Interrogatory responses
Answers to questions 32
Files210
RSR-032 Attachment 178.pdf
PDF · 8.1 MB · 83 pagesText searchable
Download RSR-032 Attachment 178.pdfRead the text of RSR-032 Attachment 178.pdf
RSR-032 Attachment 177.pdf
PDF · 2.2 MB · 6 pagesText searchable
Download RSR-032 Attachment 177.pdfRead the text of RSR-032 Attachment 177.pdf
RSR-032 Attachment 176_Part2.pdf
PDF · 29 MB · 754 pagesText searchable
Download RSR-032 Attachment 176_Part2.pdfRead the text of RSR-032 Attachment 176_Part2.pdf
RSR-032 Attachment 176_Part1.pdf
PDF · 30 MB · 110 pagesText searchable
Download RSR-032 Attachment 176_Part1.pdfRead the text of RSR-032 Attachment 176_Part1.pdf
RSR-032 Attachment 175_Part7.pdf
PDF · 3.3 MB · 275 pagesText searchable
Download RSR-032 Attachment 175_Part7.pdfRead the text of RSR-032 Attachment 175_Part7.pdf
RSR-032 Attachment 175_Part6.pdf
PDF · 4.6 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part6.pdfRead the text of RSR-032 Attachment 175_Part6.pdf
RSR-032 Attachment 175_Part5.pdf
PDF · 5.6 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part5.pdfRead the text of RSR-032 Attachment 175_Part5.pdf
RSR-032 Attachment 175_Part4.pdf
PDF · 3.8 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part4.pdfRead the text of RSR-032 Attachment 175_Part4.pdf
RSR-032 Attachment 175_Part3.pdf
PDF · 22 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part3.pdfRead the text of RSR-032 Attachment 175_Part3.pdf
RSR-032 Attachment 175_Part2.pdf
PDF · 8.1 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part2.pdfRead the text of RSR-032 Attachment 175_Part2.pdf
RSR-032 Attachment 175_Part1.pdf
PDF · 36 MB · 350 pagesText searchable
Download RSR-032 Attachment 175_Part1.pdfRead the text of RSR-032 Attachment 175_Part1.pdf
RSR-032 Attachment 174.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download RSR-032 Attachment 174.pdfRead the text of RSR-032 Attachment 174.pdf
RSR-032 Attachment 173.pdf
PDF · 3.0 MB · 9 pagesText searchable
Download RSR-032 Attachment 173.pdfRead the text of RSR-032 Attachment 173.pdf
RSR-032 Attachment 172.pdf
PDF · 994 KB · 2 pagesText searchable
Download RSR-032 Attachment 172.pdfRead the text of RSR-032 Attachment 172.pdf
RSR-032 Attachment 171.pdf
PDF · 959 KB · 2 pagesText searchable
Download RSR-032 Attachment 171.pdfRead the text of RSR-032 Attachment 171.pdf
RSR-032 Attachment 170.pdf
PDF · 1.6 MB · 4 pagesText searchable
Download RSR-032 Attachment 170.pdfRead the text of RSR-032 Attachment 170.pdf
RSR-032 Attachment 169.pdf
PDF · 2.2 MB · 14 pagesText searchable
Download RSR-032 Attachment 169.pdfRead the text of RSR-032 Attachment 169.pdf
RSR-032 Attachment 168.pdf
PDF · 8.4 MB · 178 pagesText searchable
Download RSR-032 Attachment 168.pdfRead the text of RSR-032 Attachment 168.pdf
RSR-032 Attachment 167_Part2.pdf
PDF · 29 MB · 844 pagesText searchable
Download RSR-032 Attachment 167_Part2.pdfRead the text of RSR-032 Attachment 167_Part2.pdf
RSR-032 Attachment 167_Part1.pdf
PDF · 35 MB · 284 pagesText searchable
Download RSR-032 Attachment 167_Part1.pdfRead the text of RSR-032 Attachment 167_Part1.pdf
RSR-032 Attachment 166.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download RSR-032 Attachment 166.pdfRead the text of RSR-032 Attachment 166.pdf
RSR-032 Attachment 165_Part 4.pdf
PDF · 8.2 MB · 84 pagesText searchable
Download RSR-032 Attachment 165_Part 4.pdfRead the text of RSR-032 Attachment 165_Part 4.pdf
RSR-032 Attachment 165_Part 3.pdf
PDF · 33 MB · 482 pagesText searchable
Download RSR-032 Attachment 165_Part 3.pdfRead the text of RSR-032 Attachment 165_Part 3.pdf
RSR-032 Attachment 165_Part 2.pdf
PDF · 18 MB · 509 pagesText searchable
Download RSR-032 Attachment 165_Part 2.pdfRead the text of RSR-032 Attachment 165_Part 2.pdf
RSR-032 Attachment 165_Part 1.pdf
PDF · 22 MB · 500 pagesText searchable
Download RSR-032 Attachment 165_Part 1.pdfRead the text of RSR-032 Attachment 165_Part 1.pdf
RSR-032 Attachment 164.pdf
PDF · 20 MB · 42 pagesText searchable
Download RSR-032 Attachment 164.pdfRead the text of RSR-032 Attachment 164.pdf
RSR-032 Attachment 163.pdf
PDF · 24 MB · 575 pagesText searchable
Download RSR-032 Attachment 163.pdfRead the text of RSR-032 Attachment 163.pdf
RSR-032 Attachment 162.pdf
PDF · 14 MB · 17 pagesText searchable
Download RSR-032 Attachment 162.pdfRead the text of RSR-032 Attachment 162.pdf
RSR-032 Attachment 161 _Part2.pdf
PDF · 29 MB · 609 pagesText searchable
Download RSR-032 Attachment 161 _Part2.pdfRead the text of RSR-032 Attachment 161 _Part2.pdf
RSR-032 Attachment 161 _Part1.pdf
PDF · 30 MB · 131 pagesText searchable
Download RSR-032 Attachment 161 _Part1.pdfRead the text of RSR-032 Attachment 161 _Part1.pdf
RSR-032 Attachment 160.pdf
PDF · 7.6 MB · 56 pagesText searchable
Download RSR-032 Attachment 160.pdfRead the text of RSR-032 Attachment 160.pdf
RSR-032 Attachment 159.pdf
PDF · 14 MB · 97 pagesText searchable
Download RSR-032 Attachment 159.pdfRead the text of RSR-032 Attachment 159.pdf
RSR-032 Attachment 158.pdf
PDF · 4.7 MB · 54 pagesText searchable
Download RSR-032 Attachment 158.pdfRead the text of RSR-032 Attachment 158.pdf
RSR-032 Attachment 157.pdf
PDF · 17 MB · 261 pagesText searchable
Download RSR-032 Attachment 157.pdfRead the text of RSR-032 Attachment 157.pdf
RSR-032 Attachment 156.pdf
PDF · 4.7 MB · 74 pagesText searchable
Download RSR-032 Attachment 156.pdfRead the text of RSR-032 Attachment 156.pdf
RSR-032 Attachment 155.pdf
PDF · 2.7 MB · 40 pagesText searchable
Download RSR-032 Attachment 155.pdfRead the text of RSR-032 Attachment 155.pdf
RSR-032 Attachment 154.pdf
PDF · 2.4 MB · 37 pagesText searchable
Download RSR-032 Attachment 154.pdfRead the text of RSR-032 Attachment 154.pdf
RSR-032 Attachment 153.pdf
PDF · 2.8 MB · 61 pagesText searchable
Download RSR-032 Attachment 153.pdfRead the text of RSR-032 Attachment 153.pdf
RSR-032 Attachment 152.pdf
PDF · 11 MB · 126 pagesText searchable
Download RSR-032 Attachment 152.pdfRead the text of RSR-032 Attachment 152.pdf
RSR-032 Attachment 151.pdf
PDF · 16 MB · 340 pagesText searchable
Download RSR-032 Attachment 151.pdfRead the text of RSR-032 Attachment 151.pdf
RSR-032 Attachment 150.pdf
PDF · 2.6 MB · 33 pagesText searchable
Download RSR-032 Attachment 150.pdfRead the text of RSR-032 Attachment 150.pdf
RSR-032 Attachment 149.pdf
PDF · 2.8 MB · 47 pagesText searchable
Download RSR-032 Attachment 149.pdfRead the text of RSR-032 Attachment 149.pdf
RSR-032 Attachment 148.pdf
PDF · 2.8 MB · 52 pagesText searchable
Download RSR-032 Attachment 148.pdfRead the text of RSR-032 Attachment 148.pdf
RSR-032 Attachment 147.pdf
PDF · 7.6 MB · 136 pagesText searchable
Download RSR-032 Attachment 147.pdfRead the text of RSR-032 Attachment 147.pdf
RSR-032 Attachment 146.pdf
PDF · 13 MB · 211 pagesText searchable
Download RSR-032 Attachment 146.pdfRead the text of RSR-032 Attachment 146.pdf
RSR-032 Attachment 145.pdf
PDF · 3.0 MB · 58 pagesText searchable
Download RSR-032 Attachment 145.pdfRead the text of RSR-032 Attachment 145.pdf
RSR-032 Attachment 144.pdf
PDF · 2.4 MB · 31 pagesText searchable
Download RSR-032 Attachment 144.pdfRead the text of RSR-032 Attachment 144.pdf
RSR-032 Attachment 143.pdf
PDF · 2.4 MB · 30 pagesText searchable
Download RSR-032 Attachment 143.pdfRead the text of RSR-032 Attachment 143.pdf
RSR-032 Attachment 142.pdf
PDF · 2.7 MB · 33 pagesText searchable
Download RSR-032 Attachment 142.pdfRead the text of RSR-032 Attachment 142.pdf
RSR-032 Attachment 141.pdf
PDF · 24 MB · 578 pagesText searchable
Download RSR-032 Attachment 141.pdfRead the text of RSR-032 Attachment 141.pdf
RSR-032 Attachment 140.pdf
PDF · 2.2 MB · 26 pagesText searchable
Download RSR-032 Attachment 140.pdfRead the text of RSR-032 Attachment 140.pdf
RSR-032 Attachment 139.pdf
PDF · 2.2 MB · 29 pagesText searchable
Download RSR-032 Attachment 139.pdfRead the text of RSR-032 Attachment 139.pdf
RSR-032 Attachment 138.pdf
PDF · 2.2 MB · 24 pagesText searchable
Download RSR-032 Attachment 138.pdfRead the text of RSR-032 Attachment 138.pdf
RSR-032 Attachment 137.pdf
PDF · 2.6 MB · 54 pagesText searchable
Download RSR-032 Attachment 137.pdfRead the text of RSR-032 Attachment 137.pdf
RSR-032 Attachment 136.pdf
PDF · 16 MB · 618 pagesText searchable
Download RSR-032 Attachment 136.pdfRead the text of RSR-032 Attachment 136.pdf
RSR-032 Attachment 135.pdf
PDF · 2.5 MB · 52 pagesText searchable
Download RSR-032 Attachment 135.pdfRead the text of RSR-032 Attachment 135.pdf
RSR-032 Attachment 134.pdf
PDF · 2.5 MB · 57 pagesText searchable
Download RSR-032 Attachment 134.pdfRead the text of RSR-032 Attachment 134.pdf
RSR-032 Attachment 133.pdf
PDF · 2.7 MB · 82 pagesText searchable
Download RSR-032 Attachment 133.pdfRead the text of RSR-032 Attachment 133.pdf
RSR-032 Attachment 132.pdf
PDF · 4.2 MB · 137 pagesText searchable
Download RSR-032 Attachment 132.pdfRead the text of RSR-032 Attachment 132.pdf
RSR-032 Attachment 131.pdf
PDF · 1.8 MB · 7 pagesText searchable
Download RSR-032 Attachment 131.pdfRead the text of RSR-032 Attachment 131.pdf
RSR-032 Attachment 130.pdf
PDF · 22 MB · 847 pagesText searchable
Download RSR-032 Attachment 130.pdfRead the text of RSR-032 Attachment 130.pdf
RSR-032 Attachment 129.pdf
PDF · 3.6 MB · 124 pagesText searchable
Download RSR-032 Attachment 129.pdfRead the text of RSR-032 Attachment 129.pdf
RSR-032 Attachment 128.pdf
PDF · 3.6 MB · 104 pagesText searchable
Download RSR-032 Attachment 128.pdfRead the text of RSR-032 Attachment 128.pdf
RSR-032 Attachment 127.pdf
PDF · 4.8 MB · 125 pagesText searchable
Download RSR-032 Attachment 127.pdfRead the text of RSR-032 Attachment 127.pdf
RSR-032 Attachment 126.pdf
PDF · 3.7 MB · 128 pagesText searchable
Download RSR-032 Attachment 126.pdfRead the text of RSR-032 Attachment 126.pdf
RSR-032 Attachment 125.pdf
PDF · 26 MB · 824 pagesText searchable
Download RSR-032 Attachment 125.pdfRead the text of RSR-032 Attachment 125.pdf
RSR-032 Attachment 124.pdf
PDF · 2.4 MB · 28 pagesText searchable
Download RSR-032 Attachment 124.pdfRead the text of RSR-032 Attachment 124.pdf
RSR-032 Attachment 123.pdf
PDF · 2.1 MB · 29 pagesText searchable
Download RSR-032 Attachment 123.pdfRead the text of RSR-032 Attachment 123.pdf
RSR-032 Attachment 122.pdf
PDF · 2.7 MB · 29 pagesText searchable
Download RSR-032 Attachment 122.pdfRead the text of RSR-032 Attachment 122.pdf
RSR-032 Attachment 121.pdf
PDF · 36 MB · 50 pagesText searchable
Download RSR-032 Attachment 121.pdfRead the text of RSR-032 Attachment 121.pdf
RSR-032 Attachment 120.PDF
PDF · 948 KB · 2 pagesText searchable
Download RSR-032 Attachment 120.PDFRead the text of RSR-032 Attachment 120.PDF
RSR-032 Attachment 119_Part3.pdf
PDF · 19 MB · 105 pagesText searchable
Download RSR-032 Attachment 119_Part3.pdfRead the text of RSR-032 Attachment 119_Part3.pdf
RSR-032 Attachment 119_Part2.pdf
PDF · 35 MB · 169 pagesText searchable
