Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Words on different pages
  1. Page 84 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 84 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Introduction July 13, 2021 remain in place subject to the implementation of required controls (e.g., property use restrictions, activity and use limitations, institutional controls, or engineering controls). As defined by ASTM, RECs can include hazardous substances or petroleum products present under conditions in compliance with laws if that presence represents a material threat of future release. The presence of hazardous substances or petroleum products is, however, not a REC if that presence is a de minimis condition. De minimis conditions are minor occurrences of contamination that generally do not present a material risk to human health and would not likely be subject to enforcement action if brought to the attention of governmental agencies. ASTM also considers the potential for a business environmental risk (BER), defined as a risk which can have a material environmental or environmentally driven impact on the business associated with the current or planned use of the Property, not necessarily limited to those environmental issues required to be investigated by the ASTM standard. Consideration of BERs may involve addressing one or more ASTM non-scope considerations. SCGD defines AOCs as locations or areas at a site or property where hazardous wastes and/or hazardous substances, inclusive of petroleum products, have been or may have been used, stored, treated, handled, disposed, spilled, and/or released to the environment. In accordance with the SCGD, the Phase I ESA was conducted to evaluate current and historical uses of the Property and the activities that have been conducted at the Property in order to identify AOCs where release(s) to the environment has the potential to have occurred. This Phase I ESA was conducted in accordance with our proposal to Eversource dated 14 May 2021 and Client’s authorization on 17 May 2021. The scope of work conducted during this Phase I ESA consisted of a visual reconnaissance of the Property, interviews with key individuals, and review of reasonably ascertainable documents. The scope of work did not include an assessment for environmental regulatory compliance of any facility ever operated at the Property (past or present), or sampling and analyzing of environmental media. Stantec was not contracted to perform an independent evaluation of the purchase or lease price of the Property and its relationship to current fair market value. The conclusions presented in this Phase I ESA report are professional opinions based on data described herein. The opinions are subject to the limitations described in Section 2.3. ASTM E1527-13 notes that the availability of record information varies from source to source. The User or EP is not obligated to identify, obtain, or review every possible source that might exist with respect to a property. Instead, ASTM identifies record information that is reasonably ascertainable from standard sources. “Reasonably ascertainable” means: • • • 2.1 Information that is publicly available; Information that is obtainable from its source within reasonable time and cost constraints; and Information that is practicably reviewable. PROPERTY DESCRIPTION The subject Property located at 1985 Blue Hills Avenue Extension, in Windsor, CT consists of approximately 19.42 acres of land developed with a single story 165,000 square foot masonry / slab on Project No.: 195602175 2.2
  2. Page 85 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 85 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Introduction July 13, 2021 grade constructed building used as office space and a data center. The building is surrounded by asphalt parking lots and landscaped areas. The Property is owned by Indus Development I, LLC of Bloomfield CT. Eversource currently leases and operates the Property as office space for a call/data center. The Property and surrounding area are zoned as “I” for industrial use. The surrounding property uses are summarized below. • North: Blue Hills Avenue Extension (State Route 187) is a 4-lane divided road bordering the Property to the north. Community Health Resources and CIGNA office buildings are present across the road. • South: Day Hill Road borders the Property to the south, which is also the municipal boundary between Towns of Windsor and Bloomfield. A parcel of land across the road is used as an agricultural field and developed with an industrial building occupied by CTEC Solar, LLC (solar supplier) and Lesro Industries (furniture manufacturer). • East: An undeveloped parcel of land adjoins the Property to the east (1975 Blue Hills Avenue Extension), which includes a grassed area contiguous with landscaping from the subject Property, a wooded area, and a cleared area. This parcel was historically used for agriculture. • West: An undeveloped parcel of land adjoins the Property to the west (1995 Blue Hills Avenue Extension), which is in use for agriculture (i.e., tobacco). At the time of the site visit, the building occupancy was reduced due to the COVID-19 pandemic. Property location and vicinity maps are illustrated on Figures 1 and 2, respectively. A Site Plan illustrating the main features of the Property is provided as Figure 3. Photographs taken during the site reconnaissance visit are provided in Appendix A. 2.2 SPECIAL TERMS, CONDITIONS, AND ADDITIONAL ASSUMPTIONS There were no special