Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Words on different pages
  1. Page 187 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 887 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 1.0 INTRODUCTION In May and June 2021, Stantec Consulting Services Inc. (Stantec) on behalf of Eversource Energy Service Company as agent for The Rocky River Realty Company (Eversource) completed a Phase I Environmental Site Assessment (Phase I ESA) report for 1985 Blue Hills Avenue, Windsor, Connecticut, “the Property”, the “subject Property”, and/or the “Site” (Figure-1), dated July 13, 2021. The Phase I ESA was performed in support of due diligence activities in preparation for acquisition of the Property. Recognized Environmental Conditions (RECs) and Areas of Concern (AOCs) were identified during the Phase I ESA, which warranted further evaluation. A Phase II ESA was performed to evaluate the findings of the Phase I ESA. The Phase II ESA subsurface investigation field activities were performed between May 24th and May 28th, 2021. The Phase II ESA investigation activities, analytical results and supporting conceptual site model (CSM) are presented herein. The Phase I and Phase II ESA were conducted in accordance with the Connecticut Department of Energy and Environmental Protection (CT DEEP) Site Characterization Guidance Document (SCGD). 1.1 PURPOSE AND SCOPE The Phase II ESA was conducted to 1) evaluate potential contamination in the subsurface from documented historical releases, and 2) determine the presence or absence of contamination at areas where historical releases may have occurred. The investigation included the collection and laboratory analysis of soil and groundwater samples at targeted areas based on the CSM. The analytical data were compared to the CT DEEP Remediation Standard Regulations (RSR) to evaluate the significance of the results and compliance. The investigation targeted the four RECs and the four AOCs identified in the Phase I ESA and listed below. Detailed descriptions of these eight potential release areas are provided in Section 1.2.5, and 1.2.6, respectively. • REC-1: Diesel Fuel Release at the Loading Docks • REC-2: Coolant Release from Emergency Generator • REC-3: Historical Barn / Warehouse Fire • REC-4: Release from Snow Removal Equipment • AOC-1: Loading Docks, Storm Drain, and Southeast Stormwater Detention Basin • AOC-2: Historical Agricultural Use • AOC-3: Exterior Oil-Filled Electrical Transformers 1
  2. Page 188 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 888 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 • 1.2 AOC-4: Suspected Dumping Area PRELIMINARY CSM A summary of the pertinent information used to develop the CSM is provided below. 1.2.1 Site Description and Use The Property consists of approximately 19.42 acres of land developed with a single story 165,000 square foot masonry / slab on grade constructed building. The building is surrounded by asphalt parking lots and landscaped areas. The Property is owned by Indus Development I LLC of Bloomfield CT. Eversource currently leases and operates the Property as office space for a call/data center. 1.2.2 Historical Site Use Historically, the Property was used for agricultural land (tobacco fields) and residential dwellings. The Property was then developed with the current Site building in 2001 and occupied by JDS Uniphase (JDS), a fiber optic component manufacturer until 2004. JDS was a small quantity generator (SQG) of hazardous waste (greater than 100 kilograms and less than 1,000 kilograms per month). Manifested hazardous wastes included ignitable waste, corrosive acids, corrosive bases, and spent solvents. Based on the information obtained and reviewed during this Phase I ESA, documentation of former hazardous waste activities were identified that indicates that the Property meets the definition of an “establishment”, as defined by Connecticut General Statutes (CGS) Section 22a-134 et seq. 1.2.3 Surrounding Land use The Property and surrounding area are zoned as “I” for industrial use. The surrounding land uses are summarized below. • North: Blue Hills Avenue Extension (State Route 187) is a 4-lane divided road bordering the Property to the north. Community Health Resources and CIGNA office buildings are present across the road. • South: Day Hill Road borders the Property to the south, which is also the municipal boundary between the Towns of Windsor and Bloomfield. A parcel of land across the road is used as an agricultural field and developed with an industrial building occupied by CTEC Solar, LLC (solar supplier) and Lesro Industries (furniture manufacturer). • East: An undeveloped parcel of land adjoins the Property to the east, which includes a grassed area contiguous with landscaping from the subject Property, a wooded area, and a cleared area. This parcel was historically used for agriculture. 2
