Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Words on different pages
  1. Page 193 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 893 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Field Sampling and Analysis July 28, 2021 2.2 GROUNDWATER MONITORING Four of the soil boring locations were completed as monitoring wells (L1985-3MW, -5MW, -6MW, and 10MW). Each monitoring well was constructed using prepacked screens. The wells were finished at grade with flush-mount protectors set in concrete. Following construction, each well was purged to remove residual debris and establish hydraulic connectivity. The four wells were sampled on May 28, 2021 following a 4-day stabilization period. Copies of the groundwater sampling purge and sampling logs are including in Appendix B. Groundwater samples were collected in accordance with low stress/low flow purge and sampling procedures. Groundwater was collected in a flow-through cell using a peristaltic pump and dedicated polyethylene and silicon tubing and monitored for pH, temperature, conductivity, oxidation reduction potential, and turbidity. Non-aqueous phase liquid (NAPL) was not observed during groundwater sampling. Stabilization of the groundwater depth and geochemical parameters was achieved over three successive readings prior to sample collection at three of the wells (L1985-3MW, 5MW, and 10MW). Stabilization at well L1985-6MW was not achieved. Refusal was repeatedly encountered at a depth of 15.5 to 16.5 feet bgs during drilling for the well. The well was installed to a depth 16.15 feet bgs and at the beginning of sampling contained a water column of 4.65 feet. The water level did not stabilize during sampling; therefore, a grab sample was collected for laboratory analysis. An elevation survey was conducted using an auto-level and rod to determine the relative elevations of the monitoring wells with reference to a site-specific datum. The elevation survey data and depth to groundwater data were used to prepare a groundwater contour map (Figure 3). The groundwater elevation data indicated a groundwater flow direction to the southeast. 2.3 SAMPLE HANDLING AND ANALYSIS A total of 15 soil samples and 4 groundwater samples were collected from the locations shown on Figure2. The soil and groundwater samples were submitted to SGS Accutest, a Connecticut certified laboratory under chain of custody. The samples were collected into laboratory supplied containers, with preservatives as appropriated for the analysis, and stored on ice. The laboratory was directed to analyse and report the results in accordance with the CT DEEP Reasonable Confidence Protocols (RCP). Samples were collected and analyzed for the COCs associated with the respective REC and AOC. The COCs included: chlorinated herbicides, organochlorine pesticides, volatile organic compounds (VOCs), petroleum hydrocarbons, polychlorinated biphenyls (PCBs), and target metals. The list of target metals was selected to evaluate potential releases of chemicals and wastes by JDS and for types of pesticides and herbicides that have been historically documented to contain such metals as primary components (e.g., arsenic, copper, lead, mercury, nickel, zinc, etc.). VOC analysis was performed to evaluate potential releases of chemicals and wastes from former industrial operations by JDS and specific pesticides, such as ethylene dibromide (EDB) and 1,3-dichloropropene, which were commonly used as soil fumigants for shade tobacco. Historical releases and potential past releases of petroleum products were evaluated 7
  2. Page 194 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 894 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Field Sampling and Analysis July 28, 2021 using analysis of extractable total petroleum hydrocarbons (ETPH), VOCs, and polynuclear aromatic hydrocarbons (PAHs). Herbicide and pesticide analysis were performed to evaluate impacts from historical agricultural land use and chemical storage in the historical barn/warehouse. Analysis for PCBs was performed to evaluate potential historical releases from oil-filled transformers and the compactors. A summary of the samples collected, and analysis performed for each REC and AOC is provided in the table below. Sample ID Soil Samples L1985-1-S2 REC/AOC AOC-1, REC-1, REC-2 AOC-1, REC-1 AOC-1, REC-1 AOC-1, REC-1 REC-4 AOC-2 AOC-2, REC-2 AOC-2, REC-3 AOC-2,REC-3 