Download RSR-032 Attachment 119_Part2.pdfRead the text of RSR-032 Attachment 119_Part2.pdf
RSR-032 Attachment 119_Part1.pdf
PDF · 35 MB · 51 pagesText searchable
Download RSR-032 Attachment 119_Part1.pdfRead the text of RSR-032 Attachment 119_Part1.pdf
RSR-032 Attachment 118_Part6.pdf
PDF · 4.4 MB · 54 pagesText searchable
Download RSR-032 Attachment 118_Part6.pdfRead the text of RSR-032 Attachment 118_Part6.pdf
RSR-032 Attachment 118_Part5.pdf
PDF · 30 MB · 254 pagesText searchable
Download RSR-032 Attachment 118_Part5.pdfRead the text of RSR-032 Attachment 118_Part5.pdf
RSR-032 Attachment 118_Part4.pdf
PDF · 25 MB · 378 pagesText searchable
Download RSR-032 Attachment 118_Part4.pdfRead the text of RSR-032 Attachment 118_Part4.pdf
RSR-032 Attachment 118_Part3.pdf
PDF · 26 MB · 218 pagesText searchable
Download RSR-032 Attachment 118_Part3.pdfRead the text of RSR-032 Attachment 118_Part3.pdf
RSR-032 Attachment 118_Part2.pdf
PDF · 35 MB · 334 pagesText searchable
Download RSR-032 Attachment 118_Part2.pdfRead the text of RSR-032 Attachment 118_Part2.pdf
RSR-032 Attachment 118_Part1.pdf
PDF · 35 MB · 164 pagesText searchable
Download RSR-032 Attachment 118_Part1.pdfRead the text of RSR-032 Attachment 118_Part1.pdf
RSR-032 Attachment 117.pdf
PDF · 18 MB · 55 pagesText searchable
Download RSR-032 Attachment 117.pdfRead the text of RSR-032 Attachment 117.pdf
RSR-032 Attachment 116.pdf
PDF · 815 KB · 2 pagesText searchable
Download RSR-032 Attachment 116.pdfRead the text of RSR-032 Attachment 116.pdf
RSR-032 Attachment 115.pdf
PDF · 13 MB · 135 pagesText searchable
Download RSR-032 Attachment 115.pdfRead the text of RSR-032 Attachment 115.pdf
RSR-032 Attachment 114.pdf
PDF · 12 MB · 123 pagesText searchable
Download RSR-032 Attachment 114.pdfRead the text of RSR-032 Attachment 114.pdf
RSR-032 Attachment 113.pdf
PDF · 1.1 MB · 4 pagesText searchable
Download RSR-032 Attachment 113.pdfRead the text of RSR-032 Attachment 113.pdf
RSR-032 Attachment 112.pdf
PDF · 296 KB · 2 pagesText searchable
Download RSR-032 Attachment 112.pdfRead the text of RSR-032 Attachment 112.pdf
RSR-032 Attachment 111.pdf
PDF · 4.1 MB · 42 pagesText searchable
Download RSR-032 Attachment 111.pdfRead the text of RSR-032 Attachment 111.pdf
RSR-032 Attachment 110.pdf
PDF · 30 MB · 38 pagesText searchable
Download RSR-032 Attachment 110.pdfRead the text of RSR-032 Attachment 110.pdf
RSR-032 Attachment 109.pdf
PDF · 844 KB · 1 pageText searchable
Download RSR-032 Attachment 109.pdfRead the text of RSR-032 Attachment 109.pdf
RSR-032 Attachment 108.pdf
PDF · 4.0 MB · 23 pagesText searchable
Download RSR-032 Attachment 108.pdfRead the text of RSR-032 Attachment 108.pdf
RSR-032 Attachment 107.pdf
PDF · 820 KB · 1 pageText searchable
Download RSR-032 Attachment 107.pdfRead the text of RSR-032 Attachment 107.pdf
RSR-032 Attachment 106.pdf
PDF · 924 KB · 1 pageText searchable
Download RSR-032 Attachment 106.pdfRead the text of RSR-032 Attachment 106.pdf
RSR-032 Attachment 105.pdf
PDF · 16 MB · 493 pagesText searchable
Download RSR-032 Attachment 105.pdfRead the text of RSR-032 Attachment 105.pdf
RSR-032 Attachment 104.pdf
PDF · 19 MB · 628 pagesText searchable
Download RSR-032 Attachment 104.pdfRead the text of RSR-032 Attachment 104.pdf
RSR-032 Attachment 103.pdf
PDF · 3.3 MB · 40 pagesText searchable
Download RSR-032 Attachment 103.pdfRead the text of RSR-032 Attachment 103.pdf
RSR-032 Attachment 102.pdf
PDF · 1.7 MB · 2 pagesText searchable
Download RSR-032 Attachment 102.pdfRead the text of RSR-032 Attachment 102.pdf
RSR-032 Attachment 101.pdf
PDF · 6.8 MB · 186 pagesText searchable
Download RSR-032 Attachment 101.pdfRead the text of RSR-032 Attachment 101.pdf
RSR-032 Attachment 100.pdf
PDF · 4.3 MB · 244 pagesText searchable
Download RSR-032 Attachment 100.pdfRead the text of RSR-032 Attachment 100.pdf
RSR-032 Attachment 99.pdf
PDF · 8.3 MB · 193 pagesText searchable
Download RSR-032 Attachment 99.pdfRead the text of RSR-032 Attachment 99.pdf
RSR-032 Attachment 98.pdf
PDF · 33 MB · 2,201 pagesText searchable
Download RSR-032 Attachment 98.pdfRead the text of RSR-032 Attachment 98.pdf
RSR-032 Attachment 97.pdf
PDF · 826 KB · 2 pagesText searchable
Download RSR-032 Attachment 97.pdfRead the text of RSR-032 Attachment 97.pdf
RSR-032 Attachment 96.pdf
PDF · 2.1 MB · 2 pagesText searchable
Download RSR-032 Attachment 96.pdfRead the text of RSR-032 Attachment 96.pdf
RSR-032 Attachment 95.pdf
PDF · 3.0 MB · 27 pagesText searchable
Download RSR-032 Attachment 95.pdfRead the text of RSR-032 Attachment 95.pdf
RSR-032 Attachment 94.pdf
PDF · 1.0 MB · 3 pagesText searchable
Download RSR-032 Attachment 94.pdfRead the text of RSR-032 Attachment 94.pdf
RSR-032 Attachment 93.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 93.pdfRead the text of RSR-032 Attachment 93.pdf
RSR-032 Attachment 92.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 92.pdfRead the text of RSR-032 Attachment 92.pdf
RSR-032 Attachment 91.pdf
PDF · 896 KB · 2 pagesText searchable
Download RSR-032 Attachment 91.pdfRead the text of RSR-032 Attachment 91.pdf
RSR-032 Attachment 90.pdf
PDF · 925 KB · 2 pagesText searchable
Download RSR-032 Attachment 90.pdfRead the text of RSR-032 Attachment 90.pdf
RSR-032 Attachment 89.pdf
PDF · 909 KB · 2 pagesText searchable
Download RSR-032 Attachment 89.pdfRead the text of RSR-032 Attachment 89.pdf
RSR-032 Attachment 88.pdf
PDF · 911 KB · 2 pagesText searchable
Download RSR-032 Attachment 88.pdfRead the text of RSR-032 Attachment 88.pdf
RSR-032 Attachment 87.pdf
PDF · 865 KB · 2 pagesText searchable
Download RSR-032 Attachment 87.pdfRead the text of RSR-032 Attachment 87.pdf
RSR-032 Attachment 86.pdf
PDF · 910 KB · 2 pagesText searchable
Download RSR-032 Attachment 86.pdfRead the text of RSR-032 Attachment 86.pdf
RSR-032 Attachment 85.pdf
PDF · 911 KB · 2 pagesText searchable
Download RSR-032 Attachment 85.pdfRead the text of RSR-032 Attachment 85.pdf
RSR-032 Attachment 84.pdf
PDF · 912 KB · 2 pagesText searchable
Download RSR-032 Attachment 84.pdfRead the text of RSR-032 Attachment 84.pdf
RSR-032 Attachment 83.pdf
PDF · 904 KB · 2 pagesText searchable
Download RSR-032 Attachment 83.pdfRead the text of RSR-032 Attachment 83.pdf
RSR-032 Attachment 82.pdf
PDF · 926 KB · 2 pagesText searchable
Download RSR-032 Attachment 82.pdfRead the text of RSR-032 Attachment 82.pdf
RSR-032 Attachment 81.pdf
PDF · 865 KB · 2 pagesText searchable
Download RSR-032 Attachment 81.pdfRead the text of RSR-032 Attachment 81.pdf
RSR-032 Attachment 80.pdf
PDF · 849 KB · 2 pagesText searchable
Download RSR-032 Attachment 80.pdfRead the text of RSR-032 Attachment 80.pdf
RSR-032 Attachment 79.pdf
PDF · 910 KB · 2 pagesText searchable
Download RSR-032 Attachment 79.pdfRead the text of RSR-032 Attachment 79.pdf
RSR-032 Attachment 78.pdf
PDF · 1005 KB · 3 pagesText searchable
Download RSR-032 Attachment 78.pdfRead the text of RSR-032 Attachment 78.pdf
RSR-032 Attachment 77.pdf
PDF · 962 KB · 3 pagesText searchable
Download RSR-032 Attachment 77.pdfRead the text of RSR-032 Attachment 77.pdf
RSR-032 Attachment 76.pdf
PDF · 957 KB · 3 pagesText searchable
Download RSR-032 Attachment 76.pdfRead the text of RSR-032 Attachment 76.pdf
RSR-032 Attachment 75.pdf
PDF · 2.0 MB · 9 pagesText searchable
Download RSR-032 Attachment 75.pdfRead the text of RSR-032 Attachment 75.pdf
RSR-032 Attachment 74.pdf
PDF · 949 KB · 3 pagesText searchable
Download RSR-032 Attachment 74.pdfRead the text of RSR-032 Attachment 74.pdf
RSR-032 Attachment 73.pdf
PDF · 964 KB · 3 pagesText searchable
Download RSR-032 Attachment 73.pdfRead the text of RSR-032 Attachment 73.pdf
RSR-032 Attachment 72.pdf
PDF · 878 KB · 3 pagesText searchable
Download RSR-032 Attachment 72.pdfRead the text of RSR-032 Attachment 72.pdf
RSR-032 Attachment 71.pdf
PDF · 925 KB · 3 pagesText searchable
Download RSR-032 Attachment 71.pdfRead the text of RSR-032 Attachment 71.pdf
RSR-032 Attachment 70.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download RSR-032 Attachment 70.pdfRead the text of RSR-032 Attachment 70.pdf
RSR-032 Attachment 69.pdf
PDF · 967 KB · 3 pagesText searchable
Download RSR-032 Attachment 69.pdfRead the text of RSR-032 Attachment 69.pdf
RSR-032 Attachment 68.pdf
PDF · 970 KB · 3 pagesText searchable
Download RSR-032 Attachment 68.pdfRead the text of RSR-032 Attachment 68.pdf
RSR-032 Attachment 67.pdf
PDF · 1.4 MB · 4 pagesText searchable
Download RSR-032 Attachment 67.pdfRead the text of RSR-032 Attachment 67.pdf
RSR-032 Attachment 66.pdf
PDF · 938 KB · 3 pagesText searchable
Download RSR-032 Attachment 66.pdfRead the text of RSR-032 Attachment 66.pdf
RSR-032 Attachment 65.pdf
PDF · 814 KB · 3 pagesText searchable
Download RSR-032 Attachment 65.pdfRead the text of RSR-032 Attachment 65.pdf
RSR-032 Attachment 64.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download RSR-032 Attachment 64.pdfRead the text of RSR-032 Attachment 64.pdf
RSR-032 Attachment 63.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download RSR-032 Attachment 63.pdfRead the text of RSR-032 Attachment 63.pdf
RSR-032 Attachment 62.pdf
PDF · 3.4 MB · 7 pagesText searchable
Download RSR-032 Attachment 62.pdfRead the text of RSR-032 Attachment 62.pdf
RSR-032 Attachment 61.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download RSR-032 Attachment 61.pdfRead the text of RSR-032 Attachment 61.pdf
RSR-032 Attachment 60.pdf
PDF · 856 KB · 2 pagesText searchable
Download RSR-032 Attachment 60.pdfRead the text of RSR-032 Attachment 60.pdf
RSR-032 Attachment 59.pdf
PDF · 900 KB · 2 pagesText searchable
Download RSR-032 Attachment 59.pdfRead the text of RSR-032 Attachment 59.pdf
RSR-032 Attachment 58.pdf
PDF · 760 KB · 1 pageText searchable
Download RSR-032 Attachment 58.pdfRead the text of RSR-032 Attachment 58.pdf
RSR-032 Attachment 57.pdf
PDF · 869 KB · 2 pagesText searchable
Download RSR-032 Attachment 57.pdfRead the text of RSR-032 Attachment 57.pdf
RSR-032 Attachment 56.pdf
PDF · 1.4 MB · 10 pagesText searchable
Download RSR-032 Attachment 56.pdfRead the text of RSR-032 Attachment 56.pdf
RSR-032 Attachment 55_Part10.pdf
PDF · 20 MB · 286 pagesText searchable
Download RSR-032 Attachment 55_Part10.pdfRead the text of RSR-032 Attachment 55_Part10.pdf
RSR-032 Attachment 55_Part9.pdf
PDF · 14 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part9.pdfRead the text of RSR-032 Attachment 55_Part9.pdf
RSR-032 Attachment 55_Part8.pdf
PDF · 10.0 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part8.pdfRead the text of RSR-032 Attachment 55_Part8.pdf
RSR-032 Attachment 55_Part7.pdf
PDF · 18 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part7.pdfRead the text of RSR-032 Attachment 55_Part7.pdf
RSR-032 Attachment 55_Part6.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part6.pdfRead the text of RSR-032 Attachment 55_Part6.pdf
RSR-032 Attachment 55_Part5.pdf