  3. Page 189 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 889 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 • West: An undeveloped parcel of land adjoins the Property to the west, which is in agricultural use (i.e., tobacco cultivation). 1.2.4 Environmental Setting 1.2.4.1 Topography The surface topography is relatively level with gentle grades toward stormwater catch basins. The elevation range at the Property is approximately 180 to 185 feet above mean sea level (msl), except for lower points within the stormwater detention basins to the northeast and southeast. 1.2.4.2 Soil According to the USDA Soil Conservation Service (SCS), surficial soils are mapped as sandy loam, to a depth of 16 inches, underlain by gravelly sandy loam to 24 inches below ground surface (bgs), transitioning to gravelly sand from 24 to 59 inches bgs. Field observations during the investigation were generally consistent with the mapped descriptions. Surface and shallow soils observed during sampling consisted of a brown fine to medium coarse sand with trace fine gravel, transitioning to a fine to coarse sand with depth. 1.2.4.3 Bedrock Depth to bedrock was not evaluated or observed during the Phase II subsurface investigation, however, based on available mapping, it is estimated to be approximately 175-feet below the ground surface. The bedrock mapped for the Property is the Portland Arkose, a reddish-brown arkose sandstone. 1.2.4.4 Surface Water The Property does not contain mapped surface water bodies, and no significant areas of standing water or other unmapped surface water bodies were observed during the Phase I or Phase II ESA. Culbro Lake is located approximately 350 feet northeast of the Property and in an office park. The Farmington River is present approximately 4,000 feet due north. Stormwater runoff will preferentially flow towards the area catch basin and detention basins, which are located in the northeast and southeast areas of the Property. 1.2.4.5 Groundwater The Property is located within a GA groundwater classification area, indicating that groundwater is presumed suitable for use as a potable water supply without treatment. The observed depth to groundwater in soil boring and monitoring wells ranged from approximately 10 to 15 feet below ground surface (bgs). The interpreted groundwater flow direction is toward the southeast (Figure 4). 3
  4. Page 190 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 890 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 1.2.5 Recognized Environmental Conditions The following four RECs were identified at the Property and evaluated during the Phase II ESA as release areas, as shown on Figure 2. REC-1: DIESEL FUEL RELEASE AT THE LOADING DOCKS A release of diesel fuel occurred at the loading dock area of the building on May 16, 2011. Diesel fuel was released to storm drains and subsequently to a detention basin located southeast of the building. The release was contained, and hard surfaces cleaned of residual fuel. REC-2: COOLANT RELEASE FROM EMERGENCY GENERATOR The Property uses two backup power emergency generators. One generator is located within the parking lot to the southwest of the building, and the other generator is adjacent to the west of the loading docks. Each generator contains a diesel storage tank with capacities of 4,400 gallons (adjacent to the loading dock) and 3,100 gallons (southwest of the building in the parking lot). A hose failure on emergency generator adjacent to the loading docks resulted in the release of 50-gallons of coolant to the floor of the generator enclosure, approximately 5 gallons impacted the concrete pad and gravel surface, reported to CT DEEP on June 1, 2017 and listed as closed. An environmental contractor responded to the release and performed a cleanup. REC-3: HISTORICAL BARN/WAREHOUSE FIRE In May 1994, a former barn/warehouse located in the southwestern portion of the Property was destroyed by a structure fire. The barn/warehouse had been used for storing pesticide, herbicides, and other chemicals. According to the Deputy Fire Marshal (Rich Shea),the fire was suppressed using water. Samples of air, surface wipes, surface water runoff from fire suppression and surface soil were collected immediately following the fire and tested for specific pesticides, which were detected in one runoff water sample. REC-4: RELEASE FROM SNOW REMOVAL EQUIPMENT Heavy equipment for snow removal is occasionally stored at the east end of the north parking lot. Oily pavement staining, which intersected a pavement crack, was observed in this area during the Phase I ESA site reconnaissance. 1.2.6 Areas of Concern In addition to the RECs, listed above, the following four AOCs were identified at the Property and evaluated during the Phase II ESA as potential release areas (Figure 2). AOC-1: LOADING DOCKS, STORM DRAIN, AND SOUTHEAST STORMWATER DETENTION BASIN 4
