laboratory analytical data report, which are included in Appendices D, E, and F. The purpose of the RCP is to provide quality data and allow the evaluation of whether the results are of sufficient quality for the intended purpose and in relation to project-specific objectives. The objective of testing is to evaluate the nature, degree and extent of releases identified during the Phase II and III environmental site assessments. To validate the data, a data quality assessment and data usability evaluation (DQA/DUE) of the analytical data was conducted in general conformance with the CTDEEP “Laboratory Quality Assurance and Quality Control – Data Quality Assessment and Data Usability Evaluation Guidance Document,” dated May 2010 and revised in April 2024. The DUE forms completed for soil, groundwater and soil vapor laboratory reports are included in Appendices D, E and F. As part of the evaluation, the laboratory reports were reviewed to ensure that all sample and associated quality assurance results were available. Results of the completeness review indicated that all collected samples were analyzed and all quality control results were available to complete the data validation process. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 12 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  3. Page 99 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 99 of 864 Consistent procedures and laboratory analyses of the samples were achieved. Sample containers were packed on ice and delivered to the laboratory under standard chain of custody procedures. All samples were received within the allowable temperature range, and were extracted and analyzed within allowable holding times for the methods with the exception of the following: • Soil samples B24A 4-6 fbg, B56 2-4 fbg B60 2-4 fbg and B61 2-4 fbg. were analyzed for leachable pesticides a couple of days past hold time. Leachable pesticides were not detected in the samples. The pesticides present at the Site persist in the environment for many years without degradation and the data are therefore usable. Results of the DQA/DUE indicate that the analytical data for the Site are of adequate quality for the intended objectives. Minor non-conformances were noted that do not affect data usability. 7.0 SUMMARY, CONCEPTUAL SITE MODEL AND RECOMMENDATIONS 7.1 Introduction ZUVIC was retained by Eversource to complete a Supplemental Investigation of the Eversource Call/Data Center located at 1985 Blue Hills Avenue Extension, Windsor, Connecticut. The purpose of the Supplemental Investigation is to further evaluate AOCs 4, 5, 6, and 8 and REC 3 and site-wide groundwater quality to better define the nature, degree and extent of contamination at those AOCs and REC. The work was completed based on the results of previous Phase I, II and III ESAs. The work completed included the advancement of soil borings and sampling and testing of soil, groundwater, and vapor. Using the information from this and previous investigations, the conceptual site model (CSM) of those AOCs and REC that were evaluated during this investigation was refined. The CSM is used to understand the history of the Site, the releases that have occurred at the Site, the fate and transport of soil and groundwater contamination, and its potential impact on sensitive receptors in the site vicinity. A summary of the recognized environmental conditions and areas of concern is presented in Table 5. 7.2 Background Information The Site located at 1985 Blue Hills Avenue Extension in Windsor, CT is developed with a single story 165,000 square foot masonry / slab on grade building currently used by Eversource as office space and a call/data center. The building is surrounded by asphalt parking lots and landscaped areas. Historically, the Site was used for agricultural purposes (cultivation of tobacco), presumed drying of tobacco in two barns, storage of chemicals used for agricultural purposes in a third barn, and residential dwellings. The Site was developed with the current building in 2001 and occupied by JDS until 2004 when Eversource occupied the building for use as office space for a call/data center. The property is an “establishment,” subject to the Connecticut Transfer Act (CGS Section 22a-134 through 22a-134e). The “establishment” determination was based on documentation of former hazardous waste generation by JDS. The property was transferred on December 1, 2021 to Eversource and was entered into the Property Transfer Program in December 2021 with an acknowledgement of receipt issued by the CTDEEP in March 2022. Eversource is the Certifying Party to the transfer, and as such, is responsible for investigation and remediation of the Site. The CTDEEP assigned REM ID No. 14862 to the Site. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 13 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  4. Page 100 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 100 of 864 7.3 Summary of Conditions at AOCs 4, 5, 6 and 8 and REC 3 For this investigation, soil sample intervals selected for laboratory analyses, soil and groundwater sampling locations, and analytical parameters were based on each REC/AOC release mechanism, COCs, and contaminants released as identified during previous ESAs. A description of the CSM for each of the identified RECs/AOCs is presented in Table 5, and data generated, and observations made during this, and prior investigations for AOCs 4, 5, 6 and 8 and REC 3, are presented below. Details of the CSM for the other AOCs and RECs are presented in the Phase II/III report. 7.3.1 AOC 6 – Emergency Generator Diesel ASTs Two backup emergency generators equipped with diesel storage tanks are present at the Site, one in the parking lot southwest of the building and one adjacent to the south wall of the building, west of the loading dock area. June 2017 records indicate that a hose on one of the generators failed leading to a release of approximately 40-gallons of coolant inside the generator enclosure. Approximately 5-gallons of coolant seeped through seams of the enclosure onto a concrete pad and gravel near the enclosure and represents REC 2. It is unknown which of the two generators experienced the release. Note that REC 2 and AOC 6 are co-located but involve different COCs. REC 2 is not discussed herein since it was not evaluated during the Supplemental Investigation. COCs identified for REC 2 are glycols which were not detected in Phase II or Phase III soil samples. Sufficient investigation has been completed to conclude that a release to the environment has not occurred. Additional evaluation and remediation are not warranted at REC 2. Phase II ESA samples collected from borings L1985-1, -7, and -13, Phase III samples from B9, B10, B11 and B32 and Supplemental Investigation samples from B40, B41 and B58 were used to evaluate AOC 6. COCs are VOCs, ETPH and PAHs. Low-level ETPH contamination is present in surficial soil at L1985-1, located near the loading docks east of the backup emergency generator and adjacent to the south wall of the building; PAHs were not detected in the sample. ETPH was not detected in surficial soil or in soil collected from 8 to 10 fbg at B58, located south of L1985-1. The surficial contamination by L1985-1 is likely related to incidental releases from the normal operation of motor vehicles at AOC 1 (Loading Dock Area). Sufficient investigation has been completed to conclude that a low-level release to the environment has occurred that does not require remediation. Additional evaluation and remediation are not warranted in connection with the ETPH detection in L1985-1. Low levels of PAHs or ETPH were detected in surficial soil collected from L1985-7 (near the emergency generator/AST southwest of the building), and L1985-13, B9, and B32 (near the emergency generator west of the loading docks). The contamination is likely related to placement of contaminated fill during installation of the generator enclosures. Sufficient investigation has been completed to conclude that a low-level release to the environment has occurred that does not require remediation. Additional evaluation and remediation are not warranted. Surficial soil samples collected from Phase III borings near the generator southwest of the building (B10 and B11) did not contain detectable PAHs, however ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC potentially related to a release during refueling of the generator. Leachable ETPH was not detected in the sample, demonstrating compliance with the PMC. The ETPH release at B10 was delineated vertically by sample B10 1-3 fbg and laterally by samples B40 0.3-1 fbg and B41 0.3-1 fbg, in which ETPH was not detected. The nature, extent and degree of ETPH contamination has been sufficiently delineated and remediation is warranted near B10. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  5. Page 101 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 101 of 864 7.3.2 REC 3 – Historical Barn/Warehouse and Fire A former barn/warehouse was located in the southern portion of the Site and was destroyed in May 1994 by a structure fire that was suppressed using water. The structure was used for storing pesticides, herbicides, and other chemicals, and as office space in its eastern end. Following the fire, samples of air, surface wipes, water runoff from the fire suppression, and surficial soil were analyzed for pesticides. According to previous documentation, pesticides were detected in one water runoff sample. An approximately 6,750-gallon heating oil UST (AOC 7) was reportedly located north of the northeastern corner of the barn/warehouse. Some of the borings completed during the Supplemental Investigation are located near AOC 7 but were not tested for COCs associated with the UST since previous investigations were sufficient to evaluate the nature, extent and degree of contamination associated with the UST. In addition, aerial photographs indicate that an outdoor storage area was present near the northwestern corner of the barn Phase II soil samples collected from borings L1985-8, -9, and -10MW were used to evaluate soil apparently within the footprint of the former barn/warehouse. Phase II borings B24/MW6 and B25 were used to evaluate soil and groundwater near the former UST. Soil samples from the borings contained low-level PAHs potentially related to asphalt, and pesticide impacts likely associated with the barn. Phase III and Supplemental Investigation borings included B24A, B26, B27, B27A, B28, B29 and B44 through B57 within, or near the footprint of the barn, and borings B30, B31, B42 and B43 in the outdoor storage area. COCs for REC 3 include VOCs, ETPH, SVOCs, pesticides, herbicides and RCRA 8 metals plus copper, nickel, and zinc. Fill materials, including non-native red-brown soil and/or non-soil materials (asphalt, coal, brick, concrete, glass, and ash) was encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-10, B27, B29, B45, B48, B49, B51 and B56. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in borings L1987-8, L1985-10, B26, B27, B27A, B29, B45, B47, B48 and B51 at various depths between approximately 6 and 10 fbg. The shallower depths of concrete may be remnants of foundation walls that were pushed into the basement after the fire. Based on material encountered in B24/MW6, B25, B55, B56 and B57, these borings are located outside the former barn footprint. B29, B49 and B51 are within an “entrance/exit” structure on the north side of the barn, apparent in aerial photographs. B50 appears to be located outside the northwest corner of the “entrance/exit”. B28 and B44 are located west of the barn footprint and L1985-9, B53 and B54 are apparently located within the office area that was constructed between 1935 and 1941 at the eastern end of the building which may have been a slab-on-grade addition, without a basement. It appears that at least a portion of the demolished structure and imported fill material were placed inside the footprint of the barn to backfill the basement and may have also been spread and placed northeast of the structure in the vicinity of B56. The VOC, acetone was detected in soil samples L1985-10MW 1-3 ft. and B47 2-4 fbg at concentrations below RSR criteria. The apparent acetone contamination may be related to laboratory-induced contamination. The SVOC, isophorone was detected in soil sample B26 8-10 fbg at a concentration below RSR criteria. This sample was collected just below the apparent concrete floor of the basement and the isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and not related to a release. Herbicides were not detected in soil samples. Low-level VOC (naphthalene, xylenes and/or MEK) contamination was detected in samples B27 2-4 fbg, B27A 2-4 fbg and B47 2-4 fbg at concentrations below RSR criteria. The contamination may be due to the presence Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  6. Page 102 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 102 of 864 of demolished building materials, potentially containing materials that were stored in the basement prior to the fire. Low-level ETPH and/or PAH contamination were detected in surficial soil near L1985-9, L1985-10MW, B24/MW6, B45, B55, B57 and in deeper soil at B26 8-10 fbg, B27A 2-4 fbg, B28 6-8 fbg, B29 6-8.5 fbg, B44 2-4 fbg, B45 4-6 fbg, B46 2-4 fbg, B47 2-4 fbg, B48 4-5 fbg, B52 4-6 fbg and B54 6-8 fbg, at concentrations below RSR criteria. Soil collected from B26 5-7.5 fbg and B27 2-4 fbg contain ETPH and SVOCs, respectively, at concentrations above the RDEC, I/C DEC and/or GA PMC. Leachable SVOCs/PAHs in the B27 sample and leachable ETPH in the B26 sample were below