Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 12 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 12 of 2375 6.5.6 AOC 4 - Suspected Dumping Area .................................................................................. 17 6.5.7 AOC 5 - Former JDS Uniphase Site Operations ............................................................... 18 6.6 Groundwater Analytical Results ............................................................................................ 18 6.7 Sub-Slab Soil Vapor Analytical Results .................................................................................. 19 6.8 Data Quality Assessment (DQA) and Data Usability Evaluation (DUE) .................................... 19 6.9 Data Gaps ........................................................................................................................... 20 7.0 SUMMARY, CONCEPTUAL SITE MODEL, AND CONCLUSIONS.............. 20 7.1 Introduction ......................................................................................................................... 20 7.2 Background Information ....................................................................................................... 21 7.3 Summary of Conditions at RECs and AOCs and Conceptual Site Model ................................. 21 7.3.1 REC 1 – Diesel Fuel Release at Loading Dock .................................................................. 21 REC 2 - Coolant Release from Emergency Generator ...................................................... 21 AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin .... 21 7.3.2 REC 3 - Historical Barn/Warehouse and Fire .................................................................... 22 AOC 7 - Former 7,000-gallon Fuel Oil Underground Storage Tank (UST) ......................... 22 7.3.3 REC 4 - Release from Snow Removal Equipment ............................................................. 24 7.3.4 AOC 2 - Agricultural Use .................................................................................................. 25 AOC 8 - Former Barns in the Central and Southeastern Portions of the Site ..................... 25 7.3.5 AOC 3: Exterior Oil-Filled Transformers ............................................................................ 26 7.3.6 AOC 4 - Suspected Dumping Area .................................................................................. 26 7.3.7 AOC 5 - Former Uniphase Site Operations ....................................................................... 27 7.3.8 AOC 9: Potential Off-Site Sources .................................................................................... 29 7.4 Site-Wide Groundwater Quality ............................................................................................. 29 8.0 RECOMMENDATIONS ...................................................................................... 30 9.0 LIMITATIONS...................................................................................................... 31 10.0 REFERENCES ...................................................................................................... 31 Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page ii of v \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs - 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  2. Page 13 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 13 of 2375 Figures 1 2 3 4 5 6 Site Location Map Site Plan Soil Boring and Well Location Map Groundwater Contour Map – September 21, 2023 Interior Soil Boring and Sub-Slab Soil Vapor Point Location Map Soil Exceedance Areas Tables 1 2 3 4 Groundwater Elevation Table Summary of Soil Sample Analytical Results Summary of Groundwater Sample Analytical Results Summary of Sub-Slab Soil Vapor Sample Analytical Results Appendices A B C D E F G Previous Site Reports and Documentation Test Boring and Well Installation Logs Low-Flow Groundwater Sampling Field Logs Helium Leak Test Field Data Sheets Soil Sample Laboratory Analytical Reports Groundwater Sample Laboratory Analytical Reports Sub-Slab Soil Vapor Laboratory Analytical Report Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page iii of v \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs - 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  3. Page 14 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 14 of 2375 List of Abbreviations, Acronyms, and Symbols Company, Firm, and Government Agency Acronyms USEPA United States Environmental Protection Agency CTDPH Connecticut Department of Public Health CTDEEP Connecticut Department of Energy and Environmental Protection CTDEP Connecticut Department of Environmental Protection RCSA Regulations of Connecticut State Agencies NIST National Institute of Standards and Technology DOT Department of Transportation CFR Code of Federal Regulations ESA Environmental site Assessment Report Acronyms USCS Unified Soil Classification System CSM Conceptual site Model HASP Health and Safety Plan UST/AST Underground/Aboveground Storage Tank RAP Remedial Action Plan RAR Remedial Action Report REC Recognized Environmental Conditions Chemical