Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 29 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 29 of 2375 6.3 Results of Photoionization Detector Test Screening The results of test-screening of soil samples for total VOCs are presented in the Test Boring and Well Installation Logs (Appendix B). Detectable levels of VOCs (greater than 0.1 vapor per parts per million (vppm) were present in 16 of the 39 borings, with results ranging from 0.1 to 23.7 vppm. 6.4 Background Concentrations of Site-Specific Metals in Soil Based on ZUVIC’s experience at other sites in Connecticut, published resources, and concentrations in samples collected from apparently unimpacted areas at the Site, background concentrations of metals in soil at the Site are inferred to be within the approximate ranges provided in the following table. Metal Arsenic Barium Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc Soil Background Concentration Range (mg/kg) ND - 4 5 - 60 ND 3 - 15 3 - 30 ND - 23 ND 3 - 12 ND ND 5 - 60 Notes: mg/kg = milligrams per kilogram ND = not detected The Phase II/III soil testing results were compared to these background metals concentrations to evaluate whether a release had occurred. The results of the comparison and evaluation are presented in the sections that follow. 6.5 Soil Analytical Results A summary of the soil sample analytical results is presented in Table 2 and the laboratory reports are included in Appendix E. During the sampling, stained, discolored, and/or odorous soil was not encountered. A discussion of the soil analytical results is below. A summary of the soil analytical results for RECs and/or AOCs investigated is presented below. Due to the type and proximity of the AOCs to each other, certain RECs and/or AOCs are discussed together or referenced to previous sections if the data was used to evaluate multiple RECs and AOCs. Note that “elevated levels” refers to concentrations of metals above inferred background levels but below applicable criteria. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 14 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  2. Page 30 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 30 of 2375 6.5.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Generator Diesel ASTs Nine (9) borings were completed in the vicinity of REC 1, REC 2, AOC 1, and AOC 6. Soil samples were collected from two borings (B17 and B18) advanced near the stormwater outlet pipe in the southern stormwater detention basin, from two borings (B9 and B32) advanced near the backup emergency generator/AST located west of the loading dock, from two borings (B10 and B11) advanced near the backup emergency generator/AST southwest of the building, and from three borings (B6, B7, and B8) advanced in the loading dock area and near the catch basin. The borings were performed to provide additional coverage near RECs 1 and 2 and AOCs 1 and 6 and to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA in L1985-1, L1985-2, L1985-3MW, L1985-4, L1985-7, L1985-13, and L1985-15. The samples were analyzed for one or more of the following: VOCs, ETPH, PAHs, ethylene glycol (EG) and propylene gylcol (PG) (REC 2 only), and alcohols (AOC 1 only). COCs were not detected in the samples except as follows: • • • 6.5.2 ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. One or more PAHs were detected in soil samples B17 0-0.5 fbg and B18 0-1.5 fbg at concentrations below applicable RSR criteria. Elevated levels of copper, lead, nickel and/or zinc were also detected in the samples. One or more PAHs were detected in soil samples B9 0.4-2 fbg and B32 2-4 fbg at concentrations below applicable RSR criteria. The samples were collected by the backup emergency generator/AST located west of the loading dock area. REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former Culbro 7,000-gallon Fuel Oil Underground Storage Tank (UST) Eight (8) borings were completed in the southern portion of the Site where a former barn/warehouse/office and 7,000-gallon fuel oil UST were located. The borings were completed to evaluate the presence of releases at AOC 7 (B24/MW6 and B25) and at an apparent outdoor storage area northwest of the barn (B30 and B31); to provide additional coverage near REC 3 (B26 through B29); and, to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA at L1985-1, L1985-8, L1985-9, and L1985-10MW. The samples were analyzed for one or more of the following: VOCs (REC 3 and AOC 7), ETPH (REC 3 and AOC 7), SVOCs (REC 3) and/or PAHs (AOC 7), pesticides (REC 3), herbicides (REC 3), and RCRA 8 metals plus copper, nickel, and zinc (REC 3). COCs were not detected in the samples except as follows: • • • • • The VOC, naphthalene was detected in sample B27 2-4 fbg at a concentration below RSR criteria. ETPH was detected in sample B26 5-7.5 fbg at a concentration exceeding