PDF · 19 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part5.pdfRead the text of RSR-032 Attachment 55_Part5.pdf
RSR-032 Attachment 55_Part4.pdf
PDF · 17 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part4.pdfRead the text of RSR-032 Attachment 55_Part4.pdf
RSR-032 Attachment 55_Part3.pdf
PDF · 11 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part3.pdfRead the text of RSR-032 Attachment 55_Part3.pdf
RSR-032 Attachment 55_Part2.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part2.pdfRead the text of RSR-032 Attachment 55_Part2.pdf
RSR-032 Attachment 55_Part1.pdf
PDF · 26 MB · 500 pagesText searchable
Download RSR-032 Attachment 55_Part1.pdfRead the text of RSR-032 Attachment 55_Part1.pdf
RSR-032 Attachment 54.pdf
PDF · 8.0 MB · 121 pagesText searchable
Download RSR-032 Attachment 54.pdfRead the text of RSR-032 Attachment 54.pdf
RSR-032 Attachment 53.pdf
PDF · 13 MB · 204 pagesText searchable
Download RSR-032 Attachment 53.pdfRead the text of RSR-032 Attachment 53.pdf
RSR-032 Attachment 52.pdf
PDF · 10 MB · 130 pagesText searchable
Download RSR-032 Attachment 52.pdfRead the text of RSR-032 Attachment 52.pdf
RSR-032 Attachment 51.pdf
PDF · 1.9 MB · 57 pagesText searchable
Download RSR-032 Attachment 51.pdfRead the text of RSR-032 Attachment 51.pdf
RSR-032 Attachment 50.pdf
PDF · 1.7 MB · 6 pagesText searchable
Download RSR-032 Attachment 50.pdfRead the text of RSR-032 Attachment 50.pdf
RSR-032 Attachment 49.pdf
PDF · 3.1 MB · 83 pagesText searchable
Download RSR-032 Attachment 49.pdfRead the text of RSR-032 Attachment 49.pdf
RSR-032 Attachment 48.pdf
PDF · 1016 KB · 3 pagesText searchable
Download RSR-032 Attachment 48.pdfRead the text of RSR-032 Attachment 48.pdf
RSR-032 Attachment 47.pdf
PDF · 9.7 MB · 10 pagesText searchable
Download RSR-032 Attachment 47.pdfRead the text of RSR-032 Attachment 47.pdf
RSR-032 Attachment 46.pdf
PDF · 4.9 MB · 7 pagesText searchable
Download RSR-032 Attachment 46.pdfRead the text of RSR-032 Attachment 46.pdf
RSR-032 Attachment 45.pdf
PDF · 48 MB · 373 pagesText searchable
Download RSR-032 Attachment 45.pdfRead the text of RSR-032 Attachment 45.pdf
RSR-032 Attachment 44.pdf
PDF · 10 MB · 38 pagesText searchable
Download RSR-032 Attachment 44.pdfRead the text of RSR-032 Attachment 44.pdf
RSR-032 Attachment 43.pdf
PDF · 10.0 MB · 49 pagesText searchable
Download RSR-032 Attachment 43.pdfRead the text of RSR-032 Attachment 43.pdf
RSR-032 Attachment 42.pdf
PDF · 15 MB · 25 pagesText searchable
Download RSR-032 Attachment 42.pdfRead the text of RSR-032 Attachment 42.pdf
RSR-032 Attachment 41.pdf
PDF · 1.1 MB · 3 pagesText searchable
Download RSR-032 Attachment 41.pdfRead the text of RSR-032 Attachment 41.pdf
RSR-032 Attachment 40.pdf
PDF · 1012 KB · 1 pageText searchable
Download RSR-032 Attachment 40.pdfRead the text of RSR-032 Attachment 40.pdf
RSR-032 Attachment 39.pdf
PDF · 9.9 MB · 14 pagesText searchable
Download RSR-032 Attachment 39.pdfRead the text of RSR-032 Attachment 39.pdf
RSR-032 Attachment 38.pdf
PDF · 6.1 MB · 12 pagesText searchable
Download RSR-032 Attachment 38.pdfRead the text of RSR-032 Attachment 38.pdf
RSR-032 Attachment 37.pdf
PDF · 4.2 MB · 12 pagesText searchable
Download RSR-032 Attachment 37.pdfRead the text of RSR-032 Attachment 37.pdf
RSR-032 Attachment 36.pdf
PDF · 3.5 MB · 12 pagesText searchable
Download RSR-032 Attachment 36.pdfRead the text of RSR-032 Attachment 36.pdf
RSR-032 Attachment 35.pdf
PDF · 14 MB · 38 pagesText searchable
Download RSR-032 Attachment 35.pdfRead the text of RSR-032 Attachment 35.pdf
RSR-032 Attachment 34.pdf
PDF · 7.8 MB · 13 pagesText searchable
Download RSR-032 Attachment 34.pdfRead the text of RSR-032 Attachment 34.pdf
RSR-032 Attachment 33.pdf
PDF · 7.2 MB · 11 pagesText searchable
Download RSR-032 Attachment 33.pdfRead the text of RSR-032 Attachment 33.pdf
RSR-032 Attachment 32.pdf
PDF · 1.3 MB · 3 pagesText searchable
Download RSR-032 Attachment 32.pdfRead the text of RSR-032 Attachment 32.pdf
RSR-032 Attachment 31.pdf
PDF · 2.3 MB · 26 pagesText searchable
Download RSR-032 Attachment 31.pdfRead the text of RSR-032 Attachment 31.pdf
RSR-032 Attachment 30.pdf
PDF · 12 MB · 18 pagesText searchable
Download RSR-032 Attachment 30.pdfRead the text of RSR-032 Attachment 30.pdf
RSR-032 Attachment 29.pdf
PDF · 3.2 MB · 9 pagesText searchable
Download RSR-032 Attachment 29.pdfRead the text of RSR-032 Attachment 29.pdf
RSR-032 Attachment 28.pdf
PDF · 19 MB · 127 pagesText searchable
Download RSR-032 Attachment 28.pdfRead the text of RSR-032 Attachment 28.pdf
RSR-032 Attachment 27.pdf
PDF · 7.7 MB · 12 pagesText searchable
Download RSR-032 Attachment 27.pdfRead the text of RSR-032 Attachment 27.pdf
RSR-032 Attachment 26.pdf
PDF · 4.5 MB · 12 pagesText searchable
Download RSR-032 Attachment 26.pdfRead the text of RSR-032 Attachment 26.pdf
RSR-032 Attachment 25.pdf
PDF · 3.9 MB · 14 pagesText searchable
Download RSR-032 Attachment 25.pdfRead the text of RSR-032 Attachment 25.pdf
RSR-032 Attachment 24.pdf
PDF · 6.1 MB · 13 pagesText searchable
Download RSR-032 Attachment 24.pdfRead the text of RSR-032 Attachment 24.pdf
RSR-032 Attachment 23.pdf
PDF · 4.2 MB · 19 pagesText searchable
Download RSR-032 Attachment 23.pdfRead the text of RSR-032 Attachment 23.pdf
RSR-032 Attachment 22.pdf
PDF · 24 MB · 1,282 pagesText searchable
Download RSR-032 Attachment 22.pdfRead the text of RSR-032 Attachment 22.pdf
RSR-032 Attachment 21.pdf
PDF · 27 MB · 1,005 pagesText searchable
Download RSR-032 Attachment 21.pdfRead the text of RSR-032 Attachment 21.pdf
RSR-032 Attachment 20_Part2.pdf
PDF · 24 MB · 109 pagesText searchable
Download RSR-032 Attachment 20_Part2.pdfRead the text of RSR-032 Attachment 20_Part2.pdf
RSR-032 Attachment 20_Part1.pdf
PDF · 35 MB · 150 pagesText searchable
Download RSR-032 Attachment 20_Part1.pdfRead the text of RSR-032 Attachment 20_Part1.pdf
RSR-032 Attachment 19.pdf
PDF · 5.8 MB · 23 pagesText searchable
Download RSR-032 Attachment 19.pdfRead the text of RSR-032 Attachment 19.pdf
RSR-032 Attachment 18.pdf
PDF · 4.7 MB · 8 pagesText searchable
Download RSR-032 Attachment 18.pdfRead the text of RSR-032 Attachment 18.pdf
RSR-032 Attachment 17_Part3.pdf
PDF · 12 MB · 282 pagesText searchable
Download RSR-032 Attachment 17_Part3.pdfRead the text of RSR-032 Attachment 17_Part3.pdf
RSR-032 Attachment 17_Part2.pdf
PDF · 26 MB · 500 pagesText searchable
Download RSR-032 Attachment 17_Part2.pdfRead the text of RSR-032 Attachment 17_Part2.pdf
RSR-032 Attachment 17_Part1.pdf
PDF · 16 MB · 500 pagesText searchable
Download RSR-032 Attachment 17_Part1.pdfRead the text of RSR-032 Attachment 17_Part1.pdf
RSR-032 Attachment 16.pdf
PDF · 7.5 MB · 46 pagesText searchable
Download RSR-032 Attachment 16.pdfRead the text of RSR-032 Attachment 16.pdf
RSR-032 Attachment 15.pdf
PDF · 6.6 MB · 17 pagesText searchable
Download RSR-032 Attachment 15.pdfRead the text of RSR-032 Attachment 15.pdf
RSR-032 Attachment 14.pdf
PDF · 5.2 MB · 10 pagesText searchable
Download RSR-032 Attachment 14.pdfRead the text of RSR-032 Attachment 14.pdf
RSR-032 Attachment 13.pdf
PDF · 8.7 MB · 17 pagesText searchable
Download RSR-032 Attachment 13.pdfRead the text of RSR-032 Attachment 13.pdf
RSR-032 Attachment 12.pdf
PDF · 5.8 MB · 12 pagesText searchable
Download RSR-032 Attachment 12.pdfRead the text of RSR-032 Attachment 12.pdf
RSR-032 Attachment 11.pdf
PDF · 7.5 MB · 15 pagesText searchable
Download RSR-032 Attachment 11.pdfRead the text of RSR-032 Attachment 11.pdf
RSR-032 Attachment 10.pdf
PDF · 13 MB · 145 pagesText searchable
Download RSR-032 Attachment 10.pdfRead the text of RSR-032 Attachment 10.pdf
RSR-032 Attachment 9.pdf
PDF · 31 MB · 897 pagesText searchable
Download RSR-032 Attachment 9.pdfRead the text of RSR-032 Attachment 9.pdf
RSR-032 Attachment 8.pdf
PDF · 13 MB · 203 pagesText searchable
Download RSR-032 Attachment 8.pdfRead the text of RSR-032 Attachment 8.pdf
RSR-032 Attachment 7.pdf
PDF · 10 MB · 12 pagesText searchable
Download RSR-032 Attachment 7.pdfRead the text of RSR-032 Attachment 7.pdf
RSR-032 Attachment 6.pdf
PDF · 11 MB · 335 pagesText searchable
Download RSR-032 Attachment 6.pdfRead the text of RSR-032 Attachment 6.pdf
RSR-032 Attachment 5.pdf
PDF · 24 MB · 65 pagesText searchable
Download RSR-032 Attachment 5.pdfRead the text of RSR-032 Attachment 5.pdf
RSR-032 Attachment 4.pdf
PDF · 26 MB · 570 pagesText searchable
Download RSR-032 Attachment 4.pdfRead the text of RSR-032 Attachment 4.pdf
RSR-032 Attachment 3.pdf
PDF · 2.8 MB · 8 pagesText searchable
Download RSR-032 Attachment 3.pdfRead the text of RSR-032 Attachment 3.pdf
RSR-032 Attachment 2.pdf
PDF · 1.5 MB · 26 pagesText searchable
Download RSR-032 Attachment 2.pdfRead the text of RSR-032 Attachment 2.pdf
RSR-032 Attachment 1.pdf
PDF · 12 MB · 18 pagesText searchable
Download RSR-032 Attachment 1.pdfRead the text of RSR-032 Attachment 1.pdf
Text of RSR-032 Attachment 176_Part2.pdf
Extracted from the file · 754 pages · 1,598,897 characters
Text of RSR-032 Attachment 176_Part1.pdf
Extracted from the file · 110 pages · 439,601 characters
Text of RSR-032 Attachment 175_Part7.pdf
Extracted from the file · 275 pages · 622,526 characters
Text of RSR-032 Attachment 175_Part6.pdf
Extracted from the file · 350 pages · 828,421 characters
Text of RSR-032 Attachment 175_Part5.pdf
Extracted from the file · 350 pages · 841,526 characters
Text of RSR-032 Attachment 175_Part4.pdf
Extracted from the file · 350 pages · 529,828 characters
Text of RSR-032 Attachment 175_Part3.pdf
Extracted from the file · 350 pages · 417,827 characters
Text of RSR-032 Attachment 175_Part2.pdf
Extracted from the file · 350 pages · 717,402 characters
