Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 20 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 20 of 2375 During the Phase II ESA, soil samples collected from borings L1985-1, -2, -3MW, -4 (near the loading dock), and -15 (near the outlet of the pipe that conveys stormwater from the loading dock catch basin to the detention basin) were used to evaluate soil associated with this AOC. PCBs were not detected in soil samples L19853MW 10-11 ft. and L1985-15 0-0.5 ft. VOCs were not detected in one sample tested from each boring. PAHs were not detected in the borings except for in L1985-15 0-0.5 ft., at concentrations below RSR criteria. ETPH was detected in three soil samples (L1985-1 1-3 ft., L1985-3MW 10-11 ft. and L1985-15 0-0.5 ft.) at concentrations of 16 mg/kg, 11 mg/kg and 41 mg/kg, respectively. A groundwater sample was also collected from monitoring well L1985-3MW to evaluate groundwater associated with this AOC. COCs were not detected in groundwater collected from monitoring well L1985-3MW. Based on detections of ETPH in soil samples collected near the loading dock and PAHs and ETPH in the soil sample collected from the detention basin, additional investigation is warranted. AOC 2: Agricultural Use The western and central portions of the Site were historically used for agriculture, including tobacco cultivation from before 1943 and through the 1990s. In addition, three barns were located at the Site, one of which was located near the southern property line and reportedly used for chemical storage (see REC 3). The other barns are assumed to have been used for tobacco drying and were located in the southern portion of the stormwater detention basin and near the south-central portion of the current building. Possible impacts to the west and central areas of the property used for agriculture and near the tobacco drying barns may have occurred. Pesticides, fertilizers and possibly herbicides were likely applied to farmed fields at the Site and were stored in the former barn/warehouse (REC 3). COCs identified for this AOC include VOCs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel and zinc. Recognizing that farming practices may have involved use of petroleum products, ETPH and PAHs are also COCs. Results of testing of samples collected at L1985-8, -9, -10MW are described above associated with REC 3 and are not described below. Samples collected from L1985-1, -4, -5MW, -6MW, -7, -11, and -15 were additionally used to evaluate soil and groundwater at this AOC. One sample from each boring was tested for RCRA 8 metals plus copper, nickel, and zinc, VOCs, ETPH and PAHs. Four samples were also tested for pesticides. VOCs were not detected in the samples. PAHs were detected at concentrations below RSR criteria in samples L1985-7 1-3 ft., L1985-11 0-0.5 ft., and L1985-15 0-0.5 ft. ETPH was detected in samples L1985-1 1-3 ft., L1985-11 0-0.5 ft., and L1985-15 0-0.5 ft. at concentrations of 16 mg/kg, 34 mg/kg and 41 mg/kg, respectively. Total metals were detected in the samples within the ranges of naturally-occurring background levels present in uncontaminated soil with the exception of an elevated level of nickel in L1985-7 1-3 ft. All concentrations are below RSR criteria. The pesticides heptachlor epoxide, DDT and/or DDE were detected in L1985-7 1-3 ft., L1985-11 0-0.5 ft. and L1985-15 0-0.5 ft. The samples are located in the western portion of the Site, in the southeastern corner of the Site, and in the stormwater detention basin, respectively. Total concentrations exceed the GA PMC in two of the samples (L1985-7 1-3 ft. and L1985-15 0-0.5 ft), however leachable DDE and DDT were not detected and leachable lindane (gamma-BHC) was below RSR criteria in soil sample L1985-7 1-3 ft. Soil sample, L1985-15 0-0.5 ft. was not tested for leachable pesticides during the Phase II investigation. Pesticides DDT, DDE and heptachlor epoxide and copper, lead and nickel were detected in groundwater collected in the western portion of the property from L1985-6MW; concentrations are below RSR criteria. ETPH was also detected in groundwater collected from this well above the SWPC, GWPC and the RVC. Based on groundwater sampling logs provided in the Phase II report (Appendix A), the sample collected from L1985Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 5 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  2. Page 21 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 21 of 2375 6MW was reddish and turbid which may have resulted in the apparent groundwater contamination due to soiladsorbed contaminants in the sample. Based on the results described above, additional investigation is warranted. AOC 