the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. Several PAHs were detected in sample B27 2-4 fbg at concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC. Three leachable PAHs were detected at concentrations below the GWPC. PAHs were detected in samples B24/MW6 0-2 fbg, B28 6-8 fbg, and B29 6-8.5 fbg at concentrations below RSR criteria. The SVOC, isophorone was detected in sample B26 8-10 fbg at a concentration below RSR criteria. The sample was collected just below the apparent concrete floor in the basement and the presence of Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  3. Page 31 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 31 of 2375 • • 6.5.3 isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and not from a release. Pesticides (including dieldrin, chlordane, DDD, DDT and DDE) were detected in samples B24/MW6 02 fbg, B27 2-4 fbg. B28 6-8 fbg, B28 16-18 fbg, B29 6-8.5 fbg, and B31 0-2 fbg at concentrations above the GA PMC. Chlordane was detected in B24/MW6 0-2 fbg at a concentration above the RDEC. Five of the six samples were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Arsenic was detected above RDEC and I/C DEC in soil sample B29 6-8.5 fbg and elevated concentrations of cadmium, lead, and zinc were also present. The sample was tested for leachable metals (arsenic, cadmium, chromium, lead, nickel, and zinc) to evaluate compliance with the GA PMC. Leachable arsenic and lead concentrations were above the GA PMC and the other metals were either not detected or detected below the GA PMC. o Elevated concentrations of arsenic, barium, and nickel were present in B26 5-7.5 fbg. Elevated concentrations of arsenic, barium, chromium, and nickel were present in B27 2-4 fbg. In addition, an elevated lead concentration was present in B28 6-8 fbg. Samples B24/MW6 8-10 fbg, B27 2-4 fbg, and B29 9-11 fbg were tested for leachable metals (arsenic, barium, and/or chromium) to evaluate compliance with the GA PMC. Leachable metals were either not detected or detected at concentrations below the GA PMC. REC 4 - Release from Snow Removal Equipment Three borings (B12, B13, and B14) were completed near the southeastern corner of the northern parking lot near L1985-5MW to evaluate the nature, degree and extent of COCs detected during the Phase II ESA. Soil samples collected from the borings were analyzed for VOCs, ETPH and PAHs. COCs were not detected in samples except as follows: • • 6.5.4 ETPH was detected in sample B12 0.5-2 fbg at a concentration below RSR criteria. Several PAHs were detected in samples B12 0.5-2 fbg and B13 0.5-2 fbg at concentrations below RSR criteria. AOC 2 - Agricultural Use AOC 8 - Former Barns in the Central and Southeastern Portions of the Site Twenty-eight (28) borings were completed throughout the site to provide coverage and to evaluate the extent and degree of COCs (including elevated metals) detected during the Phase II ESA in L1985-7, L1985-8, L19859, L1985-10MW, L1985-11, and L1985-15. Borings B1/MW1, B2/MW2 and B3/MW3 were completed at and near the centrally-located barn (AOC 8). Borings B19 and B20 were completed at and near the barn in the southeastern portion of the Site (AOC 8). Samples from borings used, in part, to evaluate other AOCs (B4/MW4, B5/MW5, B6, B7, B8, B9, B11, B12, B17, B18, B21, B22, B23/MW7, B24/MW6, B25, B26, B27, B28, B29, B30, B31, B32 and B33) were tested for pesticides and/or metals to provide coverage throughout the Site (AOC 2). Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, and SVOCs or PAHs (AOC 8), and pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc (AOCs 2 and 8). The discussion below includes all COCs for borings B1/MW1, B2/MW2, B3/MW3, B19 and B20, and is limited to pesticides and metals for the remaining borings, with the exception of B24/MW6 and B25 through B31, which are discussed in Section 6.5.2 and B21, B22 and B23/MW7, which are discussed in Section 6.5.6. Non- Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  4. Page 32 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 32 of 2375 pesticide and non-metal COCs for the remaining borings are discussed in other sections of the report applicable to their respective RECs and/or AOCs. COCs were not detected in samples except as follows: • • • • • • 6.5.5 Two PAHs were detected in sample B1/MW1 0.3-1 fbg at concentrations below RSR criteria. Several PAHs were detected in sample B20 0-2 fbg at concentrations below RSR criteria. Pesticides (dieldrin, DDD and/or DDE) were detected in samples B1/MW1 5-6.5 fbg, B2/MW2 1-3 fbg, B3/MW3 2-4 fbg, B19 0-2 fbg and B20 0-2 fbg at concentrations below criteria with the exception of B2/MW2, B3/MW3, B19 and B20, which exceeded the GA PMC. Three of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC; leachable pesticides were not detected. The chlordane concentration in B20 exceeded the RDEC. Pesticides (chlordane, lindane, DDD, DDE and/or DDT) were detected in samples B4/MW4 0-2 fbg, B5/MW5 0-2 fbg, B7 1-3 fbg, B9 0.4-2 fbg, B11 0.5-2 fbg, B12 0.5-2 fbg, B17 2-4 fbg, B18 0-1.5 fbg, B21 0-2 fbg, B22 0-2 fbg, B23/MW7 0-2 fbg and B33 0-0.5 fbg at concentrations above the GA PMC. Six of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC with the exception of leachable dieldrin in B23/MW7 0-2 fbg. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, barium, chromium, copper, lead, mercury, nickel, and/or zinc were detected in samples B17 0-0.5 fbg, B18 0-1.5 fbg, B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below RSR criteria. Leachable metals were either not detected or detected below the GWPC except for leachable lead which exceeded the GA PMC in B23/MW7. AOC 3 - Exterior Oil-Filled Transformers Four (4) borings were completed adjacent to transformers located in the northeast portion of the Site (B15 and B16) and adjacent to transformers and/or electrical equipment near the northwest corner of the stormwater detention basin (B33 and B34). The borings were completed to evaluate potential releases near the stormwater basin transformers and to evaluate the extent and degree of COCs detected at L1985-15. One soil sample was collected from each boring from ground surface to 0.5 fbg and tested for ETPH and PCBs. ETPH and PCBs were not detected in the samples. 6.5.6 AOC 4 - Suspected Dumping Area Three (3) borings (B21, B22, and B23/MW7) were completed near the southeastern corner of the Site to evaluate the extent and degree of COCs detected during the Phase II ESA at L1985-11. Soil samples collected from the borings were analyzed for the following: VOCs, ETPH, SVOCs or PAHs, PCBs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected in samples except as follows: • • • Several PAHs were detected in sample B21 0-2 fbg, with some concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC; leachable PAHs were not detected. Several PAHs were detected in sample B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. Pesticides (chlordane, dieldrin, DDT and/or DDE) were detected in samples B21 0-2 fbg, B22 0-2 fbg and B23/MW7 0-2 fbg at concentrations above the GA PMC. Two of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides. Leachable pesticides Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  5. Page 33 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 33 of 2375 • 6.5.7 were not detected in the samples with the exception of dieldrin in B23/MW7 which exceeded the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, lead, and/or mercury were detected in samples B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. The sample collected from B23/MW7 was tested for leachable metals to evaluate compliance with the GA PMC. Leachable metals were not detected with the exception of leachable lead which exceeds the GA PMC. AOC 5 - Former JDS Uniphase Site Operations Six (6) borings (B1/MW1, B2/MW2, B3/MW3, B6, B7 and B8) were completed outside the southern wall of the site building and two borings (B4/MW4 and B5/MW5) were completed outside the eastern wall of the building. The borings were advanced to evaluate whether releases occurred associated with former site occupant (JDS Uniphase (JDS)) activities that included fiber optic component manufacturing. Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, SVOCs, alcohols, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected except for one or more PAHs detected in samples B1/MW1 0.3-1 fbg, B4/MW4 2-4 fbg, and B5/MW5 0-2 fbg at concentrations below RSR criteria. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil in samples. Interior soil samples were collected at five locations in a former JDS ”Clean Room” in the southeastern portion of the building. Six samples were tested (B35 0.5-1.5 fbg, B36 0.5-1.5 fbg, B36 1.5-2.5 fbg, B37 0.5-1.5 fbg, B38 0.5-1.5 fbg, and B39 0.5-1.5 fbg). Five of the six samples were analyzed for ETPH, VOCs, 1,4-dioxane, SVOCs, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), PFAS, and alcohols. Two duplicate samples were tested for PFAS and a deeper sample at B36 was also tested for PFAS. COCs were not detected in samples except as follows: • • 6.6 One PFAS compound, perfluorodecanesulfonic acid (PFDS) was detected in sample B36 0-1.5 fbg at a concentration of 0.11 µg/kg. PFAS were not detected in a deeper sample collected from 1.5 to 2.5 fbg at B36. CTDEEP has established remedial criteria for the sum of five PFAS compounds (perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)). Remedial criteria for the remaining PFAS compounds, including PFDS, have not been established. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Groundwater Analytical Results A summary of the groundwater sampling results, and the laboratory analytical reports are presented in Table 3 and Appendix F, respectively. Groundwater samples collected from the newly-installed and existing monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, B24/MW6, L1985-3MW, L1985-5MW, L1985-6MW, and L198510MW) were analyzed for one or more of the following: VOCs, ETPH, SVOCs or PAHs, herbicides, pesticides, RCRA 8 metals plus copper, nickel and zinc, alcohols, and glycols. COCs were not detected in samples except as follows: Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  6. Page 34 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 34 of 2375 • • • 6.7 The SVOCs 2-methyl phenol and 3+4 methyl phenol were detected in groundwater collected from L1985-3MW at concentrations below RSR criteria. Benzyl alcohol was also detected in the sample and remedial criteria have not been established for this compound. Total barium was detected in seven wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, L1985-3MW, L1985-5MW, and L1985-6MW) at concentrations below criteria and within the range occurring naturally in uncontaminated groundwater. Pesticides DDT and DDE were detected in groundwater collected from L1985-6MW at concentrations below RSR criteria. L1985-6MW is the most upgradient monitoring well, located northwest of the site building and downgradient of the adjacent parcel that was formerly used for agricultural purposes. Pesticides were not detected in groundwater collected from other wells at the site during the Phase II and Phase II/III investigations. Sub-Slab Soil Vapor Analytical Results A summary of the sub-slab soil vapor sampling results and the laboratory analytical reports are presented in Table 4 and Appendix G, respectively. Vapor samples were collected from eighteen (18) SSVPs and tested for VOCs, including 1,4-dioxane, to evaluate the quality of vapor beneath the building, and to provide information where elevated VOC concentrations might indicate the presence of a soil or groundwater source beneath the building associated with the former JDS operations (AOC 5). A duplicate sample was collected from SV-13 (SV-13A). VOCs were not detected in the samples except as follows: • • • • • • • • 6.8 1,4-dioxane was detected in samples SV-1, SV-2, SV-3, SV-6, SV-11, SV-12, SV-13, and SV-13A at concentrations between 1.1 and 10 ppbv, below the Res SVVC and I/C SVVC. Acetone was detected in samples SV-1 through SV16 at concentrations ranging from approximately 10 to 380 parts per billion-volume (ppbv), all below the Res SVVC and I/C SVVC. Methyl ethyl ketone (MEK) was detected in samples SV-12 and SV-13 at concentrations of 7.8 and 2.8, respectively, below the Res SVVC and I/C SVVC. Ethanol was detected in all of the vapor samples at concentrations ranging from approximately 25 to 240 ppbv. Remedial criteria have not been established for this compound. Isopropylalcohol was detected in soil vapor samples SV-1, SV-2, SV-3, SV-6, SV-11, SV-12, SV-13, SV-13A, and SV-15, at concentrations ranging from approximately 3.8 to 31 ppbv. Remedial criteria have not been established for this compound. Ethylbenzene was detected in samples SV-11, SV-13, and SV-13A samples at concentrations ranging from approximately 48 to 160 ppbv, below the Res SVVC and I/C SVVC. Xylenes (m,p-xylenes and o-xylene) were detected in samples SV-11, SV-13, and SV-13A, at concentrations ranging from 54 to 570 ppbv, and total xylene concentrations ranging from 230 to 760 ppbv, below the Res SVVC and I/C SVVC applicable to total xylenes. Tetrachloroethene (PCE) was detected in samples SV-12, SV-13, SV-13A, SV-14, SV-17, and SV-18 at concentrations between 0.6 and 1.1 ppbv, below the Res SVVC and I/C SVVC. Data Quality Assessment (DQA) and Data Usability Evaluation (DUE) The soil, groundwater, and soil vapor analytical data were generated in accordance with the Connecticut RCPs. The RCP reports are presented in each laboratory analytical data report, which are included in Appendices E, F, and G. The purpose of the RCP is to provide quality data and allow the evaluation of whether the results are of sufficient quality for the intended purpose and in relation to project-specific objectives. The objective of testing is to evaluate the nature, degree and extent of releases identified during Phase III investigations and to determine whether releases occurred at five newly-identified AOCs based on information contained in the Phase I ESA. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 19 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  7. Page 35 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 35 of 2375 To validate the data, a data quality assessment and data usability evaluation (DQA/DUE) of the analytical data was conducted in general conformance with the CTDEEP “Laboratory Quality Assurance and Quality Control – Data Quality Assessment and Data Usability Evaluation Guidance Document,” dated May 2010. As part of the evaluation, the laboratory reports were reviewed to ensure that all sample and associated quality assurance results were available. Results of the completeness review indicated that all collected samples were analyzed and all quality control results were available to complete the data validation process. Consistent procedures and laboratory analyses of the samples were achieved. Sample containers were packed on ice and delivered to the laboratory under standard chain of custody procedures. All samples were received within the allowable temperature range, and were extracted and analyzed within allowable holding times for the method with the exception of the following samples: • • Soil sample B23/MW7 2-4 fbg was analyzed for SPLP Pesticides past its hold time. Leachable pesticides were not detected in the sample. Pesticides persist in the environment for many years without degradation; therefore, the data are usable. Soil sample B27 2-4 fbg was analyzed for SPLP SVOCs past its hold time. Leachable phenanthrene was the only compound detected in the sample below remedial criteria. The sample was also analyzed for leachable PAHs within allowable hold times. One or more leachable PAHs, including phenanthrene were detected in the sample. Since remediation due to DEC exceedances is warranted in this area due to PAH-impacted soil, the data are usable. Results of the DQA/DUE indicate that the analytical data for the Site are of adequate quality for the intended objectives. Minor non-conformances were noted that do not affect data usability. 6.9 Data Gaps The CTDEEP SCGD requires the identification and evaluation of data gaps, which are defined as a lack of, or inability to obtain, information required by standard practice despite good faith efforts by the environmental professional to gather such information. No data gaps were identified while performing this Phase II/III Environmental Site Assessment except for evaluation of the nature, degree and extent of potential contamination at certain AOCs, as discussed in Section 7. In addition, assessment of groundwater for PFAS and 1,4-dioxane is warranted. 7.0 SUMMARY, CONCEPTUAL SITE MODEL AND CONCLUSIONS 7.1 Introduction ZUVIC was retained by Eversource to complete a Phase II/III Environmental Site Assessment (ESA) of the current Eversource Call/Data Center located at 1985 Blue Hills Avenue Extension, Windsor, Connecticut. The purpose of the Phase II/III ESA is to evaluate the nature, degree and extent of releases identified during the Phase II ESA completed by others and to evaluate whether releases have occurred at AOCs identified by ZUVIC. The work was completed based on ZUVIC’s review of previous reports. The work completed included the advancement of soil borings, installation of groundwater monitoring wells, soil sampling inside the site building, installation of vapor points inside the building and sampling and testing of soil, groundwater, and vapor. Using the information from this and previous investigations, a conceptual site model (CSM) was formulated for the Site. A CSM is used to understand the history of the Site, the releases that have occurred at the Site, the fate and transport of soil and groundwater contamination, and its potential impact on sensitive receptors in the Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 20 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  8. Page 36 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 36 of 2375 site vicinity. A summary of the recognized environmental conditions and areas of concern is presented in Table 5. 7.2 Background Information The Site located at 1985 Blue Hills Avenue Extension in Windsor, CT is developed with a single story 165,000 square foot masonry / slab on grade building currently used by Eversource as office space and a call/data center. The building is surrounded by asphalt parking lots and landscaped areas. Historically, the Site was used for agricultural purposes (cultivation of tobacco), presumed drying of tobacco in two barns, storage of chemicals used for agricultural purposes in a third barn, and residential dwellings. The Site was developed with the site building in 2001 and occupied by JDS until 2004 when Eversource occupied the building for use as office space for a call/data center. The property is an “establishment,” and was subject to the Connecticut Transfer Act (CGS Section 22a-134 through 22a-134e) when it was purchased by Eversource. The “establishment” determination was based on documentation of former hazardous waste generation by JDS. The property was transferred on December 1, 2021 to Eversource and was entered into the Property Transfer Program in December 2021 with an acknowledgement of receipt issued by the CTDEEP in March 2022. Eversource is the Certifying Party to the transfer, and as such, is responsible for investigation and remediation of the Site. The CTDEEP assigned REM ID No. 14862 to the Site. 7.3 Summary of Conditions at RECs and AOCs and Conceptual Site Model For this investigation, soil sample intervals selected for laboratory analyses, soil and groundwater sampling locations, and analytical parameters were based on each REC/AOC release mechanism, COCs, and COCs released as identified during the Phase II ESA. A description of the CSM for each of the identified RECs/AOCs is presented in Section 2 and Table 5, and data generated, and observations made during this, and prior investigations, are presented below. 