AOC-2, REC-3 AOC-2, AOC-4 AOC-3 AOC-3, REC-2 AOC-3 AOC-1, AOC-2 L1985-2-S3 L1985-3MW-S3 L1985-4-S2 L1985-5MW-S1 L1985-6MW-S3 L-1985-7-S2 L1985-8- S3 L1985-9-S1 L1985-10MW-S2 L1985-11-S1 L1985-12-S1 L1985-13-S1 L1985-14-S1 L1985-15-S1 Groundwater Samples AOC-1, REC-1, L1985-3MW AOC-2 REC-4, AOC-2 L1985-5MW AOC-2 L1985-6MW REC-3, AOC-2 L1985-10MW VOC 8260 CT ETPH PAHs 8270 Metals* X X X X X X X X X X X X X X X X X X X X X X X X X X, S X X X X X X X, S X X X X X X X X X X X X X X X X X X X X X X X X X PCB 8082 Pesticides 8081 X X, S X X X X, S X X X X X X X X X X X X X X X X X X X X X Notes: *Metals analysis included the RCRA 8 metals, plus copper, nickel, and zinc. “X” denotes the sample was analysed for the total concentration by mass analysis. “S” denotes the sample was analysed following SPLP extraction. “S1” sample ID suffix denotes surface sample “S2” sample ID suffix denotes shallow soil Herbicides 8151 X X X X 8
  3. Page 195 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 895 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 “S3” sample ID suffix denotes sample collection at depth, generally at the groundwater interface or bottom of the boring (approximately 15 fbg). 2.4 INVESTIGATION DERIVED WASTE Investigation derived waste (IDW) that was generated was containerized in drums and stored at a location designated by Eversource. IDW included soil cuttings, purged groundwater, decontamination fluids, used personal protective equipment, and disposable sampling equipment and materials (e.g. polyethylene sheeting, tubing, spatulas, etc.). The IDW is planned for disposal off the Site following accumulation during subsequent phases of investigation, if warranted. 3.0 INVESTIGATION RESULTS 3.1 RSR COMPARISON CRITERIA The laboratory analytical results were reviewed and compared to applicable criteria provided in the RSR. The RSRs apply to sites subject to certain CT DEEP cleanup programs. Based on the Phase I ESA, the Property meets the definition of an “establishment” under the Property Transfer Law and will be required to achieve and demonstrate compliance with the RSRs. The selection of applicable comparison criteria from the RSR for the evaluation of data considered the following factors: 1) Land use for the Property is not currently restricted from residential use or soil disturbances, 2) Public water is available to the Property and surrounding area, and the 3) The groundwater classification is GA, The analytical results were compared to the following RSR criteria. Soil • Residential Direct Exposure Criteria (RDEC), and • Pollutant Mobility Criteria for GA groundwater classification areas (GA PMC), including the Groundwater Protection Criteria (GWPC) for comparison of SPLP results. Groundwater • Groundwater Protection Criteria (GWPC), • Surface Water Protection Criteria (SWPC), and • Residential Volatilization Criteria (RVC) 9
  4. Page 196 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 896 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 A summary of the soil and groundwater analytical results is provided below and summarized in Table 1 and 2, respectively. Copies of the laboratory report is included in Appendix C. 3.2 SOIL RESULTS Soil samples were collected at the surface and varying depths for laboratory analysis. The “S1” sample ID suffix denotes surface samples, which were generally obtained from 0 to 0.5 feet bgs or below the finished surface, such as asphalt. The “S2” sample ID suffix denotes shallow soils that were generally obtained from 1 to 3 feet bgs. Soil samples at depth are denoted with suffix “S3”. Samples collected at depth were obtained at the groundwater interface or bottom of the boring (approximately 15 fbg). A review of the analytical results for soil samples is provided below. The concentrations of constituents detected in soil samples are summarized in Table 1. Copies of the laboratory analytical reports are provided in Appendix C. • VOCs detected in soil included acetone (L1985-10MW-S2) and m,p-xylenes (L1985-5MW-S1). The reported concentrations of VOC were less than applicable RSR soil criteria. • PAHs were detected in five soil samples (L1985-7-S2, L1985-9-S1, L1985-10MW-S2, L1985-11S1, and L1985-15-S1). The reported PAHs included: acenaphthylene, anthracene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-cd)pyrene, phenanthrene, and pyrene. The reported concentrations of PAHs were less