Page 30 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 30 of 2375 6.5.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Generator Diesel ASTs Nine (9) borings were completed in the vicinity of REC 1, REC 2, AOC 1, and AOC 6. Soil samples were collected from two borings (B17 and B18) advanced near the stormwater outlet pipe in the southern stormwater detention basin, from two borings (B9 and B32) advanced near the backup emergency generator/AST located west of the loading dock, from two borings (B10 and B11) advanced near the backup emergency generator/AST southwest of the building, and from three borings (B6, B7, and B8) advanced in the loading dock area and near the catch basin. The borings were performed to provide additional coverage near RECs 1 and 2 and AOCs 1 and 6 and to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA in L1985-1, L1985-2, L1985-3MW, L1985-4, L1985-7, L1985-13, and L1985-15. The samples were analyzed for one or more of the following: VOCs, ETPH, PAHs, ethylene glycol (EG) and propylene gylcol (PG) (REC 2 only), and alcohols (AOC 1 only). COCs were not detected in the samples except as follows: • • • 6.5.2 ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. One or more PAHs were detected in soil samples B17 0-0.5 fbg and B18 0-1.5 fbg at concentrations below applicable RSR criteria. Elevated levels of copper, lead, nickel and/or zinc were also detected in the samples. One or more PAHs were detected in soil samples B9 0.4-2 fbg and B32 2-4 fbg at concentrations below applicable RSR criteria. The samples were collected by the backup emergency generator/AST located west of the loading dock area. REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former Culbro 7,000-gallon Fuel Oil Underground Storage Tank (UST) Eight (8) borings were completed in the southern portion of the Site where a former barn/warehouse/office and 7,000-gallon fuel oil UST were located. The borings were completed to evaluate the presence of releases at AOC 7 (B24/MW6 and B25) and at an apparent outdoor storage area northwest of the barn (B30 and B31); to provide additional coverage near REC 3 (B26 through B29); and, to evaluate the extent and degree of COCs (including elevated metals concentrations) detected during the Phase II ESA at L1985-1, L1985-8, L1985-9, and L1985-10MW. The samples were analyzed for one or more of the following: VOCs (REC 3 and AOC 7), ETPH (REC 3 and AOC 7), SVOCs (REC 3) and/or PAHs (AOC 7), pesticides (REC 3), herbicides (REC 3), and RCRA 8 metals plus copper, nickel, and zinc (REC 3). COCs were not detected in the samples except as follows: • • • • • The VOC, naphthalene was detected in sample B27 2-4 fbg at a concentration below RSR criteria. ETPH was detected in sample B26 5-7.5 fbg at a concentration exceeding the RDEC and GA PMC. The sample was tested for leachable ETPH to evaluate compliance with the GA PMC; leachable ETPH was not detected. Several PAHs were detected in sample B27 2-4 fbg at concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC. Three leachable PAHs were detected at concentrations below the GWPC. PAHs were detected in samples B24/MW6 0-2 fbg, B28 6-8 fbg, and B29 6-8.5 fbg at concentrations below RSR criteria. The SVOC, isophorone was detected in sample B26 8-10 fbg at a concentration below RSR criteria. The sample was collected just below the apparent concrete floor in the basement and the presence of Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 15 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 31 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 31 of 2375 • • 6.5.3 isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and not from a release. Pesticides (including dieldrin, chlordane, DDD, DDT and DDE) were detected in samples B24/MW6 02 fbg, B27 2-4 fbg. B28 6-8 fbg, B28 16-18 fbg, B29 6-8.5 fbg, and B31 0-2 fbg at concentrations above the GA PMC. Chlordane was detected in B24/MW6 0-2 fbg at a concentration above the RDEC. Five of the six samples were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Arsenic was detected above RDEC and I/C DEC in soil sample B29 6-8.5 fbg and elevated concentrations of cadmium, lead, and zinc were also present. The sample was tested for leachable metals (arsenic, cadmium, chromium, lead, nickel, and zinc) to evaluate compliance with the GA PMC. Leachable arsenic and lead concentrations were above the GA PMC and the other metals were either not detected or detected below the GA PMC. o Elevated concentrations of arsenic, barium, and nickel were present in B26 5-7.5 fbg. Elevated concentrations of arsenic, barium, chromium, and nickel were present in B27 2-4 fbg. In addition, an elevated lead concentration was present in B28 6-8 fbg. Samples B24/MW6 8-10 fbg, B27 2-4 fbg, and B29 9-11 fbg were tested for leachable metals (arsenic, barium, and/or chromium) to evaluate compliance with the GA PMC. Leachable metals were either not detected or detected at concentrations below the GA PMC. REC 4 - Release from Snow Removal Equipment Three borings (B12, B13, and B14) were completed near the southeastern corner of the northern parking lot near L1985-5MW to evaluate the nature, degree and extent of COCs detected during the Phase II ESA. Soil samples collected from the borings were analyzed for VOCs, ETPH and PAHs. COCs were not detected in samples except as follows: • • 6.5.4 ETPH was detected in sample B12 0.5-2 fbg at a concentration below RSR criteria. Several PAHs were detected in samples B12 0.5-2 fbg and B13 0.5-2 fbg at concentrations below RSR criteria. AOC 2 - Agricultural Use AOC 8 - Former Barns in the Central and Southeastern Portions of the Site Twenty-eight (28) borings were completed throughout the site to provide coverage and to evaluate the extent and degree of COCs (including elevated metals) detected during the Phase II ESA in L1985-7, L1985-8, L19859, L1985-10MW, L1985-11, and L1985-15. Borings B1/MW1, B2/MW2 and B3/MW3 were completed at and near the centrally-located barn (AOC 8). Borings B19 and B20 were completed at and near the barn in the southeastern portion of the Site (AOC 8). Samples from borings used, in part, to evaluate other AOCs (B4/MW4, B5/MW5, B6, B7, B8, B9, B11, B12, B17, B18, B21, B22, B23/MW7, B24/MW6, B25, B26, B27, B28, B29, B30, B31, B32 and B33) were tested for pesticides and/or metals to provide coverage throughout the Site (AOC 2). Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, and SVOCs or PAHs (AOC 8), and pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc (AOCs 2 and 8). The discussion below includes all COCs for borings B1/MW1, B2/MW2, B3/MW3, B19 and B20, and is limited to pesticides and metals for the remaining borings, with the exception of B24/MW6 and B25 through B31, which are discussed in Section 6.5.2 and B21, B22 and B23/MW7, which are discussed in Section 6.5.6. Non- Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 16 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 32 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 32 of 2375 pesticide and non-metal COCs for the remaining borings are discussed in other sections of the report applicable to their respective RECs and/or AOCs. COCs were not detected in samples except as follows: • • • • • • 6.5.5 Two PAHs were detected in sample B1/MW1 0.3-1 fbg at concentrations below RSR criteria. Several PAHs were detected in sample B20 0-2 fbg at concentrations below RSR criteria. Pesticides (dieldrin, DDD and/or DDE) were detected in samples B1/MW1 5-6.5 fbg, B2/MW2 1-3 fbg, B3/MW3 2-4 fbg, B19 0-2 fbg and B20 0-2 fbg at concentrations below criteria with the exception of B2/MW2, B3/MW3, B19 and B20, which exceeded the GA PMC. Three of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC; leachable pesticides were not detected. The chlordane concentration in B20 exceeded the RDEC. Pesticides (chlordane, lindane, DDD, DDE and/or DDT) were detected in samples B4/MW4 0-2 fbg, B5/MW5 0-2 fbg, B7 1-3 fbg, B9 0.4-2 fbg, B11 0.5-2 fbg, B12 0.5-2 fbg, B17 2-4 fbg, B18 0-1.5 fbg, B21 0-2 fbg, B22 0-2 fbg, B23/MW7 0-2 fbg and B33 0-0.5 fbg at concentrations above the GA PMC. Six of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides to evaluate compliance with the GA PMC. Leachable pesticides were either not detected or detected at concentrations below the GWPC with the exception of leachable dieldrin in B23/MW7 0-2 fbg. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, barium, chromium, copper, lead, mercury, nickel, and/or zinc were detected in samples B17 0-0.5 fbg, B18 0-1.5 fbg, B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below RSR criteria. Leachable metals were either not detected or detected below the GWPC except for leachable lead which exceeded the GA PMC in B23/MW7. AOC 3 - Exterior Oil-Filled Transformers Four (4) borings were completed adjacent to transformers located in the northeast portion of the Site (B15 and B16) and adjacent to transformers and/or electrical equipment near the northwest corner of the stormwater detention basin (B33 and B34). The borings were completed to evaluate potential releases near the stormwater basin transformers and to evaluate the extent and degree of COCs detected at L1985-15. One soil sample was collected from each boring from ground surface to 0.5 fbg and tested for ETPH and PCBs. ETPH and PCBs were not detected in the samples. 6.5.6 AOC 4 - Suspected Dumping Area Three (3) borings (B21, B22, and B23/MW7) were completed near the southeastern corner of the Site to evaluate the extent and degree of COCs detected during the Phase II ESA at L1985-11. Soil samples collected from the borings were analyzed for the following: VOCs, ETPH, SVOCs or PAHs, PCBs, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected in samples except as follows: • • • Several PAHs were detected in sample B21 0-2 fbg, with some concentrations above the RDEC and GA PMC. The sample was tested for leachable PAHs to evaluate compliance with the GA PMC; leachable PAHs were not detected. Several PAHs were detected in sample B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. Pesticides (chlordane, dieldrin, DDT and/or DDE) were detected in samples B21 0-2 fbg, B22 0-2 fbg and B23/MW7 0-2 fbg at concentrations above the GA PMC. Two of these samples which contain the highest concentrations of total pesticides were tested for leachable pesticides. Leachable pesticides Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 17 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 33 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 33 of 2375 • 6.5.7 were not detected in the samples with the exception of dieldrin in B23/MW7 which exceeded the GWPC. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of arsenic, lead, and/or mercury were detected in samples B21 0-2 fbg and B23/MW7 0-2 fbg at concentrations below applicable RSR criteria. The sample collected from B23/MW7 was tested for leachable metals to evaluate compliance with the GA PMC. Leachable metals were not detected with the exception of leachable lead which exceeds the GA PMC. AOC 5 - Former JDS Uniphase Site Operations Six (6) borings (B1/MW1, B2/MW2, B3/MW3, B6, B7 and B8) were completed outside the southern wall of the site building and two borings (B4/MW4 and B5/MW5) were completed outside the eastern wall of the building. The borings were advanced to evaluate whether releases occurred associated with former site occupant (JDS Uniphase (JDS)) activities that included fiber optic component manufacturing. Soil samples collected from the borings were analyzed for one or more of the following: VOCs, ETPH, SVOCs, alcohols, and RCRA 8 metals plus copper, nickel, and zinc. COCs were not detected except for one or more PAHs detected in samples B1/MW1 0.3-1 fbg, B4/MW4 2-4 fbg, and B5/MW5 0-2 fbg at concentrations below RSR criteria. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil in samples. Interior soil samples were collected at five locations in a former JDS ”Clean Room” in the southeastern portion of the building. Six samples were tested (B35 0.5-1.5 fbg, B36 0.5-1.5 fbg, B36 1.5-2.5 fbg, B37 0.5-1.5 fbg, B38 0.5-1.5 fbg, and B39 0.5-1.5 fbg). Five of the six samples were analyzed for ETPH, VOCs, 1,4-dioxane, SVOCs, total metals (arsenic, barium, cadmium, chromium, copper, lead, nickel, selenium, silver, and zinc), PFAS, and alcohols. Two duplicate samples were tested for PFAS and a deeper sample at B36 was also tested for PFAS. COCs were not detected in samples except as follows: • • 6.6 One PFAS compound, perfluorodecanesulfonic acid (PFDS) was detected in sample B36 0-1.5 fbg at a concentration of 0.11 µg/kg. PFAS were not detected in a deeper sample collected from 1.5 to 2.5 fbg at B36. CTDEEP has established remedial criteria for the sum of five PFAS compounds (perfluoroheptanoic acid (PFHpA), perfluorohexane sulfonic acid (PFHxS), perfluorononanoic acid (PFNA), perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA)). Remedial criteria for the remaining PFAS compounds, including PFDS, have not been established. Metals were either not detected or reported at concentrations within the naturally-occurring ranges present in uncontaminated soil with the following exceptions: o Elevated levels of cadmium, chromium, and nickel were detected in sample B36 0.5-1.5 fbg at concentrations below applicable RSR criteria. Groundwater Analytical Results A summary of the groundwater sampling results, and the laboratory analytical reports are presented in Table 3 and Appendix F, respectively. Groundwater samples collected from the newly-installed and existing monitoring wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, B5/MW5, B23/MW7, B24/MW6, L1985-3MW, L1985-5MW, L1985-6MW, and L198510MW) were analyzed for one or more of the following: VOCs, ETPH, SVOCs or PAHs, herbicides, pesticides, RCRA 8 metals plus copper, nickel and zinc, alcohols, and glycols. COCs were not detected in samples except as follows: Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 18 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 34 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 34 of 2375 • • • 6.7 The SVOCs 2-methyl phenol and 3+4 methyl phenol were detected in groundwater collected from L1985-3MW at concentrations below RSR criteria. Benzyl alcohol was also detected in the sample and remedial criteria have not been established for this compound. Total barium was detected in seven wells (B1/MW1, B2/MW2, B3/MW3, B4/MW4, L1985-3MW, L1985-5MW, and L1985-6MW) at concentrations below criteria and within the range occurring naturally in uncontaminated groundwater. Pesticides DDT and DDE were detected in groundwater collected from L1985-6MW at concentrations below RSR criteria. L1985-6MW is the most upgradient monitoring well, located northwest of the site building and downgradient of the adjacent parcel that was formerly used for agricultural purposes. Pesticides were not detected in groundwater collected from other wells at the site during the Phase II and Phase II/III investigations. Sub-Slab Soil Vapor Analytical Results A summary of the sub-slab soil vapor sampling results and the laboratory analytical reports are presented in Table 4 and Appendix G, respectively. Vapor samples were collected from eighteen (18) SSVPs and tested for VOCs, including 1,4-dioxane, to evaluate the quality of vapor beneath the building, and to provide information where elevated VOC concentrations might indicate the presence of a soil or groundwater source beneath the building associated with the former JDS operations (AOC 5). A duplicate sample was collected from SV-13 (SV-13A). VOCs were not detected in the samples except as follows: • • • • • • • • 6.8 1,4-dioxane was detected in samples SV-1, SV-2, SV-3, SV-6, SV-11, SV-12, SV-13, and SV-13A at concentrations between 1.1 and 10 ppbv, below the Res SVVC and I/C SVVC. Acetone was detected in samples SV-1 through SV16 at concentrations ranging from approximately 10 to 380 parts per billion-volume (ppbv), all below the Res SVVC and I/C SVVC. Methyl ethyl ketone (MEK) was detected in samples SV-12 and SV-13 at concentrations of 7.8 and 2.8, respectively, below the Res SVVC and I/C SVVC. Ethanol was detected in all of the vapor samples at concentrations ranging from approximately 25 to 240 ppbv. Remedial criteria have not been established for this compound. Isopropylalcohol was detected in soil vapor samples SV-1, SV-2, SV-3, SV-6, SV-11, SV-12, SV-13, SV-13A, and SV-15, at concentrations ranging from approximately 3.8 to 31 ppbv. Remedial criteria have not been established for this compound. Ethylbenzene was detected in samples SV-11, SV-13, and SV-13A samples at concentrations ranging from approximately 48 to 160 ppbv, below the Res SVVC and I/C SVVC. Xylenes (m,p-xylenes and o-xylene) were detected in samples SV-11, SV-13, and SV-13A, at concentrations ranging from 54 to 570 ppbv, and total xylene concentrations ranging from 230 to 760 ppbv, below the Res SVVC and I/C SVVC applicable to total xylenes. Tetrachloroethene (PCE) was detected in samples SV-12, SV-13, SV-13A, SV-14, SV-17, and SV-18 at concentrations between 0.6 and 1.1 ppbv, below the Res SVVC and I/C SVVC. Data Quality Assessment (DQA) and Data Usability Evaluation (DUE) The soil, groundwater, and soil vapor analytical data were generated in accordance with the Connecticut RCPs. The RCP reports are presented in each laboratory analytical data report, which are included in Appendices E, F, and G. The purpose of the RCP is to provide quality data and allow the evaluation of whether the results are of sufficient quality for the intended purpose and in relation to project-specific objectives. The objective of testing is to evaluate the nature, degree and extent of releases identified during Phase III investigations and to determine whether releases occurred at five newly-identified AOCs based on information contained in the Phase I ESA. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 19 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 35 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 35 of 2375 To validate the data, a data quality assessment and data usability evaluation (DQA/DUE) of the analytical data was conducted in general conformance with the CTDEEP “Laboratory Quality Assurance and Quality Control – Data Quality Assessment and Data Usability Evaluation Guidance Document,” dated May 2010. As part of the evaluation, the laboratory reports were reviewed to ensure that all sample and associated quality assurance results were available. Results of the completeness review indicated that all collected samples were analyzed and all quality control results were available to complete the data validation process. Consistent procedures and laboratory analyses of the samples were achieved. Sample containers were packed on ice and delivered to the laboratory under standard chain of custody procedures. All samples were received within the allowable temperature range, and were extracted and analyzed within allowable holding times for the method with the exception of the following samples: • • Soil sample B23/MW7 2-4 fbg was analyzed for SPLP Pesticides past its hold time. Leachable pesticides were not detected in the sample. Pesticides persist in the environment for many years without degradation; therefore, the data are usable. Soil sample B27 2-4 fbg was analyzed for SPLP SVOCs past its hold time. Leachable phenanthrene was the only compound detected in the sample below remedial criteria. The sample was also analyzed for leachable PAHs within allowable hold times. One or more leachable PAHs, including phenanthrene were detected in the sample. Since remediation due to DEC exceedances is warranted in this area due to PAH-impacted soil, the data are usable. Results of the DQA/DUE indicate that the analytical data for the Site are of adequate quality for the intended objectives. Minor non-conformances were noted that do not affect data usability. 6.9 Data Gaps The CTDEEP SCGD requires the identification and evaluation of data gaps, which are defined as a lack of, or inability to obtain, information required by standard practice despite good faith efforts by the environmental professional to gather such information. No data gaps were identified while performing this Phase II/III Environmental Site Assessment except for evaluation of the nature, degree and extent of potential contamination at certain AOCs, as discussed in Section 7. In addition, assessment of groundwater for PFAS and 1,4-dioxane is warranted. 7.0 SUMMARY, CONCEPTUAL SITE MODEL AND CONCLUSIONS 7.1 Introduction ZUVIC was retained by Eversource to complete a Phase II/III Environmental Site Assessment (ESA) of the current Eversource Call/Data Center located at 1985 Blue Hills Avenue Extension, Windsor, Connecticut. The purpose of the Phase II/III ESA is to evaluate the nature, degree and extent of releases identified during the Phase II ESA completed by others and to evaluate whether releases have occurred at AOCs identified by ZUVIC. The work was completed based on ZUVIC’s review of previous reports. The work completed included the advancement of soil borings, installation of groundwater monitoring wells, soil sampling inside the site building, installation of vapor points inside the building and sampling and testing of soil, groundwater, and vapor. Using the information from this and previous investigations, a conceptual site model (CSM) was formulated for the Site. A CSM is used to understand the history of the Site, the releases that have occurred at the Site, the fate and transport of soil and groundwater contamination, and its potential impact on sensitive receptors in the Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 20 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 36 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 36 of 2375 site vicinity. A summary of the recognized environmental conditions and areas of concern is presented in Table 5. 7.2 Background Information The Site located at 1985 Blue Hills Avenue Extension in Windsor, CT is developed with a single story 165,000 square foot masonry / slab on grade building currently used by Eversource as office space and a call/data center. The building is surrounded by asphalt parking lots and landscaped areas. Historically, the Site was used for agricultural purposes (cultivation of tobacco), presumed drying of tobacco in two barns, storage of chemicals used for agricultural purposes in a third barn, and residential dwellings. The Site was developed with the site building in 2001 and occupied by JDS until 2004 when Eversource occupied the building for use as office space for a call/data center. The property is an “establishment,” and was subject to the Connecticut Transfer Act (CGS Section 22a-134 through 22a-134e) when it was purchased by Eversource. The “establishment” determination was based on documentation of former hazardous waste generation by JDS. The property was transferred on December 1, 2021 to Eversource and was entered into the Property Transfer Program in December 2021 with an acknowledgement of receipt issued by the CTDEEP in March 2022. Eversource is the Certifying Party to the transfer, and as such, is responsible for investigation and remediation of the Site. The CTDEEP assigned REM ID No. 14862 to the Site. 7.3 Summary of Conditions at RECs and AOCs and Conceptual Site Model For this investigation, soil sample intervals selected for laboratory analyses, soil and groundwater sampling locations, and analytical parameters were based on each REC/AOC release mechanism, COCs, and COCs released as identified during the Phase II ESA. A description of the CSM for each of the identified RECs/AOCs is presented in Section 2 and Table 5, and data generated, and observations made during this, and prior investigations, are presented below. 