  5. Page 191 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 891 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Introduction July 28, 2021 Potential historical releases may have occurred during the transfers of chemicals and hazardous wastes; or hydraulic oil leaks from the operations of two hydraulic compactors at the loading docks. Like the diesel release identified under REC-1, other potential historical releases at the loading docks may have impacted the associated stormwater drainage system (catch basins and piping) and the detention basin. No surface staining or other visual evidence of a release was observed in this AOC during the Phase I ESA site reconnaissance. AOC-2: HISTORICAL AGRICULTURAL USE The west and central areas of the Property were historically used for agricultural purposes (i.e., tobacco cultivation) from before 1934 and through the 1990’s. Various pesticides, fertilizers and possibly herbicides were likely applied on fields at the Property that were stored in the former barn/warehouse identified under REC-3. A former 6,750–gallon heating oil underground storage tank (UST) was used and reportedly removed adjacent to the barn/warehouse. Additionally, hazardous building materials were identified in the barn/warehouse including lead paint and asbestos containing materials (ACM). AOC-3: EXTERIOR OIL-FILLED ELECTRICAL TRANSFORMERS The Property contains three pad-mounted oil-filled electrical transformers. A spill of less than one gallon of oil was documented at one of the transformers, which was contained and removed. The transformer areas are located at the southeast exterior of the building, west of the loading docks, northeast of the north parking lot, and along the northwest of the building exterior. AOC-4: SUSPECTED DUMPING AREA Historical dumping was noted in numerous areas across the target property of a 2000 Phase I ESA, which included the subject Property. A sign was observed, during the “insert date” Site inspection at the southeast forested area of the Property that read “No Dumping”. A small amount of trash was observed in this area. No other dump areas were observed on the Property during the site reconnaissance for the 2021 Phase I ESA. 5
  6. Page 192 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 892 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Field Sampling and Analysis July 28, 2021 2.0 FIELD SAMPLING AND ANALYSIS In consideration of the eight potential release areas listed in Section 1.2, Stantec developed a sampling and analysis plan to evaluate the contaminants of concern (COCs) in soil and groundwater. Soil and groundwater sample locations are depicted on Figure 2. 2.1 SOIL SAMPLING Prior to field sampling, the proposed locations were marked in the field and reviewed with Eversource. Call-Before-You-Dig (CBYD) was notified to locate public utilities, and GPRS, Inc. (GPRS) was retained to screen for on-site private utilities or other subsurface anomalies in the vicinity of the proposed sample locations. GPRS used ground penetrating radar (GPR) and electromagnetic technologies. On May 24th and 25th, 2021, Stantec collected soil samples from the Property. Soil sample locations were located utilizing a Global Positioning System (GPS) with sub-meter accuracy. The locations of the soil samples are depicted on Figure 2. Surface soil (0 to 0.5 feet bgs) grab samples (L1985-12 through L1985-14) were collected at the three exterior electrical transformers (AOC-3) using manual methods. CES Environmental Services LLC was retained by Stantec and advanced twelve soil borings (L1985-1 through L1985-11, and L1985-15) using a direct-push drilling rig. Soil borings were advanced to a maximum depth of 25 feet bgs. Soil was retrieved from each boring in five-foot intervals. The soils were inspected, screened, sampled and observations were documented on a soil boring log. Copies of the soil boring logs are included in Appendix A. Soil samples were screened for VOC using a photoionization detector (PID) and inspected for visual and olfactory evidence of contamination. Soil samples from borings were collected for laboratory analysis from the intervals exhibiting the elevated PID headspace readings, staining and/or strong odors, or the presence of debris. Low level PID readings were observed ranging from 0.0 ppm to 3.3 ppm. In general, no evidence of staining, debris, or odours were noted in the soil samples that were collected, with one exception. Concrete was observed at an approximate depth of 7.5 feet bgs in borings L1985-8 and L1985-10MW, in the area of the former barn/warehouse. In the absence of field observations for the presence of contamination, the soil sample depth interval was selected for laboratory analysis based on the CSM for the potential release. Disposable PPE and single use sampling equipment, such as nitrile gloves and soil coring devices, respectively, were changed between sample collections. The soil samples were collected into laboratory supplied containers, preserved according to their analytical method, (e.g., Volatile Organic Compounds, (VOCs) samples were preserved via EPA Method 5035) and submitted to SGS Accutest Laboratory (SGS), a Connecticut certified laboratory under chain of custody. Following collection, samples were stored on ice until delivery to SGS. 6