and Technical Acronyms and Abbreviations AEC Potential Area of Environmental Concern PRA Potential Release Area COC Contaminant of Concern VOCs Volatile Organic Compounds AVOCs/HVOCs Aromatic/Halogenated Volatile Organic Compounds SVOCs Semi Volatile Organic Compounds PAHs Polynuclear Aromatic Hydrocarbons ETPH Extractable Total Petroleum Hydrocarbons PCBs Polychlorinated Biphenyls TCE Trichloroethene PCE Tetrachloroethene TCA 1,1,1,-Trichloroethane Cis-1,2-DCE cis-1,2-Dichloroethene MEK 2-Butanone (Methyl Ethyl Ketone) VC Vinyl Chloride SVE Soil Vapor Extraction HCl Hydrochloric Acid NAPL Non-Aqueous Phase Liquid DNAPL Dense Non-Aqueous Phase Liquid LNAPL Light Non-Aqueous Phase Liquid Regulatory and Criteria Acronyms CT RSRs Connecticut Remediation Standard Regulations RDEC Residential Direct Exposure Criteria I/CDEC Industrial/Commercial Direct Exposure Criteria GA PMC GA Pollutant Mobility Criteria Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page iv of v \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs - 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  4. Page 15 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 15 of 2375 List of Abbreviations, Acronyms, and Symbols (cont.) Regulatory and Criteria Acronyms (cont.) GB PMC GB Pollutant Mobility Criteria GWPC Groundwater Protection Criteria SWPC Surface Water Protection Criteria ALC Aquatic Life Criteria HHC Human Health Criteria RVC Residential Groundwater Volatilization Criteria I/CVC Industrial/Commercial Groundwater Volatilization Criteria RSVVC Residential Soil Vapor Volatilization Criteria I/CSVVC Industrial/Commercial Soil Vapor Volatilization Criteria ELUR Environmental Land Use Restriction RCP Reasonable Confidence Protocol DEC Direct Exposure Criteria Analytical Acronyms QA/QC Quality Assurance/Quality Control LCS Laboratory Control Standards CCS Calibration Control Standards RPD Relative Percent Difference GC/MS Gas Chromatography/Mass Spectrometry SPLP Synthetic Precipitation Leaching Procedure Well Location and Sampling Acronyms and Abbreviations TP Test Pit (soil sample) SB or B Soil Boring (soil sample) SS Surficial Soil (soil sample) MW monitoring well (sampling locations) fbg Feet below grade PVC Polyvinyl Chloride PID Photoionization Detector ORP Oxidation/Reduction Potential DO Dissolved Oxygen SC Specific Conductance Measurement and Calculation Abbreviations and Symbols g/L Micrograms per Liter mg/L Milligrams per Liter g/kg Micrograms per Kilogram mg/k Milligrams per Kilogram ppm Parts per Million ppb Parts per Billion ppbv Parts per Billion by Volume S/cm MicroSeimens per centimeter MV Millivolts (ORP) NTU Nephelometric Turbidity Units (Turbidity) Note: Not all acronyms are used in this report. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page v of v \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs - 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  5. Page 16 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 16 of 2375 1.0 INTRODUCTION AND PURPOSE ZUVIC was retained by Eversource Energy Service Company on behalf of The Rocky River Realty Company (Eversource or Client) to complete this Phase II/III Environmental Site Assessment (ESA) of the current Eversource Call/Data Center located at 1985 Blue Hills Avenue Extension, Windsor, Connecticut, hereafter referred to as the “Site”. The goal of this Phase II/III ESA is to evaluate the nature, degree and extent of releases identified during Phase I and II ESAs completed by Stantec Consulting Services, Inc. (Stantec) in July 2021 and to determine whether soil or groundwater remediation will be required. In addition, five newly-identified areas of concern (AOCs) that were identified by ZUVIC based on information contained in the Phase I ESA were also assessed to determine whether releases had occurred at these AOCs. The Phase I and II/III ESAs were performed in general conformance with the Connecticut Department of Energy and Environmental Protection (CTDEEP) “Site Characterization Guidance Document” (SCGD) (September 2007, Revised December 2010). The work included the advancement of soil borings, installation of groundwater monitoring wells and sub-slab vapor points, and collection and analyses of soil, groundwater, and vapor samples and evaluation of groundwater flow direction. 2.0 BACKGROUND/PREVIOUS INVESTIGATIONS 2.1 Site Description The Site location is shown on Figure 1 and a Site Plan is included as Figure 2. The Site is located at 1985 Blue Hills Avenue Extension in Windsor, CT and consists of approximately 19.42 acres. The property is at approximate latitude 41° 52' 40.93"N and longitude 72° 44' 17.65"W, and at an approximate elevation of 180 to 185 feet above mean sea level. The Site is developed with a single story 165,000 square foot masonry / slab on grade constructed building used by Eversource as office space and a call/data center. The building is surrounded by asphalt parking lots and landscaped areas. The Site and surrounding area are zoned as “I” for industrial use. The surrounding area is also zoned for B-2 (business use) in the Town of Windsor and for R-40 Residential in the Town