than applicable RSR soil criteria. • ETPH was detected in nine soil samples (L1985-1-S2, L1985-3MW-S3, L1985-9-S1, L198510MW-S2, L1985-11-S1, L1985-12-S1, L1985-13-S1, L1985-14-S1, and L1985-15-S1). The reported concentrations of EPTH were less than applicable RSR soil criteria. • Pesticides were detected in three soil samples (L1985-7-S2, L1985-11-S1, and L1985-15-S1). The pesticides identified in the samples included 4,4’ DDE, 4,4’ DDT, heptachlor epoxide, and lindane (by SPLP). o Total DDT (4,4’ DDE plus 4,4’ DDT) was detected by mass analysis in all three samples. The reported concentrations of DDT in sample L1985-7-S2 was 6.2 micrograms per kilogram (µg/kg) and 33.9 µg/kg in sample L1985-15-S1, which were greater than the GA PMC (3 µg/kg). DDT was not detected in the SPLP results for sample L1985-7-S2. SPLP results were not obtained for sample L1985-15-S1. o Heptachlor epoxide was detected in sample L1985-7-S2 at a concentration less than the applicable RSR soil criteria. o Lindane was detected in the SPLP analysis from sample L1985-7-S2 at a concentration less than the GWPC. 10
  5. Page 197 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 897 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 • Herbicides were not detected in the samples at concentrations greater than the laboratory reporting limits. • PCBs were not detected in the samples at concentrations greater than the laboratory reporting limits. • Metals were analysed for twelve samples and detected in each sample. Each target metal was detected in one or more samples. The reported concentrations of metals were less than applicable RSR soil criteria and generally consistent with anticipated naturally occurring background conditions. 3.3 GROUNDWATER RESULTS A review of the analytical results for groundwater samples is provided below. The concentrations of constituents detected in soil samples are summarized in Table 2. Copies of the laboratory analytical reports are provided in Appendix C. • VOC, PAHs, PCBs, and herbicides were not detected in the groundwater samples. • COCs were not detected in groundwater samples from wells L1985-3MW and L1985-10MW. • ETPH was the only COC detected in well L1985-5MW, which was reported at a concentration less than the applicable RSR criteria. • The following compounds were detected in the groundwater sample from well L1985-6MW: 3.4 o ETPH was detected at concentration of 1.05 milligrams per litre (mg/l), which is greater than the SWPC of 0.25 mg/l. ETPH was not detected in well L1985-3MW, which is down-gradient. o Heptachlor epoxide was detected at a concentration less than the applicable RSR groundwater protection criteria. o Total DDT was detected at a concentration less than applicable RSR groundwater protection criteria. o Metals copper, lead, and nickel were detected at concentrations less than applicable RSR groundwater protection criteria. DATA QUALITY / USABILITY Soil and groundwater samples were submitted to SGS Accutest in Dayton, NJ (a CT Certified Laboratory) for laboratory analysis under Chain-of-Custody Protocols. SGS provided the analytical results in the 11
  6. Page 198 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 898 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Investigation Results July 28, 2021 following five laboratory report deliverables: JD25566 (soil samples), JD25514 (soil samples), JD25514r (SPLP analysis for soil), JD25566r (SPLP analysis for soil), JD25798 (groundwater samples). SGS adhered to Connecticut Reasonable Confidence Protocols (RCP) and the required RCP reporting information is included with the laboratory analytical reports in Appendix C. A review of the case narratives and QA/QC summaries was performed. Laboratory reporting limits for the samples were below the applicable CT RSR Criteria. The samples were received within temperature requirements (less than 4°celcius). The case narratives indicated that several compounds were qualified as out of range in the continuing calibration, and the relative percent difference (RPD) exceeded the threshold in a few instances. These non-conformances noted in the reports were further evaluated using the QA/QC summary data. Several of the non-conformances were related to analysis of sample dilutions, low initial concentrations, or poorly performing compounds. The non-conformances did not affect the usability of the data because the results were either biased high, the COC was not detected, and/or the compounds were not a COC for the Site. Field QA/QC sampling included equipment blanks and trip blanks. Equipment rinse water was collected to confirm decontamination procedures were sufficient. No detections of the COCs were identified in the equipment blanks. Acetone was detected in one trip blank, however acetone is a common laboratory background contaminant. Acetone was also detected in one shallow soil sample (L1985-10MW-S2) at a low concentration (6.6 µg/kg), which is attributed to a laboratory artifact at this time. 12