7.3.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Diesel ASTs A diesel fuel release occurred at the loading docks in May 2011. Diesel fuel was released to paved surfaces and a catch basin in the area and conveyed to a stormwater detention basin located southeast of the building. According to records, the release was contained, and “hard” surfaces cleaned of residual fuel. Two backup emergency generators are present at the Site, one in the parking lot southwest of the building and one adjacent to the south wall of the building and west of the loading dock area; each generator is equipped with a diesel storage tank. June 2017 records indicate that a hose on one of the generators failed leading to a release of approximately 40-gallons of coolant inside the generator enclosure. Approximately 5-gallons of coolant seeped through seams of the enclosure onto a concrete pad and gravel near the enclosure. JDS presumably received, shipped and managed chemicals and hazardous materials, including wastes, at the loading docks. In addition, hydraulic oil associated with two hydraulic compactors, and potential temporary storage of oil or chemicals in the dumpsters may have resulted in releases in the area. Phase II ESA samples collected from borings L1985-1, -2, -3MW, -4, -7, -13, and -15 and Phase III samples from B6 through B11, B17, B18 and B32 were used to evaluate these RECs and AOCs. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 21 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  9. Page 37 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 37 of 2375 COCs identified for the RECs and AOCs include VOCs, ETPH, SVOCs or PAHs; EG and PG (REC 2 only); and RCRA 8 metals plus copper, nickel, and zinc and alcohols (AOC 1 only). VOCs, glycols and alcohols were not detected in soil samples. The results of metals testing applicable to AOC 1 are discussed in Section 7.3.4. Low-level ETPH contamination is present in surficial soil near the loading docks, at L1985-1 and in deeper soil (10-11 fbg) at L1985-3MW; PAHs were not detected. The concentrations in these samples were all below remedial criteria. Phase II/III samples collected at B6, B7, B8 did not contain detectable levels of ETPH or PAHs. The surficial contamination near the loading docks is likely related to incidental releases from the normal operation of motor vehicles. The deeper contamination in L1985-3MW is likely related to cross-contamination from surficial soils mixing with deeper soils during drilling. Low-level ETPH and PAH contamination was detected in surficial soil at L1985-15, near the stormwater outlet pipe in the southern stormwater detention basin; concentrations are below remedial criteria. Phase II/III surficial soil samples collected from B17 and B18 contained PAHs below criteria. The release of diesel fuel to the catch basin in the loading dock area apparently resulted in residual contamination below remedial criteria in the stormwater basin. Alternatively, the PAH detections may be due to temporary storage of stormwater in the basin that contains PAHs leached from asphalt parking areas. Additional evaluation and remediation are not warranted near these borings. Low levels of PAHs or ETPH were detected in surficial soil collected from L1985-7 (near the emergency generator/AST southwest of the building), and L1985-13, B9, and B32 (near the emergency generator west of the loading docks). The contamination may be due to placement of contaminated fill during installation of the generator enclosures. Additional evaluation and remediation are not warranted near these borings. Surficial soil samples collected from Phase III borings near the generator southwest of the building (B10 and B11) did not contain detectable PAHs, however ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC potentially related to a release during refueling of the generator. Leachable ETPH was not detected in the sample, demonstrating compliance with the PMC. The ETPH release at B10 was delineated vertically by sample B10 1-3 fbg, in which ETPH was not detected. Remediation is required near B10 and the generator. Additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Releases associated with the coolant release were not evident and no further evaluation or remediation is warranted. The nature, extent and degree of ETPH and PAH contamination near the loading docks, stormwater detention basin and the emergency generator located west of the loading dock are sufficiently evaluated and all contaminant concentrations are below the RDEC and GA PMC, therefore additional evaluation or remediation are not warranted. Additional investigation may be desired, and remediation is required, in the vicinity of the generator located southwest of the building. 