Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 103 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 103 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Site Reconnaissance July 13, 2021 Observations Description/Location • Strong, Pungent, or Noxious Odors: Pools of Liquid: Unidentified Substance Containers: PCB-Containing Equipment: Other Observed Evidence of Hazardous Substances or Petroleum Products: None detected. None observed. None observed. None observed. • • • • • • • • • • Project No.: 195602175 The waste storage room contained: o Empty 55-gallon steel drum o 55-gallon steel drum of hazardous waste (aerosol cans) o 55-gallon steel drum of used oil o Four 10-gallon steel drums of universal wastes (bulbs, batteries, etc.) o 20-gallon plastic drum of hazardous waste (compressed gas cylinders) A 5-gallon container of gasoline was stored in the shed on the roof level for snow clearing equipment. Three 20-pound refrigerant (nonhydrochlorofluorocarbon) tanks were stored in a storage room adjacent to the maintenance room. Five welding gas cylinders (40 cubic feet each) were stored in the maintenance room. The Property contains three pad-mounted transformers with oil reservoirs. A pad-mounted transformer is along the south exterior (east end), adjacent to the loading docks, with a reported (SPCC plan) oil capacity of 413gallons. A pad-mounted transformer is to the northeast of the north parking lot with an estimated oil capacity of 150 to 200-gallons based on the kVA rating. A pad-mounted transformer is along the north exterior of the building (west end) with an estimated oil capacity of 150 to 200-gallons based on the kVA rating. A hydraulic oil reservoir tank is located in the elevator room with a reported (SPCC plan) capacity of 60gallons. The Property uses two hydraulic compactors, the oil reservoirs capacities are typically 20 to 30 gallons based on the compactors size. The Property uses two backup generators located south of the building and which contain diesel storage 5.3
  2. Page 104 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 104 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Site Reconnaissance July 13, 2021 Observations Description/Location tanks with capacities of 4,400-gallons and 3,100 gallons (refer to Section 5.7). • 5.4 The data center computer servers are connected to an Uninterrupted Power Service (UPS). The UPS includes five rows of cabinets containing lead-acid batteries (approximately 450 to 500 units). No indications of corrosion, staining, leaks or other visual evidence of a release to the floor was observed in the vicinity of the cabinets. INTERIOR OBSERVATIONS Stantec made the following observations during the Property reconnaissance of the building interiors at the Property and/or identified the following information during the interview or records review portions of the assessment: Observations Heating/Cooling Method: Surface Stains or Corrosion: Floor Drains and Sumps: Waste Streams and Waste Collection Areas: Description The building uses three roof top units (RTUs) for the heating, ventilation, and air conditioning system (HVAC). The systems use natural gas for heating. The RTUs contain refrigerants, compressors, and heat exchangers for cooling. One area of floor staining was observed in the hallway next to the former check sorting room. The visible area of the stain did not intersect a floor crack or joint. Floor drains were present in bathroom areas and janitor closets contained floor level mop sinks. Wastes generated at the Property include general office trash/refuse, fat/oil/grease from the cafeteria’s kitchen, universal waste from building occupancy, used oil from building systems, and hazardous waste from building maintenance activities. A waste storage room is located adjacent to the loading docks in the southeast area of the building. The waste storage room contained the following wastes: • • • • • Project No.: 195602175 55-gallon steel drum of hazardous waste (aerosol cans) 55-gallon steel drum of used oil Four 10-gallon steel drums of universal wastes (bulbs, batteries, etc.) 20-gallon plastic drum of hazardous waste (compressed gas cylinders) Cardboard boxes of universal waste (spent fluorescent lamps and other mercury containing bulbs) 5.4