  7. Page 199 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 899 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Findings, Conclusions, and Recommendations July 28, 2021 4.0 FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS Stantec has completed a Phase II ESA to evaluate the RECs and AOCs identified in the Stantec 2021 Phase I ESA report. The Property has been historically used for residential, agricultural, and manufacturing purposes. Several documented releases have occurred on the Property that include: a diesel fuel release at the loading docks (REC-1), a coolant release (REC-2), a barn/warehouse fire where pesticides were stored in bulk (REC-3), and a petroleum release from heavy equipment storage (REC-4). In addition to the documented releases, the potential for releases of other substances and at other areas of the Property were identified at four AOCs, which include: the loading docks and associated stormwater system (AOC-1), the historical agricultural activities (AOC-2), three exterior oil-filled transformers (AOC3), and a suspected dumping area (AOC-4). Each of these four AOCs and four RECs were investigated during the Phase II ESA. The subsurface investigation included sampling and analysis of soil and groundwater samples. The COCs detected in soil and groundwater samples are consistent with historical site operations and the designated RECs and AOCs. 4.1 OVERVIEW OF SAMPLING RESULTS Detections of COCs in soil above background levels are indicative that a release has occurred. Samples with concentrations of COCs in soil (VOCs, PAHs, pesticides, and ETPH) above background levels were located in the vicinity of AOC-1 (L1985-15), REC-2 and AOC-2 (L1985-7), REC-3 (L1985- 9, -10), REC-4 (L1985-5) and AOC-4 (L1985-11). Pesticide concentrations exceeded the GA PMC in shallow soil at boring location L1985-7 and in surface soil at boring location L1985-15. Groundwater was investigated to evaluate site-wide conditions and historical releases from RECs. COCs were detected in two of the four monitoring wells (L1985-5MW and L1985-6MW) that were installed during this investigation. ETPH was also detected in L1985-5MW at a concentration less than applicable RSR criteria, which is attributed to a release from REC-4. ETPH was detected at concentrations exceeding the SWPC in L1985-6MW, which is attributed to historical agricultural uses (AOC-2). ETPH and pesticides were not detected in down-gradient groundwater samples. 4.2 CONCEPTUAL SITE MODEL UPDATE The observations and results from the Phase II ESA investigation were used to update the CSM. The investigation findings were incorporated into the environmental setting and summaries of the RECs and AOCs provided below. REC-1: DIESEL FUEL RELEASE AT THE LOADING DOCKS A surface release of diesel fuel occurred at the loading dock area of the building on the Property on May 16, 2011, which was contained, and hard surfaces cleaned of residual fuel. Sample locations associated with this REC are L1985-1, -2, -3MW, and -4 were used to evaluate surface and shallow soil and groundwater. The COCs identified for this REC included ETPH and PAHs. ETPH was detected in two 13