  7. Page 193 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 893 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Field Sampling and Analysis July 28, 2021 2.2 GROUNDWATER MONITORING Four of the soil boring locations were completed as monitoring wells (L1985-3MW, -5MW, -6MW, and 10MW). Each monitoring well was constructed using prepacked screens. The wells were finished at grade with flush-mount protectors set in concrete. Following construction, each well was purged to remove residual debris and establish hydraulic connectivity. The four wells were sampled on May 28, 2021 following a 4-day stabilization period. Copies of the groundwater sampling purge and sampling logs are including in Appendix B. Groundwater samples were collected in accordance with low stress/low flow purge and sampling procedures. Groundwater was collected in a flow-through cell using a peristaltic pump and dedicated polyethylene and silicon tubing and monitored for pH, temperature, conductivity, oxidation reduction potential, and turbidity. Non-aqueous phase liquid (NAPL) was not observed during groundwater sampling. Stabilization of the groundwater depth and geochemical parameters was achieved over three successive readings prior to sample collection at three of the wells (L1985-3MW, 5MW, and 10MW). Stabilization at well L1985-6MW was not achieved. Refusal was repeatedly encountered at a depth of 15.5 to 16.5 feet bgs during drilling for the well. The well was installed to a depth 16.15 feet bgs and at the beginning of sampling contained a water column of 4.65 feet. The water level did not stabilize during sampling; therefore, a grab sample was collected for laboratory analysis. An elevation survey was conducted using an auto-level and rod to determine the relative elevations of the monitoring wells with reference to a site-specific datum. The elevation survey data and depth to groundwater data were used to prepare a groundwater contour map (Figure 3). The groundwater elevation data indicated a groundwater flow direction to the southeast. 2.3 SAMPLE HANDLING AND ANALYSIS A total of 15 soil samples and 4 groundwater samples were collected from the locations shown on Figure2. The soil and groundwater samples were submitted to SGS Accutest, a Connecticut certified laboratory under chain of custody. The samples were collected into laboratory supplied containers, with preservatives as appropriated for the analysis, and stored on ice. The laboratory was directed to analyse and report the results in accordance with the CT DEEP Reasonable Confidence Protocols (RCP). Samples were collected and analyzed for the COCs associated with the respective REC and AOC. The COCs included: chlorinated herbicides, organochlorine pesticides, volatile organic compounds (VOCs), petroleum hydrocarbons, polychlorinated biphenyls (PCBs), and target metals. The list of target metals was selected to evaluate potential releases of chemicals and wastes by JDS and for types of pesticides and herbicides that have been historically documented to contain such metals as primary components (e.g., arsenic, copper, lead, mercury, nickel, zinc, etc.). VOC analysis was performed to evaluate potential releases of chemicals and wastes from former industrial operations by JDS and specific pesticides, such as ethylene dibromide (EDB) and 1,3-dichloropropene, which were commonly used as soil fumigants for shade tobacco. Historical releases and potential past releases of petroleum products were evaluated 7
  8. Page 194 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 894 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Field Sampling and Analysis July 28, 2021 using analysis of extractable total petroleum hydrocarbons (ETPH), VOCs, and polynuclear aromatic hydrocarbons (PAHs). Herbicide and pesticide analysis were performed to evaluate impacts from historical agricultural land use and chemical storage in the historical barn/warehouse. Analysis for PCBs was performed to evaluate potential historical releases from oil-filled transformers and the compactors. A summary of the samples collected, and analysis performed for each REC and AOC is provided in the table below. Sample ID Soil Samples L1985-1-S2 REC/AOC AOC-1, REC-1, REC-2 AOC-1, REC-1 AOC-1, REC-1 AOC-1, REC-1 REC-4 AOC-2 AOC-2, REC-2 AOC-2, REC-3 AOC-2,REC-3 AOC-2, REC-3 AOC-2, AOC-4 AOC-3 AOC-3, REC-2 AOC-3 AOC-1, AOC-2 L1985-2-S3 L1985-3MW-S3 L1985-4-S2 L1985-5MW-S1 L1985-6MW-S3 L-1985-7-S2 L1985-8- S3 L1985-9-S1 L1985-10MW-S2 L1985-11-S1 L1985-12-S1 L1985-13-S1 L1985-14-S1 L1985-15-S1 Groundwater Samples AOC-1, REC-1, L1985-3MW AOC-2 REC-4, AOC-2 L1985-5MW AOC-2 L1985-6MW REC-3, AOC-2 L1985-10MW VOC 8260 CT ETPH PAHs 8270 Metals* X X X X X X X X X X X X X X X X X X X X X X X X X X, S X X X X X X X, S X X X X X X X X X X X X X X X X X X X X X X X X X PCB 8082 Pesticides 8081 X X, S X X X X, S X X X X X X X X X X X X X X X X X X X X X Notes: *Metals analysis included the RCRA 8 metals, plus copper, nickel, and zinc. “X” denotes the sample was analysed for the total concentration by mass analysis. “S” denotes the sample was analysed following SPLP extraction. “S1” sample ID suffix denotes surface sample “S2” sample ID suffix denotes shallow soil Herbicides 8151 X X X X 8
