Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Words on different pages
  1. Page 20 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 370 of 2375
  2. Page 21 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 371 of 2375
  3. Page 22 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 372 of 2375 6.0 OIL SPILL RESPONSE PROCEDURES Oil spill response procedures described herein provide a readily useable set of response procedures (per 40 CFR 112.7(a)(5)), and are consistent with Eversource Procedures and Environmental Requirements. 6.1 General This section describes the response, countermeasure and cleanup activities that must be taken in the event of an oil discharge. While the probability of oil spills from “in use” electrical equipment at this facility into a navigable water is low, an uncontrolled discharge of oil to groundwater, surface water or soil is prohibited by state and federal regulations. Immediate actions must be taken to stop the flow of oil, contain any spilled product and report the incident to your supervisor and/or Environmental Field Response. Eversource employees who detect an oil discharge or spill shall immediately take action to stop or reduce the flow and contain the oil if possible to do so safely. At a minimum, steps should be taken to contain the spill on site. Once initial containment has been established the employee shall notify their supervisor and/or Environmental Field Response for additional support. 6.2 Initial Spill Response To contain and minimize releases and to expedite cleanup of the spill, employees shall follow the initial spill response actions described below. 6.3 1. Determine the source and type of spill; 2. For incidental releases, stop the spill at source and contain, if possible and if it can be done safely; 3. Notify other employees in the area about the spill and restrict access; 4. Report the spill to your supervisor and Environmental Field Response as outlined in the section below. Notification and Reporting of a Spill 1. Initial Notification shall be made to your supervisor and Eversource Environmental Field Response. The initial notification shall include the following information: • exact address or location and phone number of the facility; • date and time of the discharge, • the type of material discharged; • estimates of the total quantity discharged; • the source of the discharge; F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor 5CT.docx May 2019
  4. Page 23 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 373 of 2375 • • • • • • a description of affected media; cause of the discharge; damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and names of individuals and/or organizations who have also been contacted. If spill occurs outside normal working hours, call System Operations Center (SOC, [phone removed]) and call the On-Call Environmental Coordinator. Environmental Field Response shall be responsible for notifying state and federal environmental agencies if required by the guidelines outlined herein. 6.4 Regulatory Notification and Reporting Requirements 1. Federal Water Pollution Control Act (FWPCA) requires any discharge of “harmful quantities” of oil into waters of the United States be reported to the U.S. Environmental Protection Agency (EPA). · In general, harmful quantities has been defined as any amount of oil on the water or adjoining shore which causes a sheen or discoloration upon the surface, violates applicable water quality standards and/or causes a sludge or emulsion to be deposited below the surface of the navigable water. · In general, navigable waters include all lakes, rivers, and streams. Also included are tributaries, wetlands or impoundments, which could affect navigable waters. Further, on-site drainage systems with a potential for direct release to navigable waters should be assumed to have the potential to impact navigable waters unless there is prior knowledge otherwise. If an oil spill incident to the navigable water of the United States causes a film or sheen, or a violation of applicable water quality standards, then the National Response Center must be notified. 2. The following are the National Response Center and State-specific reporting requirements: · If spills are to “navigable waters,” Environmental Field Response will report to the National Response Center and U.S. EPA. Þ [phone removed] and Þ [phone removed] (U.S EPA emergency response 24/7) F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor 6CT.docx May 2019
  5. Page 24 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 374 of 2375 · If spill is into waterway and PCB content is greater than or equal to 50 ppm, Environmental Field Response will also report to the U.S. EPA Region I Remediation and Restoration II Branch – RCRA Corrective Action Section. Þ [phone removed], within 24 hours · SOC reports spills to the appropriate state agency: Connecticut: all spills reported to: Connecticut Department of Energy & Environmental Protection (CT DEEP) [phone removed] 6.5 Oil Spill Cleanup Eversource employees who have received the appropriate training shall undertake clean up actions only for incidental releases that can be immediately absorbed, neutralized, or otherwise controlled safely at the time of the release. Normally, small spills will be responded to as follows: 1. Minor oil leakage from electrical equipment is contained in drip pans or is cleaned up with oil absorbing material. Spill kits and cleanup materials are available at the Eversource Central Warehouse. Portable spill kits are available at various locations. 2. Cleanup with sand or other absorbents. Cleanup debris is to be segregated according to its PCB content. Deliver drums or transport in dump truck(s) all cleanup debris from the source area. For regulated spills, Environmental Field Response must be contacted immediately. They shall coordinate the cleanup using the qualified emergency spill response contractor listed below that specializes in spill containment and cleanup. Clean Harbors [phone removed] or [phone removed] Waste material generated as a result from cleanup activities will be managed and disposed in accordance with Federal, State and local regulations. F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor 7CT.docx May 2019