the GWPC, demonstrating compliance with the PMC. The ETPH release at B26 was delineated vertically by sample B26 8-10 fbg in which ETPH was not detected and laterally by B52 4-6 fbg, B53 6-8 fbg and B54 6-8 fbg. The SVOC release at B27 was delineated vertically by samples B27A 4-6 fbg and B27 6-7.5 fbg and laterally by B47 2-4 fbg, B48 2-4, B48 4-5 fbg and B52 4-6 fbg, in which SVOCs/PAHs were either not detected or detected below RSR criteria. Remediation is required near B26 and B27 and the releases are sufficiently delineated vertically and laterally to proceed with remediation. PAHs were also detected above the RDEC, I/C DEC and/or GA PMC in soil samples outside the northeast corner of the presumed barn/warehouse footprint from B56 2-4 fbg and B56 4-6 fbg. Leachable PAHs in the 2 to 4 fbg sample were below the GWPC, demonstrating compliance with the PMC. The 4-6 fbg sample was not tested for leachable PAHs, however concentrations of PAHs in the sample were below or similar in concentrations to PAHs detected in B27 2-4 fbg, therefore soil from B56 4-6 fbg is likely compliant with the PMC. PAH contaminants encountered in B56 may be attributed to the presence of demolished/burned building materials containing ash and brick or imported backfill that was used to backfill the footprint of the former barn/warehouse and likely spread out in the vicinity of B56 prior to the area being paved. The release at B56 was partially delineated laterally by samples B24A 2-4 fbg, B25 2-4 fbg and B55 0-2 fbg. Remediation is required near B56, and the release is sufficiently delineated laterally in most directions. Additional evaluation to delineate the vertical and lateral extent of contamination in this area may be desired prior to remediation. Pesticides, and in some cases, elevated metals (arsenic, barium, cadmium, chromium, lead and/or nickel), were detected in soil in and near the footprint of the barn in surficial soil at B24/MW6, B50, B53, B55 and B57 and in deeper soil at B24A 2-4 and 4-6 fbg, B27 2-4 fbg, B28 6-8 and 16-18 fbg, B29 6-8.5 fbg, B44 2-4 and 16-18 fbg, B47 8-9.5 fbg and B56 2-4 fbg; concentrations in most cases exceed the GA PMC. Leachable pesticides in the samples tested were below the GWPC, including those with some of the highest concentrations of total pesticides, demonstrating compliance with the PMC. The chlordane concentration in samples B24/MW6 0-2 fbg and B55 0-2 fbg (near the northeast corner of the barn) are above the RDEC. The pesticide releases at B24/MW6 and B55 were delineated vertically by samples B24A 2-4 fbg and B25 2-4 fbg and laterally by samples B57 0-2 fbg and B56 2-4 fbg. Remediation is required near B24/MW6 and B55 and the pesticide contamination is sufficiently delineated vertically and laterally in most directions to proceed with remediation. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil except for elevated concentrations of arsenic, barium, cadmium, chromium, lead, mercury, nickel and/or zinc in L1985-9, L1985-10MW, B26, B48 and B51. Where tested, these samples did not contain detectable pesticides. Leachable metals in the tested samples are compliant with the GA PMC except as described below. Total arsenic in sample B29 6-8.5 fbg exceeds the RDEC and I/C DEC and leachable arsenic and lead exceed the GA PMC. The metals exceedances in B29 were delineated vertically by soil sample B29 9-11 fbg and laterally by soil samples B50 6-8 fbg, B51 6-7.5 fbg, B49 4-6 fbg and B49 6-8 fbg. Remediation is required near the boring and the contamination is sufficiently delineated vertically and laterally to proceed with remediation. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  7. Page 103 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 103 of 864 The leachable lead concentration in soil sample B44 2-4 fbg exceeds the GA PMC. The exceedance is delineated vertically by B44 4-6 fbg and partially delineated laterally by B28 6-8 fbg. Additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation The ETPH, PAH, pesticide and metals contaminants co-occur in backfill material that is within the footprint of the barn. The contamination is attributed to the presence of demolished building materials including ash, and potentially containing materials that were stored in the basement prior to the fire. The contaminated material requiring remediation is likely irregular and may occur throughout the entire barn footprint. Evidence of a surficial pesticide release in the vicinity of the outdoor storage area near the northwest corner of the barn was identified