Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 24 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 24 of 2375 Groundwater beneath the Site is classified by the CTDEEP as “GA”, therefore, the pollutant mobility criteria (PMC) for soil in GA areas would be applicable. For both DEC and PMC, the CTDEEP has adopted numeric standards that serve as “default” criteria unless acceptable site-specific or alternate criteria are developed, or unless background concentrations or analytical detection limits in soil exceed these numeric standards. In addition, there are a few circumstances where conditional exemptions or variances from the DEC and PMC are allowed. Where applicable, based on existing data, these exemptions, variances, site-specific or alternate criteria will be discussed. In general, site-specific or alternate criteria are not developed unless there are exceedances of the more protective default criteria. According to the RSRs, the DEC are compared to soil quality data from total mass analyses, and apply to soil within 15 feet (ft.) of the ground surface. In a GA area, the PMC apply to soil from ground surface to the seasonal low water table. For pollutant mobility for metals or PCBs, one can either compare predicted or actual leaching data for a given metal or PCB to its GA PMC. For other constituents, one can compare leaching data to the GWPC multiplied by the appropriate dilution/attenuation factor if appropriate, or one can compare total mass analysis data to the PMC. 4.4 Groundwater Remediation Standards In “GA” classified areas such as this site, there are four types of groundwater remediation standards which could potentially apply under the RSRs: (i) the groundwater protection criteria (GWPC); (ii) the surface-water protection criteria (SWPC); (iii) background concentrations; and (iv) the volatilization criteria (VC) for any groundwater polluted with VOCs within a certain depth below the ground surface or a building. The GWPC are designed to ensure that the quality of existing and potential drinking water supplies is not impacted. The SWPC are designed to ensure that contaminant concentrations in groundwater do not adversely impact water quality in a surface water body receiving groundwater discharges, except as follows. For a wetland or intermittent stream, the RSRs assume there may be no dilution and therefore the aquatic life criteria (AQLC) (contained in the Water Quality Standards) are used as the SWPC (i.e., are compared directly to the contaminant concentrations in the groundwater plume(s)). The AQLC are not applicable to the Site since groundwater does not discharge to wetlands or an intermittent stream. The SWPC can be compared to plume concentrations immediately upgradient of the point of discharge to the surface water body or to the 95% upper confidence limit of the arithmetic mean of samples representative of the subject groundwater plume. Groundwater in a GA area is required to meet background concentrations unless the conditions described below are met, then compliance with the GWPC is permitted. • Concentrations in groundwater are below the GWPC. • One of the following conditions is met: o Public water is available within 200 ft. of the site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume; the plume is not located in an aquifer protection area; and the plume is not located within the area of influence of any public water supply well. o The plume is a diminishing state groundwater plume prior to any remediation. o Reduction of concentrations in groundwater to background concentrations cannot be achieved using sound engineering and hydrogeologic remediation practices. Provided concentrations in groundwater are compliant with the GWPC, compliance with background concentrations is not required since public water is available within 200 ft. of the Site, within 200 ft. of all abutting properties, and within 200 ft. of all properties within the aerial extent of the plume. In addition, any plumes at Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 9 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  2. Page 25 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 25 of 2375 the Site are not located in an aquifer protection area and are not located within the area of influence of any public water supply well. The volatilization criteria (VC) apply to groundwater polluted with VOCs within a certain depth beneath the ground surface or a structure depending on the type of VOC present. The VC apply to groundwater within 10 feet of the ground surface or lowest portion of a building if it is polluted with petroleum substances and 30 feet for VOCs other than petroleum substances. There are both residential and industrial/commercial default VC; residential VC apply to properties except those used solely for industrial or commercial activity, provided an EUR is in effect which ensures that the parcel will not be used for any residential purpose in the future, and that any future use of the parcel is limited