Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 129 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 129 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 17 Photo Location: Central, interior Direction: West Survey Date: 5/18/2021 Comments: The western and central areas of the building (approximatley 60%) have a raised floor used for ventilation and wiring. Photograph ID: 18 Photo Location: Central, interior Direction: North Survey Date: 5/18/2021 Comments: Typical janitor closet with mop sink, hot water heater and cleaning supplies. Page 9 of 15
  2. Page 130 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 130 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 19 Photo Location: Central-east, interior Direction: South Survey Date: 5/18/2021 Comments: First compressor room associated with former billing operations. Photograph ID: 20 Photo Location: Central-east, interior Direction: South Survey Date: 5/18/2021 Comments: Second compressor room associated with former billing operations. Page 10 of 15
  3. Page 131 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 131 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 21 Photo Location: Central-east, interior Direction: Northwest Survey Date: 5/18/2021 Comments: The former billing operations included a warehouse equipped with an electric forklift, shown at the charging station. Photograph ID: 22 Photo Location: West, interior Direction: Southwest Survey Date: 5/18/2021 Comments: One of five rows of batttery cabinets is shown, which are used for uninterrupted power service to the data center. Page 11 of 15
  4. Page 132 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 132 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 23 Photo Location: West, interior Direction: West Survey Date: 5/18/2021 Comments: The interior of a typical battery cabinet is shown. Photograph ID: 24 Photo Location: Southeast, interior Direction: South Survey Date: 5/18/2021 Comments: The hallway between the compressor rooms, storage rooms, and former check sorting room is shown. One area of floor staining (shown) was was observed, but did not intersect any floor cracks or joints. Page 12 of 15
  5. Page 133 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 133 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 25 Photo Location: Southeast, interior Direction: Northwest Survey Date: 5/18/2021 Comments: The loading dock area was inactive. The area was used to store trash and recycling barrels. Photograph ID: 26 Photo Location: Southeast, interior Direction: Northeast Survey Date: 5/18/2021 Comments: A waste storage room is located along the north side of the loading dock room, which contained universal and hazardous wastes. Page 13 of 15
  6. Page 134 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 134 of 2375 Photographic Log Client: Eversource Energy Project: Phase I Environmental Site Assessment Site Name: Windsor Call Center Site Location: 1985 Blue Hills Avenue Ext., Windsor, Connecticut Photograph ID: 27 Photo Location: Southeast, interior mezzanine. Direction: West Survey Date: 5/18/2021 Comments: The maintenance department was located on the mezzanine level and contained typical tools, parts, and two similar flammable storage cabinet, as shown. Photograph ID: 28 Photo Location: Roof, interior Direction: South Survey Date: 5/18/2021 Comments: The building has three roof top unit (RTU) for HVAC. Compressors inside one RTU is shown. Page 14 of 15
  7. Page 135 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 135 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Appendix B - Stantec Resumes July 13, 2021 APPENDIX B - STANTEC RESUMES Project No.: 195602175 B.1
  8. Page 136 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 136 of 2375 Eric Boswell LEP Associate, Senior Project Manager Eric has provided environmental engineering and consulting services for over 20 years with a discipline focus on site investigation and remediation. His clients have included educational institutions, lenders and investors, developers, municipalities, and industrial manufacturers. He has assisted these clients with characterization of their properties, selection and implementation of remediation, and site closure. Eric has advised several clients regarding short-term and long-term environmental liabilities related to property acquisition and divestiture. He has been involved in management, design and implementation of numerous remediation technologies, such as excavation, in situ chemical oxidation, enhanced bioremediation, soil vapor extraction, air sparge, vacuum enhanced product recovery, sub-slab depressurization, capping, and in situ thermal treatment. In his spare time, Eric spends time with his wife, two kids and two dogs. In the winter you will find him either snowboarding or curling, and in the summer he enjoys hiking and tending to his garden. EDUCATION Non-Degree Studies, Environmental Engineering, University of Hartford, Hartford, Connecticut, 2007 Bachelor of Science, Geology, Allegheny College of Liberal Arts, Meadville, Pennsylvania, 1999 SITE REMEDIATION AND RESTORATION Investigation and Verification of Property Transfer Act Site* | Torrington, Connecticut | Project Manager, LEP Served as the Project