of Bloomfield. For purposes of discussion in this report, Blue Hills Avenue Extension and Day Hill Road are referred to as lying east-west, and the sides of the building are referred to as lying east-west or north-south. All directions mentioned in describing the site reference these assumed directions. The Site is bounded to the north by Blue Hills Avenue Extension (State Route 187) and Community Health Resources and CIGNA office buildings across the road. The Site is bounded to the south by Day Hill Road, which is the municipal boundary between the Towns of Windsor and Bloomfield. A parcel of land across the road is used as an agricultural field and is developed with an industrial building occupied by CTEC Solar, LLC (solar supplier) and Lesro Industries (furniture manufacturer). The Site is bounded to the east by an undeveloped parcel of land (1975 Blue Hills Avenue Extension), which includes a grassed area contiguous with landscaping at the Site, a wooded area, and a cleared area. This parcel was historically used for agriculture. The Site is bounded to the west by an undeveloped parcel of land (1995 Blue Hills Avenue Extension) that was formerly used for agricultural. (i.e., tobacco cultivation) and recently paved. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 1 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  6. Page 17 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 17 of 2375 2.2 Background and Previous Investigations The following investigations and Connecticut Property Transfer Program (PTP) documentation for the Site have been completed and are included in Appendix A: • • • • • • Phase I Environmental Site Assessment, 1985 Blue Hills Avenue Extension, Windsor, CT prepared by Stantec Consulting Services Inc. (Stantec), dated July 13, 2021 Phase II Environmental Site Assessment, 1985 Blue Hills Avenue Extension, Windsor, CT prepared by Stantec, dated July 28, 2021 2022 Well Receptor Survey, 1985 Blue Hills Avenue Extension, Windsor, CT (REM ID# 14862) prepared by Stantec, dated June 6, 2022 Environmental Condition Assessment Form (ECAF), dated December 9, 2021; Form III Transfer of Establishment Form (Form III), dated December 9, 2021; Schedule Letter prepared by a Licensed Environmental Professional (LEP), dated May 24, 2022 CTDEEP Form III Receipt Acknowledgement Letter, dated March 21, 2022 Change of LEP Letter, dated January 31, 2024 Historically, the Site was used for agricultural purposes (cultivation of tobacco) and residential dwellings. The Site was developed with the current site building in 2001 and occupied by a fiber optic component manufacturer (JDS Uniphase (JDS)) until 2004 when it was occupied by Eversource as office space for a call/data center to present day. JDS was a small quantity generator (SQG) of hazardous waste (greater than 100 kilograms per month and less than 1,000 kilograms per month), including ignitable waste, corrosive acids, corrosive bases, and spent solvents. Due to hazardous waste generation rates by JDS, the property qualifies as an “establishment,” and when it was purchased by Eversource, was subject to the Connecticut Transfer Act (Section 22a-134 through 22a-134e of the Connecticut General Statutes). The property was transferred on December 1, 2021 to The Rocky River Realty Company (Eversource) and was entered into the PTP with submission of a Form III and ECAF to the CTDEEP on December 9, 2021. CTDEEP acknowledged receipt of the documentation on March 21, 2022. Eversource is the Certifying Party to the transfer, and as such, is responsible for investigation and remediation of the Site. CTDEEP assigned REM ID No. 14862 to the Site. Investigations by Stantec were completed in accordance with the CTDEEP’s “Site Characterization Guidance Document” (September, 2007, Revised December 2010). Four Recognized Environmental Conditions (RECs) and four Areas of Concern (AOCs) listed below were identified by Stantec for the Site and investigated during its Phase II ESA. Releases were identified at RECs 1 through 4 and at AOCs 1 through 4 and Phase III investigations are warranted. Additional AOCs identified by ZUVIC also warrant investigation, including the building formerly occupied by JDS (AOC 5), aboveground storage tanks (ASTs) associated with two emergency generators (AOC 6), a former 7,000-gallon fuel oil UST associated with the former Culbro barn/office (AOC 7), two former additional barns (AOC 8), and the potential of off-site sources (AOC 9). The goal of the Phase III ESA is to evaluate the nature, degree and extent of releases at RECs/AOCs 1 through 4 and whether soil or groundwater remediation is required. The goal of the Phase II ESA is to determine whether releases have occurred at AOCs 5 through 9. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 2 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  7. Page 18 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 18 of 2375 2.2.1 Phase I and II Environmental Site Assessments The Phase I ESA report prepared by Stantec identified the four RECs and four AOCs that are described below. The Phase II ESA completed by Stantec evaluated whether releases had occurred at the identified AOCs and RECs identified in the Phase I ESA. Soil borings and monitoring well locations are depicted on Figures 3, 4, and 6. Tables summarizing groundwater elevations, and soil and groundwater analytical data are included in the Phase II ESA report presented in Appendix A and are also presented in Tables 1, 2, and 3, respectively. REC 1: Diesel Fuel Release at the Loading Docks A diesel fuel release occurred at the loading dock area of the building in May 2011. Diesel fuel was released to storm drains and subsequently to a stormwater detention basin located southeast of the building. According to records, the release was contained, and “hard” surfaces cleaned of residual fuel. During the Phase II ESA, soil samples collected from borings L1985-1, -2, -3MW, -4 and -15 were used to evaluate surficial and deeper soil associated with this REC. Soil samples were analyzed for volatile organic compounds (VOCs), polynuclear aromatic hydrocarbons (PAHs) and extractable total petroleum hydrocarbons (ETPH). Contaminants of concern (COCs) were not detected except for ETPH in soil samples (L1985-1 1-3 ft., L1985-3MW 10-11 ft. and L1985-15 0-0.5 ft.) at concentrations of 16 mg/kg, 11 mg/kg and 41 mg/kg, respectively; the concentrations are below applicable RSR criteria. Additionally, a groundwater sample was collected from monitoring well L1985-3MW to evaluate groundwater associated with this REC. COCs were not detected in groundwater collected from L1985-3MW. Staining and non-aqueous petroleum liquids were not observed in soil or groundwater. Based on detections of ETPH in soil, additional investigation is warranted to complete characterization of this REC. REC 2: Coolant Release from Emergency Generator Two backup emergency generators are present at the Site, one in the parking lot southwest of the building and one adjacent to the south wall of the building and west of the loading dock area. Each generator contains a diesel storage tank with capacities of 3,100-gallons (southwest of the building) and 4,400-gallons (west of the loading dock). Records from June 2017 indicated a hose failure at one of the two generators (unknown which one) led to the release of approximately 40-gallons of coolant inside the generator enclosure. Approximately 5gallons of coolant seeped through seams in the enclosure onto a concrete pad and gravel near the enclosure. The release represents a REC and both generators are considered potential locations of the REC since the location of the release was not identified. During the Phase II ESA, soil samples collected from borings L1985-1, -7, and -13 were used to evaluate surface and shallow soil associated with this REC. Soil samples were analyzed for ETPH and two of the samples were additionally analyzed for VOCs and PAHs. COCs were not detected with the exception of ETPH in surface soil samples L1985-1 1-3 ft. and L1985-13 0-0.5 ft., at concentrations of 16 mg/kg and 74 mg/kg, respectively. The samples are located east and west of the generator near the loading docks, respectively. In addition, PAHs were detected in L1985-7 1-3 ft., located near the generator southwest of the building, at concentrations below RSR criteria. Based on detections of ETPH and PAHs, additional investigation is warranted to complete characterization of this REC. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 3 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  8. Page 19 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 19 of 2375 REC 3: Historical Barn/Warehouse Fire A former barn/warehouse was located in the southwestern portion of the Site and was destroyed in May 1994 by a structure fire that was suppressed using water. The structure was used for storing pesticides, herbicides and other chemicals, and as office space. Following the fire, samples of air, surface wipes, water runoff from the fire suppression, and surficial soil were analyzed for specific pesticides. According to Stantec, pesticides were detected in one runoff water sample and this release indicates the presence of a REC at the Site. In addition, an approximately 6,750-gallon heating oil underground storage tank (UST) was reportedly located adjacent to the eastern end of the barn/warehouse. Additionally, hazardous building materials were identified in the barn, including lead-based paint and asbestos-containing material. COCs identified for this REC included VOCs, ETPH, PAHs, pesticides, herbicides, and Resource Conservation and Recovery Act (RCRA) 8 metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver) plus copper, nickel and zinc. During the Phase II ESA, soil samples collected from borings L1985-8, -9, and 10MW were used to evaluate soil at varying depths. COCs were not detected in the samples with the exception of ETPH in two surficial soil samples (L1985-9 0-0.5 ft. and L1985-10MW 1-3 ft.), at concentrations of 61 mg/kg and 58 mg/kg, respectively. Samples L1985-9 0-0.5 ft. and L1985-10MW 1-3 ft. were analyzed for herbicides which were not detected. The VOC acetone was detected in L1985-10MW 1-3 ft., potentially related to laboratory-induced