7.3.1 REC 1 – Diesel Fuel Release at Loading Dock REC 2 - Coolant Release from Emergency Generator AOC 1- Loading Dock Area, Storm Drain, and Southeast Stormwater Detention Basin AOC 6 – Two Emergency Diesel ASTs A diesel fuel release occurred at the loading docks in May 2011. Diesel fuel was released to paved surfaces and a catch basin in the area and conveyed to a stormwater detention basin located southeast of the building. According to records, the release was contained, and “hard” surfaces cleaned of residual fuel. Two backup emergency generators are present at the Site, one in the parking lot southwest of the building and one adjacent to the south wall of the building and west of the loading dock area; each generator is equipped with a diesel storage tank. June 2017 records indicate that a hose on one of the generators failed leading to a release of approximately 40-gallons of coolant inside the generator enclosure. Approximately 5-gallons of coolant seeped through seams of the enclosure onto a concrete pad and gravel near the enclosure. JDS presumably received, shipped and managed chemicals and hazardous materials, including wastes, at the loading docks. In addition, hydraulic oil associated with two hydraulic compactors, and potential temporary storage of oil or chemicals in the dumpsters may have resulted in releases in the area. Phase II ESA samples collected from borings L1985-1, -2, -3MW, -4, -7, -13, and -15 and Phase III samples from B6 through B11, B17, B18 and B32 were used to evaluate these RECs and AOCs. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 21 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 37 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 37 of 2375 COCs identified for the RECs and AOCs include VOCs, ETPH, SVOCs or PAHs; EG and PG (REC 2 only); and RCRA 8 metals plus copper, nickel, and zinc and alcohols (AOC 1 only). VOCs, glycols and alcohols were not detected in soil samples. The results of metals testing applicable to AOC 1 are discussed in Section 7.3.4. Low-level ETPH contamination is present in surficial soil near the loading docks, at L1985-1 and in deeper soil (10-11 fbg) at L1985-3MW; PAHs were not detected. The concentrations in these samples were all below remedial criteria. Phase II/III samples collected at B6, B7, B8 did not contain detectable levels of ETPH or PAHs. The surficial contamination near the loading docks is likely related to incidental releases from the normal operation of motor vehicles. The deeper contamination in L1985-3MW is likely related to cross-contamination from surficial soils mixing with deeper soils during drilling. Low-level ETPH and PAH contamination was detected in surficial soil at L1985-15, near the stormwater outlet pipe in the southern stormwater detention basin; concentrations are below remedial criteria. Phase II/III surficial soil samples collected from B17 and B18 contained PAHs below criteria. The release of diesel fuel to the catch basin in the loading dock area apparently resulted in residual contamination below remedial criteria in the stormwater basin. Alternatively, the PAH detections may be due to temporary storage of stormwater in the basin that contains PAHs leached from asphalt parking areas. Additional evaluation and remediation are not warranted near these borings. Low levels of PAHs or ETPH were detected in surficial soil collected from L1985-7 (near the emergency generator/AST southwest of the building), and L1985-13, B9, and B32 (near the emergency generator west of the loading docks). The contamination may be due to placement of contaminated fill during installation of the generator enclosures. Additional evaluation and remediation are not warranted near these borings. Surficial soil samples collected from Phase III borings near the generator southwest of the building (B10 and B11) did not contain detectable PAHs, however ETPH was detected in sample B10 0.3-1 fbg above the RDEC and GA PMC potentially related to a release during refueling of the generator. Leachable ETPH was not detected in the sample, demonstrating compliance with the PMC. The ETPH release at B10 was delineated vertically by sample B10 1-3 fbg, in which ETPH was not detected. Remediation is required near B10 and the generator. Additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Releases associated with the coolant release were not evident and no further evaluation or remediation is warranted. The nature, extent and degree of ETPH and PAH contamination near the loading docks, stormwater detention basin and the emergency generator located west of the loading dock are sufficiently evaluated and all contaminant concentrations are below the RDEC and GA PMC, therefore additional evaluation or remediation are not warranted. Additional investigation may be desired, and remediation is required, in the vicinity of the generator located southwest of the building. 7.3.2 REC 3 - Historical Barn/Warehouse and Fire AOC 7 - Former 7,000-gallon Fuel Oil Underground Storage Tank (UST) A former barn/warehouse was located in the southern portion of the Site and was destroyed in May 1994 by a structure fire that was suppressed using water. The structure was used for storing pesticides, herbicides, and other chemicals, and as office space in its eastern end. Following the fire, samples of air, surface wipes, water runoff from the fire suppression, and surficial soil were analyzed for pesticides. According to previous documentation, pesticides were detected in one water runoff sample. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 22 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 38 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 38 of 2375 An approximately 6,750-gallon heating oil UST was reportedly located north of the northeastern corner of the barn/warehouse. In addition, aerial photographs indicate that an outdoor storage area was present near the northwestern corner of the barn. Phase II soil samples collected from borings L1985-8, -9, and -10MW were used to evaluate soil apparently within the footprint of the former barn/warehouse. Phase II borings were not completed near the former UST. Phase III borings included B26, B27, B28 and B29 within, or near the footprint of the barn, borings B30 and B31 in the outdoor storage area, and B24/MW6 and B25 near the UST. COCs for REC 3 and AOC 7 include VOCs, ETPH, and SVOCs or PAHs: and, pesticides, herbicides, and RCRA 8 metals plus copper, nickel, and zinc (REC 3 only). Fill materials, including non-native red-brown soil and/or non-soil materials (asphalt, coal, brick, concrete, glass, and ash) were encountered from ground surface to approximately 8.5 fbg in borings L1985-8, L1985-9, L198510, B26, B27 and B29. A presumed basement concrete floor associated with the former barn/warehouse building was encountered in borings L1987-8, L1985-10, B26, B27 and B29 between approximate 7.5 to 9 fbg. Based on material encountered in borings, B24/MW6 and B25 are apparently located northeast of the former barn footprint. B29 is within an apparent “entrance/exit” structure on the north side of the barn, apparent in aerial photographs. B28 is located west of the barn footprint and L1985-9 is apparently located within the office area that was constructed between 1935 and 1941 at the eastern end of the building which may be a slab-on-grade addition, without a basement. It appears that at least a portion of the demolished structure and imported fill material were placed inside the footprint of the barn to backfill the basement. VOCs were not detected in soil samples with the exception of acetone in L1985-10MW 1-3 ft. at a concentration below RSR criteria. The apparent acetone contamination may be related to laboratory-induced contamination. The SVOC, isophorone was detected in soil sample B26 8-10 fbg at a concentration below RSR criteria. This sample was collected just below the apparent concrete floor of the basement and the isophorone is likely a result of a chemical reaction between concrete in the sample and acetone used by the laboratory and is not related to a release. Herbicides were not detected in soil samples. Low-level ETPH and/or PAH contamination were detected in surficial soil near L1985-9, L1985-10MW, B24/MW6 and in deeper soil at B28 6-8 fbg and B29 6-8.5 fbg, at concentrations below RSR criteria. Soil collected from B26 5-7.5 fbg and B27 2-4 fbg contain ETPH and SVOCs, respectively, at concentrations above the RDEC, I/C DEC and/or GA PMC. Leachable SVOCs/PAHs in the B27 sample and leachable ETPH in the B26 sample were below the GWPC, demonstrating compliance with the PMC. The ETPH release at B26 was delineated vertically by sample B26 8-10 fbg in which ETPH was not detected. The SVOC release at B27 was delineated vertically by sample B27 6-7.5 fbg, in which SVOCs/PAHs were not detected. Remediation is required near B26 and B27 and additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Pesticides were detected in soil in and near the footprint of the barn in surficial soil at B24/MW6 and B27, and in deeper soil at B28 6-8 fbg, B28 16-18 fbg, and B29 6-8.5 fbg; concentrations exceed the GA PMC. Leachable pesticides in the samples were below the GWPC, demonstrating compliance with the PMC. The chlordane concentration in sample B24/MW6 0-2 fbg is above the RDEC. The pesticide release at B24/MW6 was delineated vertically by sample B24/MW6 8-10 fbg. Remediation is required near the boring and additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 23 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docxPage 39 of 350