based on surficial soil samples tested from B31, B42 and B43. Surficial samples collected from B31, B42 and B43 that contained total pesticides above the GA PMC were tested for leachable pesticides with the results below the GWPC, demonstrating compliance with the PMC. The pesticide release to surficial soil by B31, B42 and B43 has been sufficiently delineated and no further evaluation is warranted. In addition, a deeper soil sample collected from 12 to 14 fbg at B42 contained total pesticides below applicable criteria. The contamination in the deeper sample may be due to releases near B31, B42 and B43 or from a release associated with an unknown source or off-site source located upgradient of the former outdoor storage area. Samples collected at B28 6 to 8 fbg and below the water table at B28 16 to18 fbg and B44 16-18 fbg, located outside of the barn foundation and downgradient of release area at B31, B42 and B43, contained total pesticides in some cases, above the GA PMC. Leachable pesticides in the samples were below the GWPC, demonstrating compliance with the PMC. The contamination at B28 and B44 may be related to pesticide storage at or near the two borings if outdoor storage area encompassed the area immediately west of the building or to an off-site source located upgradient of these borings that resulted in down gradient, soiladsorbed contamination below the water table. Based on the current data, remediation is not required, however additional investigations are warranted. 7.3.3 AOC 8 – Former Barns in the Central and Southeastern Portions of the Site The western and central portions of the Site were used for tobacco cultivation from before 1943 through the 1990s. In addition, three barns were located at the Site, one of which was located near the southern property line and reportedly used for chemical storage (see REC 3). The other barns are assumed to have been used for tobacco drying and were located in the southern portion of the stormwater detention basin and near the central portion of the current building. The Supplemental Investigation was conducted to further evaluate impacted soil near the barn in the southern portion of the stormwater detention basin. Phase III borings B19 and B20 and Supplemental Investigation borings B20A, B59, B60 and B61 were used to evaluate the AOC. COCs identified for AOC 8 are VOCs, ETPH, SVOCs, pesticides, herbicides and RCRA 8 metals plus copper, nickel, and zinc. ETPH, VOCs and herbicides were not detected in samples collected at AOC 8. Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  8. Page 104 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 104 of 864 Pesticides DDD, DDT and/or DDE were detected above the GA PMC in surficial soil at B19, B20, B59, B60 and B61. Leachable pesticides were either not detected or detected below the GWPC, demonstrating compliance with the GA PMC. Chlordane was detected in B20 0-2 fbg at a concentration above the RDEC and remediation is warranted. The pesticide release was delineated vertically by sample B20A 2-4 fbg and laterally by samples B59 0-2 fbg, B60 0-2 fbg and B61 0-2 fbg. One of more PAHs were detected in B20 0-2 fbg, B59 0-2 fbg, B60 0-2 fbg and B61 0-2 and 2-4 fbg. The concentrations in B61 0-2 fbg are above the RDEC. The contamination does not appear to be due to storage of chemicals inside the former barn since the same PAHs, with similar ratios, were detected in samples collected in the northwestern portion of the stormwater detention basin, approximately 200 ft. from the former barn location, and in the suspected dumping area (AOC 4), approximately 150 ft. west of the former barn. The PAHs in all three locations are likely related to impacts from stormwater containing PAHs leached from asphalt parking areas and the roadway. The PAH release at B61 was delineated vertically by sample B61 2-4 fbg and partially delineated laterally by samples B20 0-2 fbg and B60 0-2 fbg. The release is sufficiently delineated to complete remediation, however additional delineation may be desired prior to remediation. 