3: Exterior Oil- Filled Electrical Transformers Three pad-mounted oil-filled electrical transformers are present at the Site. A spill of less than 1 gallon of oil was documented at one of the transformers, which was contained and removed and therefore is not considered a REC. However, the potential that other leaks associated with the transformers have occurred qualifies the transformers as an AOC. COCs identified for this AOC included ETPH and PCBs. Sample locations L1985-12, -13, and -14 were used to evaluate surface soils near the transformers. PCBs were not detected in surficial soil collected from the borings. ETPH was detected in all three soil samples (L1985-12 0-0.5 ft., L1985-13 0-0.5 ft., and L1985-14 00.5 ft.) at 10 mg/kg, 74 mg/kg and 37 mg/kg, respectively. Based on these results, additional investigation is warranted near the northeastern transformer (L1985-14) and the transformer located near the loading dock (L1985-13). In addition, investigations are warranted near a second transformer adjacent to the northeastern one and two transformers and/or electrical equipment near the northwestern corner of the stormwater detention basin. AOC 4: Suspected Dumping Area Historical dumping was identified to have occurred throughout the Site as indicated in a 2000 Phase I ESA that was reviewed by Stantec. During Stantec’s 2021 Phase I ESA, a sign was observed near the southeastern corner of the Site that read “No Dumping”. Small amounts of trash were observed in this area and illegal dumping apparently occurred in this area. COCs identified for this AOC included VOCs, ETPH, PAHs, and RCRA 8 metals plus copper, nickel, and zinc. Pesticides were also tested as part of the evaluation (see AOC 2). One soil sample collected from boring L198511 0-0.5 ft. was used to evaluate soil at the surface. PAHs, ETPH, and pesticides (DDT) were detected at concentrations below applicable RSR criteria. Based on these results, additional investigation is warranted. 2.2.2 2022 Well Receptor Survey Stantec completed a Well Receptor Survey in 2022 to determine if any potential receptors, including public and private drinking water supply wells are located within a 500-foot (ft.) radius of the Site. The survey was completed in accordance with the CTDEEP Water Supply Well Receptor Survey Guidance Document (September 2009, revised January 2015). In part, Stantec concluded the following: • • • • • Water supply wells or sensitive receptors were not identified within 500 feet of the Site. One property on Adams Road, southwest of the Site, is zoned residential but appeared vacant. Developed properties within the 500-foot radius are currently connected to the Metropolitan District (MDC) public water distribution system. No wetlands are mapped at the Site or 500 feet of the Site. ZUVIC noted that wetlands associated with Culbro Lake are present north of Blue Hills Avenue Extension, northeast, and within 500 ft., of the Site. Wetlands are also located on one property on Adams Road, southwest, and within 500 ft. of the Site. No further investigations of water supply wells within 500 feet of the Site are warranted. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 6 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  3. Page 22 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 22 of 2375 3.0 SCOPE OF WORK Based on the results of the previous Phase I and II ESAs, ZUVIC completed the following to evaluate the nature, degree and extent of releases identified previously and to determine if releases have occurred at the additional AOCs identified by ZUVIC: • • • • • AOC 5 - Former JDS Uniphase Site Operations AOC 6 - Two Emergency Diesel ASTs Associated with Emergency Generators (REC 2) AOC 7 - Former 7,000-Gallon Fuel Oil UST at Barn/Office (REC 3) AOC 8 - Former Barns in the Central and the Southeastern Portions of the Site AOC 9 - Potential Off-Site Sources The Phase II/III work included the following: • • • • • Advancement of, and test screening of soil from, 34 exterior soil borings completed in September 2023 (B1 through B34) and five soil samples collected from inside the southeast portion of the building in October 2023 (B35 through B39) to evaluate releases and/or characterize and delineate previouslyidentified releases. Testing of soil samples collected from exterior borings for one or more of the following COCs: ETPH, leachable ETPH, PCBs, pesticides, leachable pesticides, herbicides, SVOCs/PAHs, leachable SVOCs/PAHs, VOCs, alcohols, glycols (ethylene glycol and propylene glycol), RCRA 8 metals plus copper, nickel, and zinc, and one or more leachable metals. Testing of soil samples collected from the interior of the