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 39 of 2375 Total metals were either not detected or reported at concentrations within the ranges of naturally-occurring levels present in uncontaminated soil except for elevated concentrations of arsenic, cadmium, lead, mercury, nickel and/or zinc in L1985-9, L1985-10MW, B26, B27 and 28. Leachable metals in the tested samples are compliant with the GA PMC except as described below. The arsenic concentration in B29 6-8.5 fbg exceeds the RDEC and I/C DEC and leachable arsenic and lead exceed the GA PMC. The metals exceedances in B29 were delineated vertically by soil sample B29 9-11 fbg. Remediation is required near the boring and additional evaluation to delineate the lateral extent of contamination in this area may be desired prior to remediation. ETPH, PAH, pesticide and metals contaminants co-occur in backfill material that is within the footprint of the barn. The contamination is attributed to the presence of demolished building materials, potentially containing materials that were stored in the basement prior to the fire. Evidence of a release in the vicinity of the outdoor storage area near the northwest corner of the barn was not observed based on surficial and deeper samples collected/tested from B30, however a surficial sample collected from B31 contained pesticides above the GA PMC. Leachable pesticides in the sample were below the GWPC, demonstrating compliance with the PMC. The data indicate that a release has occurred in the vicinity of B31 which warrants further evaluation. In addition, samples collected at 6 to 8 fbg and 16 to18 fbg at B28, located outside of the barn foundation and downgradient of B31, contained total pesticides above the GA PMC. Leachable pesticides were below the GWPC, demonstrating compliance with the PMC. The contamination at B28 may be related to pesticide storage at or near B28 if pesticide storage areas encompassed the area immediately west of the building. The contamination in the 16 to 18 fbg sample from the boring may be due to releases near B28 or releases near B31 that resulted in down gradient, soil-adsorbed contamination below the water table in the sample. Based on the current data, remediation is not required, however additional investigations are warranted to evaluate the nature, degree and extent of pesticide contamination near B28 and B31. Evidence of a release in the vicinity of the UST was not observed based on surficial and deeper samples analyzed from B24/MW6 and B25. In addition, groundwater collected from B24/MW6 did not contain detectable levels of ETPH, VOCs or PAHs. Low-level PAH detections in surficial soil at B24/MW6 are likely related to runoff from adjacent paved surfaces containing PAHs leached from asphalt pavement. Sufficient investigation associated with the UST has been completed and remediation is not required. 7.3.3 REC 4 - Release from Snow Removal Equipment Snow removal equipment is at times stored in the eastern end of the northern parking lot. During a site visit, Stantec observed oily staining on pavement in this area. One stain appeared wet from a recent equipment leak and was observed intersecting a crack in the pavement. Phase II boring L1985-5MW and Phase III borings B12, B13 and B14 were used to evaluate the REC. COCs for REC 4 include VOCs, ETPH, and PAHs. A constituent of petroleum products, m,p-xylene, was detected below remedial criteria in a surficial soil at L1985-5MW; VOCs were not detected in surficial samples from B12, B13, and B14. Low-level ETPH and/or PAH contamination was detected in surficial soil at B12 and B13 at concentrations below remedial criteria. The release of fuel associated with snow removal equipment storage in this area apparently resulted in residual contamination below remedial criteria. Phase II/III Environmental Site Assessment Eversource Call/Data Center, 1985 Blue Hills Ave Ext., Windsor, CT Page 24 of 31 \\ZUVIC-DC01\data\Projects\23246 - Eversource Blue Hills Ave Windsor Phase III\Reports\Enviro\Phase II-III Report\Revised Final Docs 3-18-2024\23246-6 Phase II-III ESA - 1985 Blue Hills Ave Windsor CT -FINAL_3-18-2024.docx
Text of RSR-032 Attachment 174.pdf
Extracted from the file · 2 pages · 3,788 characters
Text of RSR-032 Attachment 173.pdf
Extracted from the file · 9 pages · 19,276 characters
Text of RSR-032 Attachment 172.pdf
Extracted from the file · 2 pages · 5,216 characters
Text of RSR-032 Attachment 171.pdf
Extracted from the file · 2 pages · 7,025 characters
Text of RSR-032 Attachment 170.pdf
Extracted from the file · 4 pages · 596 characters
Text of RSR-032 Attachment 169.pdf
Extracted from the file · 14 pages · 2,105 characters
Text of RSR-032 Attachment 168.pdf
Extracted from the file · 178 pages · 303,260 characters
Text of RSR-032 Attachment 167_Part2.pdf
Extracted from the file · 844 pages · 1,367,165 characters
Text of RSR-032 Attachment 167_Part1.pdf
Extracted from the file · 284 pages · 480,797 characters
Text of RSR-032 Attachment 166.pdf
Extracted from the file · 4 pages · 5,984 characters
Text of RSR-032 Attachment 165_Part 4.pdf
Extracted from the file · 84 pages · 130,960 characters
Text of RSR-032 Attachment 165_Part 3.pdf
Extracted from the file · 482 pages · 674,897 characters
Text of RSR-032 Attachment 165_Part 2.pdf
Extracted from the file · 509 pages · 549,394 characters
Text of RSR-032 Attachment 165_Part 1.pdf
Extracted from the file · 500 pages · 578,799 characters
Text of RSR-032 Attachment 164.pdf
Extracted from the file · 42 pages, 16 without text · 66,266 characters
Text of RSR-032 Attachment 163.pdf
Extracted from the file · 575 pages · 624,136 characters
Text of RSR-032 Attachment 162.pdf
Extracted from the file · 17 pages · 19,879 characters
Text of RSR-032 Attachment 161 _Part2.pdf
Extracted from the file · 609 pages · 625,572 characters
Text of RSR-032 Attachment 161 _Part1.pdf
Extracted from the file · 131 pages · 171,359 characters
Text of RSR-032 Attachment 160.pdf
Extracted from the file · 56 pages · 84,793 characters
Text of RSR-032 Attachment 159.pdf
Extracted from the file · 97 pages · 159,126 characters
Text of RSR-032 Attachment 158.pdf
Extracted from the file · 54 pages · 96,528 characters
Text of RSR-032 Attachment 157.pdf
Extracted from the file · 261 pages · 326,004 characters
Text of RSR-032 Attachment 156.pdf
Extracted from the file · 74 pages · 99,158 characters
Text of RSR-032 Attachment 155.pdf
Extracted from the file · 40 pages · 40,141 characters
Text of RSR-032 Attachment 154.pdf
Extracted from the file · 37 pages · 59,275 characters
Text of RSR-032 Attachment 153.pdf
Extracted from the file · 61 pages · 86,468 characters
Text of RSR-032 Attachment 152.pdf
Extracted from the file · 126 pages · 258,689 characters
Text of RSR-032 Attachment 151.pdf
Extracted from the file · 340 pages · 405,994 characters
Text of RSR-032 Attachment 150.pdf
Extracted from the file · 33 pages · 27,344 characters
Text of RSR-032 Attachment 149.pdf
Extracted from the file · 47 pages · 51,678 characters
Text of RSR-032 Attachment 148.pdf
Extracted from the file · 52 pages · 65,933 characters
Text of RSR-032 Attachment 147.pdf
Extracted from the file · 136 pages · 187,807 characters
Text of RSR-032 Attachment 146.pdf
Extracted from the file · 211 pages · 257,714 characters
Text of RSR-032 Attachment 145.pdf
Extracted from the file · 58 pages · 84,698 characters
Text of RSR-032 Attachment 144.pdf
Extracted from the file · 31 pages · 57,751 characters
Text of RSR-032 Attachment 143.pdf
Extracted from the file · 30 pages · 51,258 characters
Text of RSR-032 Attachment 142.pdf
Extracted from the file · 33 pages · 29,732 characters
Text of RSR-032 Attachment 141.pdf
Extracted from the file · 578 pages · 899,265 characters
Text of RSR-032 Attachment 140.pdf
Extracted from the file · 26 pages · 45,518 characters
Text of RSR-032 Attachment 139.pdf
Extracted from the file · 29 pages · 58,671 characters
Text of RSR-032 Attachment 138.pdf
Extracted from the file · 24 pages · 44,766 characters
Text of RSR-032 Attachment 137.pdf
Extracted from the file · 54 pages · 85,922 characters
Text of RSR-032 Attachment 136.pdf
Extracted from the file · 618 pages · 1,036,591 characters
Text of RSR-032 Attachment 135.pdf
Extracted from the file · 52 pages · 107,952 characters
Text of RSR-032 Attachment 134.pdf
Extracted from the file · 57 pages · 119,843 characters
Text of RSR-032 Attachment 133.pdf
Extracted from the file · 82 pages · 196,725 characters
Text of RSR-032 Attachment 132.pdf
Extracted from the file · 137 pages · 251,594 characters
Text of RSR-032 Attachment 131.pdf
Extracted from the file · 7 pages · 1,043 characters
Text of RSR-032 Attachment 130.pdf
Extracted from the file · 847 pages · 1,478,588 characters
Text of RSR-032 Attachment 129.pdf
Extracted from the file · 124 pages · 255,121 characters
Text of RSR-032 Attachment 128.pdf
Extracted from the file · 104 pages · 208,223 characters
Text of RSR-032 Attachment 127.pdf
Extracted from the file · 125 pages · 243,340 characters
Text of RSR-032 Attachment 126.pdf
Extracted from the file · 128 pages · 264,919 characters
Text of RSR-032 Attachment 125.pdf
Extracted from the file · 824 pages · 1,180,085 characters
Text of RSR-032 Attachment 124.pdf
Extracted from the file · 28 pages · 47,835 characters
Text of RSR-032 Attachment 123.pdf
Extracted from the file · 29 pages · 4,370 characters
Text of RSR-032 Attachment 122.pdf
Extracted from the file · 29 pages · 4,370 characters
Text of RSR-032 Attachment 121.pdf
Extracted from the file · 50 pages · 7,541 characters
Text of RSR-032 Attachment 120.PDF
Extracted from the file · 2 pages · 3,192 characters
Text of RSR-032 Attachment 119_Part3.pdf
Extracted from the file · 105 pages · 238,387 characters
Text of RSR-032 Attachment 119_Part2.pdf
Extracted from the file · 169 pages · 372,755 characters
Text of RSR-032 Attachment 119_Part1.pdf
Extracted from the file · 51 pages · 61,331 characters
Text of RSR-032 Attachment 118_Part6.pdf
Extracted from the file · 54 pages · 47,246 characters
Text of RSR-032 Attachment 118_Part5.pdf
Extracted from the file · 254 pages · 39,246 characters
Text of RSR-032 Attachment 118_Part4.pdf
Extracted from the file · 378 pages · 97,273 characters
Text of RSR-032 Attachment 118_Part3.pdf
Extracted from the file · 218 pages · 519,182 characters
Text of RSR-032 Attachment 118_Part2.pdf
Extracted from the file · 334 pages · 879,939 characters
Text of RSR-032 Attachment 118_Part1.pdf
Extracted from the file · 164 pages · 353,286 characters
Text of RSR-032 Attachment 117.pdf
Extracted from the file · 55 pages · 49,861 characters
Text of RSR-032 Attachment 116.pdf
Extracted from the file · 2 pages · 5,651 characters
Text of RSR-032 Attachment 115.pdf
Extracted from the file · 135 pages · 191,165 characters
Text of RSR-032 Attachment 114.pdf
Extracted from the file · 123 pages · 185,862 characters
Text of RSR-032 Attachment 113.pdf
Extracted from the file · 4 pages · 596 characters
Text of RSR-032 Attachment 112.pdf
Extracted from the file · 2 pages · 298 characters
Text of RSR-032 Attachment 111.pdf
Extracted from the file · 42 pages · 123,247 characters
Text of RSR-032 Attachment 110.pdf
