Interrogatory responses
Answers to questions 32
Files210
RSR-032 Attachment 178.pdf
PDF · 8.1 MB · 83 pagesText searchable
Download RSR-032 Attachment 178.pdfRead the text of RSR-032 Attachment 178.pdf
RSR-032 Attachment 177.pdf
PDF · 2.2 MB · 6 pagesText searchable
Download RSR-032 Attachment 177.pdfRead the text of RSR-032 Attachment 177.pdf
RSR-032 Attachment 176_Part2.pdf
PDF · 29 MB · 754 pagesText searchable
Download RSR-032 Attachment 176_Part2.pdfRead the text of RSR-032 Attachment 176_Part2.pdf
RSR-032 Attachment 176_Part1.pdf
PDF · 30 MB · 110 pagesText searchable
Download RSR-032 Attachment 176_Part1.pdfRead the text of RSR-032 Attachment 176_Part1.pdf
RSR-032 Attachment 175_Part7.pdf
PDF · 3.3 MB · 275 pagesText searchable
Download RSR-032 Attachment 175_Part7.pdfRead the text of RSR-032 Attachment 175_Part7.pdf
RSR-032 Attachment 175_Part6.pdf
PDF · 4.6 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part6.pdfRead the text of RSR-032 Attachment 175_Part6.pdf
RSR-032 Attachment 175_Part5.pdf
PDF · 5.6 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part5.pdfRead the text of RSR-032 Attachment 175_Part5.pdf
RSR-032 Attachment 175_Part4.pdf
PDF · 3.8 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part4.pdfRead the text of RSR-032 Attachment 175_Part4.pdf
RSR-032 Attachment 175_Part3.pdf
PDF · 22 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part3.pdfRead the text of RSR-032 Attachment 175_Part3.pdf
RSR-032 Attachment 175_Part2.pdf
PDF · 8.1 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part2.pdfRead the text of RSR-032 Attachment 175_Part2.pdf
RSR-032 Attachment 175_Part1.pdf
PDF · 36 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part1.pdfRead the text of RSR-032 Attachment 175_Part1.pdf
RSR-032 Attachment 174.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download RSR-032 Attachment 174.pdfRead the text of RSR-032 Attachment 174.pdf
RSR-032 Attachment 173.pdf
PDF · 3.0 MB · 9 pagesText searchable
Download RSR-032 Attachment 173.pdfRead the text of RSR-032 Attachment 173.pdf
RSR-032 Attachment 172.pdf
PDF · 994 KB · 2 pagesText searchable
Download RSR-032 Attachment 172.pdfRead the text of RSR-032 Attachment 172.pdf
RSR-032 Attachment 171.pdf
PDF · 959 KB · 2 pagesText searchable
Download RSR-032 Attachment 171.pdfRead the text of RSR-032 Attachment 171.pdf
RSR-032 Attachment 170.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download RSR-032 Attachment 170.pdfRead the text of RSR-032 Attachment 170.pdf
RSR-032 Attachment 169.pdf
PDF · 2.2 MB · 14 pagesText searchable
Download RSR-032 Attachment 169.pdfRead the text of RSR-032 Attachment 169.pdf
RSR-032 Attachment 168.pdf
PDF · 8.4 MB · 178 pagesText searchable
Download RSR-032 Attachment 168.pdfRead the text of RSR-032 Attachment 168.pdf
RSR-032 Attachment 167_Part2.pdf
PDF · 29 MB · 844 pagesText searchable
Download RSR-032 Attachment 167_Part2.pdfRead the text of RSR-032 Attachment 167_Part2.pdf
RSR-032 Attachment 167_Part1.pdf
PDF · 35 MB · 284 pagesText searchable
Download RSR-032 Attachment 167_Part1.pdfRead the text of RSR-032 Attachment 167_Part1.pdf
RSR-032 Attachment 166.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download RSR-032 Attachment 166.pdfRead the text of RSR-032 Attachment 166.pdf
RSR-032 Attachment 165_Part 4.pdf
PDF · 8.2 MB · 84 pagesText searchable
Download RSR-032 Attachment 165_Part 4.pdfRead the text of RSR-032 Attachment 165_Part 4.pdf
RSR-032 Attachment 165_Part 3.pdf
PDF · 33 MB · 482 pagesText searchable
Download RSR-032 Attachment 165_Part 3.pdfRead the text of RSR-032 Attachment 165_Part 3.pdf
RSR-032 Attachment 165_Part 2.pdf
PDF · 18 MB · 509 pagesText searchable
Download RSR-032 Attachment 165_Part 2.pdfRead the text of RSR-032 Attachment 165_Part 2.pdf
RSR-032 Attachment 165_Part 1.pdf
PDF · 22 MB · 500 pagesText searchable
Download RSR-032 Attachment 165_Part 1.pdfRead the text of RSR-032 Attachment 165_Part 1.pdf
RSR-032 Attachment 164.pdf
PDF · 20 MB · 42 pagesText searchable
Download RSR-032 Attachment 164.pdfRead the text of RSR-032 Attachment 164.pdf
RSR-032 Attachment 163.pdf
PDF · 24 MB · 575 pagesText searchable
Download RSR-032 Attachment 163.pdfRead the text of RSR-032 Attachment 163.pdf
RSR-032 Attachment 162.pdf
PDF · 14 MB · 17 pagesText searchable
Download RSR-032 Attachment 162.pdfRead the text of RSR-032 Attachment 162.pdf
RSR-032 Attachment 161 _Part2.pdf
PDF · 29 MB · 609 pagesText searchable
Download RSR-032 Attachment 161 _Part2.pdfRead the text of RSR-032 Attachment 161 _Part2.pdf
RSR-032 Attachment 161 _Part1.pdf
PDF · 30 MB · 131 pagesText searchable
Download RSR-032 Attachment 161 _Part1.pdfRead the text of RSR-032 Attachment 161 _Part1.pdf
RSR-032 Attachment 160.pdf
PDF · 7.6 MB · 56 pagesText searchable
Download RSR-032 Attachment 160.pdfRead the text of RSR-032 Attachment 160.pdf
RSR-032 Attachment 159.pdf
PDF · 14 MB · 97 pagesText searchable
Download RSR-032 Attachment 159.pdfRead the text of RSR-032 Attachment 159.pdf
RSR-032 Attachment 158.pdf
PDF · 4.7 MB · 54 pagesText searchable
Download RSR-032 Attachment 158.pdfRead the text of RSR-032 Attachment 158.pdf
RSR-032 Attachment 157.pdf
PDF · 17 MB · 261 pagesText searchable
Download RSR-032 Attachment 157.pdfRead the text of RSR-032 Attachment 157.pdf
RSR-032 Attachment 156.pdf
PDF · 4.7 MB · 74 pagesText searchable
Download RSR-032 Attachment 156.pdfRead the text of RSR-032 Attachment 156.pdf
RSR-032 Attachment 155.pdf
PDF · 2.7 MB · 40 pagesText searchable
Download RSR-032 Attachment 155.pdfRead the text of RSR-032 Attachment 155.pdf
RSR-032 Attachment 154.pdf
PDF · 2.4 MB · 37 pagesText searchable
Download RSR-032 Attachment 154.pdfRead the text of RSR-032 Attachment 154.pdf
RSR-032 Attachment 153.pdf
PDF · 2.8 MB · 61 pagesText searchable
Download RSR-032 Attachment 153.pdfRead the text of RSR-032 Attachment 153.pdf
RSR-032 Attachment 152.pdf
PDF · 11 MB · 126 pagesText searchable
Download RSR-032 Attachment 152.pdfRead the text of RSR-032 Attachment 152.pdf
RSR-032 Attachment 151.pdf
PDF · 16 MB · 340 pagesText searchable
Download RSR-032 Attachment 151.pdfRead the text of RSR-032 Attachment 151.pdf
RSR-032 Attachment 150.pdf
PDF · 2.6 MB · 33 pagesText searchable
Download RSR-032 Attachment 150.pdfRead the text of RSR-032 Attachment 150.pdf
RSR-032 Attachment 149.pdf
PDF · 2.8 MB · 47 pagesText searchable
Download RSR-032 Attachment 149.pdfRead the text of RSR-032 Attachment 149.pdf
RSR-032 Attachment 148.pdf
PDF · 2.8 MB · 52 pagesText searchable
Download RSR-032 Attachment 148.pdfRead the text of RSR-032 Attachment 148.pdf
RSR-032 Attachment 147.pdf
PDF · 7.6 MB · 136 pagesText searchable
Download RSR-032 Attachment 147.pdfRead the text of RSR-032 Attachment 147.pdf
RSR-032 Attachment 146.pdf
PDF · 13 MB · 211 pagesText searchable
Download RSR-032 Attachment 146.pdfRead the text of RSR-032 Attachment 146.pdf
RSR-032 Attachment 145.pdf
PDF · 3.0 MB · 58 pagesText searchable
Download RSR-032 Attachment 145.pdfRead the text of RSR-032 Attachment 145.pdf
RSR-032 Attachment 144.pdf
PDF · 2.4 MB · 31 pagesText searchable
Download RSR-032 Attachment 144.pdfRead the text of RSR-032 Attachment 144.pdf
RSR-032 Attachment 143.pdf
PDF · 2.4 MB · 30 pagesText searchable
Download RSR-032 Attachment 143.pdfRead the text of RSR-032 Attachment 143.pdf
RSR-032 Attachment 142.pdf
PDF · 2.7 MB · 33 pagesText searchable
Download RSR-032 Attachment 142.pdfRead the text of RSR-032 Attachment 142.pdf
RSR-032 Attachment 141.pdf
PDF · 24 MB · 578 pagesText searchable
Download RSR-032 Attachment 141.pdfRead the text of RSR-032 Attachment 141.pdf
RSR-032 Attachment 140.pdf
PDF · 2.2 MB · 26 pagesText searchable
Download RSR-032 Attachment 140.pdfRead the text of RSR-032 Attachment 140.pdf
RSR-032 Attachment 139.pdf
PDF · 2.2 MB · 29 pagesText searchable
Download RSR-032 Attachment 139.pdfRead the text of RSR-032 Attachment 139.pdf
RSR-032 Attachment 138.pdf
PDF · 2.2 MB · 24 pagesText searchable
Download RSR-032 Attachment 138.pdfRead the text of RSR-032 Attachment 138.pdf
RSR-032 Attachment 137.pdf
PDF · 2.6 MB · 54 pagesText searchable
Download RSR-032 Attachment 137.pdfRead the text of RSR-032 Attachment 137.pdf
RSR-032 Attachment 136.pdf
PDF · 16 MB · 618 pagesText searchable
Download RSR-032 Attachment 136.pdfRead the text of RSR-032 Attachment 136.pdf
RSR-032 Attachment 135.pdf
PDF · 2.5 MB · 52 pagesText searchable
Download RSR-032 Attachment 135.pdfRead the text of RSR-032 Attachment 135.pdf
RSR-032 Attachment 134.pdf
PDF · 2.5 MB · 57 pagesText searchable
Download RSR-032 Attachment 134.pdfRead the text of RSR-032 Attachment 134.pdf
RSR-032 Attachment 133.pdf
PDF · 2.7 MB · 82 pagesText searchable
Download RSR-032 Attachment 133.pdfRead the text of RSR-032 Attachment 133.pdf
RSR-032 Attachment 132.pdf
PDF · 4.2 MB · 137 pagesText searchable
Download RSR-032 Attachment 132.pdfRead the text of RSR-032 Attachment 132.pdf
RSR-032 Attachment 131.pdf
PDF · 1.8 MB · 7 pagesText searchable
Download RSR-032 Attachment 131.pdfRead the text of RSR-032 Attachment 131.pdf
RSR-032 Attachment 130.pdf
PDF · 22 MB · 847 pagesText searchable
Download RSR-032 Attachment 130.pdfRead the text of RSR-032 Attachment 130.pdf
RSR-032 Attachment 129.pdf
PDF · 3.6 MB · 124 pagesText searchable
Download RSR-032 Attachment 129.pdfRead the text of RSR-032 Attachment 129.pdf
RSR-032 Attachment 128.pdf
PDF · 3.6 MB · 104 pagesText searchable
Download RSR-032 Attachment 128.pdfRead the text of RSR-032 Attachment 128.pdf
RSR-032 Attachment 127.pdf
PDF · 4.8 MB · 125 pagesText searchable
Download RSR-032 Attachment 127.pdfRead the text of RSR-032 Attachment 127.pdf
RSR-032 Attachment 126.pdf
PDF · 3.7 MB · 128 pagesText searchable
Download RSR-032 Attachment 126.pdfRead the text of RSR-032 Attachment 126.pdf
RSR-032 Attachment 125.pdf
PDF · 26 MB · 824 pagesText searchable
Download RSR-032 Attachment 125.pdfRead the text of RSR-032 Attachment 125.pdf
RSR-032 Attachment 124.pdf
PDF · 2.4 MB · 28 pagesText searchable
Download RSR-032 Attachment 124.pdfRead the text of RSR-032 Attachment 124.pdf
RSR-032 Attachment 123.pdf
PDF · 2.1 MB · 29 pagesText searchable
Download RSR-032 Attachment 123.pdfRead the text of RSR-032 Attachment 123.pdf
RSR-032 Attachment 122.pdf
PDF · 2.7 MB · 29 pagesText searchable
Download RSR-032 Attachment 122.pdfRead the text of RSR-032 Attachment 122.pdf
RSR-032 Attachment 121.pdf
PDF · 36 MB · 50 pagesText searchable
Download RSR-032 Attachment 121.pdfRead the text of RSR-032 Attachment 121.pdf
RSR-032 Attachment 120.PDF
PDF · 948 KB · 2 pagesText searchable
Download RSR-032 Attachment 120.PDFRead the text of RSR-032 Attachment 120.PDF
RSR-032 Attachment 119_Part3.pdf
PDF · 19 MB · 105 pagesText searchable