contamination. In addition, PAHs were detected in the same samples at concentrations below RSR criteria. Elevated levels of cadmium, lead, mercury, and/or zinc were also detected in the two samples. COCs were not detected in groundwater collected from monitoring well L1985-10MW. Based on detections of ETPH, PAHs and elevated levels of metals, additional investigation is warranted. REC 4: Release from Snow Removal Equipment Heavy snow removal equipment is at times stored in the eastern end of the northern parking lot. During a site visit, Stantec observed oily staining on the pavement in this area. One stain appeared wet from a recent equipment leak and was observed intersecting a pavement crack, therefore presenting a REC to the Site. COCs identified for this REC included VOCs, ETPH, PAHs, and RCRA 8 metals plus copper, nickel and zinc. During the Phase II ESA, one soil sample was collected from 0.5 to 1 ft below grade (fbg) from L1985-5MW and used to characterize shallow soil. In addition, a monitoring well was installed at this location to assess groundwater conditions in the area. COCs were not detected except for a petroleum-related VOC (m, p-xylene) at a concentration of 0.84 µg/kg, below RSR criteria. Groundwater collected from monitoring well L1985-5W contained ETPH at a concentration of 0.187 mg/l below RSR criteria. Based on groundwater sampling logs provided in the Phase II report (Appendix A), the sample was reddish in color and turbid which may have resulted in the apparent groundwater contamination due to soil-adsorbed contaminants in the sample. Based on detections of a VOC in soil and ETPH in groundwater, additional investigation is warranted. AOC 1: Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin A loading dock and associated stormwater drainage system constitutes an AOC due to management of chemicals and hazardous wastes in the loading dock area by JDS. In addition, hydraulic oil associated with two hydraulic compactors in the area, potential temporary storage of oil or chemicals in the dumpsters, and discharges to a catch basin in the area which drains to a stormwater detention basin may have caused releases at this AOC. COCs identified for this AOC included: VOCs, ETPH, PAHs, polychlorinated biphenyls (PCBs), and RCRA 8 metals plus copper, nickel and zinc. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 4 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  9. Page 20 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 20 of 2375 During the Phase II ESA, soil samples collected from borings L1985-1, -2, -3MW, -4 (near the loading dock), and -15 (near the outlet of the pipe that conveys stormwater from the loading dock catch basin to the detention basin) were used to evaluate soil associated with this AOC. PCBs were not detected in soil samples L19853MW 10-11 ft. and L1985-15 0-0.5 ft. VOCs were not detected in one sample tested from each boring. PAHs were not detected in the borings except for in L1985-15 0-0.5 ft., at concentrations below RSR criteria. ETPH was detected in three soil samples (L1985-1 1-3 ft., L1985-3MW 10-11 ft. and L1985-15 0-0.5 ft.) at concentrations of 16 mg/kg, 11 mg/kg and 41 mg/kg, respectively. A groundwater sample was also collected from monitoring well L1985-3MW to evaluate groundwater associated with this AOC. COCs were not detected in groundwater collected from monitoring well L1985-3MW. Based on detections of ETPH in soil samples collected near the loading dock and PAHs and ETPH in the soil sample collected from the detention basin, additional investigation is warranted. AOC 2: Agricultural Use The western and central portions of the Site were historically used for agriculture, including tobacco cultivation from before 1943 and through the 1990s. In addition, three barns were located at the Site, one of which was located near the southern property line and reportedly used for chemical storage (see REC 3). The other barns are assumed to have been used for tobacco drying and were located in the southern portion of the stormwater detention basin and near the south-central portion of the current building. Possible impacts to the west and central areas of the property used for agriculture and near the tobacco drying barns may have occurred. Pesticides, fertilizers and possibly herbicides were likely applied to farmed fields at the Site and were stored in the former barn/warehouse (REC 3). COCs identified for this AOC include VOCs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel and zinc. Recognizing that farming practices may have involved use of petroleum products, ETPH and PAHs are also COCs. Results of testing of samples collected at L1985-8, -9, -10MW are described above associated with REC 3 and are not described below. Samples collected from L1985-1, -4, -5MW, -6MW, -7, -11, and -15 were additionally used to evaluate soil and groundwater at this AOC. One sample from each boring was tested for RCRA 8 metals plus copper, nickel, and zinc, VOCs, ETPH and PAHs. Four samples were also tested for pesticides. VOCs were not detected in the samples. PAHs were detected at concentrations below RSR criteria in