building for one or more of the following COCs: ETPH, 1,4-dioxane, SVOCs, VOCs, alcohols, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc) and per- and polyfluoroalkyl substances (PFAS). Installation of seven monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B24/MW6, and B23/MW7), and collection and analyses of groundwater from the newly-installed wells and four pre-existing wells (L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) for ETPH, SVOCs or PAHs, VOCs, alcohols, glycols, RCRA 8 metals plus copper, nickel, and zinc, pesticides and herbicides. Installation of eighteen (18) sub-slab vapor points (SSVP) (SV-1 through SV-18) inside the building, and collection and analysis of vapor samples from the SSVPs for VOCs. 4.0 ENVIRONMENTAL SETTING AND STANDARDS 4.1 Geologic and Hydrogeologic Information The Site is relatively level with grade gently sloping down toward stormwater catch basins and steeper grade changes down to stormwater detention basins in the southeastern and northeastern portions of the Site and a drainage swale centrally located in the southern parking area. Based on topographic maps, Site elevation ranges from approximately 180 to 185 feet above mean sea level (msl) except for lower elevations within the stormwater detention basins. The surficial geology of the Site is identified as sand overlying fines and the bedrock underlying the Site is mapped as the Portland Arkose formation, which is described as reddish-brown arkose (brownstone). The mapped overburden deposits were confirmed during this Phase II/III ESA except that glacial till, consisting of red-brown sand, silt, and gravel, was encountered in two borings (B1/MW1 and B2/MW2) completed along the southern side of the building at 15 to 20 feet below grade (fbg). Bedrock was not observed during this evaluation, however during previous environmental investigations, and during a 2001 geotechnical evaluation bedrock was not encountered as deep as 41.5 ft. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 7 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  4. Page 23 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 23 of 2375 Depths to groundwater ranged from approximately 10.6 to 17.3 feet when measured in May 2021 and approximately 8.9 to 15.6 feet deep when measured in September 2023. Shallow groundwater flow was mapped as flowing southeast toward Day Hill Road during the previous Phase II ESA and this investigation. 4.2 Groundwater and Surface Water Classifications The majority of the Site is located within the Connecticut River major drainage basin, the Farmington River regional basin, and the Farmington River subregional basin with the exception of the southwest corner of the Site which is located within the Connecticut River major drainage basin, the Park River regional basin, and the North Branch Park River subregional basin. Local runoff is likely conveyed via ground surface to the Site’s stormwater catch basins and to stormwater detention basins located in the northeast and southeast portions of the Site. According to CTDEEP Geographical Information System (GIS) mapping (accessed January 2024), groundwater at the Site is classified as “GA”. The “GA” groundwater quality classification indicates that the water resource is intended to be suitable for existing private or potential public or private drinking water without treatment, stream base flow, and industrial and miscellaneous use (CTDEEP, October 2013). According to CTDEEP mapping, the Site is not within an Aquifer Protection Area. ZUVIC did not observe any evidence of, or review any documentation, indicating the presence of water wells at the Site. A site-specific drinking water receptor survey was completed in 2022 and no drinking water wells were identified at, or within 500 ft. of, the Site (see Section 2.2.2). The Site does not contain mapped surface water bodies, and no significant areas of standing water or other unmapped surface water bodies were observed during previous ESAs and this Phase II/III ESA. The Site is located approximately 4,000 feet south of the Farmington River, and approximately 350 feet southwest of Culbro Lake. The Farmington River is classified as a class “B” surface waterbody. The “B” classification indicates degraded water bodies that are suitable for fish, aquatic life and wildlife habitat; recreation; navigation; and water supply for industry and agriculture (CTDEEP, October 2013). Culbro Lake is classified as a class “A” surface waterbody. The “A” classification indicates water bodies that are suitable for potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation (CTDEEP, October 2013). Discharges to class “A” surface waterbodies are restricted to discharges from public or private drinking water treatment systems, dredging and dewatering, emergency and clean water discharges (CTDEEP, October 2013). 