  9. Page 195 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 895 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 “S3” sample ID suffix denotes sample collection at depth, generally at the groundwater interface or bottom of the boring (approximately 15 fbg). 2.4 INVESTIGATION DERIVED WASTE Investigation derived waste (IDW) that was generated was containerized in drums and stored at a location designated by Eversource. IDW included soil cuttings, purged groundwater, decontamination fluids, used personal protective equipment, and disposable sampling equipment and materials (e.g. polyethylene sheeting, tubing, spatulas, etc.). The IDW is planned for disposal off the Site following accumulation during subsequent phases of investigation, if warranted. 3.0 INVESTIGATION RESULTS 3.1 RSR COMPARISON CRITERIA The laboratory analytical results were reviewed and compared to applicable criteria provided in the RSR. The RSRs apply to sites subject to certain CT DEEP cleanup programs. Based on the Phase I ESA, the Property meets the definition of an “establishment” under the Property Transfer Law and will be required to achieve and demonstrate compliance with the RSRs. The selection of applicable comparison criteria from the RSR for the evaluation of data considered the following factors: 1) Land use for the Property is not currently restricted from residential use or soil disturbances, 2) Public water is available to the Property and surrounding area, and the 3) The groundwater classification is GA, The analytical results were compared to the following RSR criteria. Soil • Residential Direct Exposure Criteria (RDEC), and • Pollutant Mobility Criteria for GA groundwater classification areas (GA PMC), including the Groundwater Protection Criteria (GWPC) for comparison of SPLP results. Groundwater • Groundwater Protection Criteria (GWPC), • Surface Water Protection Criteria (SWPC), and • Residential Volatilization Criteria (RVC) 9
  10. Page 196 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 896 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 A summary of the soil and groundwater analytical results is provided below and summarized in Table 1 and 2, respectively. Copies of the laboratory report is included in Appendix C. 3.2 SOIL RESULTS Soil samples were collected at the surface and varying depths for laboratory analysis. The “S1” sample ID suffix denotes surface samples, which were generally obtained from 0 to 0.5 feet bgs or below the finished surface, such as asphalt. The “S2” sample ID suffix denotes shallow soils that were generally obtained from 1 to 3 feet bgs. Soil samples at depth are denoted with suffix “S3”. Samples collected at depth were obtained at the groundwater interface or bottom of the boring (approximately 15 fbg). A review of the analytical results for soil samples is provided below. The concentrations of constituents detected in soil samples are summarized in Table 1. Copies of the laboratory analytical reports are provided in Appendix C. • VOCs detected in soil included acetone (L1985-10MW-S2) and m,p-xylenes (L1985-5MW-S1). The reported concentrations of VOC were less than applicable RSR soil criteria. • PAHs were detected in five soil samples (L1985-7-S2, L1985-9-S1, L1985-10MW-S2, L1985-11S1, and L1985-15-S1). The reported PAHs included: acenaphthylene, anthracene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-cd)pyrene, phenanthrene, and pyrene. The reported concentrations of PAHs were less than applicable RSR soil criteria. • ETPH was detected in nine soil samples (L1985-1-S2, L1985-3MW-S3, L1985-9-S1, L198510MW-S2, L1985-11-S1, L1985-12-S1, L1985-13-S1, L1985-14-S1, and L1985-15-S1). The reported concentrations of EPTH were less than applicable RSR soil criteria. • Pesticides were detected in three soil samples (L1985-7-S2, L1985-11-S1, and L1985-15-S1). The pesticides identified in the samples included 4,4’ DDE, 4,4’ DDT, heptachlor epoxide, and lindane (by SPLP). o Total DDT (4,4’ DDE plus 4,4’ DDT) was detected by mass analysis in all three samples. The reported concentrations of DDT in sample L1985-7-S2 was 6.2 micrograms per kilogram (µg/kg) and 33.9 µg/kg in sample L1985-15-S1, which were greater than the GA PMC (3 µg/kg). DDT was not detected in the SPLP results for sample L1985-7-S2. SPLP results were not obtained for sample L1985-15-S1. o Heptachlor epoxide was detected in sample L1985-7-S2 at a concentration less than the applicable RSR soil criteria. o Lindane was detected in the SPLP analysis from sample L1985-7-S2 at a concentration less than the GWPC. 10

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)