  3. Page 105 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 105 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Site Reconnaissance July 13, 2021 Observations Other Interior Observations: 5.5 Description The Property uses two exterior hydraulic compactors that are located at the loading dock and are enclosed. None observed. EXTERIOR OBSERVATIONS Stantec made the following observations during the site reconnaissance of exterior areas of the Property and/or identified the following information during the interview or records review portions of the assessment: Observations On-site Pits, Ponds, or Lagoons: Stained Soil or Pavement: Stressed Vegetation: Solid Waste Disposal: Potential Areas of Fill Placement: None observed. No areas indicative of solid waste disposal was observed. No mounds, piles, or depressions suggesting the placement of fill material were observed on the Property. Stormwater runoff from roof leaders and parking lot/driveway catch basins discharges to two stormwater detention basins. One stormwater detention basin was located in the northeast area of the Property, and the second detention basin was located in the southeast area of the Property. Both detention basins were dry at the time of the Site reconnaissance. Stormwater: No wells were observed. Wells: Septic Systems: Other Exterior Observations: Existing USTs: Stained pavement was observed south the of the contractor’s office trailer at the east end for the north parking lot. The staining was attributed to staged snow removal equipment. A recent oily stain was observed in this area and intersected a pavement crack. No exterior wastewater discharge was observed. Wastewater: 5.6 None observed. Description No visible evidence of the existence of a septic system was observed. During the Site reconnaissance, a sign was observed at the southeast forested area of the Property that read “No Dumping”. A small amount of trash was observed in this area. UNDERGROUND STORAGE TANKS/STRUCTURES No visible evidence (fill pipes, vent pipes, dispensers, surface patches), which would indicate the presence of USTs, was discovered during the Site reconnaissance. Project No.: 195602175 5.5
  4. Page 106 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 106 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Site Reconnaissance July 13, 2021 No visible evidence (fill pipes, vent pipes, dispensers, surface patches), reports, or other evidence of the former presence of USTs was discovered during this Phase I ESA. Former USTs: Other Underground Structures: 5.7 Existing ASTs: Former ASTs: 5.8 5.8.1 Two concrete pads with steel covers were observed in the grassed area south of the loading docks. Reportedly by the site contacts, the structures overlie electrical vaults that were associated with a planned addition which was not constructed. ABOVEGROUND STORAGE TANKS The Property uses two backup power generators, each is equipped with a subbase diesel AST and secondary containment. The generator adjacent to the loading dock contains a 4,400-gallon storage tank, and the generator southwest of the building contains a 3,100-gallon storage tank. No odors or visual indications of leaks or spillage around the generators was observed. No visible evidence (fill pipes, vent pipes, dispensers, surface stains), reports, or other evidence of the former presence of ASTs was discovered during this Phase I ESA. ADJOINING PROPERTIES Current Uses of Adjoining Properties As viewed from the Property and/or from public rights-of-way, Stantec made the following observations about use and activities on adjoining sites: NORTH EAST SOUTH WEST 5.8.2 The site is developed with commercial office buildings, occupied by Cigna (health insurance) and Community Health resources (health care offices). This site appears to be undeveloped. This site appears to be undeveloped and used for agriculture This site appears to be undeveloped and used for agriculture. Observed Evidence of Past Uses of Adjoining Properties Observations of adjoining sites providing indications of past use and activities, if any, are described below. NORTH EAST SOUTH WEST None observed. None observed. None observed. None observed. Project No.: 195602175 5.6
  5. Page 107 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 107 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Site Reconnaissance July 13, 2021 5.8.3 Pits, Ponds or Lagoons on Adjoining Properties As viewed from the Property and/or from public rights-of-way, Stantec made the following observations about the presence of pits, ponds and lagoons on adjoining sites: NORTH EAST SOUTH WEST 5.9 None observed. None observed. None observed. None observed. OBSERVED PHYSICAL SETTING Topography of the Property and Surrounding Area: Project No.: 195602175 The ground surface slopes across the Property and vicinity are gentle or level. The overall downslope direction is to the east and northeast. 5.7