terms, conditions, or additional assumptions associated with this Phase I ESA. 2.3 EXCEPTIONS AND LIMITING CONDITIONS This report documents work that was performed in accordance with generally accepted professional standards at the time and location in which the services were provided and given the schedule and budget constraints established by the client. No other representations, warranties, or guarantees are made concerning the accuracy or completeness of the data or conclusions contained within this report, including no assurance that this work has uncovered all potential and actual liabilities and conditions associated with the Property. This report provides an evaluation of selected environmental conditions associated with the Property that was assessed at the time the work was conducted and is based on information obtained by and/or provided to Stantec at that time. There are no assurances regarding the accuracy and completeness of this information received from others. Project No.: 195602175 2.3
  3. Page 86 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 86 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Introduction July 13, 2021 Conclusions made within this report consist of Stantec’s professional opinion as of the time of the writing of this report and are based solely on the scope of work described in the report, the limited data available, and the results of the work. They are not a certification of the Property’s environmental condition. The client did not provide or contract Stantec to provide recorded title records or search results for environmental liens or activity and use limitations encumbering the Property or in connection with the Property. Stantec did not obtain historical records that document the entire property history in 5-year intervals. Based on the information obtained during the course of this ESA and general knowledge of development at and near the Property, the absence of this information did not affect the ability of the EPs to identify AOCs, RECs, HRECs, CRECs, or de minimis conditions. This report has been prepared for the exclusive use of the Client identified herein and any use of or reliance on this report by any third party is prohibited, except as may be consented to in writing by Stantec or as required by law. The provision of any such consent is at Stantec’s sole and unfettered discretion and will only be authorized pursuant to the conditions of Stantec’s standard form reliance letter. Stantec assumes no responsibility for losses, damages, liabilities, or claims, howsoever arising, from third party use of this report. Project Specific limiting conditions are provided in Section 2.2. The conclusions are based on the conditions encountered at the Property by Stantec at the time the work was conducted. As the purpose of this report is to identify property conditions which may pose an environmental risk; the identification of non-environmental risks to structures or people on the Property is beyond the scope of this assessment. The findings, observations, and conclusions expressed by Stantec in this report are not an opinion concerning the compliance of any past or present owner or operator of the Property which is the subject of this report with any Federal, state, provincial or local law or regulation. This report presents professional opinions and findings of a scientific and technical nature. It does not and shall not be construed to offer a legal opinion or representations as to the requirements of, nor compliance with, environmental laws, rules, regulations, or policies of Federal, state, provincial or local governmental agencies. It is recommended that issues raised by the report should be reviewed for the client by its legal counsel. Stantec specifically disclaims any responsibility to update the conclusions in this report if new or different information later becomes available or if the conditions or activities on the Property subsequently change. 2.4 PERSONNEL QUALIFICATIONS This Phase I ESA was conducted by, or under the supervision of, an individual that meets the ASTM definition of an EP. The credentials of the EP and other key Stantec personnel involved in conducting this Phase I ESA are provided in Appendix B. Project No.: 195602175 2.4
  4. Page 87 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 87 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT User-Provided Information July 13, 2021 3.0 USER-PROVIDED INFORMATION ASTM E1527-13 describes responsibilities of the User to complete certain tasks in connection with the performance of “All Appropriate Inquiries” into the Property. The ASTM standard requires that the EP request information from the User on the results of those tasks because that information can assist in the identification of RECs, CRECs, HRECs, or de minimis conditions in connection with the Property. Towards that end, Stantec requested that the User provide the following documents and information: Description of Information Provided (Yes / No) User Questionnaire and/or Interview Yes Environmental Liens or Activity Use Limitations No Previous Environmental Permits or Reports Provided by User Project No.: 195602175 Yes Description and/or Key Findings The User questionnaire was completed by Ms. Kaitlyn Weider of Eversource Energy Service Company on 24 May 2021. Per the responses in the questionnaire provided in Appendix C, Ms. Weider was not aware of environmental liens, activity use restrictions, or specialized knowledge of the Property. A title/ lien / AUL search was not performed as part of this assessment. A list of the documents provided by the User is given below. A summary of the documents follows this table. • Subdivision #208N – Re-approval, 90-day filing extension, JDS, 1975, 1985, 1995 Blue Hills Avenue Extension, I-1 Zone, Alford/Griffin Land (correspondence), Town of Windsor Planning and Zoning Commission, January 19, 2001. • Correspondence from Environmental Property Management, “FOG tank issues” dated March 15, 2012. • Phase I Environmental Site Assessment, 65 Acres on Day Hill Road, Windsor CT, GeoQuest Inc., May 2000 • Correspondence from CT DEP to Andrew Lord and Murtha Cullina LLP, acknowledging Form I receipt, October 25, 2001. • Property Condition Report, 1985 Blue Hills Avenue Extension, Windsor, CT, by EnviroBuisness, Inc. (EBI), February 27, 2001. 3.1