Download RSR-032 Attachment 119_Part3.pdfRead the text of RSR-032 Attachment 119_Part3.pdf
RSR-032 Attachment 119_Part2.pdf
PDF · 35 MB · 169 pagesText searchable
Download RSR-032 Attachment 119_Part2.pdfRead the text of RSR-032 Attachment 119_Part2.pdf
RSR-032 Attachment 119_Part1.pdf
PDF · 35 MB · 51 pagesText searchable
Download RSR-032 Attachment 119_Part1.pdfRead the text of RSR-032 Attachment 119_Part1.pdf
RSR-032 Attachment 118_Part6.pdf
PDF · 4.4 MB · 54 pagesText searchable
Download RSR-032 Attachment 118_Part6.pdfRead the text of RSR-032 Attachment 118_Part6.pdf
RSR-032 Attachment 118_Part5.pdf
PDF · 30 MB · 254 pagesText searchable
Download RSR-032 Attachment 118_Part5.pdfRead the text of RSR-032 Attachment 118_Part5.pdf
RSR-032 Attachment 118_Part4.pdf
PDF · 25 MB · 378 pagesText searchable
Download RSR-032 Attachment 118_Part4.pdfRead the text of RSR-032 Attachment 118_Part4.pdf
RSR-032 Attachment 118_Part3.pdf
PDF · 26 MB · 218 pagesText searchable
Download RSR-032 Attachment 118_Part3.pdfRead the text of RSR-032 Attachment 118_Part3.pdf
RSR-032 Attachment 118_Part2.pdf
PDF · 35 MB · 334 pagesText searchable
Download RSR-032 Attachment 118_Part2.pdfRead the text of RSR-032 Attachment 118_Part2.pdf
RSR-032 Attachment 118_Part1.pdf
PDF · 35 MB · 164 pagesText searchable
Download RSR-032 Attachment 118_Part1.pdfRead the text of RSR-032 Attachment 118_Part1.pdf
RSR-032 Attachment 117.pdf
PDF · 18 MB · 55 pagesText searchable
Download RSR-032 Attachment 117.pdfRead the text of RSR-032 Attachment 117.pdf
RSR-032 Attachment 116.pdf
PDF · 815 KB · 2 pagesText searchable
Download RSR-032 Attachment 116.pdfRead the text of RSR-032 Attachment 116.pdf
RSR-032 Attachment 115.pdf
PDF · 13 MB · 135 pagesText searchable
Download RSR-032 Attachment 115.pdfRead the text of RSR-032 Attachment 115.pdf
RSR-032 Attachment 114.pdf
PDF · 12 MB · 123 pagesText searchable
Download RSR-032 Attachment 114.pdfRead the text of RSR-032 Attachment 114.pdf
RSR-032 Attachment 113.pdf
PDF · 1.1 MB · 4 pagesText searchable
Download RSR-032 Attachment 113.pdfRead the text of RSR-032 Attachment 113.pdf
RSR-032 Attachment 112.pdf
PDF · 296 KB · 2 pagesText searchable
Download RSR-032 Attachment 112.pdfRead the text of RSR-032 Attachment 112.pdf
RSR-032 Attachment 111.pdf
PDF · 4.1 MB · 42 pagesText searchable
Download RSR-032 Attachment 111.pdfRead the text of RSR-032 Attachment 111.pdf
RSR-032 Attachment 110.pdf
PDF · 30 MB · 38 pagesText searchable
Download RSR-032 Attachment 110.pdfRead the text of RSR-032 Attachment 110.pdf
RSR-032 Attachment 109.pdf
PDF · 844 KB · 1 pageText searchable
Download RSR-032 Attachment 109.pdfRead the text of RSR-032 Attachment 109.pdf
RSR-032 Attachment 108.pdf
PDF · 4.0 MB · 23 pagesText searchable
Download RSR-032 Attachment 108.pdfRead the text of RSR-032 Attachment 108.pdf
RSR-032 Attachment 107.pdf
PDF · 820 KB · 1 pageText searchable
Download RSR-032 Attachment 107.pdfRead the text of RSR-032 Attachment 107.pdf
RSR-032 Attachment 106.pdf
PDF · 924 KB · 1 pageText searchable
Download RSR-032 Attachment 106.pdfRead the text of RSR-032 Attachment 106.pdf
RSR-032 Attachment 105.pdf
PDF · 16 MB · 493 pagesText searchable
Download RSR-032 Attachment 105.pdfRead the text of RSR-032 Attachment 105.pdf
RSR-032 Attachment 104.pdf
PDF · 19 MB · 628 pagesText searchable
Download RSR-032 Attachment 104.pdfRead the text of RSR-032 Attachment 104.pdf
RSR-032 Attachment 103.pdf
PDF · 3.3 MB · 40 pagesText searchable
Download RSR-032 Attachment 103.pdfRead the text of RSR-032 Attachment 103.pdf
RSR-032 Attachment 102.pdf
PDF · 1.7 MB · 2 pagesText searchable
Download RSR-032 Attachment 102.pdfRead the text of RSR-032 Attachment 102.pdf
RSR-032 Attachment 101.pdf
PDF · 6.8 MB · 186 pagesText searchable
Download RSR-032 Attachment 101.pdfRead the text of RSR-032 Attachment 101.pdf
RSR-032 Attachment 100.pdf
PDF · 4.3 MB · 244 pagesText searchable
Download RSR-032 Attachment 100.pdfRead the text of RSR-032 Attachment 100.pdf
RSR-032 Attachment 99.pdf
PDF · 8.3 MB · 193 pagesText searchable
Download RSR-032 Attachment 99.pdfRead the text of RSR-032 Attachment 99.pdf
RSR-032 Attachment 98.pdf
PDF · 33 MB · 2,201 pagesText searchable
Download RSR-032 Attachment 98.pdfRead the text of RSR-032 Attachment 98.pdf
RSR-032 Attachment 97.pdf
PDF · 826 KB · 2 pagesText searchable
Download RSR-032 Attachment 97.pdfRead the text of RSR-032 Attachment 97.pdf
RSR-032 Attachment 96.pdf
PDF · 2.1 MB · 2 pagesText searchable
Download RSR-032 Attachment 96.pdfRead the text of RSR-032 Attachment 96.pdf
RSR-032 Attachment 95.pdf
PDF · 3.0 MB · 27 pagesText searchable
Download RSR-032 Attachment 95.pdfRead the text of RSR-032 Attachment 95.pdf
RSR-032 Attachment 94.pdf
PDF · 1.0 MB · 3 pagesText searchable
Download RSR-032 Attachment 94.pdfRead the text of RSR-032 Attachment 94.pdf
RSR-032 Attachment 93.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 93.pdfRead the text of RSR-032 Attachment 93.pdf
RSR-032 Attachment 92.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 92.pdfRead the text of RSR-032 Attachment 92.pdf
RSR-032 Attachment 91.pdf
PDF · 896 KB · 2 pagesText searchable
Download RSR-032 Attachment 91.pdfRead the text of RSR-032 Attachment 91.pdf
RSR-032 Attachment 90.pdf
PDF · 925 KB · 2 pagesText searchable
Download RSR-032 Attachment 90.pdfRead the text of RSR-032 Attachment 90.pdf
RSR-032 Attachment 89.pdf
PDF · 909 KB · 2 pagesText searchable
Download RSR-032 Attachment 89.pdfRead the text of RSR-032 Attachment 89.pdf
RSR-032 Attachment 88.pdf
PDF · 911 KB · 2 pagesText searchable
Download RSR-032 Attachment 88.pdfRead the text of RSR-032 Attachment 88.pdf
RSR-032 Attachment 87.pdf
PDF · 865 KB · 2 pagesText searchable
Download RSR-032 Attachment 87.pdfRead the text of RSR-032 Attachment 87.pdf
RSR-032 Attachment 86.pdf
PDF · 910 KB · 2 pagesText searchable
Download RSR-032 Attachment 86.pdfRead the text of RSR-032 Attachment 86.pdf
RSR-032 Attachment 85.pdf
PDF · 911 KB · 2 pagesText searchable
Download RSR-032 Attachment 85.pdfRead the text of RSR-032 Attachment 85.pdf
RSR-032 Attachment 84.pdf
PDF · 912 KB · 2 pagesText searchable
Download RSR-032 Attachment 84.pdfRead the text of RSR-032 Attachment 84.pdf
RSR-032 Attachment 83.pdf
PDF · 904 KB · 2 pagesText searchable
Download RSR-032 Attachment 83.pdfRead the text of RSR-032 Attachment 83.pdf
RSR-032 Attachment 82.pdf
PDF · 926 KB · 2 pagesText searchable
Download RSR-032 Attachment 82.pdfRead the text of RSR-032 Attachment 82.pdf
RSR-032 Attachment 81.pdf
PDF · 865 KB · 2 pagesText searchable
Download RSR-032 Attachment 81.pdfRead the text of RSR-032 Attachment 81.pdf
RSR-032 Attachment 80.pdf
PDF · 849 KB · 2 pagesText searchable
Download RSR-032 Attachment 80.pdfRead the text of RSR-032 Attachment 80.pdf
RSR-032 Attachment 79.pdf
PDF · 910 KB · 2 pagesText searchable
Download RSR-032 Attachment 79.pdfRead the text of RSR-032 Attachment 79.pdf
RSR-032 Attachment 78.pdf
PDF · 1005 KB · 3 pagesText searchable
Download RSR-032 Attachment 78.pdfRead the text of RSR-032 Attachment 78.pdf
RSR-032 Attachment 77.pdf
PDF · 962 KB · 3 pagesText searchable
Download RSR-032 Attachment 77.pdfRead the text of RSR-032 Attachment 77.pdf
RSR-032 Attachment 76.pdf
PDF · 957 KB · 3 pagesText searchable
Download RSR-032 Attachment 76.pdfRead the text of RSR-032 Attachment 76.pdf
RSR-032 Attachment 75.pdf
PDF · 2.0 MB · 9 pagesText searchable
Download RSR-032 Attachment 75.pdfRead the text of RSR-032 Attachment 75.pdf
RSR-032 Attachment 74.pdf
PDF · 949 KB · 3 pagesText searchable
Download RSR-032 Attachment 74.pdfRead the text of RSR-032 Attachment 74.pdf
RSR-032 Attachment 73.pdf
PDF · 964 KB · 3 pagesText searchable
Download RSR-032 Attachment 73.pdfRead the text of RSR-032 Attachment 73.pdf
RSR-032 Attachment 72.pdf
PDF · 878 KB · 3 pagesText searchable
Download RSR-032 Attachment 72.pdfRead the text of RSR-032 Attachment 72.pdf
RSR-032 Attachment 71.pdf
PDF · 925 KB · 3 pagesText searchable
Download RSR-032 Attachment 71.pdfRead the text of RSR-032 Attachment 71.pdf
RSR-032 Attachment 70.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download RSR-032 Attachment 70.pdfRead the text of RSR-032 Attachment 70.pdf
RSR-032 Attachment 69.pdf
PDF · 967 KB · 3 pagesText searchable
Download RSR-032 Attachment 69.pdfRead the text of RSR-032 Attachment 69.pdf
RSR-032 Attachment 68.pdf
PDF · 970 KB · 3 pagesText searchable
Download RSR-032 Attachment 68.pdfRead the text of RSR-032 Attachment 68.pdf
RSR-032 Attachment 67.pdf
PDF · 1.4 MB · 4 pagesText searchable
Download RSR-032 Attachment 67.pdfRead the text of RSR-032 Attachment 67.pdf
RSR-032 Attachment 66.pdf
PDF · 938 KB · 3 pagesText searchable
Download RSR-032 Attachment 66.pdfRead the text of RSR-032 Attachment 66.pdf
RSR-032 Attachment 65.pdf
PDF · 814 KB · 3 pagesText searchable
Download RSR-032 Attachment 65.pdfRead the text of RSR-032 Attachment 65.pdf
RSR-032 Attachment 64.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download RSR-032 Attachment 64.pdfRead the text of RSR-032 Attachment 64.pdf
RSR-032 Attachment 63.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download RSR-032 Attachment 63.pdfRead the text of RSR-032 Attachment 63.pdf
RSR-032 Attachment 62.pdf
PDF · 3.4 MB · 7 pagesText searchable
Download RSR-032 Attachment 62.pdfRead the text of RSR-032 Attachment 62.pdf
RSR-032 Attachment 61.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download RSR-032 Attachment 61.pdfRead the text of RSR-032 Attachment 61.pdf
RSR-032 Attachment 60.pdf
PDF · 856 KB · 2 pagesText searchable
Download RSR-032 Attachment 60.pdfRead the text of RSR-032 Attachment 60.pdf
RSR-032 Attachment 59.pdf
PDF · 900 KB · 2 pagesText searchable
Download RSR-032 Attachment 59.pdfRead the text of RSR-032 Attachment 59.pdf
RSR-032 Attachment 58.pdf
PDF · 760 KB · 1 pageText searchable
Download RSR-032 Attachment 58.pdfRead the text of RSR-032 Attachment 58.pdf
RSR-032 Attachment 57.pdf
PDF · 869 KB · 2 pagesText searchable
Download RSR-032 Attachment 57.pdfRead the text of RSR-032 Attachment 57.pdf
RSR-032 Attachment 56.pdf
PDF · 1.4 MB · 10 pagesText searchable
Download RSR-032 Attachment 56.pdfRead the text of RSR-032 Attachment 56.pdf
RSR-032 Attachment 55_Part10.pdf
PDF · 20 MB · 286 pagesText searchable
Download RSR-032 Attachment 55_Part10.pdfRead the text of RSR-032 Attachment 55_Part10.pdf
RSR-032 Attachment 55_Part9.pdf
PDF · 14 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part9.pdfRead the text of RSR-032 Attachment 55_Part9.pdf
RSR-032 Attachment 55_Part8.pdf
PDF · 10.0 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part8.pdfRead the text of RSR-032 Attachment 55_Part8.pdf
