Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Words on different pages
  1. Page 181 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 881 of 2375 STATE OF CONNECTICUT WM DEPARTMENT OF ENVIRONMENTAL PROTECTION Manifest Document No. |. ^ . 1. Generator s US Ef’A 10 No. Generator's Name and Mailing Address 2. Page 1 of , A. State Manifest Document Number CT F1090062 J&S UKIPNASE 4 5. 1985 BUIE BILLS AVE. EJtT. Generator’s Phone ( ■ ) Transporter 1 Company Name ! r* l B. G.S.I. (Gen. Site Address) IfISPSQfi, CT ATTHtALEX TARR 6 tWTEB IHDUST8IAL 7 K Transporter 2 Company Name US EPA ID Number 5AHE T & » 2 1 ft t ». I US EPA ID Number 8 Designated Facility Name and Site Address D. Tran. Phone ( to. US EPA ID Number >238-6743 E. S.T.I. (Trahs. Lie. Plate #) F. Tran. Phone ( BRIDGEPORT U8ITED RECYCHHC 50 CROSS STREET BRIDGEPORT. CT 0Af>10 25 C. S.T.I. (Trans. Lie. Plate #) 1 9 information in ihe shaded areas is not required by Federal law. bul may be required by Stale law ) G. State Facility's ID (Not Required) # & 2 % jcjl 11 US DOT Description (Including Proper Shipping Name. Hazard Class, and ID Number) 3 H. Facility's Phone 12. Containers Total No Type Quantity j It-n;.. 14 - 1 Waste No. Unit Wl/Vol K RWi HASTE C-ORROSI (BISPWEXOl FI, 8, HID, ACID It Ml ft Rti Fpa H FHOL. NONE ERA ■ HASTE CORROSl’ sPHEROL FI, 8, _T _ <_______ srlrf T <H1, HONE H.: EPA (Q, HASTE CORROSIVE Lt< CERIC AfUfOKIUM HIT8AT1 I '. f N .K NONE EPA STATi" ,\A ■—-raJ. Additional Descriptions for Materials Listed Above BDdFHEHOL F - EPOXY ADHESIVE K. Handling Codes for Wastes Listed Above Interim i Final i Interim i Final PERCHLORIC ACID, CERIC ANIK U IUH NITRATE * <£ [CHART CR b. BISPHENOL F - EPOXY ADHESIVE 15. Special Handling Instructions and Additional Information 0898CD2NFB N898CD2HFB (589SCD2LST EMERGENCY ft! EMERGENCY ft! ENERGENCT Rt HOIK f 1! *4« 114! Point ol Departure: 16. GENERATOR'S CERTIFICATION: I hereby declare that the contents of this eonsignment are fully and accurately described above by proper shipping namerand are cjassilied, packed, marked, and labeled, and fere iri all respects in proper condition for transport by highway according to applicable international and national government regulations, and all applicable State laws and regulations. If I am a large quantity generator, I certify that I have a program in place to reduce the volume and toxicity of waste generated to the degree I have determined to be economically practicable and that I have selected the practicable method of treatment, storage, or disposal currently available to me which minimizes the present and future threat to human health and the environment; OR, if I am a small quantity generator, I have made a good faith effort to minimize my waste generation and select the best waste management method that is available lo me and that I can allorrf. -* ■> Month Day Year inted/Typed Name 2^/ z* T Signature, ikdi -ZJ- 18. Trarisporrer 2 Acknowledgement of Receipt of Materials Printed/Typed Name k &a Month Signature Day Year Day Year 19. Discrepancy Indication Space 20. Facility Owner or Operator: Certification of receipt of hazardous materials covered by this manifest except as noted in Item 19. Signature Printed/Typed Name Month I EPA Form 8700-22 (Rev. 9/91) Form Approved OMB No.2050-0039. COPY 7: GENERATOR MAILS TO GENERATOR STATE ' I 1090062 £ / \ —T'— 17. Transporter 1 Acknowledgersart of Receipt of Materials Printed/Typed Name CT F IN THE EVENT OF A SPILL, CONTACT THE NATIONAL R ESPO N SE CENTER, U.S. COAST GUARD [phone removed]. 3. FOR STATE USE ONLY (Form assigned for use on elite (12-pitch) typewriter.) UNIFORM HAZARDOUS WASTE MANIFEST COPY ?: GENERATOR MAILS TO GENERATOR STATE FO R SPILLS WITHIN CONNECTICUT. CONTACT CT P E P - OIL AND CHEMICAL SPILL RESPO N SE AT [phone removed] Please type (or print) Hazardous Waste MANIFEST PROGRAM 79 Elm St., Hartford, CT 06106-5127
  2. Page 182 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 882 of 2375 Phase II Environmental Site Assessment 1985 Blue Hills Avenue Extension, Windsor, CT July 28, 2021 Prepared for: Eversource Energy Service Company 107 Selden Street Berlin, CT 06037 Prepared by: Stantec Consulting Services Inc. 100 Pearl Street 10th Floor Hartford, CT 06103 1
  3. Page 183 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 883 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Revision Description Author Quality Check Independent Review 1