  5. Page 88 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 88 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT User-Provided Information July 13, 2021 Description of Information Provided (Yes / No) Description and/or Key Findings • Fireman’s Fund Loss Prevention Report, Griffin Land & Nurseries, Inc. January 6, 2006. • Exhibit C – Site Plan for Amended and Restated Leas with Rocky River Development Company, for Griffin Center Development I, LLC, 1985 Blue Hills Avenue Extension dated May 4, 2004. • Infrared Survey Results, Multiple Properties, for Griffin Land & Nurseries, Infrared Testing Inc., August 30, 2010. • Appraisal Report, 1985 Blue Hills Avenue Extension, Windsor, CT. CBRE, June 2, 2014. • Spill Prevention, Control, and Countermeasures (SPCC) Plan, 1985 Blue Hills Ave Ext. Windsor, CT, Fuss & O’Neill, May 2019. • • Purpose of the Phase I ESA Connecticut Light and Power (CL&P) Windsor Facility Shipment Inventory, May 2012 through July 2020. CL&P Windsor Facility Spills, May 2012 through July 2020. Due diligence in preparation for potential acquisition of the Property. Stantec forwarded the ASTM recommended User Questionnaire to Ms. Kaitlyn Weider of Eversource. The completed User Questionnaire returned to us by Ms. Weider is included in Appendix C. Documents provided by the User are summarized as follows: • Subdivision #208N – Re-approval, 90-day filing extension, JDS, 1975, 1985, 1995 Blue Hills Avenue Extension, I-1 Zone, Alford/Griffin Land (correspondence), Town of Windsor Planning and Zoning Commission, January 19, 2001. This correspondence from the Town of Windsor to Alford Associates communicated an extension of a previous zoning application approval for an additional 90-days. • Correspondence from Environmental Property Management, “FOG tank issues” dated March 15, 2012. This correspondence pertained to maintenance activities and deficiencies related to a food oil and grease separator system at the Property. • Fireman’s Fund Loss Prevention Report, Griffin Land & Nurseries, Inc. January 6, 2006. The report documented conditions of building and conduct of an initial loss prevention inspection for insurance purposes prior to occupancy by Northeast Utilities (NU). According to this report, NU intended to Project No.: 195602175 3.2
  6. Page 89 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 89 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT User-Provided Information July 13, 2021 occupy the premises effective March 2006. At the time of the inspection, the intended use was detailed as 15,000 square-foot data center, 10,650 square-foot bill printing operations, and 2,000 square-foot rack storage warehouse. Additionally, the report noted two emergency generators for back-up power supply. The only deficiency noted by the report was insufficient sprinkler system for the warehouse portion of the building. No above ground storage tanks, underground storage tanks, or chemical storage areas were noted in the report. • Phase I Environmental Site Assessment, 65 Acres on Day Hill Road, Windsor CT, GeoQuest Inc., May 2000. This Phase I ESA reviewed environmental conditions on multiple parcels including the Property and lots 1995 (adjoining the Property to the west) and 1975 (adjoining the Property to the east). The 2000 Phase I ESA was conducted before the development of the current building. At the time of the site inspection for the 2000 Phase I ESA, the Property was noted to be wooded, with evidence of dumping (household trash, white goods, and auto parts) present. The GeoQuest Inc. ESA did not identify any evidence of spills, discharges, or hazardous waste generation, treatment, or storage on the Property. The 2000 Phase I ESA did cite the historical agricultural use and inferred likely usage of pesticides and herbicides. While no evidence of hazardous waste generation was observed, hazardous waste manifests from 1988 an1994 indicated that drums of hazardous waste had previously been generated (excess pesticides / herbicides) and shipped off-site for disposal. The report also noted there was a fire in May 1994 that destroyed a large barn structure previously on the Property. In response to the fire and subsequent concern about potential releases of lead paint, petroleum, asbestos, and pesticides to the environment, environmental contractors were retained to remove asbestos containing materials, lead paint, and remove a 6,750-gallon UST. No evidence of release was observed upon UST removal, and reportedly confirmation samples were collected which indicated that no contamination was detected. Fuss and O’Neill collected one surface soil and three surface water samples from the Site. Surface water samples were collected