RSR-032 Attachment 55_Part7.pdf
PDF · 18 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part7.pdfRead the text of RSR-032 Attachment 55_Part7.pdf
RSR-032 Attachment 55_Part6.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part6.pdfRead the text of RSR-032 Attachment 55_Part6.pdf
RSR-032 Attachment 55_Part5.pdf
PDF · 19 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part5.pdfRead the text of RSR-032 Attachment 55_Part5.pdf
RSR-032 Attachment 55_Part4.pdf
PDF · 17 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part4.pdfRead the text of RSR-032 Attachment 55_Part4.pdf
RSR-032 Attachment 55_Part3.pdf
PDF · 11 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part3.pdfRead the text of RSR-032 Attachment 55_Part3.pdf
RSR-032 Attachment 55_Part2.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part2.pdfRead the text of RSR-032 Attachment 55_Part2.pdf
RSR-032 Attachment 55_Part1.pdf
PDF · 26 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part1.pdfRead the text of RSR-032 Attachment 55_Part1.pdf
RSR-032 Attachment 54.pdf
PDF · 8.0 MB · 121 pagesText searchable
Download RSR-032 Attachment 54.pdfRead the text of RSR-032 Attachment 54.pdf
RSR-032 Attachment 53.pdf
PDF · 13 MB · 204 pagesText searchable
Download RSR-032 Attachment 53.pdfRead the text of RSR-032 Attachment 53.pdf
RSR-032 Attachment 52.pdf
PDF · 10 MB · 130 pagesText searchable
Download RSR-032 Attachment 52.pdfRead the text of RSR-032 Attachment 52.pdf
RSR-032 Attachment 51.pdf
PDF · 1.9 MB · 57 pagesText searchable
Download RSR-032 Attachment 51.pdfRead the text of RSR-032 Attachment 51.pdf
RSR-032 Attachment 50.pdf
PDF · 1.7 MB · 6 pagesText searchable
Download RSR-032 Attachment 50.pdfRead the text of RSR-032 Attachment 50.pdf
RSR-032 Attachment 49.pdf
PDF · 3.1 MB · 83 pagesText searchable
Download RSR-032 Attachment 49.pdfRead the text of RSR-032 Attachment 49.pdf
RSR-032 Attachment 48.pdf
PDF · 1016 KB · 3 pagesText searchable
Download RSR-032 Attachment 48.pdfRead the text of RSR-032 Attachment 48.pdf
RSR-032 Attachment 47.pdf
PDF · 9.7 MB · 10 pagesText searchable
Download RSR-032 Attachment 47.pdfRead the text of RSR-032 Attachment 47.pdf
RSR-032 Attachment 46.pdf
PDF · 4.9 MB · 7 pagesText searchable
Download RSR-032 Attachment 46.pdfRead the text of RSR-032 Attachment 46.pdf
RSR-032 Attachment 45.pdf
PDF · 48 MB · 373 pagesText searchable
Download RSR-032 Attachment 45.pdfRead the text of RSR-032 Attachment 45.pdf
RSR-032 Attachment 44.pdf
PDF · 10 MB · 38 pagesText searchable
Download RSR-032 Attachment 44.pdfRead the text of RSR-032 Attachment 44.pdf
RSR-032 Attachment 43.pdf
PDF · 10.0 MB · 49 pagesText searchable
Download RSR-032 Attachment 43.pdfRead the text of RSR-032 Attachment 43.pdf
RSR-032 Attachment 42.pdf
PDF · 15 MB · 25 pagesText searchable
Download RSR-032 Attachment 42.pdfRead the text of RSR-032 Attachment 42.pdf
RSR-032 Attachment 41.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 41.pdfRead the text of RSR-032 Attachment 41.pdf
RSR-032 Attachment 40.pdf
PDF · 1012 KB · 1 pageText searchable
Download RSR-032 Attachment 40.pdfRead the text of RSR-032 Attachment 40.pdf
RSR-032 Attachment 39.pdf
PDF · 9.9 MB · 14 pagesText searchable
Download RSR-032 Attachment 39.pdfRead the text of RSR-032 Attachment 39.pdf
RSR-032 Attachment 38.pdf
PDF · 6.1 MB · 12 pagesText searchable
Download RSR-032 Attachment 38.pdfRead the text of RSR-032 Attachment 38.pdf
RSR-032 Attachment 37.pdf
PDF · 4.2 MB · 12 pagesText searchable
Download RSR-032 Attachment 37.pdfRead the text of RSR-032 Attachment 37.pdf
RSR-032 Attachment 36.pdf
PDF · 3.5 MB · 12 pagesText searchable
Download RSR-032 Attachment 36.pdfRead the text of RSR-032 Attachment 36.pdf
RSR-032 Attachment 35.pdf
PDF · 14 MB · 38 pagesText searchable
Download RSR-032 Attachment 35.pdfRead the text of RSR-032 Attachment 35.pdf
RSR-032 Attachment 34.pdf
PDF · 7.8 MB · 13 pagesText searchable
Download RSR-032 Attachment 34.pdfRead the text of RSR-032 Attachment 34.pdf
RSR-032 Attachment 33.pdf
PDF · 7.2 MB · 11 pagesText searchable
Download RSR-032 Attachment 33.pdfRead the text of RSR-032 Attachment 33.pdf
RSR-032 Attachment 32.pdf
PDF · 1.3 MB · 3 pagesText searchable
Download RSR-032 Attachment 32.pdfRead the text of RSR-032 Attachment 32.pdf
RSR-032 Attachment 31.pdf
PDF · 2.3 MB · 26 pagesText searchable
Download RSR-032 Attachment 31.pdfRead the text of RSR-032 Attachment 31.pdf
RSR-032 Attachment 30.pdf
PDF · 12 MB · 18 pagesText searchable
Download RSR-032 Attachment 30.pdfRead the text of RSR-032 Attachment 30.pdf
RSR-032 Attachment 29.pdf
PDF · 3.2 MB · 9 pagesText searchable
Download RSR-032 Attachment 29.pdfRead the text of RSR-032 Attachment 29.pdf
RSR-032 Attachment 28.pdf
PDF · 19 MB · 127 pagesText searchable
Download RSR-032 Attachment 28.pdfRead the text of RSR-032 Attachment 28.pdf
RSR-032 Attachment 27.pdf
PDF · 7.7 MB · 12 pagesText searchable
Download RSR-032 Attachment 27.pdfRead the text of RSR-032 Attachment 27.pdf
RSR-032 Attachment 26.pdf
PDF · 4.5 MB · 12 pagesText searchable
Download RSR-032 Attachment 26.pdfRead the text of RSR-032 Attachment 26.pdf
RSR-032 Attachment 25.pdf
PDF · 3.9 MB · 14 pagesText searchable
Download RSR-032 Attachment 25.pdfRead the text of RSR-032 Attachment 25.pdf
RSR-032 Attachment 24.pdf
PDF · 6.1 MB · 13 pagesText searchable
Download RSR-032 Attachment 24.pdfRead the text of RSR-032 Attachment 24.pdf
RSR-032 Attachment 23.pdf
PDF · 4.2 MB · 19 pagesText searchable
Download RSR-032 Attachment 23.pdfRead the text of RSR-032 Attachment 23.pdf
RSR-032 Attachment 22.pdf
PDF · 24 MB · 1,282 pagesText searchable
Download RSR-032 Attachment 22.pdfRead the text of RSR-032 Attachment 22.pdf
RSR-032 Attachment 21.pdf
PDF · 27 MB · 1,005 pagesText searchable
Download RSR-032 Attachment 21.pdfRead the text of RSR-032 Attachment 21.pdf
RSR-032 Attachment 20_Part2.pdf
PDF · 24 MB · 109 pagesText searchable
Download RSR-032 Attachment 20_Part2.pdfRead the text of RSR-032 Attachment 20_Part2.pdf
RSR-032 Attachment 20_Part1.pdf
PDF · 35 MB · 150 pagesText searchable
Download RSR-032 Attachment 20_Part1.pdfRead the text of RSR-032 Attachment 20_Part1.pdf
RSR-032 Attachment 19.pdf
PDF · 5.8 MB · 23 pagesText searchable
Download RSR-032 Attachment 19.pdfRead the text of RSR-032 Attachment 19.pdf
RSR-032 Attachment 18.pdf
PDF · 4.7 MB · 8 pagesText searchable
Download RSR-032 Attachment 18.pdfRead the text of RSR-032 Attachment 18.pdf
RSR-032 Attachment 17_Part3.pdf
PDF · 12 MB · 282 pagesText searchable
Download RSR-032 Attachment 17_Part3.pdfRead the text of RSR-032 Attachment 17_Part3.pdf
RSR-032 Attachment 17_Part2.pdf
PDF · 26 MB · 500 pagesText searchable
Download RSR-032 Attachment 17_Part2.pdfRead the text of RSR-032 Attachment 17_Part2.pdf
RSR-032 Attachment 17_Part1.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 17_Part1.pdfRead the text of RSR-032 Attachment 17_Part1.pdf
RSR-032 Attachment 16.pdf
PDF · 7.5 MB · 46 pagesText searchable
Download RSR-032 Attachment 16.pdfRead the text of RSR-032 Attachment 16.pdf
RSR-032 Attachment 15.pdf
PDF · 6.6 MB · 17 pagesText searchable
Download RSR-032 Attachment 15.pdfRead the text of RSR-032 Attachment 15.pdf
RSR-032 Attachment 14.pdf
PDF · 5.2 MB · 10 pagesText searchable
Download RSR-032 Attachment 14.pdfRead the text of RSR-032 Attachment 14.pdf
RSR-032 Attachment 13.pdf
PDF · 8.7 MB · 17 pagesText searchable
Download RSR-032 Attachment 13.pdfRead the text of RSR-032 Attachment 13.pdf
RSR-032 Attachment 12.pdf
PDF · 5.8 MB · 12 pagesText searchable
Download RSR-032 Attachment 12.pdfRead the text of RSR-032 Attachment 12.pdf
RSR-032 Attachment 11.pdf
PDF · 7.5 MB · 15 pagesText searchable
Download RSR-032 Attachment 11.pdfRead the text of RSR-032 Attachment 11.pdf
RSR-032 Attachment 10.pdf
PDF · 13 MB · 145 pagesText searchable
Download RSR-032 Attachment 10.pdfRead the text of RSR-032 Attachment 10.pdf
RSR-032 Attachment 9.pdf
PDF · 31 MB · 897 pagesText searchable
Download RSR-032 Attachment 9.pdfRead the text of RSR-032 Attachment 9.pdf
RSR-032 Attachment 8.pdf
PDF · 13 MB · 203 pagesText searchable
Download RSR-032 Attachment 8.pdfRead the text of RSR-032 Attachment 8.pdf
RSR-032 Attachment 7.pdf
PDF · 10 MB · 12 pagesText searchable
Download RSR-032 Attachment 7.pdfRead the text of RSR-032 Attachment 7.pdf
RSR-032 Attachment 6.pdf
PDF · 11 MB · 335 pagesText searchable
Download RSR-032 Attachment 6.pdfRead the text of RSR-032 Attachment 6.pdf
RSR-032 Attachment 5.pdf
PDF · 24 MB · 65 pagesText searchable
Download RSR-032 Attachment 5.pdfRead the text of RSR-032 Attachment 5.pdf
RSR-032 Attachment 4.pdf
PDF · 26 MB · 570 pagesText searchable
Download RSR-032 Attachment 4.pdfRead the text of RSR-032 Attachment 4.pdf
RSR-032 Attachment 3.pdf
PDF · 2.8 MB · 8 pagesText searchable
Download RSR-032 Attachment 3.pdfRead the text of RSR-032 Attachment 3.pdf
RSR-032 Attachment 2.pdf
PDF · 1.5 MB · 26 pagesText searchable
Download RSR-032 Attachment 2.pdfRead the text of RSR-032 Attachment 2.pdf
RSR-032 Attachment 1.pdf
PDF · 12 MB · 18 pagesText searchable
Download RSR-032 Attachment 1.pdfRead the text of RSR-032 Attachment 1.pdf
Text of RSR-032 Attachment 176_Part2.pdf
Extracted from the file · 754 pages · 1,598,897 characters
Text of RSR-032 Attachment 176_Part1.pdf
Extracted from the file · 110 pages · 439,601 characters
Text of RSR-032 Attachment 175_Part7.pdf
Extracted from the file · 275 pages · 622,526 characters
Text of RSR-032 Attachment 175_Part6.pdf
Extracted from the file · 350 pages · 828,421 characters
Text of RSR-032 Attachment 175_Part5.pdf
Extracted from the file · 350 pages · 841,526 characters
Text of RSR-032 Attachment 175_Part4.pdf
Extracted from the file · 350 pages · 529,828 characters
Text of RSR-032 Attachment 175_Part3.pdf
Extracted from the file · 350 pages · 417,827 characters
Text of RSR-032 Attachment 175_Part2.pdf
Extracted from the file · 350 pages · 717,402 characters