Manager and LEP for an industrial printing site. Services facilitated entry and exit of the property with the CT DEEP Property Transfer Program within the anticipated project schedule and budget. Oversaw Phase II and III site characterization, groundwater monitoring and verified that the site was in compliance with the CT DEEP remediation standard regulations. A letter of “No Audit” was issued. Superfund Site Removal Actions, Former Carter Carburetor* | Saint Louis, Missouri | 2014-2018 | Project Manager Served as the Project Engineer for site demolition and excavation and the Project Manager for remediation of solvents in soil at an industrial site in Saint Louis. The PCB removal actions required demolition of a 145,000 square foot four-story building, soil removal (approximately 32,000 cubic yards) for off-site disposal, and construction of an engineered control (Cap). Remediation of solvents in soil (approximately 28,000 cubic yards) was completed using in situ thermal desorption combined with soil vapor extraction. Responsibilities included: site investigation of soil and groundwater, conceptual remediation design, preparation of several Removal Action Work Plans, preparation of contract documents (including technical specifications for site work and remediation), contracting, coordination of subcontractors, contractor management, evaluation of analytical data, developing and maintaining project budgets and schedules, and preparation and distribution of project information to the community. The work was performed under US EPA oversight. CERTIFICATIONS & TRAINING 40-hr HAZWOPER, OSHA, Hartford, Connecticut, 2000 REGISTRATIONS Licensed Environmental Professional #496, State of Connecticut, Department of Environmental Protection, 2021 PROJECT EXPERIENCE * denotes projects completed with other firms
  9. Page 137 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 137 of 2375 Willow Street and Willow Brook Pond* | East Hartford, Connecticut | Project Geologist Pacific Scientific, Orange, CT* | Orange, Connecticut, United States | Project Manager Mr. Boswell was responsible for the final notification, implementation, and closeout reporting of this TSCA approved clean-up for PCBs. During active on-site remediation, he conducted and managed staff for the performance of the following tasks: 1) health & safety officer, including air monitoring, security inspection, and awareness training for visitors; 2) inspection & monitoring of a temporary wastewater treatment system (settlement and phase separation tanks, solids filtration, air stripping, DEEP permitted discharge to sanitary sewer); 3) oversight of subcontractors (construction, landscapers, dewatering system, geomembrane/polyethylene liner); 4) directing excavation activities (two simultaneous teams); 5) management of waste soils in accordance with SESC plan; 6) characterization of wastes for disposal; 7) coordination of weekly project & stakeholder meetings; 8) waste tracking and coordination of transport (avg. 30 loads per day); 9) supervise the collection and documentation of over 600 post excavation soil samples in accordance with work plan approved under 40CFR761 and coordinate laboratory analysis; 10) coordination of land survey of excavation, cap, and sample locations. 11) review of sample analytical results and determination of final excavation limits, determine if remedial objectives have been met and recommend closure or direct further remedial action; 12) prepare remedial action report for EPA approval. 13) coordinate and supervise adherence to QAPP including Tier II data validation, performance evaluation samples (obtain and analyze), field QA/QC samples Mr. Boswell was responsible for design and implementation of characterization and remediation of an HVOC release. He conducted and managed staff for the performance of the following tasks: 1) Supplemental interior/exterior soil investigation design and implementation, coordination with parties (drillers, client, site owner and their consultant, private & public underground utility markout, and laboratory), conduct soil sampling & logging, evaluate results with RSR criteria and site goals, provide recommendations for remedial approach to LEP and client (removal of exterior soil & modify existing SVE system beneath building). 2) Expedited preparation of remedial action plan. 3) Design soil removal action including: removal area, removal depth, dewatering system, and on-site soil management/temporary storage (173 tons, RCRA listed waste). 4) Supervise preparation and review health & safety plan. 5) Oversee soil removal contractor to ensure adherence with plan, protection of workers, site occupants and building. 6) Evaluate data from post-excavation soil samples for compliance with remediation criteria and determine limits of excavation. 7) Supervise collection and review land survey data. 8) Coordination of staff and supervise preparation of remedial action report. 9) QA/QC review of analytical data with respect to RCP and DQO. 10) Review, revise/draft remedial action report for LEP review. 11) Design and coordinate installation of supplemental SVE wells. 12) Rebalance SVE/SSD system to maximize stripping function and maintain control of vapors beneath concrete slab floor. ERH Soil and Groundwater Remediation, Former Industrial Site* | La Ferte-Bernard, Sarthe, France | Project Manager Served as the Project Manager for the remediation of solvents in soil and groundwater at an industrial site in France between 2010 and 2017. Remediation was completed between 2012 and 2013 using limited excavation and in situ Electrical Resistance Heating (ERH). Directional boring injections of persulfate were conducted to treat residual contamination at inaccessible areas (i.e, beneath building foundations and transformers). Following active site remediation, administrative controls were implemented to limit site uses, which were recorded in 2017. Responsibilities included: site investigation of soil and groundwater, groundwater modeling, remediation design, preparation of contract documents, contracting, coordination of all parties, contractor management, evaluation of analytical data, groundwater monitoring, and final reporting to the regulatory agency. Notably, midway through the project, the client changed from the former owner to the City of La Ferté-Bernard; despite the change, the project was completed on-schedule and within the initial budget. * denotes projects completed with other firms
  10. Page 138 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 138 of 2375 Melissa Bezanson LEED AP Senior Scientist Ms. Bezanson has 11 years of experience as an environmental scientist. Ms. Bezanson’s portfolio of projects span multiple disciplines: routine field investigations of soil and groundwater; demolition oversight; emergency response work for the U.S. Environmental Protection Agency, National Park Service, and U.S. Postal Service; air sampling and monitoring; health and safety oversight; pipeline decommissioning; soil remediation; and green roofing. EDUCATION B.S. Environmental Earth Science, Eastern Connecticut State University, Eastern Connecticut State University, Willimantic, Connecticut, 2004 CERTIFICATIONS & TRAINING Fall Protection Competent Person Initial, Fall Protection Competent Person Initial, West Chester, Philadelphia, 2006 eTraining, Inc., Fall Protection for the Competent Person, Online Learning, 2013 30-Hour Construction Safety and Health Training Course, OSHA Outreach Training Program, West Chester, Philadelphia, 2006 OSHA 40-hour Hazardous Waste Operations Training, Eastern Connecticut State University, Eastern Connecticut State University, Connecticut, 2003 Excavation and Trenching Competent Person, Excavation and Trenching Competent Person, West Chester,, Philadelphia, 2006 8-Hour Hazwoper Refresher Training Course, OSHA Outreach Training Program, West Chester, Philadelphia, 2014 PROJECT EXPERIENCE BROWNFIELD REMEDIATION AND REDEVELOPMENT Whittaker Mechanic – 82 Mechanic Street | Pawcatuck, Connecticut Oversight and execution of a remedial design to excavate approximately 1,500 tons of TCE/PCE impacted soils as a result of historical industrial operations. Remediation was performed to facilitate the sale and redevelopment of the property. Greenway Commons, Former Ideal Forging Facilities (Remediation Phase 1) | Southington, Connecticut Project Coordinator, Task Manager, and Field Supervisor overseeing the remediation of soil and groundwater associated previously identified petroleum release. Approximately 4,500 tons of soil was excavated and sent for disposal, and approximately 7,000 gallons of oil and oily water was recovered. Greenway Commons, Former Ideal Forging Facilities (Demolition and Abatement) | Southington, Connecticut Project Coordinator and Task Manager for the abatement and demolition of the former industrial buildings on the Former Ideal Forge Manufacturing Facility in Southington CT. Coordinated project logistics with the demolition contractor, and multiple agencies including the Connecticut Department of Economic and Community Development (CT DECD), Town of Southington, Connecticut Department of Health, Connecticut Department of Energy and Environmental Protection, and Meridian Development Partners, Southington LLC. Established a community air monitoring program to monitor dust conditions during demolition. Greenway Commons, Former Ideal Forging Facilities (Phase III Investigation and Abandoned Waste Removal)* | Southington, Connecticut Planned and executed Phase III Site Investigation which included the collection and analysis of over 500 soil samples, groundwater sampling, XRF screening for lead and arsenic, and monitoring well installation. Following the investigation, supported the abandoned waste inventory and subsequent removal operations. ENVIRONMENTAL SITE REMEDIATION Norampac – Thompson Facility Oversight and management of remediation contractor excavating petroleum impacted soils as a result of historical underground and above ground storage tank operations. Approximately 7,400 tons of petroleum impacted soil was excavated and sent for disposal. Naval Submarine Base Pipeline Decommissioning* | Groton, Connecticut Tasks included Oversight of UST / AST Integrity Inspections, HASP, Work Plan development, implementation, and closure report for the Diesel Marine Fuel Line pressure testing and decommissioning. * denotes projects completed with other firms

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)