Extracted from the file · 38 pages · 8,159 characters
Text of RSR-032 Attachment 109.pdf
Extracted from the file · 1 page · 149 characters
Text of RSR-032 Attachment 108.pdf
Extracted from the file · 23 pages · 27,882 characters
Text of RSR-032 Attachment 107.pdf
Extracted from the file · 1 page · 243 characters
Text of RSR-032 Attachment 106.pdf
Extracted from the file · 1 page · 321 characters
Text of RSR-032 Attachment 105.pdf
Extracted from the file · 493 pages · 1,262,208 characters
Text of RSR-032 Attachment 104.pdf
Extracted from the file · 628 pages · 1,570,354 characters
Text of RSR-032 Attachment 103.pdf
Extracted from the file · 40 pages · 129,345 characters
Text of RSR-032 Attachment 102.pdf
Extracted from the file · 2 pages · 298 characters
Text of RSR-032 Attachment 101.pdf
Extracted from the file · 186 pages · 437,630 characters
Text of RSR-032 Attachment 100.pdf
Extracted from the file · 244 pages · 509,938 characters
Text of RSR-032 Attachment 99.pdf
Extracted from the file · 193 pages · 412,257 characters
Text of RSR-032 Attachment 98.pdf
Extracted from the file · 2,201 pages · 3,529,384 characters
Text of RSR-032 Attachment 97.pdf
Extracted from the file · 2 pages · 2,870 characters
Text of RSR-032 Attachment 96.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 95.pdf
Extracted from the file · 27 pages · 8,963 characters
Text of RSR-032 Attachment 94.pdf
Extracted from the file · 3 pages · 5,367 characters
Text of RSR-032 Attachment 93.pdf
Extracted from the file · 3 pages · 5,315 characters
Text of RSR-032 Attachment 92.pdf
Extracted from the file · 3 pages · 5,225 characters
Text of RSR-032 Attachment 91.pdf
Extracted from the file · 2 pages · 2,709 characters
Text of RSR-032 Attachment 90.pdf
Extracted from the file · 2 pages · 2,630 characters
Text of RSR-032 Attachment 89.pdf
Extracted from the file · 2 pages · 2,615 characters
Text of RSR-032 Attachment 88.pdf
Extracted from the file · 2 pages · 2,771 characters
Text of RSR-032 Attachment 87.pdf
Extracted from the file · 2 pages · 2,948 characters
Text of RSR-032 Attachment 86.pdf
Extracted from the file · 2 pages · 2,772 characters
Text of RSR-032 Attachment 85.pdf
Extracted from the file · 2 pages · 2,764 characters
Text of RSR-032 Attachment 84.pdf
Extracted from the file · 2 pages · 2,999 characters
Text of RSR-032 Attachment 83.pdf
Extracted from the file · 2 pages · 2,995 characters
Text of RSR-032 Attachment 82.pdf
Extracted from the file · 2 pages · 2,968 characters
Text of RSR-032 Attachment 81.pdf
Extracted from the file · 2 pages · 2,973 characters
Text of RSR-032 Attachment 80.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 79.pdf
Extracted from the file · 2 pages · 2,694 characters
Text of RSR-032 Attachment 78.pdf
Extracted from the file · 3 pages · 3,876 characters
Text of RSR-032 Attachment 77.pdf
Extracted from the file · 3 pages · 3,646 characters
Text of RSR-032 Attachment 76.pdf
Extracted from the file · 3 pages · 3,805 characters
Text of RSR-032 Attachment 75.pdf
Extracted from the file · 9 pages · 13,840 characters
Text of RSR-032 Attachment 74.pdf
Extracted from the file · 3 pages · 3,990 characters
Text of RSR-032 Attachment 73.pdf
Extracted from the file · 3 pages · 4,170 characters
Text of RSR-032 Attachment 72.pdf
Extracted from the file · 3 pages · 3,957 characters
Text of RSR-032 Attachment 71.pdf
Extracted from the file · 3 pages · 3,642 characters
Text of RSR-032 Attachment 70.pdf
Extracted from the file · 2 pages · 2,078 characters
Text of RSR-032 Attachment 69.pdf
Extracted from the file · 3 pages · 4,357 characters
Text of RSR-032 Attachment 68.pdf
Extracted from the file · 3 pages · 3,165 characters
Text of RSR-032 Attachment 67.pdf
Extracted from the file · 4 pages · 3,715 characters
Text of RSR-032 Attachment 66.pdf
Extracted from the file · 3 pages · 3,168 characters
Text of RSR-032 Attachment 65.pdf
Extracted from the file · 3 pages · 444 characters
Text of RSR-032 Attachment 64.pdf
Extracted from the file · 2 pages · 2,099 characters
Text of RSR-032 Attachment 63.pdf
Extracted from the file · 2 pages · 2,062 characters
Text of RSR-032 Attachment 62.pdf
Extracted from the file · 7 pages · 5,200 characters
Text of RSR-032 Attachment 61.pdf
Extracted from the file · 5 pages · 10,643 characters
Text of RSR-032 Attachment 60.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 59.pdf
Extracted from the file · 2 pages · 4,147 characters
Text of RSR-032 Attachment 58.pdf
Extracted from the file · 1 page · 2,448 characters
Text of RSR-032 Attachment 57.pdf
Extracted from the file · 2 pages · 296 characters
Text of RSR-032 Attachment 56.pdf
Extracted from the file · 10 pages · 1,491 characters
Text of RSR-032 Attachment 55_Part10.pdf
Extracted from the file · 286 pages · 344,076 characters
Text of RSR-032 Attachment 55_Part9.pdf
Extracted from the file · 500 pages · 957,292 characters
Text of RSR-032 Attachment 55_Part8.pdf
Extracted from the file · 500 pages · 874,750 characters
Text of RSR-032 Attachment 55_Part7.pdf
Extracted from the file · 500 pages · 470,022 characters
Text of RSR-032 Attachment 55_Part6.pdf
Extracted from the file · 500 pages · 494,317 characters
Text of RSR-032 Attachment 55_Part5.pdf
Extracted from the file · 500 pages · 461,760 characters
Text of RSR-032 Attachment 55_Part4.pdf
Extracted from the file · 500 pages · 492,694 characters
Text of RSR-032 Attachment 55_Part3.pdf
Extracted from the file · 500 pages · 580,603 characters
Text of RSR-032 Attachment 55_Part2.pdf
Extracted from the file · 500 pages · 483,371 characters
Text of RSR-032 Attachment 55_Part1.pdf
Extracted from the file · 500 pages · 881,595 characters
Text of RSR-032 Attachment 54.pdf
Extracted from the file · 121 pages · 447,477 characters
Text of RSR-032 Attachment 53.pdf
Extracted from the file · 204 pages · 625,248 characters
Text of RSR-032 Attachment 52.pdf
Extracted from the file · 130 pages · 298,641 characters
Text of RSR-032 Attachment 51.pdf
Extracted from the file · 57 pages · 123,610 characters
Text of RSR-032 Attachment 50.pdf
Extracted from the file · 6 pages · 8,050 characters
Text of RSR-032 Attachment 49.pdf
Extracted from the file · 83 pages · 194,182 characters
Text of RSR-032 Attachment 48.pdf
Extracted from the file · 3 pages · 8,556 characters
Text of RSR-032 Attachment 47.pdf
Extracted from the file · 10 pages · 14,266 characters
Text of RSR-032 Attachment 46.pdf
Extracted from the file · 7 pages · 10,783 characters
Text of RSR-032 Attachment 45.pdf
Extracted from the file · 373 pages · 490,688 characters
Text of RSR-032 Attachment 44.pdf
Extracted from the file · 38 pages · 6,799 characters
Text of RSR-032 Attachment 43.pdf
Extracted from the file · 49 pages · 83,514 characters
Text of RSR-032 Attachment 42.pdf
Extracted from the file · 25 pages, 14 without text · 13,836 characters
Text of RSR-032 Attachment 41.pdf
Extracted from the file · 3 pages · 5,506 characters
Text of RSR-032 Attachment 40.pdf
Extracted from the file · 1 page · 1,448 characters
Text of RSR-032 Attachment 39.pdf
Extracted from the file · 14 pages · 17,145 characters
Text of RSR-032 Attachment 38.pdf
Extracted from the file · 12 pages · 14,555 characters
Text of RSR-032 Attachment 37.pdf
Extracted from the file · 12 pages · 14,398 characters
Text of RSR-032 Attachment 36.pdf
Extracted from the file · 12 pages · 15,426 characters
Text of RSR-032 Attachment 35.pdf
Extracted from the file · 38 pages · 61,388 characters
Text of RSR-032 Attachment 34.pdf
Extracted from the file · 13 pages · 12,161 characters
Text of RSR-032 Attachment 33.pdf
Extracted from the file · 11 pages · 7,928 characters
Text of RSR-032 Attachment 32.pdf
Extracted from the file · 3 pages · 444 characters
Text of RSR-032 Attachment 31.pdf
Extracted from the file · 26 pages · 3,891 characters
Text of RSR-032 Attachment 30.pdf
Extracted from the file · 18 pages · 2,691 characters
Text of RSR-032 Attachment 29.pdf
Extracted from the file · 9 pages · 10,238 characters
Text of RSR-032 Attachment 28.pdf
Extracted from the file · 127 pages · 218,825 characters
Text of RSR-032 Attachment 27.pdf
Extracted from the file · 12 pages · 12,858 characters
Text of RSR-032 Attachment 26.pdf
Extracted from the file · 12 pages · 14,742 characters
Text of RSR-032 Attachment 25.pdf
Extracted from the file · 14 pages · 16,968 characters
Text of RSR-032 Attachment 24.pdf
Extracted from the file · 13 pages · 16,061 characters
Text of RSR-032 Attachment 23.pdf
Extracted from the file · 19 pages · 8,357 characters
Text of RSR-032 Attachment 22.pdf
Extracted from the file · 1,282 pages · 3,304,505 characters
Text of RSR-032 Attachment 21.pdf
Extracted from the file · 1,005 pages · 2,609,640 characters
Text of RSR-032 Attachment 20_Part2.pdf
Extracted from the file · 109 pages · 16,568 characters
Text of RSR-032 Attachment 20_Part1.pdf
Extracted from the file · 150 pages · 190,904 characters
Text of RSR-032 Attachment 19.pdf
Extracted from the file · 23 pages · 39,103 characters
Text of RSR-032 Attachment 18.pdf
Extracted from the file · 8 pages · 12,671 characters
Text of RSR-032 Attachment 17_Part3.pdf
Extracted from the file · 282 pages · 740,441 characters
Text of RSR-032 Attachment 17_Part2.pdf
Extracted from the file · 500 pages · 1,293,274 characters
Text of RSR-032 Attachment 17_Part1.pdf
Extracted from the file · 500 pages · 1,270,790 characters
Text of RSR-032 Attachment 16.pdf
Extracted from the file · 46 pages · 130,280 characters
Text of RSR-032 Attachment 15.pdf
Extracted from the file · 17 pages · 25,967 characters
Text of RSR-032 Attachment 14.pdf
Extracted from the file · 10 pages · 15,944 characters
Text of RSR-032 Attachment 13.pdf
Extracted from the file · 17 pages · 29,849 characters
Text of RSR-032 Attachment 12.pdf
Extracted from the file · 12 pages · 20,731 characters
Text of RSR-032 Attachment 11.pdf
Extracted from the file · 15 pages · 23,899 characters
Text of RSR-032 Attachment 10.pdf
Extracted from the file · 145 pages · 332,684 characters
Text of RSR-032 Attachment 9.pdf
Extracted from the file · 897 pages · 1,943,866 characters
Text of RSR-032 Attachment 8.pdf
Extracted from the file · 203 pages · 512,054 characters
Text of RSR-032 Attachment 7.pdf
Extracted from the file · 12 pages · 13,977 characters
Text of RSR-032 Attachment 6.pdf
Extracted from the file · 335 pages · 685,056 characters
Text of RSR-032 Attachment 5.pdf
Extracted from the file · 65 pages · 194,221 characters
Text of RSR-032 Attachment 4.pdf
Extracted from the file · 570 pages · 1,357,502 characters
Text of RSR-032 Attachment 3.pdf
Extracted from the file · 8 pages · 15,762 characters
Text of RSR-032 Attachment 2.pdf
Extracted from the file · 26 pages · 3,865 characters
Text of RSR-032 Attachment 1.pdf
Extracted from the file · 18 pages · 2,673 characters
As listed on the current system
Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026