  8. Page 200 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 900 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Findings, Conclusions, and Recommendations July 28, 2021 soil samples at concentrations an order of magnitude less than the applicable RSR Criteria and considered low. COCs were not detected in groundwater. Staining and NAPL were not observed in soil or groundwater. Although the soil analytical results confirmed that a release occurred, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. REC-2: COOLANT RELEASE FROM EMERGENCY GENERATOR The Property uses two backup power emergency generators. One generator is located within the parking lot to the southwest of the building, and the other generator is adjacent to the west of the loading docks. Each generator contains a diesel storage tank with capacities of 4,400 gallons (adjacent to the loading dock) and 3,100 gallons (southwest of the building in the parking lot). A hose failure on emergency generator adjacent to the loading docks resulted in the release of 50-gallons of coolant to the floor of the generator enclosure, approximately 5 gallons impacted the concrete pad and gravel surface, reported to CT DEEP on June 1, 2017 and listed as closed. An environmental contractor responded to the release and performed a cleanup. The COCs identified for this REC included ETPH and PAHs. Sample locations associated with this AOC are L1985-1. -7, and -13 and were used to evaluate surface and shallow soil. ETPH was detected in surface soil at the generator west of the loading docks, and PAHs were detected in surface soil at the southwest generator. The concentrations of ETPH and PAHs detected in soil were less the applicable RSR Criteria and considered low. Although the soil analytical results confirmed that a surface release occurred at these two areas, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. REC-3: HISTORICAL BARN/WAREHOUSE FIRE In May 1994, the former barn/warehouse located in the southwestern portion of the Property was destroyed by a structure fire, which had been used for storing pesticide, herbicides, and other chemicals. A former heating oil UST was also associated with this building. The COCs identified for this REC included: VOCs, ETPH, PAHs, target metals (RCRA 8, plus Cu, Ni, Zn), pesticides, and herbicides. Sample locations used to investigate this AOC were L1985-8, -9, and -10MW. These locations were used to evaluate soil at varying depths in consideration of the former structure elevations and UST, and also groundwater. ETPH and thirteen PAHs were detected above background concentrations in two samples. COCs were not detected in groundwater. Staining and NAPL were not observed in soil or groundwater. The soil analytical results confirmed that a release occurred in this area. Although the reported concentrations of COCs in soil were less than the applicable RSR criteria, given the levels of PAH compounds detected at more than location, further characterization is warranted. REC-4: RELEASE FROM SNOW REMOVAL EQUIPMENT A petroleum release was observed at the east end of the north parking lot from the temporary storage of heavy equipment. The COCs identified for this REC included: VOCs, ETPH, PAHs, and target metals (RCRA 8, plus Cu, Ni, Zn). Sample location L1985-5MW was used to characterize surface soil, shallow 14
  9. Page 201 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 901 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Findings, Conclusions, and Recommendations July 28, 2021 soil, and groundwater for this area. One VOC (m,p-xylene) was detected in soil and ETPH was detected in groundwater. The concentrations of detected COCs were above background, but below applicable RSR criteria. Staining and NAPL were not observed in soil or groundwater. Although the soil and groundwater analytical results confirmed that a release occurred, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. AOC-1: LOADING DOCKS, STORM DRAIN, AND SOUTHEAST STORMWATER DETENTION BASIN Potential historical surface releases may have occurred during the transfers of chemicals and hazardous wastes; or hydraulic oil leaks from the operations of two hydraulic compactors at the loading docks. Surface releases at the loading docks may have impacted the associated stormwater drainage system (catch basins and piping) and the detention basin. The COCs identified for this REC included: VOCs, ETPH, PAHs, target metals (RCRA 8, plus Cu, Ni, Zn), pesticides, herbicides, and PCBs. Sample locations associated with this AOC are L1985-1, -2, -3MW, -4, and -15 which were used to evaluate soil at varying depths and groundwater. ETPH was detected in three soil samples at concentrations an order of magnitude less than the applicable RSR Criteria. Although the soil analytical results confirmed that a release occurred in the loading dock area, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. In addition to ETPH, PAHs and pesticides were detected at L1985-15 (detention basin). The concentration of DDT was greater than