to industrial or commercial activity. Since an EUR is not proposed for this Site, the Residential VC (RVC) would currently apply to the Site. There are VC that apply to concentrations in groundwater (GWVC) and those that apply to concentrations in soil vapor (SVVC). Compliance with the VC can be demonstrated using either contaminant concentrations in groundwater compared to the GWVC or using contaminant concentrations in soil vapor compared to the SVVC. 4.5 Non-Aqueous Phase Liquid Remediation Standards Removal of non-aqueous phase liquids (NAPL) from soil and groundwater are required by the RSRs to the maximum extent practicable defined as the greatest degree of remediation that can be achieved using sound engineering and hydrologic practices without taking cost into consideration. CTDEEP may approve a variance for NAPL that cannot be contained or removed in accordance with the previous paragraph under certain circumstances. 5.0 METHODS 5.1 Test Borings and Soil Sampling The proposed exterior borings and interior soil sample locations were marked on the ground and/or staked out by ZUVIC personnel. Prior to drilling and sampling activities at the Site, Call Before You Dig (CBYD), a public utility-locating service, was notified (Ticket Nos. 20233400556 and 20234402634) and the proposed locations were reviewed by Corbuilt, LLC, a private utility locating company. Haz-Probe, Inc. (Haz-Probe) of Hampden, MA conducted the exterior boring drilling operations with oversight by ZUVIC personnel. On September 11, 2023, certain locations were cleared down to depths between four and five feet using an air knife. From September 12 to 14, 2024, 27 borings (B1 through B14 and B17 through B32) were advanced to as deep as 20 ft. using a dual track GeoprobeTM Model 6610DT direct push rig. On September 11 and 13, 2024, four borings (B15, B16, B33 and B34) were completed down to 1 fbg using a shovel or hand auger. For those borings completed with the drill rig, continuous soil samples were collected from the borings using a 2.25-inch diameter, four-foot-long core barrel lined with disposable acetate sleeves. Soil samples were collected from the air-knife cleared portion of each location using a metal scoop. On October 9, 2023, ZUVIC collected six soil samples from five locations (B35 through B39) inside the southeastern portion of the building. The concrete slab was approximately 6 inches thick and the samples were collected from just beneath concrete to approximately 1.5 to 2.5 fbg using a shovel and/or a hand auger. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 10 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  3. Page 26 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 26 of 2375 The Test Boring and Well Installation logs are included in Appendix B. The exterior soil boring and shallow soil sample locations are shown on Figures 3 and Figure 6 and the interior soil sample locations are shown on Figure 5. Soil samples were collected for physical logging of soil types, and test-screening for VOCs was completed using a photoionization detector (PID) equipped with a 10.6 eV lamp. Soil samples were collected and submitted under proper chain of custody procedures for laboratory analyses for one or more of the following analytes: ETPH by the CT Method, leachable ETPH using the Synthetic Precipitation Leaching Procedure (SPLP), SVOCs or PAHs by EPA Method 8270D, PCBs by EPA Method 8082A, pesticides by EPA Method 8081, leachable pesticides via the SPLP, herbicides via EPA Method 8151, VOCs via EPA Method 8260, alcohols and glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 6010c or 7471, one or more leachable metals via the SPLP, 1,4-dioxane via modified EPA Method 8260, and per- and polyfluoroalkyl substances (PFAS) via EPA Method 1633. Soil samples collected from the interior of the building were analyzed for one or more of the following COCs: ETPH, 1,4-dioxane, SVOCs, VOCs, alcohols, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), and per- and polyfluoroalkyl substances (PFAS). 5.2 Groundwater Monitoring Well Installation, Development, Sampling and Elevation Survey In September 2023, seven two-inch diameter pre-packed PVC water table monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, and B24/MW6) were installed by Haz-Probe using direct push technologies. Ten-foot sections of 0.010-inch slot prepacked PVC screen were installed to intersect the water table and connected to PVC risers to near ground surface. The wells were installed at bottom depths ranging from 16.5 feet to 20.3 feet. The annular spaces between the wells and the boreholes were packed with No. 1 silica sand to an elevation of approximately 2 feet above the top of the screens. Approximately two feet of bentonite chips were placed atop the sand pack and hydrated. Backfill was then placed atop the bentonite seal up to several inches below ground surface. The monitoring wells were completed with gripper caps and flush-mounted steel road boxes encased in concrete