from the reported runoff collection points proximal to the former barn. Pesticides were only detected in one water sample, at a concentration below the CT RSR (in 1994). Three wipe samples were also collected from the surrounding buildings to determine if pesticides were transported via smoke. The Fuss and O’Neill Report (August 1994) was appended to the 2000 Phase I ESA by GeoQuest, however analytical results were not included within the attachment. • Correspondence from CT DEP to Andrew Lord and Murtha Cullina LLP, acknowledging Form I receipt, October 25, 2001. A Form I for the Property was submitted on July 13, 2000 with supporting information including a Phase I Environmental Report on September 25, 2001. The Form I filing indicates that there had not been a discharge, spillage, uncontrolled loss, seepage, or filtration of hazardous waste at the Property. CT DEP acknowledged the Form I filing. • Property Condition Report, 1985 Blue Hills Avenue Extension, Windsor, CT, by EnviroBuisness, Inc. (EBI), February 27, 2001. This report was prepared during construction of the current 165,000 square foot building. Per the report, JDS/Uniphase was the tenant / occupant at the time of preparation. The report found the Property to be in good to excellent condition. No items of environmental concern were noted. Project No.: 195602175 3.3
  7. Page 90 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 90 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT User-Provided Information July 13, 2021 • Incident Report and Correspondence– Car Fire on April 29, 2009, from Northeast Utilities (now Eversource) to Griffin Property Management on April 29, 2009. An employee’s car caught fire in the parking lot. No environmental releases were identified, and a sheen was not apparent on runoff associated with water used to suppress the fire. • Infrared Survey Results, Multiple Properties, for Griffin Land & Nurseries, Infrared Testing Inc., August 30, 2010. The purpose of the inspection was to locate and identify thermal anomalies in electrical components that may lead to failure. No anomalies were identified for the Property. • Appraisal Report, 1985 Blue Hills Avenue Extension, Windsor, CT. CBRE, June 2, 2014. At the time of the 2014 appraisal, the Property was occupied by Northeast Utilities (now Eversource). No items of environmental concern were identified in the report. • Spill Prevention, Control, and Countermeasures (SPCC) Plan, 1985 Blue Hills Ave Ext. Windsor, CT, Fuss & O’Neill, May 2019. The SPCC plan summarizes petroleum storage areas on the Property and details response procedures. Petroleum storage areas are discussed in more detail in Section 5.0. • Windsor Facility Spills, November 2005 through February 2019, database. These spills are discussed in Section 4.2.1. • Windsor Facility Shipments, May 2012 through July 2020, database. The database included details of manifested wastes from the time CL&P (a.k.a. Northeast Utilities-now Eversource) occupied the Property through July 2020. The Generator names were listed as CL&P-Windsor Service Center from May 2012 to February 2015, and CT Electric-Windsor Service Center from February 2016 to July 2020. No hazardous wastes were manifested during this period. Manifested wastes included universal wastes including lead acid batteries, fluorescent light fixtures/bulbs/ballasts, incandescent lamps, and used electronics. The User provided information is included in Appendix C. Project No.: 195602175 3.4
  8. Page 91 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 91 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Records Review July 13, 2021 4.0 RECORDS REVIEW The objective of consulting historical sources of information is to develop the history of the Property and surrounding area and evaluate if past uses may have resulted in RECs or AOCs. Physical setting records are evaluated to determine if the physical setting may have contributed to adverse environmental conditions in connection with the Property. During the review of historical records, Stantec attempted to identify uses of the Property from the present to the first developed use of the Property. Stantec’s research included the reasonably ascertainable and useful records described in this section. 4.1 PHYSICAL SETTING A summary of the physical setting of the Property is provided in the table below with additional details in the following subsections Topography: Soil/Bedrock Data: Estimated Depth to Groundwater/ Estimated Direction of Gradient: The Property is located within the USGS Windsor Locks, Connecticut Quadrangle at approximately 180 to 185 feet above mean sea level (msl). The Property and surrounding area are relatively level with an overall gentle grade downward to the east. Surficial soils are mapped as sandy loam underlain by Portland Arkose, a reddish-brown arkose sandstone at an estimated depth of 175 feet below the ground surface (Rodgers, 1985). Per CT DEEP groundwater classification mapping, the Property is mapped as GA, indicating that groundwater is presumed suitable for use as a potable water supply without treatment. The groundwater flow direction is inferred to be easterly based on regional topography and surface waterbodies that are present. The depth to groundwater is anticipated to occur between approximate 10 and 20 feet below the ground surface. NOTE: Site-specific groundwater flow direction and depth can only be determined by conducting site-specific testing, which Stantec had not conducted at the time of the Phase I ESA site reconnaissance. 4.1.1 Property Topography and Surface Water Flow Consistent with topographic maps of the Property, the general ground surface was observed to be relatively level with gentle grades toward stormwater catch basins. The elevation range at the Property is approximately 180 to 185 feet above mean sea level (msl), with the exception of lower points within the stormwater detention basins. Culbro Lake is located 350 feet northeast of the Property and in an office park. The Farmington River is present approximately 4,000 feet due north. Manmade surface water features for stormwater were observed; therefore, stormwater runoff will preferentially flow towards the Project No.: 195602175 4.1