7.3.4 AOC 4 – Suspected Dumping Area Historical dumping was identified to have occurred throughout the Site as indicated in a 2000 Phase I ESA reviewed by Stantec during its completion of the 2021 Phase I ESA. In 2021, Stantec observed a sign near the southeastern corner of the Site that read “No Dumping”. Small amounts of trash were observed in this area indicating that dumping had occurred in the area. COCs identified for AOC 4 include VOCs, ETPH, SVOCs, PCBs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc. Phase II boring L1985-11, Phase III borings B21, B22, and B23/MW7 and Supplemental Investigation borings B62, B63 and B64 were used to evaluate this AOC. VOCs were not detected in surficial samples collected from the borings. Surficial soil samples collected from L1985-11, B21, B22, B23/MW7, B62, B63 and B64 contained PAHs, ETPH, and/or pesticides at concentrations below applicable RSR criteria, and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exceptions: • • • PAHs concentrations in B21 and B64 are above the RDEC and GA PMC; leachable PAHs were not detected in sample B21 demonstrating compliance with the PMC. Total arsenic and lead were elevated in B21, but below criteria. Leachable lead in B23/MW7 exceeds the GA PMC and an elevated level of total mercury was present, below criteria. Pesticides were present in B21, B22, B23/MW7, B62 and B64 at concentrations above the GA PMC; leachable pesticides were below the GWPC demonstrating compliance with the PMC with the exception of dieldrin in B23/MW7 and B64. Dieldrin was also present in B64 at a concentration above the RDEC. The PAH, metals and/or pesticide exceedances in B21, B23/MW7 and B64 were delineated vertically by soil samples collected from 2-4 fbg. Remediation is required near the borings and the releases have been sufficiently delineated vertically and laterally in most directions to proceed with remediation. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  9. Page 105 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 105 of 864 7.3.5 AOC 5 – Former JDS Uniphase Site Operations The Site was developed with the current site building circa 2000 and occupied by JDS until 2004 when the building was occupied by Eversource for use as office space and a call/data center. JDS manufactured fiber optic components. Areas where JDS may have used and managed chemicals included two production areas, a clean room, and loading dock area at locations shown on Figure 5. JDS was a SQG of hazardous waste, including ignitable waste, corrosive acids, corrosive bases, spent halogenated and non-halogenated solvents, bisphenol (epoxy adhesive), chromium, silver, lead, alcohols, acetone, chlorobenzene and toluene. Chemicals used in JDS processes include degreasers, silver-containing solutions, potassium iodine gold etch, acids and caustics. Phase III and Supplemental investigations included borings and monitoring wells located along the downgradient southern and eastern sides of the building (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5 and L1985-3MW), borings completed in the southeastern portion of the building in the JDS clean room (B35 through B39), and soil vapor samples collected throughout JDS production and clean room areas and the loading dock (SV-1 through SV-18). COCs identified for AOC 5 include VOCs, ETPH, SVOCs, alcohols, and RCRA 8 metals plus copper, nickel, and zinc. In addition, 1,4-dioxane and PFAS are COCs since former manufacturing of fiber optic components may have used or generated wastes containing these emerging contaminants. Surficial and water table soil samples collected from B1/MW1 through B5/MW5 did not contain detectable VOCs, ETPH, SVOCs or alcohols and metals concentrations were within the ranges of naturally-occurring levels present in uncontaminated soil with the following exceptions: • Low levels of PAHs in surficial, or near-surface, samples from B1/MW1, B4/MW and B5/MW, below criteria. The apparent PAH contamination in soil at the above locations near the building may be due to placement of contaminated soil as backfill during construction of the building or to leaching of PAHs from pavement (at B1/MW1). These detections are not attributed to JDS operations inside the building. Remediation or additional evaluation of the apparent contamination is not warranted. Groundwater collected from the wells did not contain detectable concentrations of VOCs, ETPH, SVOCs, PFAS, alcohols or metals with the following exceptions: • • • Barium was detected in the majority of samples, at concentrations within the range which occurs naturally in groundwater. PFAS compounds were detected in all of the samples at concentrations ranging from 8.5 ng/L to 55 ng/L. The highest concentrations were detected in L1985-3MW and B4/MW4, located near the southeastern corner of the building downgradient of the largest Production Area, the Clean Room and the loading area. Note that these concentrations are the sum of compounds (PFHpA, PFHxS, PFNA, PFOS and PFOA) which have established soil remediation