7.3.2 REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former 7,000-gallon Fuel Oil Underground Storage Tank (UST) A former barn/warehouse was located in the southern portion of the Site and was destroyed in May 1994 by a structure fire that was suppressed using water. The structure was used for storing pesticides, herbicides, and other chemicals, and as office space in its eastern end. Following the fire, samples of air, surface wipes, water runoff from the fire suppression, and surficial soil were analyzed for pesticides. According to previous documentation, pesticides were detected in one water runoff sample. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 22 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
  10. Page 38 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 38 of 2375 An approximately 6,750-gallon heating oil UST was reportedly located north of the northeastern corner of the barn/warehouse. In addition, aerial photographs indicate that an outdoor storage area was present near the northwestern corner of the barn. Phase II soil samples collected from borings L1985-8, -9, and -10MW were used to evaluate soil apparently within the footprint of the former barn/warehouse. Phase II borings were not completed near the former UST. Phase III borings included B26, B27, B28 and B29 within, or near the footprint of the barn, borings B30 and B31 in the outdoor storage area, and B24/MW6 and B25 near the UST. COCs for REC 3 and AOC 7 include VOCs, ETPH, and SVOCs or PAHs: and, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc (REC 3 only). Fill materials, including non-native red-brown soil and/or non-soil materials (asphalt, coal, brick, concrete, glass, and ash) were encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-9, L198510, B26, B27 and B29. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in borings L1987-8, L1985-10, B26, B27 and B29 between approximate 7.5 to 9 fbg. Based on material encountered in borings, B24/MW6 and B25 are apparently located northeast of the former barn footprint. B29 is within an apparent “entrance/exit” structure on the north side of the barn, apparent in aerial photographs. B28 is located west of the barn footprint and L1985-9 is apparently located within the office area that was constructed between 1935 and 1941 at the eastern end of the building which may be a slab-on-grade addition, without a basement. It appears that at least a portion of the demolished structure and imported fill material were placed inside the footprint of the barn to backfill the basement. VOCs were not detected in soil samples with the exception of acetone in L1985-10MW 1-3 ft. at a concentration below RSR criteria. The apparent acetone contamination may be related to laboratory-induced contamination. The SVOC, isophorone was detected in soil sample B26 8-10 fbg at a concentration below RSR criteria. This sample was collected just below the apparent concrete floor of the basement and the isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and is not related to a release. Herbicides were not detected in soil samples. Low-level ETPH and/or PAH contamination were detected in surficial soil near L1985-9, L1985-10MW, B24/MW6 and in deeper soil at B28 6-8 fbg and B29 6-8.5 fbg, at concentrations below RSR criteria. Soil collected from B26 5-7.5 fbg and B27 2-4 fbg contain ETPH and SVOCs, respectively, at concentrations above the RDEC, I/C DEC and/or GA PMC. Leachable SVOCs/PAHs in the B27 sample and leachable ETPH in the B26 sample were below the GWPC, demonstrating compliance with the PMC. The ETPH release at B26 was delineated vertically by sample B26 8-10 fbg in which ETPH was not detected. The SVOC release at B27 was delineated vertically by sample B27 6-7.5 fbg, in which SVOCs/PAHs were not detected. Remediation is required near B26 and B27 and additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Pesticides were detected in soil in and near the footprint of the barn in surficial soil at B24/MW6 and B27, and in deeper soil at B28 6-8 fbg, B28 16-18 fbg, and B29 6-8.5 fbg; concentrations exceed the GA PMC. Leachable pesticides in the samples were below the GWPC, demonstrating compliance with the PMC. The chlordane concentration in sample B24/MW6 0-2 fbg is above the RDEC. The pesticide release at B24/MW6 was delineated vertically by sample B24/MW6 8-10 fbg. Remediation is required near the boring and additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 23 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)