Page 21 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 21 of 2375 6MW was reddish and turbid which may have resulted in the apparent groundwater contamination due to soiladsorbed contaminants in the sample. Based on the results described above, additional investigation is warranted. AOC 3: Exterior Oil- Filled Electrical Transformers Three pad-mounted oil-filled electrical transformers are present at the Site. A spill of less than 1 gallon of oil was documented at one of the transformers, which was contained and removed and therefore is not considered a REC. However, the potential that other leaks associated with the transformers have occurred qualifies the transformers as an AOC. COCs identified for this AOC included ETPH and PCBs. Sample locations L1985-12, -13, and -14 were used to evaluate surface soils near the transformers. PCBs were not detected in surficial soil collected from the borings. ETPH was detected in all three soil samples (L1985-12 0-0.5 ft., L1985-13 0-0.5 ft., and L1985-14 00.5 ft.) at 10 mg/kg, 74 mg/kg and 37 mg/kg, respectively. Based on these results, additional investigation is warranted near the northeastern transformer (L1985-14) and the transformer located near the loading dock (L1985-13). In addition, investigations are warranted near a second transformer adjacent to the northeastern one and two transformers and/or electrical equipment near the northwestern corner of the stormwater detention basin. AOC 4: Suspected Dumping Area Historical dumping was identified to have occurred throughout the Site as indicated in a 2000 Phase I ESA that was reviewed by Stantec. During Stantec’s 2021 Phase I ESA, a sign was observed near the southeastern corner of the Site that read “No Dumping”. Small amounts of trash were observed in this area and illegal dumping apparently occurred in this area. COCs identified for this AOC included VOCs, ETPH, PAHs, and RCRA 8 metals plus copper, nickel, and zinc. Pesticides were also tested as part of the evaluation (see AOC 2). One soil sample collected from boring L198511 0-0.5 ft. was used to evaluate soil at the surface. PAHs, ETPH, and pesticides (DDT) were detected at concentrations below applicable RSR criteria. Based on these results, additional investigation is warranted. 2.2.2 2022 Well Receptor Survey Stantec completed a Well Receptor Survey in 2022 to determine if any potential receptors, including public and private drinking water supply wells are located within a 500-foot (ft.) radius of the Site. The survey was completed in accordance with the CTDEEP Water Supply Well Receptor Survey Guidance Document (September 2009, revised January 2015). In part, Stantec concluded the following: • • • • • Water supply wells or sensitive receptors were not identified within 500 feet of the Site. One property on Adams Road, southwest of the Site, is zoned residential but appeared vacant. Developed properties within the 500-foot radius are currently connected to the Metropolitan District (MDC) public water distribution system. No wetlands are mapped at the Site or 500 feet of the Site. ZUVIC noted that wetlands associated with Culbro Lake are present north of Blue Hills Avenue Extension, northeast, and within 500 ft., of the Site. Wetlands are also located on one property on Adams Road, southwest, and within 500 ft. of the Site. No further investigations of water supply wells within 500 feet of the Site are warranted. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 6 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 22 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 22 of 2375 3.0 SCOPE OF WORK Based on the results of the previous Phase I and II ESAs, ZUVIC completed the following to evaluate the nature, degree and extent of releases identified previously and to determine if releases have occurred at the additional AOCs identified by ZUVIC: • • • • • AOC 5 - Former JDS Uniphase Site Operations AOC 6 - Two Emergency Diesel ASTs Associated with Emergency Generators (REC 2) AOC 7 - Former 7,000-Gallon Fuel Oil UST at Barn/Office (REC 3) AOC 8 - Former Barns in the Central and the Southeastern Portions of the Site AOC 9 - Potential Off-Site Sources The Phase II/III work included the following: • • • • • Advancement of, and test screening of soil from, 34 exterior soil borings completed in September 2023 (B1 through B34) and five soil samples collected from inside the southeast portion of the building in October 2023 (B35 through B39) to evaluate releases and/or characterize and delineate previouslyidentified releases. Testing of soil samples collected from exterior borings for one or more of the following COCs: ETPH, leachable ETPH, PCBs, pesticides, leachable pesticides, herbicides, SVOCs/PAHs, leachable SVOCs/PAHs, VOCs, alcohols, glycols (ethylene glycol and propylene glycol), RCRA 8 metals plus copper, nickel, and zinc, and one or more leachable metals. Testing of soil samples collected from the interior of the building for one or more of the following COCs: ETPH, 1,4-dioxane, SVOCs, VOCs, alcohols, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc) and per- and polyfluoroalkyl substances (PFAS). Installation of seven monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B24/MW6, and B23/MW7), and collection and analyses of groundwater from the newly-installed wells and four pre-existing wells (L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) for ETPH, SVOCs or PAHs, VOCs, alcohols, glycols, RCRA 8 metals plus copper, nickel, and zinc, pesticides and herbicides. Installation of eighteen (18) sub-slab vapor points (SSVP) (SV-1 through SV-18) inside the building, and collection and analysis of vapor samples from the SSVPs for VOCs. 4.0 ENVIRONMENTAL SETTING AND STANDARDS 4.1 Geologic and Hydrogeologic Information The Site is relatively level with grade gently sloping down toward stormwater catch basins and steeper grade changes down to stormwater detention basins in the southeastern and northeastern portions of the Site and a drainage swale centrally located in the southern parking area. Based on topographic maps, Site elevation ranges from approximately 180 to 185 feet above mean sea level (msl) except for lower elevations within the stormwater detention basins. The surficial geology of the Site is identified as sand overlying fines and the bedrock underlying the Site is mapped as the Portland Arkose formation, which is described as reddish-brown arkose (brownstone). The mapped overburden deposits were confirmed during this Phase II/III ESA except that glacial till, consisting of red-brown sand, silt, and gravel, was encountered in two borings (B1/MW1 and B2/MW2) completed along the southern side of the building at 15 to 20 feet below grade (fbg). Bedrock was not observed during this evaluation, however during previous environmental investigations, and during a 2001 geotechnical evaluation bedrock was not encountered as deep as 41.5 ft. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 7 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 23 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 23 of 2375 Depths to groundwater ranged from approximately 10.6 to 17.3 feet when measured in May 2021 and approximately 8.9 to 15.6 feet deep when measured in September 2023. Shallow groundwater flow was mapped as flowing southeast toward Day Hill Road during the previous Phase II ESA and this investigation. 4.2 Groundwater and Surface Water Classifications The majority of the Site is located within the Connecticut River major drainage basin, the Farmington River regional basin, and the Farmington River subregional basin with the exception of the southwest corner of the Site which is located within the Connecticut River major drainage basin, the Park River regional basin, and the North Branch Park River subregional basin. Local runoff is likely conveyed via ground surface to the Site’s stormwater catch basins and to stormwater detention basins located in the northeast and southeast portions of the Site. According to CTDEEP Geographical Information System (GIS) mapping (accessed January 2024), groundwater at the Site is classified as “GA”. The “GA” groundwater quality classification indicates that the water resource is intended to be suitable for existing private or potential public or private drinking water without treatment, stream base flow, and industrial and miscellaneous use (CTDEEP, October 2013). According to CTDEEP mapping, the Site is not within an Aquifer Protection Area. ZUVIC did not observe any evidence of, or review any documentation, indicating the presence of water wells at the Site. A site-specific drinking water receptor survey was completed in 2022 and no drinking water wells were identified at, or within 500 ft. of, the Site (see Section 2.2.2). The Site does not contain mapped surface water bodies, and no significant areas of standing water or other unmapped surface water bodies were observed during previous ESAs and this Phase II/III ESA. The Site is located approximately 4,000 feet south of the Farmington River, and approximately 350 feet southwest of Culbro Lake. The Farmington River is classified as a class “B” surface waterbody. The “B” classification indicates degraded water bodies that are suitable for fish, aquatic life and wildlife habitat; recreation; navigation; and water supply for industry and agriculture (CTDEEP, October 2013). Culbro Lake is classified as a class “A” surface waterbody. The “A” classification indicates water bodies that are suitable for potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation (CTDEEP, October 2013). Discharges to class “A” surface waterbodies are restricted to discharges from public or private drinking water treatment systems, dredging and dewatering, emergency and clean water discharges (CTDEEP, October 2013). 4.3 Soil Remediation Standards For soil, the CTDEEP has adopted two types of remediation standards, one to address direct exposure (e.g., through ingestion of, or dermal contact with, contaminated soil) and a second to address pollutant mobility (i.e., the potential for leachate from contaminated soil to impact groundwater quality above a particular threshold). Direct exposure criteria (DEC) have been developed for two types of land use scenarios, as follows: (i) residential land use; and (ii) industrial/commercial land use. The industrial/commercial direct exposure criteria would currently be applied to this site given its past and current industrial/commercial use. However, such an application would require placement of an environmental use restriction (EUR) to ensure that the parcel or restricted portion(s) of the parcel are not used for any residential purpose in the future, and that its use be limited to industrial or commercial activities. Since an EUR has not been recorded, the Residential Direct Exposure Criteria (RDEC) would currently apply to this Site. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 8 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 24 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 24 of 2375 Groundwater beneath the Site is classified by the CTDEEP as “GA”, therefore, the pollutant mobility criteria (PMC) for soil in GA areas would be applicable. For both DEC and PMC, the CTDEEP has adopted numeric standards that serve as “default” criteria unless acceptable site-specific or alternate criteria are developed, or unless background concentrations or analytical detection limits in soil exceed these numeric standards. In addition, there are a few circumstances where conditional exemptions or variances from the DEC and PMC are allowed. Where applicable, based on existing data, these exemptions, variances, site-specific or alternate criteria will be discussed. In general, site-specific or alternate criteria are not developed unless there are exceedances of the more protective default criteria. According to the RSRs, the DEC are compared to soil quality data from total mass analyses, and apply to soil within 15 feet (ft.) of the ground surface. In a GA area, the PMC apply to soil from ground surface to the seasonal low water table. For pollutant mobility for metals or PCBs, one can either compare predicted or actual leaching data for a given metal or PCB to its GA PMC. For other constituents, one can compare leaching data to the GWPC multiplied by the appropriate dilution/attenuation factor if appropriate, or one can compare total mass analysis data to the PMC. 4.4 Groundwater Remediation Standards In “GA” classified areas such as this site, there are four types of groundwater remediation standards which could potentially apply under the RSRs: (i) the groundwater protection criteria (GWPC); (ii) the surface-water protection criteria (SWPC); (iii) background concentrations; and (iv) the volatilization criteria (VC) for any groundwater polluted with VOCs within a certain depth below the ground surface or a building. The GWPC are designed to ensure that the quality of existing and potential drinking water supplies is not impacted. The SWPC are designed to ensure that contaminant concentrations in groundwater do not adversely impact water quality in a surface water body receiving groundwater discharges, except as follows. For a wetland or intermittent stream, the RSRs assume there may be no dilution and therefore the aquatic life criteria (AQLC) (contained in the Water Quality Standards) are used as the SWPC (i.e., are compared directly to the contaminant concentrations in the groundwater plume(s)). The AQLC are not applicable to the Site since groundwater does not discharge to wetlands or an intermittent stream. The SWPC can be compared to plume concentrations immediately upgradient of the point of discharge to the surface water body or to the 95% upper confidence limit of the arithmetic mean of samples representative of the subject groundwater plume. Groundwater in a GA area is required to meet background concentrations unless the conditions described below are met, then compliance with the GWPC is permitted. • Concentrations in groundwater are below the GWPC. • One of the following conditions is met: o Public water is available within 200 ft. of the site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume; the plume is not located in an aquifer protection area; and the plume is not located within the area of influence of any public water supply well. o The plume is a diminishing state groundwater plume prior to any remediation. o Reduction of concentrations in groundwater to background concentrations cannot be achieved using sound engineering and hydrogeologic remediation practices. Provided concentrations in groundwater are compliant with the GWPC, compliance with background concentrations is not required since public water is available within 200 ft. of the Site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume. In addition, any plumes at Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 9 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 25 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 25 of 2375 the Site are not located in an aquifer protection area and are not located within the area of influence of any public water supply well. The volatilization criteria (VC) apply to groundwater polluted with VOCs within a certain depth beneath the ground surface or a structure depending on the type of VOC present. The VC apply to groundwater within 10 feet of the ground surface or lowest portion of a building if it is polluted with petroleum substances and 30 feet for VOCs other than petroleum substances. There are both residential and industrial/commercial default VC; residential VC apply to properties except those used solely for industrial or commercial activity, provided an EUR is in effect which ensures that the parcel will not be used for any residential purpose in the future, and that any future use of the parcel is limited to industrial or commercial activity. Since an EUR is not proposed for this Site, the Residential VC (RVC) would currently apply to the Site. There are VC that apply to concentrations in groundwater (GWVC) and those that apply to concentrations in soil vapor (SVVC). Compliance with the VC can be demonstrated using either contaminant concentrations in groundwater compared to the GWVC or using contaminant concentrations in soil vapor compared to the SVVC. 4.5 Non-Aqueous Phase Liquid Remediation Standards Removal of non-aqueous phase liquids (NAPL) from soil and groundwater are required by the RSRs to the maximum extent practicable defined as the greatest degree of remediation that can be achieved using sound engineering and hydrologic practices without taking cost into consideration. CTDEEP may approve a variance for NAPL that cannot be contained or removed in accordance with the previous paragraph under certain circumstances. 5.0 METHODS 5.1 Test Borings and Soil Sampling The proposed exterior borings and interior soil sample locations were marked on the ground and/or staked out by ZUVIC personnel. Prior to drilling and sampling activities at the Site, Call Before You Dig (CBYD), a public utility-locating service, was notified (Ticket Nos. 20233400556 and 20234402634) and the proposed locations were reviewed by Corbuilt, LLC, a private utility locating company. Haz-Probe, Inc. (Haz-Probe) of Hampden, MA conducted the exterior boring drilling operations with oversight by ZUVIC personnel. On September 11, 2023, certain locations were cleared down to depths between four and five feet using an air knife. From September 12 to 14, 2024, 27 borings (B1 through B14 and B17 through B32) were advanced to as deep as 20 ft. using a dual track GeoprobeTM Model 6610DT direct push rig. On September 11 and 13, 2024, four borings (B15, B16, B33 and B34) were completed down to 1 fbg using a shovel or hand auger. For those borings completed with the drill rig, continuous soil samples were collected from the borings using a 2.25-inch diameter, four-foot-long core barrel lined with disposable acetate sleeves. Soil samples were collected from the air-knife cleared portion of each location using a metal scoop. On October 9, 2023, ZUVIC collected six soil samples from five locations (B35 through B39) inside the southeastern portion of the building. The concrete slab was approximately 6 inches thick and the samples were collected from just beneath concrete to approximately 1.5 to 2.5 fbg using a shovel and/or a hand auger. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 10 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 26 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 26 of 2375 The Test Boring and Well Installation logs are included in Appendix B. The exterior soil boring and shallow soil sample locations are shown on Figures 3 and Figure 6 and the interior soil sample locations are shown on Figure 5. Soil samples were collected for physical logging of soil types, and test-screening for VOCs was completed using a photoionization detector (PID) equipped with a 10.6 eV lamp. Soil samples were collected and submitted under proper chain of custody procedures for laboratory analyses for one or more of the following analytes: ETPH by the CT Method, leachable ETPH using the Synthetic Precipitation Leaching Procedure (SPLP), SVOCs or PAHs by EPA Method 8270D, PCBs by EPA Method 8082A, pesticides by EPA Method 8081, leachable pesticides via the SPLP, herbicides via EPA Method 8151, VOCs via EPA Method 8260, alcohols and glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 6010c or 7471, one or more leachable metals via the SPLP, 1,4-dioxane via modified EPA Method 8260, and per- and polyfluoroalkyl substances (PFAS) via EPA Method 1633. Soil samples collected from the interior of the building were analyzed for one or more of the following COCs: ETPH, 1,4-dioxane, SVOCs, VOCs, alcohols, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), and per- and polyfluoroalkyl substances (PFAS). 5.2 Groundwater Monitoring Well Installation, Development, Sampling and Elevation Survey In September 2023, seven two-inch diameter pre-packed PVC water table monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, and B24/MW6) were installed by Haz-Probe using direct push technologies. Ten-foot sections of 0.010-inch slot prepacked PVC screen were installed to intersect the water table and connected to PVC risers to near ground surface. The wells were installed at bottom depths ranging from 16.5 feet to 20.3 feet. The annular spaces between the wells and the boreholes were packed with No. 1 silica sand to an elevation of approximately 2 feet above the top of the screens. Approximately two feet of bentonite chips were placed atop the sand pack and hydrated. Backfill was then placed atop the bentonite seal up to several inches below ground surface. The monitoring wells were completed with gripper caps and flush-mounted steel road boxes encased in concrete collars. Details of the well construction are included on the Test Boring and Well Installation reports contained in Appendix A. The monitoring well locations are shown on Figures 3, 4 and 6. The newly-installed monitoring wells were developed in September 2023 by purging and pumping several well volumes from the wells. The well development was conducted to remove fines from the vicinity of the well screen, establish connectivity with the formation and reduce sample turbidity during groundwater sampling. On September 21, 2023, the elevations of the top of PVC of the seven newly-installed wells and the previouslyinstalled monitoring wells (L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) were surveyed, referenced to an assumed datum of 100.00 feet at monitoring well B3/MW-3. The survey information was used to calculate groundwater elevations and evaluate groundwater flow directions. The elevation data are summarized in Table 1. Depths to groundwater were measured in the monitoring wells on September 21, 2023 using an oil/water interface probe, capable of measuring light non-aqueous phase liquids and dense non-aqueous phase liquids (LNAPL and DNAPL), and groundwater to within 0.01 feet. LNAPL and