criteria and an established GWPC of 70 ng/L. The reported concentration sums were below the GWPC. In addition, there were two or three other PFAS compounds detected which do not have established groundwater criteria. Perfluorodecanesulfonic acid (PFDS) was not detected in groundwater samples despite its presence in one soil sample (discussed below). Note that other groundwater remedial criteria (SWPC, RVC or I/C VC) for PFAS have not been established which, when established, would apply to the Site. The SVOCs 2-methyl phenol, 3+4 methyl phenol and benzyl alcohol were detected previously in groundwater collected from L1985-3MW, located near the loading docks, at concentrations below applicable RSR criteria, where established. The presence of these compounds may be associated with Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 19 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx
  10. Page 106 of 110

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 176 Page 106 of 864 former JDS operations at the site. SVOCs were not detected in the most recent round of groundwater samples. Phase III soil samples collected inside the building did not contain detectable concentrations of VOCs, 1,4dioxane, ETPH, SVOCs, PFAS or alcohols and metals concentrations were within the ranges of naturallyoccurring levels present in uncontaminated soil with the following exception: • • PFDS was detected at 0.11 µg/kg in B36 0.5-1.5 fbg; PFAS were not detected in a deeper sample from the boring or in borings northeast and south-southwest of the boring. The location of the boring is shown on Figure 5. Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Remedial criteria for PFDS have not been established. The nature, extent and degree of PFAS contamination in soil has been sufficiently evaluated and remediation is not required based on the existing data. Sub-slab soil vapor samples were collected from vapor points and tested for VOCs, including 1,4-dioxane, to indicate where potential soil or groundwater source areas may be present associated with the former JDS operations. Nine VOC compounds, including 1,4-dioxane, acetone, MEK, ethanol, isopropyl alcohol, ethylbenzene, xylenes (m-, p- and o-), and PCE) were detected in soil vapor collected from one or more of the SSVPs in November 2023 (during the heating season), whereas only acetone and ethanol were detected in vapor collected during the cooling season in August 2024. The concentrations detected during the sampling are below residential and industrial/commercial soil vapor volatilization criteria, where established. Since the results of testing during the two sampling events are vastly different, a third round of sampling is planned during the 2024/2025 heating season to determine whether detections reported in November 2023 are representative. 7.3.6 Site-Wide Groundwater Quality Depths to groundwater measured in May 2021 at L1985-3MW, -5MW, -6MW and -10MW ranged from approximately 10.6 to 17.3 fbg. Depths to groundwater measured on September 21, 2023 at Phase II/III wells ranged from approximately 8.9 to 15.6 fbg. Depths to groundwater measured on May 13, 2024 at the wells ranged from approximately 7.3 to 14.0 fbg. Depths measured in May 2024 were approximately three feet shallower compared to May 2021 and the May 2024 data may represent the seasonal high water table. Depth to groundwater during the seasonal low water table, typically September or October, is unknown since the depths to water measured in May 2021 (typical high water time period) were significantly lower than measured in September 2023. Groundwater flow on all three occasions was toward the southeast, generally consistent with expected groundwater flow based on mapped drainage basin information summarized in Section 4. Groundwater samples collected in September 2023 and/or May 2024 from the site-wide monitoring wells were analyzed for one or more AOC-specific COCs, including VOCs, 1,4-dioxane, ETPH, SVOCs, herbicides, pesticides, alcohols, glycols, PFAS and RCRA 8 metals plus copper, nickel and zinc, Contaminants were not detected in groundwater with the exceptions described above, specific to individual AOCs and RECs. Other results are discussed below. Supplemental Investigation Report Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 20 of 23 H:\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Supplemental Inv Report\Eversource comments - 11-52024\23246-12A Supp Inv Report - 1985 Blue Hills Ave Windsor CT_Text FINAL.docx

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)