4.3 Soil Remediation Standards For soil, the CTDEEP has adopted two types of remediation standards, one to address direct exposure (e.g., through ingestion of, or dermal contact with, contaminated soil) and a second to address pollutant mobility (i.e., the potential for leachate from contaminated soil to impact groundwater quality above a particular threshold). Direct exposure criteria (DEC) have been developed for two types of land use scenarios, as follows: (i) residential land use; and (ii) industrial/commercial land use. The industrial/commercial direct exposure criteria would currently be applied to this site given its past and current industrial/commercial use. However, such an application would require placement of an environmental use restriction (EUR) to ensure that the parcel or restricted portion(s) of the parcel are not used for any residential purpose in the future, and that its use be limited to industrial or commercial activities. Since an EUR has not been recorded, the Residential Direct Exposure Criteria (RDEC) would currently apply to this Site. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 8 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  5. Page 24 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 24 of 2375 Groundwater beneath the Site is classified by the CTDEEP as “GA”, therefore, the pollutant mobility criteria (PMC) for soil in GA areas would be applicable. For both DEC and PMC, the CTDEEP has adopted numeric standards that serve as “default” criteria unless acceptable site-specific or alternate criteria are developed, or unless background concentrations or analytical detection limits in soil exceed these numeric standards. In addition, there are a few circumstances where conditional exemptions or variances from the DEC and PMC are allowed. Where applicable, based on existing data, these exemptions, variances, site-specific or alternate criteria will be discussed. In general, site-specific or alternate criteria are not developed unless there are exceedances of the more protective default criteria. According to the RSRs, the DEC are compared to soil quality data from total mass analyses, and apply to soil within 15 feet (ft.) of the ground surface. In a GA area, the PMC apply to soil from ground surface to the seasonal low water table. For pollutant mobility for metals or PCBs, one can either compare predicted or actual leaching data for a given metal or PCB to its GA PMC. For other constituents, one can compare leaching data to the GWPC multiplied by the appropriate dilution/attenuation factor if appropriate, or one can compare total mass analysis data to the PMC. 4.4 Groundwater Remediation Standards In “GA” classified areas such as this site, there are four types of groundwater remediation standards which could potentially apply under the RSRs: (i) the groundwater protection criteria (GWPC); (ii) the surface-water protection criteria (SWPC); (iii) background concentrations; and (iv) the volatilization criteria (VC) for any groundwater polluted with VOCs within a certain depth below the ground surface or a building. The GWPC are designed to ensure that the quality of existing and potential drinking water supplies is not impacted. The SWPC are designed to ensure that contaminant concentrations in groundwater do not adversely impact water quality in a surface water body receiving groundwater discharges, except as follows. For a wetland or intermittent stream, the RSRs assume there may be no dilution and therefore the aquatic life criteria (AQLC) (contained in the Water Quality Standards) are used as the SWPC (i.e., are compared directly to the contaminant concentrations in the groundwater plume(s)). The AQLC are not applicable to the Site since groundwater does not discharge to wetlands or an intermittent stream. The SWPC can be compared to plume concentrations immediately upgradient of the point of discharge to the surface water body or to the 95% upper confidence limit of the arithmetic mean of samples representative of the subject groundwater plume. Groundwater in a GA area is required to meet background concentrations unless the conditions described below are met, then compliance with the GWPC is permitted. • Concentrations in groundwater are below the GWPC. • One of the following conditions is met: o Public water is available within 200 ft. of the site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume; the plume is not located in an aquifer protection area; and the