DNAPL were not detected in the wells. Depth-to-water measurements and calculated water table elevations are summarized in Table 1. Water table elevations, groundwater contour lines and inferred groundwater flow directions are depicted on Figure 4. On September 21 and 22, 2023, ZUVIC collected groundwater samples from the wells. Low-Flow Groundwater Sampling Field Logs are attached in Appendix C. The groundwater samples were submitted to CET, under Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 11 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 27 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 27 of 2375 proper chain-of-custody and analyzed in accordance with the Connecticut Reasonable Confidence Protocols (RCPs). The samples were analyzed for ETPH by the CT Method, SVOCs or PAHs by EPA Method 8270D, pesticides by EPA Method 8081B, herbicides via EPA Method 8151A, VOCs via EPA Method 8260C, alcohols via EPA Methods 8015B, glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 200.7 or 245.2 Groundwater samples were collected using CTDEEP-recommended low-flow sampling methods. Groundwater was pumped from each well using polyethylene tubing connected to a peristaltic pump, into a flow-through cell connected to a direct-reading multi-meter. Groundwater was monitored for temperature, pH, specific conductivity, oxidation-reduction potential (ORP), dissolved oxygen (DO) and turbidity at approximately fiveminute intervals. Once parameter readings had stabilized to within recommended criteria, samples were collected by directly pumping groundwater into laboratory-provided containers which contained appropriate preservatives. Due to poor recharge, L1985-6MW was not sampled using low-flow sampling methods and the well was pumped dry and allowed to fully recover prior to pumping groundwater directly into laboratory-provided sample containers. 5.3 Sub-Slab Vapor Point Installation and Sampling The proposed SSVP locations were marked inside the building by ZUVIC personnel. Prior to installation of the SSVP, CBYD was notified (Ticket No. is 20234402634). In addition, the proposed locations were reviewed by Corbuilt, LLC, using Ground Penetrating Radar (GPR). The SSVP installation and sampling was completed in accordance with the Guidance for Evaluating Soil Vapor Intrusion in the State of New York, October 2006 which is the guidance recommended by the CTDEEP. On November 17, 2023, ZUVIC installed 18 SSVPs (SV-1 through SV-18) at locations shown on Figure 5. Eight SSVPs (SV-3 through SV-9 and SV-14) were installed in the concrete slab below the raised floor of the building. floor. These SSVPs were each installed by drilling a 5/8-inch hole through the concrete, approximately one inch into underlying soil. The remaining SSVPs (SV-1, SV-2, SV-10 through SV-13 and SV-15 through SV-18) were installed with stainless steel flush mounted covers after a 1.5-inch diameter hole was drilled approximately 1.8 inches into the concrete, followed by drilling a 5/8-inch hole in the center of the larger diameter hole approximately one inch into the underlying soil. Concrete was approximately 6 inches thick at the SSVP locations with the exception of SV-5 and SV-13, where concrete was approximately 8 inches thick. At each SSVP location, a Vapor Pin® was installed in the 5/8-inch hole and capped with a protective cap. The stainless steel Vapor Pins® were installed with a silicone seal between the vapor point and surrounding concrete floor. Following installation, each point was purged of at least three void volumes using a PID and a screening value was recorded. A helium leak test was performed on each of the points after installation to confirm an airtight seal. The helium leak test was performed by covering each vapor point with an airtight dome, filling the dome with a known concentration of helium and testing vapors in the vapor point for helium using a helium detector. Regulatory guidance on helium leak testing specifies that the helium concentration in the vapor point be less than 10% of that detected in the dome for the test to be successful. The results of helium leak tests meet this requirement and confirmed proper installation of the points. The helium leak test field data sheets are included in Appendix D. Following a successful seal leak test, each point was sampled. Sub-slab vapor was collected directly into laboratory-provided 6-liter summa canisters over approximately thirty-minute time periods using a laboratorycalibrated flow controller at each location. The summa canisters were submitted to Phoenix Environmental Laboratories, a State-certified laboratory, under proper chain-of-custody procedures, and analyzed in accordance with the Connecticut RCPs for VOCs using EPA method TO-15. A duplicate soil vapor sample was collected from SV-13 and identified as SV-13A. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 12 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 28 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 28 of 2375 6.0 INVESTIGATION RESULTS 6.1 General The results of soil test screening are presented on the Test Boring and Well Installation Logs (Appendix B), and the results of soil, groundwater, and soil vapor sampling are summarized in Tables 2, 3, and 4 respectively. Exterior boring locations and monitoring wells are depicted on Figures 3, 4, and 6. Interior soil sample locations and sub-slab soil vapor point locations are depicted on Figure 5. Groundwater elevation data are summarized in Table 1, and monitoring well locations, groundwater elevation contours and inferred flow directions are shown on Figure 4. Laboratory analytical reports for soil, groundwater, and vapor samples are included in Appendices E, F, and G, respectively. Given the GA classification of groundwater beneath the Site, the RDEC, I/C DEC and GA PMC for soil were compared to soil analytical data. Groundwater analytical data were compared to the GWPC, SWPC, RVC and I/C VC for groundwater. Soil vapor analytical results were compared to the residential soil vapor volatilization criteria (Res SVVC) and industrial/commercial soil vapor volatilization criteria (I/C SVVC) included in the Connecticut RSRs. If default Connecticut RSR criteria have not been established for detected compounds, RDEC, I/C DEC, GA PMC, SWPC, RVC, I/C VC, Res SVVC, and I/C SVVS contained in the CTDEEP “Technical Support Document: Recommended Numeric Criteria for Common Additional Polluting Substances and Certain Alternative Criteria Requests,” dated September 20, 2018 or from the CTDEEP form entitled "Request for Approval of Criteria for Additional Polluting Substances," dated March 25, 2022 were used for comparison purposes. CTDEEP approval is required for use of these criteria and is commonly granted. 6.2 Geologic and Hydrogeologic Findings In general, near-surface soils observed during sampling consisted predominantly of brown/dark brown silty sand with trace gravel and/or trace organics, transitioning to brown fine to coarse sand with depth. In two borings (B1/MW1 and B2/MW2), glacial till consisting of dense, brown/red brown silty sand and gravel was observed at approximately 15 to 20 fbg. Field observations were generally consistent with the mapped descriptions of area geologic conditions. Fill material consisting of soil with non-native soil constituents (asphalt, coal, brick, concrete, glass, and ash) was encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-10, B27 and B29. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in four borings listed above and B26 from 7.5 to 8.5 fbg. Red-brown silty fine sand with subordinate amounts of gravel was encountered within the presumed footprint of the former barn, likely representing the fill material used following demolition of the building. Borings L1985-8, L1985-9, L1985-10, B26, B27 are within the footprint of the main barn structure and B29 is within an apparent “entranceway” structure to the barn. The approximate footprint of the former barn/warehouse is depicted on Figure 6. Bedrock was not encountered in any of the borings which were advanced as deep as 20 fbg. Depths to groundwater beneath the Site was measured during the Phase II/III and ranged from approximately 9 to 15.5 fbg on September 21, 2023. Depths to groundwater during the Phase II ESA were generally deeper, ranging from approximately 10.5 to 17.3 fbg. Groundwater elevation data for Phase II and Phase II/III ESA are summarized in Table 1. Groundwater elevations and inferred groundwater contours for the Phase II/III groundwater gauging round are shown on Figure 4. Groundwater beneath the Site flows southeast towards Day Hill Road and is consistent with observations made during the Phase II ESA. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 13 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 29 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 29 of 2375 6.3 Results of Photoionization Detector Test Screening The results of test-screening of soil samples for total VOCs are presented in the Test Boring and Well Installation Logs (Appendix B). Detectable levels of VOCs (greater than 0.1 vapor per parts per million (vppm) were present in 16 of the 39 borings, with results ranging from 0.1 to 23.7 vppm. 6.4 Background Concentrations of Site-Specific Metals in Soil Based on ZUVIC’s experience at other sites in Connecticut, published resources, and concentrations in samples collected from apparently unimpacted areas at the Site, background concentrations of metals in soil at the Site are inferred to be within the approximate ranges provided in the following table. Metal Arsenic Barium Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc Soil Background Concentration Range (mg/kg) ND - 4 5 - 60 ND 3 - 15 3 - 30 ND - 23 ND 3 - 12 ND ND 5 - 60 Notes: mg/kg = milligrams per kilogram ND = not detected The Phase II/III soil testing results were compared to these background metals concentrations to evaluate whether a release had occurred. The results of the comparison and evaluation are presented in the sections that follow. 6.5 Soil Analytical Results A summary of the soil sample analytical results is presented in Table 2 and the laboratory reports are included in Appendix E. During the sampling, stained, discolored, and/or odorous soil was not encountered. A discussion of the soil analytical results is below. A summary of the soil analytical results for RECs and/or AOCs investigated is presented below. Due to the type and proximity of the AOCs to each other, certain RECs and/or AOCs are discussed together or referenced to previous sections if the data was used to evaluate multiple RECs and AOCs. Note that “elevated levels” refers to concentrations of metals above inferred background levels but below applicable criteria. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 30 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 30 of 2375 6.5.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Generator Diesel ASTs Nine (9) borings were completed in the vicinity of REC 1, REC 2, AOC 1, and AOC 6. Soil samples were collected from two borings (B17 and B18) advanced near the stormwater outlet pipe in the southern stormwater detention basin, from two borings (B9 and B32) advanced near the backup emergency generator/AST located west of the loading dock, from two borings (B10 and B11) advanced near the backup emergency generator/AST southwest of the building, and from three borings (B6, B7, and B8) advanced in the loading dock area and near the catch basin. The borings were performed to provide additional coverage near RECs 1 and 2 and AOCs 1 and 6 and to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA in L1985-1, L1985-2, L1985-3MW, L1985-4, L1985-7, L1985-13, and L1985-15. The samples were analyzed for one or more of the following: VOCs, ETPH, PAHs, ethylene glycol (EG) and propylene gylcol (PG) (REC 2 only), and alcohols (AOC 1 only). COCs were not detected in the samples except as follows: • • • 6.5.2 ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. One or more PAHs were detected in soil samples B17 0-0.5 fbg and B18 0-1.5 fbg at concentrations below applicable RSR criteria. Elevated levels of copper, lead, nickel and/or zinc were also detected in the samples. One or more PAHs were detected in soil samples B9 0.4-2 fbg and B32 2-4 fbg at concentrations below applicable RSR criteria. The samples were collected by the backup emergency generator/AST located west of the loading dock area. REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former Culbro 7,000-gallon Fuel Oil Underground Storage Tank (UST) Eight (8) borings were completed in the southern portion of the Site where a former barn/warehouse/office and 7,000-gallon fuel oil UST were located. The borings were completed to evaluate the presence of releases at AOC 7 (B24/MW6 and B25) and at an apparent outdoor storage area northwest of the barn (B30 and B31); to provide additional coverage near REC 3 (B26 through B29); and, to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA at L1985-1, L1985-8, L1985-9, and L1985-10MW. The samples were analyzed for one or more of the following: VOCs (REC 3 and AOC 7), ETPH (REC 3 and AOC 7), SVOCs (REC 3) and/or PAHs (AOC 7), pesticides (REC 3), herbicides (REC 3), and RCRA 8 metals plus copper, nickel, and zinc (REC 3). COCs were not detected in the samples except as follows: • • • • • The VOC, naphthalene was detected in sample B27 2-4 fbg at a concentration below RSR criteria. ETPH was detected in sample B26 5-7.5 fbg at a concentration exceeding the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. Several PAHs were detected in sample B27 2-4 fbg at concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC. Three leachable PAHs were detected at concentrations below the GWPC. PAHs were detected in samples B24/MW6 0-2 fbg, B28 6-8 fbg, and B29 6-8.5 fbg at concentrations below RSR criteria. The SVOC, isophorone was detected in sample B26 8-10 fbg at a concentration below RSR criteria. The sample was collected just below the apparent concrete floor in the basement and the presence of Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
Text of RSR-032 Attachment 174.pdf
Extracted from the file · 2 pages · 3,788 characters
Text of RSR-032 Attachment 173.pdf
Extracted from the file · 9 pages · 19,276 characters
Text of RSR-032 Attachment 172.pdf
Extracted from the file · 2 pages · 5,216 characters
Text of RSR-032 Attachment 171.pdf
Extracted from the file · 2 pages · 7,025 characters
Text of RSR-032 Attachment 170.pdf
Extracted from the file · 4 pages · 596 characters
Text of RSR-032 Attachment 169.pdf
Extracted from the file · 14 pages · 2,105 characters
Text of RSR-032 Attachment 168.pdf
Extracted from the file · 178 pages · 303,260 characters
Text of RSR-032 Attachment 167_Part2.pdf
Extracted from the file · 844 pages · 1,367,165 characters
Text of RSR-032 Attachment 167_Part1.pdf
Extracted from the file · 284 pages · 480,797 characters
Text of RSR-032 Attachment 166.pdf
Extracted from the file · 4 pages · 5,984 characters
Text of RSR-032 Attachment 165_Part 4.pdf
Extracted from the file · 84 pages · 130,960 characters
Text of RSR-032 Attachment 165_Part 3.pdf
Extracted from the file · 482 pages · 674,897 characters
Text of RSR-032 Attachment 165_Part 2.pdf
Extracted from the file · 509 pages · 549,394 characters
Text of RSR-032 Attachment 165_Part 1.pdf
Extracted from the file · 500 pages · 578,799 characters
Text of RSR-032 Attachment 164.pdf
Extracted from the file · 42 pages, 16 without text · 66,266 characters
Text of RSR-032 Attachment 163.pdf
Extracted from the file · 575 pages · 624,136 characters
Text of RSR-032 Attachment 162.pdf
Extracted from the file · 17 pages · 19,879 characters
Text of RSR-032 Attachment 161 _Part2.pdf
Extracted from the file · 609 pages · 625,572 characters
Text of RSR-032 Attachment 161 _Part1.pdf
Extracted from the file · 131 pages · 171,359 characters
Text of RSR-032 Attachment 160.pdf
Extracted from the file · 56 pages · 84,793 characters
Text of RSR-032 Attachment 159.pdf
Extracted from the file · 97 pages · 159,126 characters
Text of RSR-032 Attachment 158.pdf
Extracted from the file · 54 pages · 96,528 characters
Text of RSR-032 Attachment 157.pdf
Extracted from the file · 261 pages · 326,004 characters
Text of RSR-032 Attachment 156.pdf
Extracted from the file · 74 pages · 99,158 characters
Text of RSR-032 Attachment 155.pdf
Extracted from the file · 40 pages · 40,141 characters
Text of RSR-032 Attachment 154.pdf
Extracted from the file · 37 pages · 59,275 characters
Text of RSR-032 Attachment 153.pdf
Extracted from the file · 61 pages · 86,468 characters
Text of RSR-032 Attachment 152.pdf
Extracted from the file · 126 pages · 258,689 characters
Text of RSR-032 Attachment 151.pdf
Extracted from the file · 340 pages · 405,994 characters
Text of RSR-032 Attachment 150.pdf
Extracted from the file · 33 pages · 27,344 characters
Text of RSR-032 Attachment 149.pdf
Extracted from the file · 47 pages · 51,678 characters
Text of RSR-032 Attachment 148.pdf
Extracted from the file · 52 pages · 65,933 characters
Text of RSR-032 Attachment 147.pdf
Extracted from the file · 136 pages · 187,807 characters
Text of RSR-032 Attachment 146.pdf
Extracted from the file · 211 pages · 257,714 characters
Text of RSR-032 Attachment 145.pdf
Extracted from the file · 58 pages · 84,698 characters
Text of RSR-032 Attachment 144.pdf
Extracted from the file · 31 pages · 57,751 characters
Text of RSR-032 Attachment 143.pdf
Extracted from the file · 30 pages · 51,258 characters
Text of RSR-032 Attachment 142.pdf
Extracted from the file · 33 pages · 29,732 characters
Text of RSR-032 Attachment 141.pdf
Extracted from the file · 578 pages · 899,265 characters
Text of RSR-032 Attachment 140.pdf
Extracted from the file · 26 pages · 45,518 characters
Text of RSR-032 Attachment 139.pdf
Extracted from the file · 29 pages · 58,671 characters
Text of RSR-032 Attachment 138.pdf
Extracted from the file · 24 pages · 44,766 characters
Text of RSR-032 Attachment 137.pdf
Extracted from the file · 54 pages · 85,922 characters
Text of RSR-032 Attachment 136.pdf
Extracted from the file · 618 pages · 1,036,591 characters
Text of RSR-032 Attachment 135.pdf
Extracted from the file · 52 pages · 107,952 characters
Text of RSR-032 Attachment 134.pdf
Extracted from the file · 57 pages · 119,843 characters
Text of RSR-032 Attachment 133.pdf
Extracted from the file · 82 pages · 196,725 characters
Text of RSR-032 Attachment 132.pdf
Extracted from the file · 137 pages · 251,594 characters
Text of RSR-032 Attachment 131.pdf
Extracted from the file · 7 pages · 1,043 characters
Text of RSR-032 Attachment 130.pdf
Extracted from the file · 847 pages · 1,478,588 characters
Text of RSR-032 Attachment 129.pdf
Extracted from the file · 124 pages · 255,121 characters
Text of RSR-032 Attachment 128.pdf
Extracted from the file · 104 pages · 208,223 characters
Text of RSR-032 Attachment 127.pdf
Extracted from the file · 125 pages · 243,340 characters
Text of RSR-032 Attachment 126.pdf
Extracted from the file · 128 pages · 264,919 characters
Text of RSR-032 Attachment 125.pdf
Extracted from the file · 824 pages · 1,180,085 characters
Text of RSR-032 Attachment 124.pdf
Extracted from the file · 28 pages · 47,835 characters
Text of RSR-032 Attachment 123.pdf
Extracted from the file · 29 pages · 4,370 characters
Text of RSR-032 Attachment 122.pdf
Extracted from the file · 29 pages · 4,370 characters
Text of RSR-032 Attachment 121.pdf
Extracted from the file · 50 pages · 7,541 characters
Text of RSR-032 Attachment 120.PDF
Extracted from the file · 2 pages · 3,192 characters
Text of RSR-032 Attachment 119_Part3.pdf
Extracted from the file · 105 pages · 238,387 characters
Text of RSR-032 Attachment 119_Part2.pdf
Extracted from the file · 169 pages · 372,755 characters
Text of RSR-032 Attachment 119_Part1.pdf
Extracted from the file · 51 pages · 61,331 characters
Text of RSR-032 Attachment 118_Part6.pdf
Extracted from the file · 54 pages · 47,246 characters
Text of RSR-032 Attachment 118_Part5.pdf
Extracted from the file · 254 pages · 39,246 characters
Text of RSR-032 Attachment 118_Part4.pdf
Extracted from the file · 378 pages · 97,273 characters
Text of RSR-032 Attachment 118_Part3.pdf
Extracted from the file · 218 pages · 519,182 characters
Text of RSR-032 Attachment 118_Part2.pdf
Extracted from the file · 334 pages · 879,939 characters
Text of RSR-032 Attachment 118_Part1.pdf
Extracted from the file · 164 pages · 353,286 characters
Text of RSR-032 Attachment 117.pdf
Extracted from the file · 55 pages · 49,861 characters
Text of RSR-032 Attachment 116.pdf
Extracted from the file · 2 pages · 5,651 characters
Text of RSR-032 Attachment 115.pdf
Extracted from the file · 135 pages · 191,165 characters
Text of RSR-032 Attachment 114.pdf
Extracted from the file · 123 pages · 185,862 characters
Text of RSR-032 Attachment 113.pdf
Extracted from the file · 4 pages · 596 characters
Text of RSR-032 Attachment 112.pdf
Extracted from the file · 2 pages · 298 characters
Text of RSR-032 Attachment 111.pdf
Extracted from the file · 42 pages · 123,247 characters
Text of RSR-032 Attachment 110.pdf
Extracted from the file · 38 pages · 8,159 characters
Text of RSR-032 Attachment 109.pdf
Extracted from the file · 1 page · 149 characters
Text of RSR-032 Attachment 108.pdf