  4. Page 184 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 884 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT This document entitled Phase II Environmental Site Assessment was prepared by Stantec Consulting Services Inc. (“Stantec”) for the account of Eversource Energy Service Company (the “Client”). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by (signature) Melissa Bezanson, Associate Project Manager, PMP Reviewed by (signature) Eric J. Boswell, LEP, Associate, Senior Project Manager Approved by (signature) Joseph Salvetti, LSP, Senior Associate, Senior Project Manager 1
  5. Page 185 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 885 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Table of Contents 1.0 1.1 1.2 INTRODUCTION ............................................................................................................ 1 PURPOSE AND SCOPE ................................................................................................ 1 PRELIMINARY CSM ...................................................................................................... 2 1.2.1 Site Description and Use ................................................................................2 1.2.2 Historical Site Use ..........................................................................................2 1.2.3 Surrounding Land use ....................................................................................2 1.2.4 Environmental Setting ....................................................................................3 1.2.5 Recognized Environmental Conditions ...........................................................4 1.2.6 Areas of Concern ...........................................................................................4 2.0 2.1 2.2 2.3 2.4 FIELD SAMPLING AND ANALYSIS .............................................................................. 6 SOIL SAMPLING ............................................................................................................ 6 GROUNDWATER MONITORING................................................................................... 7 SAMPLE HANDLING AND ANALYSIS ........................................................................... 7 INVESTIGATION DERIVED WASTE ............................................................................. 9 3.0 3.1 3.2 3.3 3.4 INVESTIGATION RESULTS .......................................................................................... 9 RSR COMPARISON CRITERIA ..................................................................................... 9 SOIL RESULTS.............................................................................................................10 GROUNDWATER RESULTS ........................................................................................11 DATA QUALITY / USABILITY .......................................................................................11 4.0 4.1 4.2 FINDINGS AND CONCLUSIONS .................................................................................13 OVERVIEW OF SAMPLING RESULTS.........................................................................13 CONCEPTUAL SITE MODEL UPDATE ........................................................................13 5.0 STATEMENT OF LIMITATIONS ...................................................................................17 6.0 REFERENCES ..............................................................................................................19 i
  6. Page 186 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 886 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT LIST OF TABLES TABLE 1: SUMMARY OF CONSTITUENTS DETECTED IN SOIL SAMPLES TABLE 2: SUMMARY OF CONSTITUENTS DETECTED IN GROUNDWATER SAMPLES LIST OF FIGURES FIGURE 1 - SITE LOCATION MAP FIGURE 2 - SITE PLAN FIGURE 3 - GROUNDWATER ELEVATION AND FLOW LIST OF APPENDICES APPENDIX A - BORING LOGS APPENDIX B - GROUNDWATER PURGE LOGS APPENDIX C - LABORATORY ANALYTICAL REPORTS ii