collars. Details of the well construction are included on the Test Boring and Well Installation reports contained in Appendix A. The monitoring well locations are shown on Figures 3, 4 and 6. The newly-installed monitoring wells were developed in September 2023 by purging and pumping several well volumes from the wells. The well development was conducted to remove fines from the vicinity of the well screen, establish connectivity with the formation and reduce sample turbidity during groundwater sampling. On September 21, 2023, the elevations of the top of PVC of the seven newly-installed wells and the previouslyinstalled monitoring wells (L1985-3MW, L1985-5MW, L1985-6MW, and L1985-10MW) were surveyed, referenced to an assumed datum of 100.00 feet at monitoring well B3/MW-3. The survey information was used to calculate groundwater elevations and evaluate groundwater flow directions. The elevation data are summarized in Table 1. Depths to groundwater were measured in the monitoring wells on September 21, 2023 using an oil/water interface probe, capable of measuring light non-aqueous phase liquids and dense non-aqueous phase liquids (LNAPL and DNAPL), and groundwater to within 0.01 feet. LNAPL and DNAPL were not detected in the wells. Depth-to-water measurements and calculated water table elevations are summarized in Table 1. Water table elevations, groundwater contour lines and inferred groundwater flow directions are depicted on Figure 4. On September 21 and 22, 2023, ZUVIC collected groundwater samples from the wells. Low-Flow Groundwater Sampling Field Logs are attached in Appendix C. The groundwater samples were submitted to CET, under Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 11 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  4. Page 27 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 27 of 2375 proper chain-of-custody and analyzed in accordance with the Connecticut Reasonable Confidence Protocols (RCPs). The samples were analyzed for ETPH by the CT Method, SVOCs or PAHs by EPA Method 8270D, pesticides by EPA Method 8081B, herbicides via EPA Method 8151A, VOCs via EPA Method 8260C, alcohols via EPA Methods 8015B, glycols (ethylene glycol and propylene glycol) via EPA Method 8015B, RCRA 8 metals plus copper, nickel, and zinc by EPA Method 200.7 or 245.2 Groundwater samples were collected using CTDEEP-recommended low-flow sampling methods. Groundwater was pumped from each well using polyethylene tubing connected to a peristaltic pump, into a flow-through cell connected to a direct-reading multi-meter. Groundwater was monitored for temperature, pH, specific conductivity, oxidation-reduction potential (ORP), dissolved oxygen (DO) and turbidity at approximately fiveminute intervals. Once parameter readings had stabilized to within recommended criteria, samples were collected by directly pumping groundwater into laboratory-provided containers which contained appropriate preservatives. Due to poor recharge, L1985-6MW was not sampled using low-flow sampling methods and the well was pumped dry and allowed to fully recover prior to pumping groundwater directly into laboratory-provided sample containers. 5.3 Sub-Slab Vapor Point Installation and Sampling The proposed SSVP locations were marked inside the building by ZUVIC personnel. Prior to installation of the SSVP, CBYD was notified (Ticket No. is 20234402634). In addition, the proposed locations were reviewed by Corbuilt, LLC, using Ground Penetrating Radar (GPR). The SSVP installation and sampling was completed in accordance with the Guidance for Evaluating Soil Vapor Intrusion in the State of New York, October 2006 which is the guidance recommended by the CTDEEP. On November 17, 2023, ZUVIC installed 18 SSVPs (SV-1 through SV-18) at locations shown on Figure 5. Eight SSVPs (SV-3 through SV-9 and SV-14) were installed in the concrete slab below the raised floor of the building. floor. These SSVPs were each installed by drilling a 5/8-inch hole through the concrete, approximately one inch into underlying soil. The remaining SSVPs (SV-1, SV-2, SV-10 through SV-13 and SV-15 through SV-18) were installed with stainless steel flush mounted covers after a 1.5-inch diameter hole was drilled approximately 1.8 inches into the concrete, followed by drilling a 5/8-inch hole in the center of the larger diameter hole approximately one inch into the underlying soil. Concrete was approximately 6 inches thick at the SSVP locations with the exception of SV-5 and SV-13, where concrete was approximately 8 inches thick. At each SSVP location, a Vapor Pin® was installed in the 5/8-inch hole and capped with a protective cap. The stainless steel Vapor Pins® were installed with a silicone seal between the vapor point and surrounding concrete floor. Following installation, each point was purged of at least three void volumes using a PID and a screening value was recorded. A helium leak test was performed on each of the points after installation to confirm an airtight seal. The helium leak test was