  9. Page 92 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 92 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Records Review July 13, 2021 area catch basin and detention basins, which are located in the northeast and southeast areas of the Property. 4.1.2 Regional and Property Geology According to the USDA Soil Conservation Service (SCS), surficial soils are sandy loam, to a depth of 16inches, underlain by gravelly sandy loam to 24 inches below ground surface, transitioning to gravelly sand from 24-59 inches. Field observations during the Site reconnaissance were consistent with the mapped descriptions. The bedrock underlying the Site is mapped as Portland arkose, reddish-brown sandstone. 4.1.3 Regional and Property Hydrogeology The shallow water table is often a subdued expression of surface topography. Shallow groundwater generally flows from areas of groundwater recharge, such as hills and broad uplands, to areas of groundwater discharge, such as wetlands, rivers, and lakes. Based on the local surface topography, local shallow groundwater is expected to flow east or northeast, away from a ridge to the west of the Property and towards the Farmington River to the north and other unnamed ponds to the east of the Property. Other man-made features such as wells, roads, filled areas, buried utility lines and sewers, and drainage ditches may alter the natural shallow groundwater flow direction. The estimated depth to shallow groundwater is approximately 10 to 20 feet below the ground surface based on the elevations of surface water in the vicinity of the Property. The Property is within an area mapped as Zone X, which is defined as an area of minimal flood hazard. A copy of the Federal Emergency Management Agency (FEMA) FIRMette flood map is included in Appendix F. 4.2 FEDERAL, STATE AND TRIBAL ENVIRONMENTAL RECORDS A regulatory agency database search report was obtained from EDR Inc., a third-party environmental database search firm. The database search report was ordered by Eversource and provided to Stantec for review. In addition to the Property, the database search included the parcels to the east and west as part of the Target Property. A complete copy of the database search report, including the date the report was prepared, the date the information was last updated, and the definition of databases searched, is provided in Appendix D. Stantec evaluated the information listed within the database relative to potential impact to the Property, assessing the potential for impacts based in part on the physical setting. As part of this process, inferences have been made regarding the likely groundwater flow direction at or near the Property. As described in 4.1.3, the inferred shallow groundwater flow direction is likely to north and east. Observations about the Property and surrounding sites made during the Property reconnaissance are provided in more detail in Section 5. Project No.: 195602175 4.2
  10. Page 93 of 350

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 175 Page 93 of 2375 WINDSOR, CT PHASE I ENVIRONMENTAL SITE ASSESSMENT Records Review July 13, 2021 4.2.1 Listings for Property The Property was identified in the environmental database report in the following databases: SPILLS: The following notable spills were listed for the Property in the database: • October 18, 2019 – Two gallons of hydraulic oil were released due to an equipment hose failure, reported by Eversource. No response action was required, the spill was cleaned by application of sand. • June 1, 2017 – A release of approximately 50-gallons of antifreeze to the ground surface occurred due to a generator radiator hose failure. Corrective action was reported as contained and an environmental contractor (Clean Harbors) responded. • May 16, 2011 – A fuel tank failure occurred which impacted surface water via catch basin and ground surface. The release was cleaned up using a vacuum truck and boom. The report record indicated an estimated release of one gallon. Eversource records provided for review indicated the vacuum truck removed 661 gallons of diesel contaminated water from the two impacted storm drains and detention basin. Emergency Response Notification System (ERNS): Diesel fuel spill from an unknown source, extending from a loading dock into two storm drains and retention pond. The source was suspected to be attributed to a third-party delivery truck. Quantity of fuel released was unknown. This database listing is associated with the May 16, 2011 incident mentioned above and considered indicative of a REC for the Property. Resource Conservation and Recovery Act (RCRA) Non-Generators / No Longer Regulated (Non Gen / NLR): The hazardous waste handler was identified as JDS Uniphase Corporation, EPA ID CTR000502229. The listing indicated the generator is no long active / regulated. