Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 2 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 2 of 2375 Bureau of Water Protection and Land Reuse Remediation Division Completion of Investigation Transmittal Form This form is prescribed by the Commissioner pursuant to CGS 22a-134a(g)(1)(A), and must be completed as a summary to transmit a final site investigation report. A report on the completed investigation of the parcel is to be attached to this form, as well as all other applicable documentation which demonstrates that the investigation of the parcel has been completed in accordance with prevailing standards and guidelines. The report should conform to all reporting requirements described in the Site Characterization Guidance Document (SCGD), rev. 12/2010. Part I of this form is to be completed and signed by the Party responsible to complete the investigation of the parcel. Part II of this form is to be completed, signed and sealed by a licensed environmental professional (LEP). All sections of this form must be completed, as applicable. PART I: GENERAL INFORMATION Remediation ID No. (Rem#): 14862 Site Identification Site Name: Eversource Windsor Operations Center Site Address: 1985 Blue Hills Avenue Extension City/Town: Windsor State: CT Zip Code: 06095-1504 Description in Property Deed: Recorded on page 1145 of volume 1904 land records, as lot 5 block 145 of the Town of Windsor on map 6 in the Tax Assessor's Office. Site Contact Information 1. Business/person submitting this form: Business Name: The Rocky River Realty Company Name of Authorized Representative: Benjamin Caswell Title: Env. Specialist Mailing Address: 107 Selden Street E-mail Address: [email removed] City/Town: Berlin Business Phone: [phone removed] State: CT Zip Code: 06037-1616 Ext. 2. Owner of the parcel: Name: The Rocky River Realty Company E-mail Address: [email removed] Mailing Address: 107 Selden Street City/Town: Berlin Business Phone: [phone removed] DEEP-REM-COI State: CT Zip Code: 06037-1616 Ext. 1 of 8 Rev. 6/15/22
  2. Page 3 of 350

    Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART I: GENERAL INFORMATION (continued) Check the box indicating under which program this documentation is being submitted: Connecticut General Statutes (CGS) section 22a-134a(a)-(e), Property Transfer filing CGS section 22a-133x, Voluntary Remediation Other (specify) List Additional Supporting Documentation and identify whether the documents are attached to this transmittal form (“A”) or are already on file with the Department (“F”). DOCUMENT DATED PREPARED BY ATTACHED (A) / ON FILE (F) Phase I Environmental Site Assessment 7/13/2021 Stantec Consulting Services, Inc. (Stantec) F Phase II Environmental Site Assessment 7/28/2021 Stantec F Environmental Condition Assessment Form 12/7/2021 Stantec F Property Transfer Form, Form III 12/9/2021 The Rocky River Realty Company F Form III Acknowledgement Letter 3/21/2022 CTDEEP F LEP Schedule Letter 5/24/2022 Stantec F Change of LEP 2/1/2024 ZUVIC Inc. F COI and Phase III Environmental Site Assessment March 2024 ZUVIC Inc. A Certification "I submit this form and attached final site investigation report, approved in writing by a licensed environmental professional, and other applicable documentation which demonstrates the investigation of the parcel has been completed in accordance with prevailing standards and guidelines." Benjamin Caswell Printed Name of Signatory Environmental Specialist Title Authorized Signature 3/21/2024 Date Representing (Name of Company): Eversource Energy Service Company Address: 107 Selden Street City/Town: Berlin State: CT Zip Code: 06037-1616 Phone: [phone removed] DEEP-REM-COI 2 of 8 Rev. 6/15/22
  3. Page 4 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 4 of 2375 Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART II: SITE SUMMARY To be completed by the LEP: Groundwater Classification: GA Drainage Basin Number: 4300-00-5+L4 Distance to / location of nearest surface water body: 350 ft NE of the Site Name of water body: Culbro Lake Type of water body: Lake Surface Water Classification: A Wastewater Discharge (check appropriate box): on-site septic/leachfield sanitary sewer NPDES Permit Number: municipal stormwater system Stormwater Discharge Permit Number: other (specify): On-site groundwater use Industrial Irrigation Potable water Industrial Commercial Residential Agricultural healthcare facility recreational (check all that apply): Abutting land uses (check all that apply): Sensitive receptor land use in vicinity (check all that apply): school childcare facility other (specify): Bedrock Type: Portland Arkose, brownstone Depth to Bedrock: >150ft. rpted >40 borings Overburden Material: sand overlying fines Depth to Water Table: ~ 9 to 17 fbg Groundwater Flow Direction: Southeast Seasonally low water table beneath elevation of bedrock surface anywhere on the site? Groundwater Flow Rate: ~22 ft/yr Yes No Hydraulic Conductivity: ~ 3 ft/yr Description of establishment operations: Waste manifests (1988) listed former occupant Culbro Tobacco (Gen. ID# CT1000007523) for waste hydroxide solution, pesticide solids, hazardous waste liquid, and waste parathion mixture. Pesticides 250-lbs of orthene (acephate) and 1,520-gal. of vydate-L (oxamyl) were stored in the a former barn/warehouse/office. The Site was redeveloped with the current building and improvements circa 2000. JDS Uniphase (JDS), a fiber optic component manufacturer, occupied the Site from 2001 to 2004. JDS was a RCRASmall Quantity Generator for D001 ignitable, D002 corrosives, D008 lead, D011 silver, F002 spent halogenated solvents, and F003 spent non-halogenated solvents. Manifested hazardous wastes included ignitable waste, corrosive acids, corrosive bases, and spent solvents. DEEP-REM-COI 3 of 8 Rev. 6/15/22
  4. Page 5 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 5 of 2375 Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART II: SITE SUMMARY (continued) Findings Date Phase I ESA completed: 7/13/21 Number of AOCs identified: 8 Date Phase II investigation completed: 7/28/21 Number of AOCs tested: 13 Date Phase III investigation completed: 3/21/24 Number of releases identified: 11 Bedrock aquifer investigated? Yes No If not, provide rationale: Bedrock was not encountered during geotechnical, and Phase II and Phase III investigations as deep as 40 ft. Are NAPLs present on-site? If yes, explain: Yes No List COCs detected in soil: VOCs, ETPH, SVOCs (including PAHs), pesticides, metals, PFAS List COCs detected in groundwater (indicate if bedrock or overburden aquifer): Overburden: ETPH, benzyl alcohol, 2-methyl phenol, 3+4 methyl phenol, Cu, Pb, Ni, pestcides (DDT, DDE, heptachlor epoxide) Groundwater plume, originating from on-site source, migrating off-site? Yes No List substance(s) detected on-site attributed to a background condition; media in which substance(s) detected; and concentrations: GW: Ba (ND-0.17 mg/l), pesticides (ND - 0.046 mg/l); Soil (mg/kg): As (ND-4), Ba (5-60), Cd (ND), Cr (3-15), Cu (3-30), Pb (ND-23, Hg (ND), Ni (3-12), Se (ND), Ag (ND), Zn (5-60) Representative sampling has been conducted to demonstrate background conditions DEEP-REM-COI 4 of 8 Yes No Rev. 6/15/22
  5. Page 6 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 6 of 2375 Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART II: SITE SUMMARY (continued) Findings (continued) Remediation or some alternative means to demonstrate / achieve compliance with the RSRs is required: RSR Criterion Exceeded: ResDEC I/C DEC Res VolC I/C VolC PMC Yes GWPC No SWPC List COCs and concentrations for each criterion exceeded: GW: ETPH (ND-1.05 mg/l, GWPC, SWPC, R GWVC, I/C GWVC); Soil: ETPH (700 mg/kg; PMC,RDEC), PAHs (>1,000-10,000 ug/kg, PMC, RDEC, I/CDEC); leachable Pb (0.028 to 0.049 mg/l; PMC); chlordane (550 - 700 ug/kg; RDEC); leachable dieldrin (0.0030 ug/l; GWPC); arsenic (30 mg/kg; RDEC), leachable arsenic (0.065 mg/l; PMC); Was analysis for TCE conducted? Yes No If TCE was detected in groundwater or soil vapor, was it evaluated and addressed in light of the joint DPH/DEEP guidance? Yes No N/A Explain all “No” answers: Note: If chlorinated solvents (specifically TCA) were detected in groundwater, 1,4-Dioxane may also be present. Was analysis for 1,4-Dioxane conducted? Yes No If 1,4-Dioxane was detected in groundwater, was it evaluated in light of CTDPH’s established Action Levels of 3.0 ug/L for drinking water and 50 ug/L for dermal contact? Yes No N/A Explain all “No” answers: Vapor samples contained 1,4-dioxane; soil and groundwater testing for 1,4-dioxane will be completed If VolC has been exceeded, has a survey been conducted to identify all occupied buildings (on-site and off-site) which overly the plume? Yes No If VolC has been exceeded, has a survey been conducted to identify all occupied buildings downgradient of plume which may be considered at risk? Yes No Provide explanation for "No" answers: Plume does not migrate off-site DEEP-REM-COI 5 of 8 Rev. 6/15/22
  6. Page 7 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 7 of 2375 Number of occupied buildings overlying plume identified : 1 Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART II: SITE SUMMARY (continued) Findings (continued) Describe type of building use for each occupied building: The Site is developed with a single story 165,000 square foot masonry / slab on grade building currently used by Eversource as office space and a call/data center. Has vapor intrusion been assessed for each occupied building? Yes No Assessment plan being developed Explain results: Sub-slab soil vapor samples were collected from 18 soil vapor points and tested for VOCs, including 1,4-dioxane, to evaluate the quality of vapor beneath the building, and provide information where elevated VOC concentrations might indicate the presence of a soil or groundwater source beneath the building. One or more VOCs, including 1,4-dioxane, were detected in soil vapor at concentrations below RSR criteria. Additional vapor sampling and assessment of soil beneath the building will be completed to determine the presence of sources beneath the building. Potable Well Receptor Survey / Assessment Date Potable Well Receptor Survey completed? 6/6/22 Radius of survey: 500 ft If not completed, explain: Number of water supply wells identified: 0 Distance to nearest public water supply well from Release Area: > 500 ft Distance to nearest private water supply well from Release Area: > 500 ft List potable wells sampled, known well construction, distance from Release Area, and indicate COCs detected: N/A DEEP-REM-COI 6 of 8 Rev. 6/15/22