  7. Page 187 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 887 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 1.0 INTRODUCTION In May and June 2021, Stantec Consulting Services Inc. (Stantec) on behalf of Eversource Energy Service Company as agent for The Rocky River Realty Company (Eversource) completed a Phase I Environmental Site Assessment (Phase I ESA) report for 1985 Blue Hills Avenue, Windsor, Connecticut, “the Property”, the “subject Property”, and/or the “Site” (Figure-1), dated July 13, 2021. The Phase I ESA was performed in support of due diligence activities in preparation for acquisition of the Property. Recognized Environmental Conditions (RECs) and Areas of Concern (AOCs) were identified during the Phase I ESA, which warranted further evaluation. A Phase II ESA was performed to evaluate the findings of the Phase I ESA. The Phase II ESA subsurface investigation field activities were performed between May 24th and May 28th, 2021. The Phase II ESA investigation activities, analytical results and supporting conceptual site model (CSM) are presented herein. The Phase I and Phase II ESA were conducted in accordance with the Connecticut Department of Energy and Environmental Protection (CT DEEP) Site Characterization Guidance Document (SCGD). 1.1 PURPOSE AND SCOPE The Phase II ESA was conducted to 1) evaluate potential contamination in the subsurface from documented historical releases, and 2) determine the presence or absence of contamination at areas where historical releases may have occurred. The investigation included the collection and laboratory analysis of soil and groundwater samples at targeted areas based on the CSM. The analytical data were compared to the CT DEEP Remediation Standard Regulations (RSR) to evaluate the significance of the results and compliance. The investigation targeted the four RECs and the four AOCs identified in the Phase I ESA and listed below. Detailed descriptions of these eight potential release areas are provided in Section 1.2.5, and 1.2.6, respectively. • REC-1: Diesel Fuel Release at the Loading Docks • REC-2: Coolant Release from Emergency Generator • REC-3: Historical Barn / Warehouse Fire • REC-4: Release from Snow Removal Equipment • AOC-1: Loading Docks, Storm Drain, and Southeast Stormwater Detention Basin • AOC-2: Historical Agricultural Use • AOC-3: Exterior Oil-Filled Electrical Transformers 1
  8. Page 188 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 888 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 • 1.2 AOC-4: Suspected Dumping Area PRELIMINARY CSM A summary of the pertinent information used to develop the CSM is provided below. 1.2.1 Site Description and Use The Property consists of approximately 19.42 acres of land developed with a single story 165,000 square foot masonry / slab on grade constructed building. The building is surrounded by asphalt parking lots and landscaped areas. The Property is owned by Indus Development I LLC of Bloomfield CT. Eversource currently leases and operates the Property as office space for a call/data center. 1.2.2 Historical Site Use Historically, the Property was used for agricultural land (tobacco fields) and residential dwellings. The Property was then developed with the current Site building in 2001 and occupied by JDS Uniphase (JDS), a fiber optic component manufacturer until 2004. JDS was a small quantity generator (SQG) of hazardous waste (greater than 100 kilograms and less than 1,000 kilograms per month). Manifested hazardous wastes included ignitable waste, corrosive acids, corrosive bases, and spent solvents. Based on the information obtained and reviewed during this Phase I ESA, documentation of former hazardous waste activities were identified that indicates that the Property meets the definition of an “establishment”, as defined by Connecticut General Statutes (CGS) Section 22a-134 et seq. 1.2.3 Surrounding Land use The Property and surrounding area are zoned as “I” for industrial use. The surrounding land uses are summarized below. • North: Blue Hills Avenue Extension (State Route 187) is a 4-lane divided road bordering the Property to the north. Community Health Resources and CIGNA office buildings are present across the road. • South: Day Hill Road borders the Property to the south, which is also the municipal boundary between the Towns of Windsor and Bloomfield. A parcel of land across the road is used as an agricultural field and developed with an industrial building occupied by CTEC Solar, LLC (solar supplier) and Lesro Industries (furniture manufacturer). • East: An undeveloped parcel of land adjoins the Property to the east, which includes a grassed area contiguous with landscaping from the subject Property, a wooded area, and a cleared area. This parcel was historically used for agriculture. 2