samples L1985-7 1-3 ft., L1985-11 0-0.5 ft., and L1985-15 0-0.5 ft. ETPH was detected in samples L1985-1 1-3 ft., L1985-11 0-0.5 ft., and L1985-15 0-0.5 ft. at concentrations of 16 mg/kg, 34 mg/kg and 41 mg/kg, respectively. Total metals were detected in the samples within the ranges of naturally-occurring background levels present in uncontaminated soil with the exception of an elevated level of nickel in L1985-7 1-3 ft. All concentrations are below RSR criteria. The pesticides heptachlor epoxide, DDT and/or DDE were detected in L1985-7 1-3 ft., L1985-11 0-0.5 ft. and L1985-15 0-0.5 ft. The samples are located in the western portion of the Site, in the southeastern corner of the Site, and in the stormwater detention basin, respectively. Total concentrations exceed the GA PMC in two of the samples (L1985-7 1-3 ft. and L1985-15 0-0.5 ft), however leachable DDE and DDT were not detected and leachable lindane (gamma-BHC) was below RSR criteria in soil sample L1985-7 1-3 ft. Soil sample, L1985-15 0-0.5 ft. was not tested for leachable pesticides during the Phase II investigation. Pesticides DDT, DDE and heptachlor epoxide and copper, lead and nickel were detected in groundwater collected in the western portion of the property from L1985-6MW; concentrations are below RSR criteria. ETPH was also detected in groundwater collected from this well above the SWPC, GWPC and the RVC. Based on groundwater sampling logs provided in the Phase II report (Appendix A), the sample collected from L1985Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 5 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  10. Page 21 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 21 of 2375 6MW was reddish and turbid which may have resulted in the apparent groundwater contamination due to soiladsorbed contaminants in the sample. Based on the results described above, additional investigation is warranted. AOC 3: Exterior Oil- Filled Electrical Transformers Three pad-mounted oil-filled electrical transformers are present at the Site. A spill of less than 1 gallon of oil was documented at one of the transformers, which was contained and removed and therefore is not considered a REC. However, the potential that other leaks associated with the transformers have occurred qualifies the transformers as an AOC. COCs identified for this AOC included ETPH and PCBs. Sample locations L1985-12, -13, and -14 were used to evaluate surface soils near the transformers. PCBs were not detected in surficial soil collected from the borings. ETPH was detected in all three soil samples (L1985-12 0-0.5 ft., L1985-13 0-0.5 ft., and L1985-14 00.5 ft.) at 10 mg/kg, 74 mg/kg and 37 mg/kg, respectively. Based on these results, additional investigation is warranted near the northeastern transformer (L1985-14) and the transformer located near the loading dock (L1985-13). In addition, investigations are warranted near a second transformer adjacent to the northeastern one and two transformers and/or electrical equipment near the northwestern corner of the stormwater detention basin. AOC 4: Suspected Dumping Area Historical dumping was identified to have occurred throughout the Site as indicated in a 2000 Phase I ESA that was reviewed by Stantec. During Stantec’s 2021 Phase I ESA, a sign was observed near the southeastern corner of the Site that read “No Dumping”. Small amounts of trash were observed in this area and illegal dumping apparently occurred in this area. COCs identified for this AOC included VOCs, ETPH, PAHs, and RCRA 8 metals plus copper, nickel, and zinc. Pesticides were also tested as part of the evaluation (see AOC 2). One soil sample collected from boring L198511 0-0.5 ft. was used to evaluate soil at the surface. PAHs, ETPH, and pesticides (DDT) were detected at concentrations below applicable RSR criteria. Based on these results, additional investigation is warranted. 2.2.2 2022 Well Receptor Survey Stantec completed a Well Receptor Survey in 2022 to determine if any potential receptors, including public and private drinking water supply wells are located within a 500-foot (ft.) radius of the Site. The survey was completed in accordance with the CTDEEP Water Supply Well Receptor Survey Guidance Document (September 2009, revised January 2015). In part, Stantec concluded the following: • • • • • Water supply wells or sensitive receptors were not identified within 500 feet of the Site. One property on Adams Road, southwest of the Site, is zoned residential but appeared vacant. Developed properties within the 500-foot radius are currently connected to the Metropolitan District (MDC) public water distribution system. No wetlands are mapped at the Site or 500 feet of the Site. ZUVIC noted that wetlands associated with Culbro Lake are present north of Blue Hills Avenue Extension, northeast, and within 500 ft., of the Site. Wetlands are also located on one property on Adams Road, southwest, and within 500 ft. of the Site. No further investigations of water supply wells within 500 feet of the Site are warranted. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 6 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)