  6. Page 25 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 375 of 2375 7.0 FACILITY OPERATIONS 7.1 Locality and Setting Adjacent Land Uses: North: Public Road (Blue Hills Ave. Ext / Route 187) East: Undeveloped Land South: Public Road (Day ill Road) West: Agricultural Property and Railroad Corridor The property is an approximate 19.4 acre parcel at the southwestern corner of Windsor near the Bloomfield border as shown on Figure 1. Adjacent properties are primarily agricultural. Based on a site review, no water-related receptors have been identified in the immediate proximity of the site. Culbro Lake is about 1000 feet northeast of the site on the opposite side of Route 187. Stormwater catch basins at exterior locations discharge to existing detention basins design for stormwater retention. There is a drainage swale along the center of the parking lot on the south side of the office building. Further discussion of site drainage is provided in Section 7.4. 7.2. Potential for Oil Spill – Sources, Flow Prediction and Control The site plan (Figure 2) provides the general locations of equipment with oil capacities greater or equal to 55 gallons. Controls are in place for the oil storage containers greater or equal to 55 gallons to meet containment requirements, as necessary. The operations at this facility that are associated with a potential for an oil spill generally involve the following activities: · Use of oil-filled electrical equipment (e.g., transformers). · Use and storage of diesel fuel for emergency generation. The following table describes the location, type and approximate capacity of on-site bulk storage containers (i.e., tank and drums) and oil-filled operational equipment. Please note the type of oil in electrical equipment (transformers, etc.) is mineral oil dielectric fluid (MODF). Other types of oil are noted in the table. F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor 8CT.docx May 2019
  7. Page 26 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 376 of 2375 Location Description Equipment Description Containment Type and Description A Emergency generator at exterior southeast side of office building. Generator set includes steel sub-base tank for storage of diesel. 1750 kW generator set. Steel sub-base tank meets UL 142, Standard for steel tanks for flammable and combustible liquids. Diesel storage aboveground storage tank (AST) equipped with integral steel rupture basin with capacity of 4,840 gallons. 4,400 gallons None. The system provides full secondary containment. (Rupture basin is “spill control” and a “continuous release detection method” in STI SP001context.) Refer to Section 7.5 for further discussion B Emergency generator at exterior west portion of site in parking area. Generator set includes steel sub-base tank for storage of diesel. 1250 kW generator set. Steel sub-base tank meets UL 142, Standard for steel tanks for flammable and combustible liquids. Diesel storage AST equipped with integral steel rupture basin with capacity of 3,410 gallons. 3,100 gallons None. The system provides full secondary containment. (Rupture basin is “spill control” and a “continuous release detection method” in STI SP001context.) Refer to Section 7.5 for further discussion C Pad-mount electrical transformer at exterior southeast side of office building. 2000 kVA energized transformer containing MODF. Identified as #3122. Vault underlying transformer and adjacent earthen area. Also sorbent materials. 413 gallons To vault and/or permeable perimeter area (grassy). D Pad-mount electrical transformer at exterior southeast side of office building. 2000 kVA energized transformer containing MODF. Identified as #3121. Vault underlying transformer and adjacent earthen area. Also sorbent materials. 413 gallons To vault and/or permeable perimeter area (grassy). Storage Location F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor CT.docx 9 Oil Capacity (approx.) May 2019 Predicted Flow Direction
  8. Page 27 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 377 of 2375 Storage Location Location Description Equipment Description Containment Type and Description Oil Capacity (approx.) Predicted Flow Direction E Elevator within office building at Room 1069 Elevator Room. Elevator system with hydraulic oil reservoir. Reservoir and elevator system are oil filled operational equipment. Steel reservoir within Elevator Room with concrete floor. Also sorbent materials. 60 F Pad-mount electrical transformer at exterior northeast side of office building and parking lot. 25 kVA energized transformer containing MODF. Identified as #3468. Vault underlying transformer and adjacent earthen area. Also sorbent materials. 55 gallons To vault and/or permeable perimeter area (grassy). G Pad-mount electrical transformer at exterior northeast side of office building and parking lot. 25 kVA energized transformer containing MODF. Identified as #3468. Vault underlying transformer and adjacent earthen area. Also sorbent materials. 55 gallons To vault and/or permeable perimeter area (grassy). If released, oil would pool on impervious base of the room. Note: The specific location of each item may be found by referencing the corresponding storage area “letter” designation with the corresponding storage area on the attached site plan (Figure 2). F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor CT.docx 10 May 2019