  6. Page 108 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 108 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Interviews July 13, 2021 6.0 INTERVIEWS Stantec conducted interviews with the following individuals: Name and contact information Relationship to Property Dan Beaudette 1985 Blue Hills Ave. Ext. Windsor, CT 06095 [phone removed] [email removed] Building Maintenance Mechanic Kaitlyn Weider 107 Selden Street Berlin, CT 06037 [phone removed] [email removed] Eversource Project Manager Key findings: Mr. Beaudette provided information regarding building operations, chemical and waste storage activities, and the prior occupant. The building was constructed in 2001 and occupied by JDS Uni-phase between 2001 and 2004. JDS manufactured fiberoptic cables. The building was renovated between 2004 and 2006 for Eversource use. The concrete floor of the building was sanded during the renovation. Eversource formerly conducted bill and payment processing at the Property, which included sorting machines, printing and use of inks. Ms. Weider provided background/user information, and historical documentation. Ms. Weider indicated that the Property had formerly contained a barn/warehouse located along Day Hill Road, which was destroyed during fire in the 1990s. Ms. Weider also provided documentation of manifest, spills, and the SPCC plan for the Property. Copies of interview notes are provided in Appendix G. Project No.: 195602175 6.1
  7. Page 109 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 109 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT FINDINGS AND CONCLUSIONS July 13, 2021 7.0 FINDINGS AND CONCLUSIONS We have performed a Phase I ESA in conformance with the scope and limitations of ASTM Practice E1527 and SCGD of the Property located at 1985 Blue Hills Avenue Extension in Windsor, Connecticut. A summary of the Phase I ESA findings and conclusion is provided below. 7.1 LAND USE AND HISTORY The Property consists of approximately 19.42 acres of land developed with a single story 165,000 square foot masonry / slab on grade constructed building. The building is surrounded by asphalt parking lots and landscaped areas. The Property is owned by Indus Development I, LLC of Bloomfield CT. Eversource currently leases and operates the Property as office space for a call/data center. The Property and surrounding area are zoned as “I” for industrial use. Historically, the Property was used for agricultural land (tobacco fields) and residential dwellings. The Property was then developed with the current site building in 2001 and occupied by JDS Uniphase (JDS), a fiber optic component manufacturer until 2004. JDS was a small quantity generator (SQG) of hazardous waste (greater than 100 kilograms and less than 1,000 kilograms per month). Manifested hazardous wastes included ignitable waste, corrosive acids, corrosive bases, and spent solvents. 7.2 DATA GAPS The federal AAI final rule [40 CFR 312.10(a)] and ASTM E1527-13 identify a “data gap” as the lack or inability to obtain information required by the standards and practices of the rule despite good faith efforts by the EP or the User. Any data gaps resulting from the Phase I ESA described in this report are listed and discussed below. Gap Deletions or Exceptions from Scope of Work Referenced in Section 1.4: Weather-Related Restrictions to Site Reconnaissance: Facility Access Restrictions to Site Reconnaissance: Other Site Reconnaissance Restrictions: Data Gaps from Environmental Records Review: Data Gaps from Historical Records Review: Project No.: 195602175 None Discussion None None None None None 7.1
  8. Page 110 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 110 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT FINDINGS AND CONCLUSIONS July 13, 2021 Gap Data Gaps from Interviews: Other Data Gaps: 7.3 None Discussion None PRELIMINARY CSM FINDINGS Information gathered from interviews, reviews of existing data, and a Property inspection was evaluated to determine if RECs and AOCs are present in connection with the Property. 7.3.1 Recognized Environmental Conditions As defined under ASTM E1527-13, this assessment has revealed evidence of the following four RECs in connection with the Property: REC-1: DIESEL FUEL RELEASE AT THE LOADING DOCKS A release of diesel fuel occurred at the loading dock area of the building on the Property on May 16, 2011. Diesel fuel was released to storm drains and subsequently a detention basin located to the southeast of the building. The release was contained, and hard surfaces cleaned of residual fuel. Subsurface investigations were not performed to evaluate impacts to the soil and groundwater beneath the asphalt/concrete and/or detention basin. The documented release of diesel fuel to the exterior surfaces, storm drains, and detention basin is considered a REC. REC-2: COOLANT RELEASE FROM EMERGENCY GENERATOR The Property uses two backup power emergency generators. One generator is located within the parking lot to the southwest of the building, and the other generator is adjacent to the west of the loading docks. Each generator contains a diesel storage tank with capacities of 4,400 gallons (adjacent to the loading dock) and 3,100 gallons (southwest of the building in the parking lot). A hose failure on one of the two