  9. Page 189 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 889 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 • West: An undeveloped parcel of land adjoins the Property to the west, which is in agricultural use (i.e., tobacco cultivation). 1.2.4 Environmental Setting 1.2.4.1 Topography The surface topography is relatively level with gentle grades toward stormwater catch basins. The elevation range at the Property is approximately 180 to 185 feet above mean sea level (msl), except for lower points within the stormwater detention basins to the northeast and southeast. 1.2.4.2 Soil According to the USDA Soil Conservation Service (SCS), surficial soils are mapped as sandy loam, to a depth of 16 inches, underlain by gravelly sandy loam to 24 inches below ground surface (bgs), transitioning to gravelly sand from 24 to 59 inches bgs. Field observations during the investigation were generally consistent with the mapped descriptions. Surface and shallow soils observed during sampling consisted of a brown fine to medium coarse sand with trace fine gravel, transitioning to a fine to coarse sand with depth. 1.2.4.3 Bedrock Depth to bedrock was not evaluated or observed during the Phase II subsurface investigation, however, based on available mapping, it is estimated to be approximately 175-feet below the ground surface. The bedrock mapped for the Property is the Portland Arkose, a reddish-brown arkose sandstone. 1.2.4.4 Surface Water The Property does not contain mapped surface water bodies, and no significant areas of standing water or other unmapped surface water bodies were observed during the Phase I or Phase II ESA. Culbro Lake is located approximately 350 feet northeast of the Property and in an office park. The Farmington River is present approximately 4,000 feet due north. Stormwater runoff will preferentially flow towards the area catch basin and detention basins, which are located in the northeast and southeast areas of the Property. 1.2.4.5 Groundwater The Property is located within a GA groundwater classification area, indicating that groundwater is presumed suitable for use as a potable water supply without treatment. The observed depth to groundwater in soil boring and monitoring wells ranged from approximately 10 to 15 feet below ground surface (bgs). The interpreted groundwater flow direction is toward the southeast (Figure 4). 3
  10. Page 190 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 890 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 1.2.5 Recognized Environmental Conditions The following four RECs were identified at the Property and evaluated during the Phase II ESA as release areas, as shown on Figure 2. REC-1: DIESEL FUEL RELEASE AT THE LOADING DOCKS A release of diesel fuel occurred at the loading dock area of the building on May 16, 2011. Diesel fuel was released to storm drains and subsequently to a detention basin located southeast of the building. The release was contained, and hard surfaces cleaned of residual fuel. REC-2: COOLANT RELEASE FROM EMERGENCY GENERATOR The Property uses two backup power emergency generators. One generator is located within the parking lot to the southwest of the building, and the other generator is adjacent to the west of the loading docks. Each generator contains a diesel storage tank with capacities of 4,400 gallons (adjacent to the loading dock) and 3,100 gallons (southwest of the building in the parking lot). A hose failure on emergency generator adjacent to the loading docks resulted in the release of 50-gallons of coolant to the floor of the generator enclosure, approximately 5 gallons impacted the concrete pad and gravel surface, reported to CT DEEP on June 1, 2017 and listed as closed. An environmental contractor responded to the release and performed a cleanup. REC-3: HISTORICAL BARN/WAREHOUSE FIRE In May 1994, a former barn/warehouse located in the southwestern portion of the Property was destroyed by a structure fire. The barn/warehouse had been used for storing pesticide, herbicides, and other chemicals. According to the Deputy Fire Marshal (Rich Shea),the fire was suppressed using water. Samples of air, surface wipes, surface water runoff from fire suppression and surface soil were collected immediately following the fire and tested for specific pesticides, which were detected in one runoff water sample. REC-4: RELEASE FROM SNOW REMOVAL EQUIPMENT Heavy equipment for snow removal is occasionally stored at the east end of the north parking lot. Oily pavement staining, which intersected a pavement crack, was observed in this area during the Phase I ESA site reconnaissance. 1.2.6 Areas of Concern In addition to the RECs, listed above, the following four AOCs were identified at the Property and evaluated during the Phase II ESA as potential release areas (Figure 2). AOC-1: LOADING DOCKS, STORM DRAIN, AND SOUTHEAST STORMWATER DETENTION BASIN 4

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)