Extracted from the file · 23 pages · 27,882 characters
Text of RSR-032 Attachment 107.pdf
Extracted from the file · 1 page · 243 characters
Text of RSR-032 Attachment 106.pdf
Extracted from the file · 1 page · 321 characters
Text of RSR-032 Attachment 105.pdf
Extracted from the file · 493 pages · 1,262,208 characters
Text of RSR-032 Attachment 104.pdf
Extracted from the file · 628 pages · 1,570,354 characters
Text of RSR-032 Attachment 103.pdf
Extracted from the file · 40 pages · 129,345 characters
Text of RSR-032 Attachment 102.pdf
Extracted from the file · 2 pages · 298 characters
Text of RSR-032 Attachment 101.pdf
Extracted from the file · 186 pages · 437,630 characters
Text of RSR-032 Attachment 100.pdf
Extracted from the file · 244 pages · 509,938 characters
Text of RSR-032 Attachment 99.pdf
Extracted from the file · 193 pages · 412,257 characters
Text of RSR-032 Attachment 98.pdf
Extracted from the file · 2,201 pages · 3,529,384 characters
Text of RSR-032 Attachment 97.pdf
Extracted from the file · 2 pages · 2,870 characters
Text of RSR-032 Attachment 96.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 95.pdf
Extracted from the file · 27 pages · 8,963 characters
Text of RSR-032 Attachment 94.pdf
Extracted from the file · 3 pages · 5,367 characters
Text of RSR-032 Attachment 93.pdf
Extracted from the file · 3 pages · 5,315 characters
Text of RSR-032 Attachment 92.pdf
Extracted from the file · 3 pages · 5,225 characters
Text of RSR-032 Attachment 91.pdf
Extracted from the file · 2 pages · 2,709 characters
Text of RSR-032 Attachment 90.pdf
Extracted from the file · 2 pages · 2,630 characters
Text of RSR-032 Attachment 89.pdf
Extracted from the file · 2 pages · 2,615 characters
Text of RSR-032 Attachment 88.pdf
Extracted from the file · 2 pages · 2,771 characters
Text of RSR-032 Attachment 87.pdf
Extracted from the file · 2 pages · 2,948 characters
Text of RSR-032 Attachment 86.pdf
Extracted from the file · 2 pages · 2,772 characters
Text of RSR-032 Attachment 85.pdf
Extracted from the file · 2 pages · 2,764 characters
Text of RSR-032 Attachment 84.pdf
Extracted from the file · 2 pages · 2,999 characters
Text of RSR-032 Attachment 83.pdf
Extracted from the file · 2 pages · 2,995 characters
Text of RSR-032 Attachment 82.pdf
Extracted from the file · 2 pages · 2,968 characters
Text of RSR-032 Attachment 81.pdf
Extracted from the file · 2 pages · 2,973 characters
Text of RSR-032 Attachment 80.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 79.pdf
Extracted from the file · 2 pages · 2,694 characters
Text of RSR-032 Attachment 78.pdf
Extracted from the file · 3 pages · 3,876 characters
Text of RSR-032 Attachment 77.pdf
Extracted from the file · 3 pages · 3,646 characters
Text of RSR-032 Attachment 76.pdf
Extracted from the file · 3 pages · 3,805 characters
Text of RSR-032 Attachment 75.pdf
Extracted from the file · 9 pages · 13,840 characters
Text of RSR-032 Attachment 74.pdf
Extracted from the file · 3 pages · 3,990 characters
Text of RSR-032 Attachment 73.pdf
Extracted from the file · 3 pages · 4,170 characters
Text of RSR-032 Attachment 72.pdf
Extracted from the file · 3 pages · 3,957 characters
Text of RSR-032 Attachment 71.pdf
Extracted from the file · 3 pages · 3,642 characters
Text of RSR-032 Attachment 70.pdf
Extracted from the file · 2 pages · 2,078 characters
Text of RSR-032 Attachment 69.pdf
Extracted from the file · 3 pages · 4,357 characters
Text of RSR-032 Attachment 68.pdf
Extracted from the file · 3 pages · 3,165 characters
Text of RSR-032 Attachment 67.pdf
Extracted from the file · 4 pages · 3,715 characters
Text of RSR-032 Attachment 66.pdf
Extracted from the file · 3 pages · 3,168 characters
Text of RSR-032 Attachment 65.pdf
Extracted from the file · 3 pages · 444 characters
Text of RSR-032 Attachment 64.pdf
Extracted from the file · 2 pages · 2,099 characters
Text of RSR-032 Attachment 63.pdf
Extracted from the file · 2 pages · 2,062 characters
Text of RSR-032 Attachment 62.pdf
Extracted from the file · 7 pages · 5,200 characters
Text of RSR-032 Attachment 61.pdf
Extracted from the file · 5 pages · 10,643 characters
Text of RSR-032 Attachment 60.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 59.pdf
Extracted from the file · 2 pages · 4,147 characters
Text of RSR-032 Attachment 58.pdf
Extracted from the file · 1 page · 2,448 characters
Text of RSR-032 Attachment 57.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 56.pdf
Extracted from the file · 10 pages · 1,491 characters
Text of RSR-032 Attachment 55_Part10.pdf
Extracted from the file · 286 pages · 344,076 characters
Text of RSR-032 Attachment 55_Part9.pdf
Extracted from the file · 500 pages · 957,292 characters
Text of RSR-032 Attachment 55_Part8.pdf
Extracted from the file · 500 pages · 874,750 characters
Text of RSR-032 Attachment 55_Part7.pdf
Extracted from the file · 500 pages · 470,022 characters
Text of RSR-032 Attachment 55_Part6.pdf
Extracted from the file · 500 pages · 494,317 characters
Text of RSR-032 Attachment 55_Part5.pdf
Extracted from the file · 500 pages · 461,760 characters
Text of RSR-032 Attachment 55_Part4.pdf
Extracted from the file · 500 pages · 492,694 characters
Text of RSR-032 Attachment 55_Part3.pdf
Extracted from the file · 500 pages · 580,603 characters
Text of RSR-032 Attachment 55_Part2.pdf
Extracted from the file · 500 pages · 483,371 characters
Text of RSR-032 Attachment 55_Part1.pdf
Extracted from the file · 500 pages · 881,595 characters
Text of RSR-032 Attachment 54.pdf
Extracted from the file · 121 pages · 447,477 characters
Text of RSR-032 Attachment 53.pdf
Extracted from the file · 204 pages · 625,248 characters
Text of RSR-032 Attachment 52.pdf
Extracted from the file · 130 pages · 298,641 characters
Text of RSR-032 Attachment 51.pdf
Extracted from the file · 57 pages · 123,610 characters
Text of RSR-032 Attachment 50.pdf
Extracted from the file · 6 pages · 8,050 characters
Text of RSR-032 Attachment 49.pdf
Extracted from the file · 83 pages · 194,182 characters
Text of RSR-032 Attachment 48.pdf
Extracted from the file · 3 pages · 8,556 characters
Text of RSR-032 Attachment 47.pdf
Extracted from the file · 10 pages · 14,266 characters
Text of RSR-032 Attachment 46.pdf
Extracted from the file · 7 pages · 10,783 characters
Text of RSR-032 Attachment 45.pdf
Extracted from the file · 373 pages · 490,688 characters
Text of RSR-032 Attachment 44.pdf
Extracted from the file · 38 pages · 6,799 characters
Text of RSR-032 Attachment 43.pdf
Extracted from the file · 49 pages · 83,514 characters
Text of RSR-032 Attachment 42.pdf
Extracted from the file · 25 pages, 14 without text · 13,836 characters
Text of RSR-032 Attachment 41.pdf
Extracted from the file · 3 pages · 5,506 characters
Text of RSR-032 Attachment 40.pdf
Extracted from the file · 1 page · 1,448 characters
Text of RSR-032 Attachment 39.pdf
Extracted from the file · 14 pages · 17,145 characters
Text of RSR-032 Attachment 38.pdf
Extracted from the file · 12 pages · 14,555 characters
Text of RSR-032 Attachment 37.pdf
Extracted from the file · 12 pages · 14,398 characters
Text of RSR-032 Attachment 36.pdf
Extracted from the file · 12 pages · 15,426 characters
Text of RSR-032 Attachment 35.pdf
Extracted from the file · 38 pages · 61,388 characters
Text of RSR-032 Attachment 34.pdf
Extracted from the file · 13 pages · 12,161 characters
Text of RSR-032 Attachment 33.pdf
Extracted from the file · 11 pages · 7,928 characters
Text of RSR-032 Attachment 32.pdf
Extracted from the file · 3 pages · 444 characters
Text of RSR-032 Attachment 31.pdf
Extracted from the file · 26 pages · 3,891 characters
Text of RSR-032 Attachment 30.pdf
Extracted from the file · 18 pages · 2,691 characters
Text of RSR-032 Attachment 29.pdf
Extracted from the file · 9 pages · 10,238 characters
Text of RSR-032 Attachment 28.pdf
Extracted from the file · 127 pages · 218,825 characters
Text of RSR-032 Attachment 27.pdf
Extracted from the file · 12 pages · 12,858 characters
Text of RSR-032 Attachment 26.pdf
Extracted from the file · 12 pages · 14,742 characters
Text of RSR-032 Attachment 25.pdf
Extracted from the file · 14 pages · 16,968 characters
Text of RSR-032 Attachment 24.pdf
Extracted from the file · 13 pages · 16,061 characters
Text of RSR-032 Attachment 23.pdf
Extracted from the file · 19 pages · 8,357 characters
Text of RSR-032 Attachment 22.pdf
Extracted from the file · 1,282 pages · 3,304,505 characters
Text of RSR-032 Attachment 21.pdf
Extracted from the file · 1,005 pages · 2,609,640 characters
Text of RSR-032 Attachment 20_Part2.pdf
Extracted from the file · 109 pages · 16,568 characters
Text of RSR-032 Attachment 20_Part1.pdf
Extracted from the file · 150 pages · 190,904 characters
Text of RSR-032 Attachment 19.pdf
Extracted from the file · 23 pages · 39,103 characters
Text of RSR-032 Attachment 18.pdf
Extracted from the file · 8 pages · 12,671 characters
Text of RSR-032 Attachment 17_Part3.pdf
Extracted from the file · 282 pages · 740,441 characters
Text of RSR-032 Attachment 17_Part2.pdf
Extracted from the file · 500 pages · 1,293,274 characters
Text of RSR-032 Attachment 17_Part1.pdf
Extracted from the file · 500 pages · 1,270,790 characters
Text of RSR-032 Attachment 16.pdf
Extracted from the file · 46 pages · 130,280 characters
Text of RSR-032 Attachment 15.pdf
Extracted from the file · 17 pages · 25,967 characters
Text of RSR-032 Attachment 14.pdf
Extracted from the file · 10 pages · 15,944 characters
Text of RSR-032 Attachment 13.pdf
Extracted from the file · 17 pages · 29,849 characters
Text of RSR-032 Attachment 12.pdf
Extracted from the file · 12 pages · 20,731 characters
Text of RSR-032 Attachment 11.pdf
Extracted from the file · 15 pages · 23,899 characters
Text of RSR-032 Attachment 10.pdf
Extracted from the file · 145 pages · 332,684 characters
Text of RSR-032 Attachment 9.pdf
Extracted from the file · 897 pages · 1,943,866 characters
Text of RSR-032 Attachment 8.pdf
Extracted from the file · 203 pages · 512,054 characters
Text of RSR-032 Attachment 7.pdf
Extracted from the file · 12 pages · 13,977 characters
Text of RSR-032 Attachment 6.pdf
Extracted from the file · 335 pages · 685,056 characters
Text of RSR-032 Attachment 5.pdf
Extracted from the file · 65 pages · 194,221 characters
Text of RSR-032 Attachment 4.pdf
Extracted from the file · 570 pages · 1,357,502 characters
Text of RSR-032 Attachment 3.pdf
Extracted from the file · 8 pages · 15,762 characters
Text of RSR-032 Attachment 2.pdf
Extracted from the file · 26 pages · 3,865 characters
Text of RSR-032 Attachment 1.pdf
Extracted from the file · 18 pages · 2,673 characters
As listed on the current system
Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026