emergency generators resulted in the release of 40-gallons of coolant to the floor of the generator enclosure. Approximately 5-gallons of coolant seeped through the seams of the enclosure onto the concrete pad and trap rock on the exterior. An environmental contractor performed the cleanup, however subsurface impacts were not evaluated. The documented release presents a REC to the Property. The records provided did not identify which generator was the source of the release therefore both generators are considered the potential location of a REC. REC-3: HISTORICAL BARN/WAREHOUSE FIRE In May 1994, a former barn/warehouse located in the southwestern portion of the Property was destroyed by a structure fire. The fire was suppressed using water. The barn/warehouse had been used for storing pesticide, herbicides, and other chemicals. Samples of air, surface wipes, surface water runoff from fire suppression and surface soil were collected immediately following the fire and tested for specific pesticides, which were detected in one runoff water sample. The confirmed release of pesticides presents a REC to the Property. Project No.: 195602175 7.2
  9. Page 111 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 111 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT FINDINGS AND CONCLUSIONS July 13, 2021 REC-4: RELEASE FROM SNOW REMOVAL EQUIPMENT Heavy equipment for snow removal is occasionally stored at the east end of the north parking lot. Oily pavement staining was observed in this area and one of the stains appeared wet from a recent equipment leak. The wet stain intersected a pavement crack presents a REC to the Property. 7.3.2 Areas of Concern In accordance with the SCGD, this assessment has identified the following four AOCs at the Property in addition to the four RECs listed above. AOC-1: LOADING DOCKS, STORM DRAIN, AND SOUTHEAST STORMWATER DETENTION BASIN The vicinity of the loading dock and associated stormwater drainage system (catch basins, detention basin, and piping) constitutes an AOC due to potential historical releases associated with transfers of chemicals and hazardous wastes; hydraulic oil leaks from the operations of two hydraulic compactors; and discharges from the loading dock area to the detention basin through the stormwater drainage system. AOC-2: HISTORICAL AGRICULTURAL USE The west and central areas of the Property were historically used for agricultural (i.e., tobacco) from before 1934 and through the 1990’s. Various pesticides, fertilizers and possibly herbicides were likely applied on fields at the Property and were stored in the former barn/warehouse identified under REC-3. A 6,750–gallon heating oil underground storage tank (UST) was reportedly located adjacent to the structure. Additionally, hazardous building materials were identified in the barn/warehouse including lead paint and asbestos containing materials (ACM). The historical agricultural use across the west and central portions of the Property and the vicinity of the former warehouse/barn constitutes an AOC. AOC-3: EXTERIOR OIL-FILLED ELECTRICAL TRANSFORMERS The Property contains three pad-mounted oil-filled electrical transformers. A spill of less than one gallon of oil was documented at one of the transformers, which was contained and removed and is not considered to meet the criteria of a REC. However, the storage of oil and operation of the oil-filled transformers are considered to meet the criteria of an AOC. The transformer areas are located at the southeast exterior of the building west of the loading docks, northeast of the north parking lot, and along the northwest of the building exterior. AOC-4: SUSPECTED DUMPING AREA Historical dumping was noted in numerous areas across the target property in a 2000 Phase I ESA, which encompassed the subject Property. A sign was observed at the southeast forested area of the Property that read “No Dumping”. A small amount of trash was observed in this area. The sign is an indication that illegal dumping may have occurred in this area, which is indicative of an AOC. No other dump areas were observed on the Property during the site reconnaissance for this Phase I ESA. Project No.: 195602175 7.3
  10. Page 112 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 112 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT FINDINGS AND CONCLUSIONS July 13, 2021 7.4 CONNECTICUT PROPERTY TRANSFER LAW Based on the information obtained and reviewed during this Phase I ESA, documentation of former hazardous waste activities was identified that indicates that the Property would likely meet the definition of an “establishment”, as defined by Connecticut General Statutes (CGS) Section 22a-134 et seq. (Connecticut Property Transfer Law) if a transfer occurred. Project No.: 195602175 7.4

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)