performed by covering each vapor point with an airtight dome, filling the dome with a known concentration of helium and testing vapors in the vapor point for helium using a helium detector. Regulatory guidance on helium leak testing specifies that the helium concentration in the vapor point be less than 10% of that detected in the dome for the test to be successful. The results of helium leak tests meet this requirement and confirmed proper installation of the points. The helium leak test field data sheets are included in Appendix D. Following a successful seal leak test, each point was sampled. Sub-slab vapor was collected directly into laboratory-provided 6-liter summa canisters over approximately thirty-minute time periods using a laboratorycalibrated flow controller at each location. The summa canisters were submitted to Phoenix Environmental Laboratories, a State-certified laboratory, under proper chain-of-custody procedures, and analyzed in accordance with the Connecticut RCPs for VOCs using EPA method TO-15. A duplicate soil vapor sample was collected from SV-13 and identified as SV-13A. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 12 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  5. Page 28 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 28 of 2375 6.0 INVESTIGATION RESULTS 6.1 General The results of soil test screening are presented on the Test Boring and Well Installation Logs (Appendix B), and the results of soil, groundwater, and soil vapor sampling are summarized in Tables 2, 3, and 4 respectively. Exterior boring locations and monitoring wells are depicted on Figures 3, 4, and 6. Interior soil sample locations and sub-slab soil vapor point locations are depicted on Figure 5. Groundwater elevation data are summarized in Table 1, and monitoring well locations, groundwater elevation contours and inferred flow directions are shown on Figure 4. Laboratory analytical reports for soil, groundwater, and vapor samples are included in Appendices E, F, and G, respectively. Given the GA classification of groundwater beneath the Site, the RDEC, I/C DEC and GA PMC for soil were compared to soil analytical data. Groundwater analytical data were compared to the GWPC, SWPC, RVC and I/C VC for groundwater. Soil vapor analytical results were compared to the residential soil vapor volatilization criteria (Res SVVC) and industrial/commercial soil vapor volatilization criteria (I/C SVVC) included in the Connecticut RSRs. If default Connecticut RSR criteria have not been established for detected compounds, RDEC, I/C DEC, GA PMC, SWPC, RVC, I/C VC, Res SVVC, and I/C SVVS contained in the CTDEEP “Technical Support Document: Recommended Numeric Criteria for Common Additional Polluting Substances and Certain Alternative Criteria Requests,” dated September 20, 2018 or from the CTDEEP form entitled "Request for Approval of Criteria for Additional Polluting Substances," dated March 25, 2022 were used for comparison purposes. CTDEEP approval is required for use of these criteria and is commonly granted. 6.2 Geologic and Hydrogeologic Findings In general, near-surface soils observed during sampling consisted predominantly of brown/dark brown silty sand with trace gravel and/or trace organics, transitioning to brown fine to coarse sand with depth. In two borings (B1/MW1 and B2/MW2), glacial till consisting of dense, brown/red brown silty sand and gravel was observed at approximately 15 to 20 fbg. Field observations were generally consistent with the mapped descriptions of area geologic conditions. Fill material consisting of soil with non-native soil constituents (asphalt, coal, brick, concrete, glass, and ash) was encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-10, B27 and B29. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in four borings listed above and B26 from 7.5 to 8.5 fbg. Red-brown silty fine sand with subordinate amounts of gravel was encountered within the presumed footprint of the former barn, likely representing the fill material used following demolition of the building. Borings L1985-8, L1985-9, L1985-10, B26, B27 are within the footprint of the main barn structure and B29 is within an apparent “entranceway” structure to the barn. The approximate footprint of the former barn/warehouse is depicted on Figure 6. Bedrock was not encountered in any of the borings which were advanced as deep as 20 fbg. Depths to groundwater beneath the Site was measured during the Phase II/III and ranged from approximately 9 to 15.5 fbg on September 21, 2023. Depths to groundwater during the Phase II ESA were generally deeper, ranging from approximately 10.5 to 17.3 fbg. Groundwater elevation data for Phase II and Phase II/III ESA are summarized in Table 1. Groundwater elevations and inferred groundwater contours for the Phase II/III groundwater gauging round are shown on Figure 4. Groundwater beneath the Site flows southeast towards Day Hill Road and is consistent with observations made during the Phase II ESA. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 13 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  6. Page 29 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 29 of 2375 6.3 Results of Photoionization Detector Test Screening The results of test-screening of soil samples for total VOCs are presented in the Test Boring and Well Installation Logs (Appendix B). Detectable levels of VOCs (greater than 0.1 vapor per parts per million (vppm) were present in 16 of the 39 borings, with results ranging from 0.1 to 23.7 vppm. 6.4 Background Concentrations of Site-Specific Metals in Soil Based on ZUVIC’s experience at other sites in Connecticut, published resources, and concentrations in samples collected from apparently unimpacted areas at the Site, background concentrations of metals in soil at the Site are inferred to be within the approximate ranges provided in the following table. Metal Arsenic Barium Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc Soil Background Concentration Range (mg/kg) ND - 4 5 - 60 ND 3 - 15 3 - 30 ND - 23 ND 3 - 12 ND ND 5 - 60 Notes: mg/kg = milligrams per kilogram ND = not detected The Phase II/III soil testing results were compared to these background metals concentrations to evaluate whether a release had occurred. The results of the comparison and evaluation are presented in the sections that follow. 6.5 Soil Analytical Results A summary of the soil sample analytical results is presented in Table 2 and the laboratory reports are included in Appendix E. During the sampling, stained, discolored, and/or odorous soil was not encountered. A discussion of the soil analytical results is below. A summary of the soil analytical results for RECs and/or AOCs investigated is presented below. Due to the type and proximity of the AOCs to each other, certain RECs and/or AOCs are discussed together or referenced to previous sections if the data was used to evaluate multiple RECs and AOCs. Note that “elevated levels” refers to concentrations of metals above inferred background levels but below applicable criteria. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  7. Page 30 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 30 of 2375 6.5.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Generator Diesel ASTs Nine (9) borings were completed in the vicinity of REC 1, REC 2, AOC 1, and AOC 6. Soil samples were collected from two borings (B17 and B18) advanced near the stormwater outlet pipe in the southern stormwater detention basin, from two borings (B9 and B32) advanced near the backup emergency generator/AST located west of the loading dock, from two borings (B10 and B11) advanced near the backup emergency generator/AST southwest of the building, and from three borings (B6, B7, and B8) advanced in the loading dock area and near the catch basin. The borings were performed to provide additional coverage near RECs 1 and 2 and AOCs 1 and 6 and to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA in L1985-1, L1985-2, L1985-3MW, L1985-4, L1985-7, L1985-13, and L1985-15. The samples were analyzed for one or more of the following: VOCs, ETPH, PAHs, ethylene glycol (EG) and propylene gylcol (PG) (REC 2 only), and alcohols (AOC 1 only). COCs were not detected in the samples except as follows: • • • 6.5.2 ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. One or more PAHs were detected in soil samples B17 0-0.5 fbg and B18 0-1.5 fbg at concentrations below applicable RSR criteria. Elevated levels of copper, lead, nickel and/or zinc were also detected in the samples. One or more PAHs were detected in soil samples B9 0.4-2 fbg and B32 2-4 fbg at concentrations below applicable RSR criteria. The samples were collected by the backup emergency generator/AST located west of the loading dock area. REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former Culbro 7,000-gallon Fuel Oil Underground Storage Tank (UST) Eight (8) borings were completed in the southern portion of the Site where a former barn/warehouse/office and 7,000-gallon fuel oil UST were located. The borings were completed to evaluate the presence of releases at AOC 7 (B24/MW6 and B25) and at an apparent outdoor storage area northwest of the barn (B30 and B31); to provide additional coverage near REC 3 (B26 through B29); and, to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA at L1985-1, L1985-8, L1985-9, and L1985-10MW. The samples were analyzed for one or more of the following: VOCs (REC 3 and AOC 7), ETPH (REC 3 and AOC 7), SVOCs (REC 3) and/or PAHs (AOC 7), pesticides (REC 3), herbicides (REC 3), and RCRA 8 metals plus copper, nickel, and zinc (REC 3). COCs were not detected in the samples except as follows: • • • • • The VOC, naphthalene was detected in sample B27 2-4 fbg at a concentration below RSR criteria. ETPH was detected in sample B26 5-7.5 fbg at a concentration exceeding the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. Several PAHs were detected in sample B27 2-4 fbg at concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC. Three leachable PAHs were detected at concentrations below the GWPC. PAHs were detected in samples B24/MW6 0-2 fbg, B28 6-8 fbg, and B29 6-8.5 fbg at concentrations below RSR criteria. The SVOC, isophorone was detected in sample B26 8-10 fbg at a concentration below RSR criteria. The sample was collected just below the apparent concrete floor in the basement and the presence of Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  8. Page 31 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 31 of 2375 • • 6.5.3 isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and not from a release. Pesticides (including dieldrin, chlordane, DDD, DDT and DDE) were detected in samples B24/MW6 02 fbg, B27 2-4 fbg. B28 6-8 fbg, B28 16-18 fbg, B29 6-8.5 fbg, and B31 0-2 fbg at concentrations above the GA PMC. Chlordane was detected in B24/MW6 0-2 fbg at a concentration above the RDEC. Five of the six samples were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Arsenic was detected above RDEC and I/C DEC in soil sample B29 6-8.5 fbg and elevated concentrations of cadmium, lead, and zinc were also present. The sample was tested for leachable metals (arsenic, cadmium, chromium, lead, nickel, and zinc) to evaluate compliance with the GA PMC. Leachable arsenic and lead concentrations were above the GA PMC and the other metals were either not detected or detected below the GA PMC. o Elevated concentrations of arsenic, barium, and nickel were present in B26 5-7.5 fbg. Elevated concentrations of arsenic, barium, chromium, and nickel were present in B27 2-4 fbg. In addition, an elevated lead concentration was present in B28 6-8 fbg. Samples B24/MW6 8-10 fbg, B27 2-4 fbg, and B29 9-11 fbg were tested for leachable metals (arsenic, barium, and/or chromium) to evaluate compliance with the GA PMC. Leachable metals were either not detected or detected at concentrations below the GA PMC. REC 4 - Release from Snow Removal Equipment Three borings (B12, B13, and B14) were completed near the southeastern corner of the northern parking lot near L1985-5MW to evaluate the nature, degree and extent of COCs detected during the Phase II ESA. Soil samples collected from the borings were analyzed for VOCs, ETPH and PAHs. COCs were not detected in samples except as follows: • • 6.5.4 ETPH was detected in sample B12 0.5-2 fbg at a concentration below RSR criteria. Several PAHs were detected in samples B12 0.5-2 fbg and B13 0.5-2 fbg at concentrations below RSR criteria. AOC 2 - Agricultural Use AOC 8 - Former Barns in the Central and Southeastern Portions of the Site Twenty-eight (28) borings were completed throughout the site to provide coverage and to evaluate the extent and degree of COCs (including elevated metals) detected during the Phase II ESA in L1985-7, L1985-8, L19859, L1985-10MW, L1985-11, and L1985-15. Borings B1/MW1, B2/MW2 and B3/MW3 were completed at and near the centrally-located barn (AOC 8). Borings B19 and B20 were completed at and near the barn in the southeastern portion of the Site (AOC 8). Samples from borings used, in part, to evaluate other AOCs (B4/MW4, B5/MW5, B6, B7, B8, B9, B11, B12, B17, B18, B21, B22, B23/MW7, B24/MW6, B25, B26, B27, B28, B29, B30, B31, B32 and B33) were tested for pesticides and/or metals to provide coverage throughout the Site (AOC 2). Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, and SVOCs or PAHs (AOC 8), and pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc (AOCs 2 and 8). The discussion below includes all COCs for borings B1/MW1, B2/MW2, B3/MW3, B19 and B20, and is limited to pesticides and metals for the remaining borings, with the exception of B24/MW6 and B25 through B31, which are discussed in Section 6.5.2 and B21, B22 and B23/MW7, which are discussed in Section 6.5.6. Non- Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  9. Page 32 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 32 of 2375 pesticide and non-metal COCs for the remaining borings are discussed in other sections of the report applicable to their respective RECs and/or AOCs. COCs were not detected in samples except as follows: • • • • • • 6.5.5 Two PAHs were detected in sample B1/MW1 0.3-1 fbg at concentrations below RSR criteria. Several PAHs were detected in sample B20 0-2 fbg at concentrations below RSR criteria. Pesticides (dieldrin, DDD and/or DDE) were detected in samples B1/MW1 5-6.5 fbg, B2/MW2 1-3 fbg, B3/MW3 2-4 fbg, B19 0-2 fbg and B20 0-2 fbg at concentrations below criteria with the exception of B2/MW2, B3/MW3, B19 and B20, which exceeded the GA PMC. Three of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC; leachable pesticides were not detected. The chlordane concentration in B20 exceeded the RDEC. Pesticides (chlordane, lindane, DDD, DDE and/or DDT) were detected in samples B4/MW4 0-2 fbg, B5/MW5 0-2 fbg, B7 1-3 fbg, B9 0.4-2 fbg, B11 0.5-2 fbg, B12 0.5-2 fbg, B17 2-4 fbg, B18 0-1.5 fbg, B21 0-2 fbg, B22 0-2 fbg, B23/MW7 0-2 fbg and B33 0-0.5 fbg at concentrations above the GA PMC. Six of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC with the exception of leachable dieldrin in B23/MW7 0-2 fbg. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, barium, chromium, copper, lead, mercury, nickel, and/or zinc were detected in samples B17 0-0.5 fbg, B18 0-1.5 fbg, B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below RSR criteria. Leachable metals were either not detected or detected below the GWPC except for leachable lead which exceeded the GA PMC in B23/MW7. AOC 3 - Exterior Oil-Filled Transformers Four (4) borings were completed adjacent to transformers located in the northeast portion of the Site (B15 and B16) and adjacent to transformers and/or electrical equipment near the northwest corner of the stormwater detention basin (B33 and B34). The borings were completed to evaluate potential releases near the stormwater basin transformers and to evaluate the extent and degree of COCs detected at L1985-15. One soil sample was collected from each boring from ground surface to 0.5 fbg and tested for ETPH and PCBs. ETPH and PCBs were not detected in the samples. 6.5.6 AOC 4 - Suspected Dumping Area Three (3) borings (B21, B22, and B23/MW7) were completed near the southeastern corner of the Site to evaluate the extent and degree of COCs detected during the Phase II ESA at L1985-11. Soil samples collected from the borings were analyzed for the following: VOCs, ETPH, SVOCs or PAHs, PCBs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected in samples except as follows: • • • Several PAHs were detected in sample B21 0-2 fbg, with some concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC; leachable PAHs were not detected. Several PAHs were detected in sample B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. Pesticides (chlordane, dieldrin, DDT and/or DDE) were detected in samples B21 0-2 fbg, B22 0-2 fbg and B23/MW7 0-2 fbg at concentrations above the GA PMC. Two of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides. Leachable pesticides Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  10. Page 33 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 33 of 2375 • 6.5.7 were not detected in the samples with the exception of dieldrin in B23/MW7 which exceeded the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, lead, and/or mercury were detected in samples B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. The sample collected from B23/MW7 was tested for leachable metals to evaluate compliance with the GA PMC. Leachable metals were not detected with the exception of leachable lead which exceeds the GA PMC. AOC 5 - Former JDS Uniphase Site Operations Six (6) borings (B1/MW1, B2/MW2, B3/MW3, B6, B7 and B8) were completed outside the southern wall of the site building and two borings (B4/MW4 and B5/MW5) were completed outside the eastern wall of the building. The borings were advanced to evaluate whether releases occurred associated with former site occupant (JDS Uniphase (JDS)) activities that included fiber optic component manufacturing. Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, SVOCs, alcohols, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected except for one or more PAHs detected in samples B1/MW1 0.3-1 fbg, B4/MW4 2-4 fbg, and B5/MW5 0-2 fbg at concentrations below RSR criteria. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil in samples. Interior soil samples were collected at five locations in a former JDS ”Clean Room” in the southeastern portion of the building. Six samples were tested (B35 0.5-1.5 fbg, B36 0.5-1.5 fbg, B36 1.5-2.5 fbg, B37 0.5-1.5 fbg, B38 0.5-1.5 fbg, and B39 0.5-1.5 fbg). Five of the six samples were analyzed for ETPH, VOCs, 1,4-dioxane, SVOCs, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), PFAS, and alcohols. Two duplicate samples were tested for PFAS and a deeper sample at B36 was also tested for PFAS. COCs were not detected in samples except as follows: • • 6.6 One PFAS compound, perfluorodecanesulfonic acid (PFDS) was detected in sample B36 0-1.5 fbg at a concentration of 0.11 µg/kg. PFAS were not detected in a deeper sample collected from 1.5 to 2.5 fbg at B36. CTDEEP has established remedial criteria for the sum of five PFAS compounds (perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)). Remedial criteria for the remaining PFAS compounds, including PFDS, have not been established. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Groundwater Analytical Results A summary of the groundwater sampling results, and the laboratory analytical reports are presented in Table 3 and Appendix F, respectively. Groundwater samples collected from the newly-installed and existing monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, B24/MW6, L1985-3MW, L1985-5MW, L1985-6MW, and L198510MW) were analyzed for one or more of the following: VOCs, ETPH, SVOCs or PAHs, herbicides, pesticides, RCRA 8 metals plus copper, nickel and zinc, alcohols, and glycols. COCs were not detected in samples except as follows: Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)