  9. Page 28 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 378 of 2375 Experience has shown the probability of an oil spill from any of the equipment is extremely low at this facility. The site plan (diagrams) is provided as Figure 2 and it depicts the general locations of oil storage areas and other key site features (e.g., parking areas). The equipment described in the table above is representative of typical types, quantities and storage locations. At this facility most of the sored oil is at “fixed” locations. There are no underground storage tanks (USTs) for oil storage on-site. There is a buried 1,000 gallon separator system for animal fats and vegetable oils (AFVO) on the exterior eastern side of office building. The system is permitted by DEEP under the General Permit for the Discharge of Wastewater Associated with Food Service Establishments. The system meets the 40 CFR part 112 exemption for wastewater treatment tanks. 7.3 Standby, Temporary, or Seasonal Storage Facilities Due to operational, routine and emergency maintenance, system emergencies, adverse weather (storms, extreme heat, etc.) and other factors, oil filled electrical equipment and bulk containers of dielectric fluid, which are not listed in Section 7.2, may be maintained as standby storage on-site. Volumes would not typically exceed the largest volume amounts of existing oil filled electrical equipment or bulk containers described in this plan nor be maintained for a period longer than 6 months. Equipment and containers that are used for standby storage, for seasonal storage, or for temporary storage will be located in a section of the facility such that a release is captured by existing secondary containment systems. Further, mobile or portable oil-containing equipment is positioned to prevent, as much as practicable, a discharge as described in §112.1(b). 7.4 Containment and Drainage Topographically, the site is relatively flat. There is a slight overall slope to the west toward stormwater detention basins. The probability of an oil spill from this facility into navigable water is low. Secondary containment is provided as indicated on the table provided in Section 7.2. Bulk storage containers are defined as follows: any container used to store oil. These containers are used for purposes including, but not limited to, the storage of oil prior to use, while being used, or prior to further distribution in commerce. Oil-filled electrical, operating, or manufacturing equipment is not a bulk storage container. Bulk storage containers (e.g., AST, drums) present at this facility have secondary containment for the entire capacity of the largest single container and sufficient freeboard to contain precipitation, as required by 40 CFR 112.8(c)(2). Based on the design of the secondary F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor CT.docx 11 May 2019
  10. Page 29 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 379 of 2375 containment systems (or the indoor storage thereof), management of accumulated stormwater is not necessary for the bulk storage containers. Oil-filled electrical and operating, or manufacturing equipment is excluded from the definition of bulk storage containers. However, oil-filled operational equipment 55 gallons or greater in capacity is required to meet diversionary containment standards, which require containment and/or diversionary structures to prevent discharged oil from reaching a navigable water. Diversionary containment standards can be met with a variety of options, including dikes, berms, retention basins and sorbent material1. (Note: for oil-filled operational equipment, if the qualification criteria of 40 CFR 112.7(k)(1) are met, the owner/operator may choose alternate requirements in lieu of general secondary containment.) The secondary containment is not equipped with an automatic drainage system. Contingency plans involve removal of spills or leaks utilizing sorbent materials and other recovery resources. 7.5 Storage Tanks and Testing As noted above, a bulk storage container is a container used to store oil, excluding oil-filled electrical, operating, or manufacturing equipment. The bulk storage containers at the Windsor facility are constructed of steel. Materials of construction are compatible with the oil being stored. Tank filling operations are performed manually with an operator in attendance. The level of product in the equipment is monitored to avoid overfilling. Also, the AST is equipped with vents so that atmospheric pressure is not exceeded. The ASTs at the facility qualify as a bulk storage container under the federal SPCC requirements and are subject to the integrity testing requirement of 40 CFR Part 112.8(c)(6). Based on EPA clarification, integrity testing for certain ASTs may be accomplished by exterior visual inspection if the following general conditions can be met: • • • The tanks are shop built containers and are elevated The shell capacity of each is less than 30,000 gallons Each side of the tanks is visible Bulk storage containers at the Windsor facility meet the above-described conditions. The equipment is visually inspected, and the inspections provide equivalent environmental protection consistent with 40 CFR 112 regulations. Sub-base tanks (under generators and on pads) are generally not fully visible; however, and as indicated in Section 7.2, the design constitutes “continuous release detection method” in STI SP001context. The tanks qualify as Category 1 tanks based on the engineering spill controls. The equipment is visually inspected, and the inspections provide equivalent environmental protection consistent with 40 CFR 112 regulations. 1 Section 112.7(c) F:\P1999\99549\A49\SPCC Plans\1985 Blue Hills Ave Windsor CT.docx 12 May 2019

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)