the GA PMC. The investigation identified DDT in surface soil in the detention basin above the RSR and further characterization is warranted. AOC-2: HISTORICAL AGRICULTURAL USE Historically, various pesticides, fertilizers and possibly herbicides were likely applied on the surface of fields at the west and central areas of the Property. Historical agricultural use includes the operations at the former barn/warehouse identified under REC-3. The COCs identified for this AOC included: VOCs, ETPH, PAHs, target metals (RCRA 8, plus Cu, Ni, Zn), pesticides, and herbicides. Sample locations L1985-6MW -7, -8, -9, -10MW, -11, and -15 were used to evaluate surface soil and shallow soil, and groundwater at this AOC. The pesticide DDT was detected in one surface soil sample (L1985-15-S1) and one shallow soil sample (L1985-7-S2) at concentrations exceeding the GA PMC. However, SPLP data at location L1985-7 was less than the GWPC, which indicates the concentration at that location meets the RSR requirements. DDT was detected in groundwater at L1985-6MW at a concentration less than the applicable RSR groundwater criteria and was not detected in the three other monitoring wells. The concentrations of pesticides observed in soil and groundwater were generally consistent with the application and not indicative of a point-source release. As mentioned under AOC-1, the investigation identified an impact of DDT to surface soil in the detention basin that is indicative of a condition warranting further characterization. ETPH was also detected in L1985-6MW at a concentration exceeding the SWPC. The source of this ETPH is attributed to historical site use and may have been elevated due to elevated turbidity in the 15
  10. Page 202 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 902 of 2375 PHASE II ENVIRONMENTAL SITE ASSESSMENT Findings, Conclusions, and Recommendations July 28, 2021 groundwater. ETPH was not detected in down-gradient monitoring wells. Further characterization of ETPH in groundwater is warranted. AOC-3: EXTERIOR OIL-FILLED ELECTRICAL TRANSFORMERS The Property contains three pad-mounted oil-filled electrical transformers. A surface spill of less than one gallon of oil occurred at one unit (not identified), which was contained and removed. The COCs identified for this AOC included: PCBs and ETPH. Sample locations L1985-12, -13, and -14 were used to evaluate surface soils at the transformers. PCBs were not detected in the three soil samples or groundwater samples above laboratory concentrations. ETPH was detected in the three soil samples at concentrations an order of magnitude less than the applicable RSR Criteria and considered low. Staining and NAPL were not observed in soil. Although the soil analytical results confirmed that a release occurred, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. AOC-4: SUSPECTED DUMPING AREA A suspected historical dumping area on the Property is located at the southeast corner. Historical dumping was noted in a 2000 Phase I ESA which included the subject Property, and a “No Dumping” sign was posted in this area and observed during the 2021 Phase I ESA Site inspection. The COCs identified for this AOC included: VOCs, ETPH, PAHs, and target metals (RCRA 8, plus Cu, Ni, Zn). Pesticides were also analyzed as part of the evaluation for AOC-2. Sample location L1985-11 was used to evaluate soils at the surface and varying depths. COCs detected in soil above background concentrations were PAHs, ETPH, and pesticides. The reported concentrations were less than the applicable RSR soil criteria. Although the soil analytical results confirmed that a release occurred, the investigation did not identify a significant adverse impact to the subsurface that is indicative of a condition warranting further characterization or remediation. 4.3 RECOMMENDATIONS The Phase II ESA investigation results confirmed that releases occurred in three areas that require additional investigation (REC-3, AOC-1, and AOC-2). Stantec recommends that further investigation is warranted in these areas to fully characterize the release areas and determine if remediation is necessary. Although, the investigation results for REC-1, REC-2, REC-4, AOC-3, and AOC-4 identified environmental impacts, further characterization or remediation of soil at these five release areas is not warranted. . 16

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)