plume is not located within the area of influence of any public water supply well. o The plume is a diminishing state groundwater plume prior to any remediation. o Reduction of concentrations in groundwater to background concentrations cannot be achieved using sound engineering and hydrogeologic remediation practices. Provided concentrations in groundwater are compliant with the GWPC, compliance with background concentrations is not required since public water is available within 200 ft. of the Site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume. In addition, any plumes at Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 9 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  6. Page 25 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 25 of 2375 the Site are not located in an aquifer protection area and are not located within the area of influence of any public water supply well. The volatilization criteria (VC) apply to groundwater polluted with VOCs within a certain depth beneath the ground surface or a structure depending on the type of VOC present. The VC apply to groundwater within 10 feet of the ground surface or lowest portion of a building if it is polluted with petroleum substances and 30 feet for VOCs other than petroleum substances. There are both residential and industrial/commercial default VC; residential VC apply to properties except those used solely for industrial or commercial activity, provided an EUR is in effect which ensures that the parcel will not be used for any residential purpose in the future, and that any future use of the parcel is limited to industrial or commercial activity. Since an EUR is not proposed for this Site, the Residential VC (RVC) would currently apply to the Site. There are VC that apply to concentrations in groundwater (GWVC) and those that apply to concentrations in soil vapor (SVVC). Compliance with the VC can be demonstrated using either contaminant concentrations in groundwater compared to the GWVC or using contaminant concentrations in soil vapor compared to the SVVC. 4.5 Non-Aqueous Phase Liquid Remediation Standards Removal of non-aqueous phase liquids (NAPL) from soil and groundwater are required by the RSRs to the maximum extent practicable defined as the greatest degree of remediation that can be achieved using sound engineering and hydrologic practices without taking cost into consideration. CTDEEP may approve a variance for NAPL that cannot be contained or removed in accordance with the previous paragraph under certain circumstances. 5.0 METHODS 5.1 Test Borings and Soil Sampling The proposed exterior borings and interior soil sample locations were marked on the ground and/or staked out by ZUVIC personnel. Prior to drilling and sampling activities at the Site, Call Before You Dig (CBYD), a public utility-locating service, was notified (Ticket Nos. 20233400556 and 20234402634) and the proposed locations were reviewed by Corbuilt, LLC, a private utility locating company. Haz-Probe, Inc. (Haz-Probe) of Hampden, MA conducted the exterior boring drilling operations with oversight by ZUVIC personnel. On September 11, 2023, certain locations were cleared down to depths between four and five feet using an air knife. From September 12 to 14, 2024, 27 borings (B1 through B14 and B17 through B32) were advanced to as deep as 20 ft. using a dual track GeoprobeTM Model 6610DT direct push rig. On September 11 and 13, 2024, four borings (B15, B16, B33 and B34) were completed down to 1 fbg using a shovel or hand auger. For those borings completed with the drill rig, continuous soil samples were collected from the borings using a 2.25-inch diameter, four-foot-long core barrel lined with disposable acetate sleeves. Soil samples were collected from the air-knife cleared portion of each location using a metal scoop. On October 9, 2023, ZUVIC collected six soil samples from five locations (B35 through B39) inside the southeastern portion of the building. The concrete slab was approximately 6 inches thick and the samples were collected from just beneath concrete to approximately 1.5 to 2.5 fbg using a shovel and/or a hand auger. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 10 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  7. Page 26 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 26 of 2375 The Test Boring and Well Installation logs are included in Appendix B. The exterior soil boring and shallow soil sample locations are shown on Figures 3 and Figure 6 and the interior soil sample locations are shown on Figure 5. Soil samples were collected for physical logging of soil types, and test-screening for VOCs was completed using a photoionization detector (PID) equipped with a 10.6 eV lamp. Soil samples were collected and submitted under proper chain of custody procedures for laboratory analyses for one or more of the following analytes: ETPH by the CT Method, leachable ETPH using the Synthetic Precipitation Leaching Procedure (SPLP), SVOCs or PAHs by EPA Method 8270D, PCBs by EPA Method 8082A, pesticides by EPA Method 8081, leachable pesticides via the SPLP, herbicides via EPA Method 8151, VOCs via EPA Method 8260, alcohols and glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 6010c or 7471, one or more leachable metals via the SPLP, 1,4-dioxane via modified EPA Method 8260, and per- and polyfluoroalkyl substances (PFAS) via EPA Method 1633. Soil samples collected from the interior of the building were analyzed for one or more of the following COCs: ETPH, 1,4-dioxane, SVOCs, VOCs, alcohols, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), and per- and polyfluoroalkyl substances (PFAS). 5.2 Groundwater Monitoring Well Installation, Development, Sampling and Elevation Survey In September 2023, seven two-inch diameter pre-packed PVC water table monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, and B24/MW6) were installed by Haz-Probe using direct push technologies. Ten-foot sections of 0.010-inch slot prepacked PVC screen were installed to intersect the water table and connected to PVC risers to near ground surface. The wells were installed at bottom depths ranging from 16.5 feet to 20.3 feet. The annular spaces between the wells and the boreholes were packed with No. 1 silica sand to an elevation of approximately 2 feet above the top of the screens. Approximately two feet of bentonite chips were placed atop the sand pack and hydrated. Backfill was then placed atop the bentonite seal up to several inches below ground surface. The monitoring wells were completed with gripper caps and flush-mounted steel road boxes encased in concrete collars. Details of the well construction are included on the Test Boring and Well Installation reports contained in Appendix A. The monitoring well locations are shown on Figures 3, 4 and 6. The newly-installed monitoring wells were developed in September 2023 by purging and pumping several well volumes from the wells. The well development was conducted to remove fines from the vicinity of the well screen, establish connectivity with the formation and reduce sample turbidity during groundwater sampling. On September 21, 2023, the elevations of the top of PVC of the seven newly-installed wells and the previouslyinstalled monitoring wells (L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) were surveyed, referenced to an assumed datum of 100.00 feet at monitoring well B3/MW-3. The survey information was used to calculate groundwater elevations and evaluate groundwater flow directions. The elevation data are summarized in Table 1. Depths to groundwater were measured in the monitoring wells on September 21, 2023 using an oil/water interface probe, capable of measuring light non-aqueous phase liquids and dense non-aqueous phase liquids (LNAPL and DNAPL), and groundwater to within 0.01 feet. LNAPL and DNAPL were not detected in the wells. Depth-to-water measurements and calculated water table elevations are summarized in Table 1. Water table elevations, groundwater contour lines and inferred groundwater flow directions are depicted on Figure 4. On September 21 and 22, 2023, ZUVIC collected groundwater samples from the wells. Low-Flow Groundwater Sampling Field Logs are attached in Appendix C. The groundwater samples were submitted to CET, under Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 11 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  8. Page 27 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 27 of 2375 proper chain-of-custody and analyzed in accordance with the Connecticut Reasonable Confidence Protocols (RCPs). The samples were analyzed for ETPH by the CT Method, SVOCs or PAHs by EPA Method 8270D, pesticides by EPA Method 8081B, herbicides via EPA Method 8151A, VOCs via EPA Method 8260C, alcohols via EPA Methods 8015B, glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 200.7 or 245.2 Groundwater samples were collected using CTDEEP-recommended low-flow sampling methods. Groundwater was pumped from each well using polyethylene tubing connected to a peristaltic pump, into a flow-through cell connected to a direct-reading multi-meter. Groundwater was monitored for temperature, pH, specific conductivity, oxidation-reduction potential (ORP), dissolved oxygen (DO) and turbidity at approximately fiveminute intervals. Once parameter readings had stabilized to within recommended criteria, samples were collected by directly pumping groundwater into laboratory-provided containers which contained appropriate preservatives. Due to poor recharge, L1985-6MW was not sampled using low-flow sampling methods and the well was pumped dry and allowed to fully recover prior to pumping groundwater directly into laboratory-provided sample containers. 