  7. Page 8 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 8 of 2375 Was a significant hazard, as defined in §22a-6u identified? Significant Hazard Notification filed? Yes No Yes Date filed: No → Explain answer: Completion of Investigation Transmittal Form (continued) Rem#: 14862 PART II: SITE SUMMARY (continued) Findings (continued) List ecological receptors identified: Wetlands associated with Culbro Lake are present north of Blue Hills Avenue Extension, and within 500 ft. of the Site. Wetlands are also located near Adams Road, southwest, and within 500 ft. of the Site. If identified, was assessment of risk to ecological receptor(s) completed? Yes No N/A If yes or no, explain: Groundwater does not flow toward wetlands north and southwest of the Site. LEP Certification “I have personally examined and am familiar with the information contained in this transmittal form and all referenced and attached supporting documentation, and I conclude and approve the information demonstrates that the investigation of the above referenced parcel has been completed in accordance with prevailing standards and guidelines. My professional services have been rendered in accordance with the ‘Rules of Professional Conduct’ (Section 22a-133v-6 of the Regulations of Connecticut State Agencies).” Victoria L. Man Printed Name of LEP 172 License Number Signature of LEP 3/21/2024 Date Company: ZUVIC Inc. Address: 40 Cold Spring Road, Suite 1 City/Town: Rocky Hill State: CT Zip Code: 06067-3169 Phone: [phone removed] DEEP-REM-COI 7 of 8 Rev. 6/15/22
  8. Page 9 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 9 of 2375
  9. Page 10 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 10 of 2375 Phase II/III Environmental Site Assessment Eversource Call/Data Center 1985 Blue Hills Avenue Extension, Windsor, Connecticut March 2024 Project No. 23246-6 Prepared for 107 Selden Road, Berlin, CT 06037 Prepared by 40 Cold Spring Road, Suite 1, Rocky Hill, CT 06067 _____________________________ Daniel Pinho, LEP Project Manager ______________________________ Victoria L. Man, LEP Director of Environmental Services
  10. Page 11 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 11 of 2375 TABLE OF CONTENTS TABLE OF CONTENTS ................................................................................................... I LIST OF ABBREVIATIONS, ACRONYMS, AND SYMBOLS ..................................... IV 1.0 INTRODUCTION AND PURPOSE ..................................................................... 1 2.0 BACKGROUND/PREVIOUS INVESTIGATIONS ............................................. 1 2.1 Site Description ..................................................................................................................... 1 2.2 Background and Previous Investigations ................................................................................. 2 2.2.1 Phase I and II Environmental Site Assessments .................................................................. 3 2.2.2 2022 Well Receptor Survey ................................................................................................ 6 3.0 SCOPE OF WORK ..................................................................................................7 4.0 ENVIRONMENTAL SETTING AND STANDARDS .........................................7 4.1 Geologic and Hydrogeologic Information ................................................................................. 7 4.2 Groundwater and Surface Water Classifications ...................................................................... 8 4.3 Soil Remediation Standards .................................................................................................... 8 4.4 Groundwater Remediation Standards...................................................................................... 9 4.5 Non-Aqueous Phase Liquid Remediation Standards............................................................... 10 5.0 METHODS ............................................................................................................ 10 5.1 Test Borings and Soil Sampling............................................................................................. 10 5.2 Groundwater Monitoring Well Installation, Development, Sampling and Elevation Survey ......... 11 5.3 Sub-Slab Vapor Point Installation and Sampling ..................................................................... 12 6.0 INVESTIGATION RESULTS .............................................................................. 13 6.1 General ............................................................................................................................... 13 6.2 Geologic and Hydrogeologic Findings ................................................................................... 13 6.3 Results of Photoionization Detector Test Screening ............................................................... 14 6.4 Background Concentrations of Site-Specific Metals in Soil ..................................................... 14 6.5 Soil Analytical Results .......................................................................................................... 14 6.5.1 REC 1 – Diesel Fuel Release at Loading Dock .................................................................. 15 REC 2 - Coolant Release from Emergency Generator ...................................................... 15 AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin .... 15 6.5.2 REC 3 - Historical Barn/Warehouse and Fire .................................................................... 15 AOC 7 - Former Culbro 7,000-gallon Fuel Oil Underground Storage Tank (UST) ............. 15 6.5.3 REC 4 - Release from Snow Removal Equipment ............................................................. 16 6.5.4 AOC 2 - Agricultural Use .................................................................................................. 16 AOC 8 - Former Barns in the Central and Southeastern Portions of the Site ..................... 16 6.5.5 AOC 3 - Exterior Oil-Filled Transformers .......................................................................... 17 Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page i of v \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs - 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)