5.3 Sub-Slab Vapor Point Installation and Sampling The proposed SSVP locations were marked inside the building by ZUVIC personnel. Prior to installation of the SSVP, CBYD was notified (Ticket No. is 20234402634). In addition, the proposed locations were reviewed by Corbuilt, LLC, using Ground Penetrating Radar (GPR). The SSVP installation and sampling was completed in accordance with the Guidance for Evaluating Soil Vapor Intrusion in the State of New York, October 2006 which is the guidance recommended by the CTDEEP. On November 17, 2023, ZUVIC installed 18 SSVPs (SV-1 through SV-18) at locations shown on Figure 5. Eight SSVPs (SV-3 through SV-9 and SV-14) were installed in the concrete slab below the raised floor of the building. floor. These SSVPs were each installed by drilling a 5/8-inch hole through the concrete, approximately one inch into underlying soil. The remaining SSVPs (SV-1, SV-2, SV-10 through SV-13 and SV-15 through SV-18) were installed with stainless steel flush mounted covers after a 1.5-inch diameter hole was drilled approximately 1.8 inches into the concrete, followed by drilling a 5/8-inch hole in the center of the larger diameter hole approximately one inch into the underlying soil. Concrete was approximately 6 inches thick at the SSVP locations with the exception of SV-5 and SV-13, where concrete was approximately 8 inches thick. At each SSVP location, a Vapor Pin® was installed in the 5/8-inch hole and capped with a protective cap. The stainless steel Vapor Pins® were installed with a silicone seal between the vapor point and surrounding concrete floor. Following installation, each point was purged of at least three void volumes using a PID and a screening value was recorded. A helium leak test was performed on each of the points after installation to confirm an airtight seal. The helium leak test was performed by covering each vapor point with an airtight dome, filling the dome with a known concentration of helium and testing vapors in the vapor point for helium using a helium detector. Regulatory guidance on helium leak testing specifies that the helium concentration in the vapor point be less than 10% of that detected in the dome for the test to be successful. The results of helium leak tests meet this requirement and confirmed proper installation of the points. The helium leak test field data sheets are included in Appendix D. Following a successful seal leak test, each point was sampled. Sub-slab vapor was collected directly into laboratory-provided 6-liter summa canisters over approximately thirty-minute time periods using a laboratorycalibrated flow controller at each location. The summa canisters were submitted to Phoenix Environmental Laboratories, a State-certified laboratory, under proper chain-of-custody procedures, and analyzed in accordance with the Connecticut RCPs for VOCs using EPA method TO-15. A duplicate soil vapor sample was collected from SV-13 and identified as SV-13A. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 12 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  9. Page 28 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 28 of 2375 6.0 INVESTIGATION RESULTS 6.1 General The results of soil test screening are presented on the Test Boring and Well Installation Logs (Appendix B), and the results of soil, groundwater, and soil vapor sampling are summarized in Tables 2, 3, and 4 respectively. Exterior boring locations and monitoring wells are depicted on Figures 3, 4, and 6. Interior soil sample locations and sub-slab soil vapor point locations are depicted on Figure 5. Groundwater elevation data are summarized in Table 1, and monitoring well locations, groundwater elevation contours and inferred flow directions are shown on Figure 4. Laboratory analytical reports for soil, groundwater, and vapor samples are included in Appendices E, F, and G, respectively. Given the GA classification of groundwater beneath the Site, the RDEC, I/C DEC and GA PMC for soil were compared to soil analytical data. Groundwater analytical data were compared to the GWPC, SWPC, RVC and I/C VC for groundwater. Soil vapor analytical results were compared to the residential soil vapor volatilization criteria (Res SVVC) and industrial/commercial soil vapor volatilization criteria (I/C SVVC) included in the Connecticut RSRs. If default Connecticut RSR criteria have not been established for detected compounds, RDEC, I/C DEC, GA PMC, SWPC, RVC, I/C VC, Res SVVC, and I/C SVVS contained in the CTDEEP “Technical Support Document: Recommended Numeric Criteria for Common Additional Polluting Substances and Certain Alternative Criteria Requests,” dated September 20, 2018 or from the CTDEEP form entitled "Request for Approval of Criteria for Additional Polluting Substances," dated March 25, 2022 were used for comparison purposes. CTDEEP approval is required for use of these criteria and is commonly granted. 6.2 Geologic and Hydrogeologic Findings In general, near-surface soils observed during sampling consisted predominantly of brown/dark brown silty sand with trace gravel and/or trace organics, transitioning to brown fine to coarse sand with depth. In two borings (B1/MW1 and B2/MW2), glacial till consisting of dense, brown/red brown silty sand and gravel was observed at approximately 15 to 20 fbg. Field observations were generally consistent with the mapped descriptions of area geologic conditions. Fill material consisting of soil with non-native soil constituents (asphalt, coal, brick, concrete, glass, and ash) was encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-10, B27 and B29. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in four borings listed above and B26 from 7.5 to 8.5 fbg. Red-brown silty fine sand with subordinate amounts of gravel was encountered within the presumed footprint of the former barn, likely representing the fill material used following demolition of the building. Borings L1985-8, L1985-9, L1985-10, B26, B27 are within the footprint of the main barn structure and B29 is within an apparent “entranceway” structure to the barn. The approximate footprint of the former barn/warehouse is depicted on Figure 6. Bedrock was not encountered in any of the borings which were advanced as deep as 20 fbg. Depths to groundwater beneath the Site was measured during the Phase II/III and ranged from approximately 9 to 15.5 fbg on September 21, 2023. Depths to groundwater during the Phase II ESA were generally deeper, ranging from approximately 10.5 to 17.3 fbg. Groundwater elevation data for Phase II and Phase II/III ESA are summarized in Table 1. Groundwater elevations and inferred groundwater contours for the Phase II/III groundwater gauging round are shown on Figure 4. Groundwater beneath the Site flows southeast towards Day Hill Road and is consistent with observations made during the Phase II ESA. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 13 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  10. Page 29 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 29 of 2375 6.3 Results of Photoionization Detector Test Screening The results of test-screening of soil samples for total VOCs are presented in the Test Boring and Well Installation Logs (Appendix B). Detectable levels of VOCs (greater than 0.1 vapor per parts per million (vppm) were present in 16 of the 39 borings, with results ranging from 0.1 to 23.7 vppm. 6.4 Background Concentrations of Site-Specific Metals in Soil Based on ZUVIC’s experience at other sites in Connecticut, published resources, and concentrations in samples collected from apparently unimpacted areas at the Site, background concentrations of metals in soil at the Site are inferred to be within the approximate ranges provided in the following table. Metal Arsenic Barium Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc Soil Background Concentration Range (mg/kg) ND - 4 5 - 60 ND 3 - 15 3 - 30 ND - 23 ND 3 - 12 ND ND 5 - 60 Notes: mg/kg = milligrams per kilogram ND = not detected The Phase II/III soil testing results were compared to these background metals concentrations to evaluate whether a release had occurred. The results of the comparison and evaluation are presented in the sections that follow. 6.5 Soil Analytical Results A summary of the soil sample analytical results is presented in Table 2 and the laboratory reports are included in Appendix E. During the sampling, stained, discolored, and/or odorous soil was not encountered. A discussion of the soil analytical results is below. A summary of the soil analytical results for RECs and/or AOCs investigated is presented below. Due to the type and proximity of the AOCs to each other, certain RECs and/or AOCs are discussed together or referenced to previous sections if the data was used to evaluate multiple RECs and AOCs. Note that “elevated levels” refers to concentrations of metals above inferred background levels but below applicable criteria. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)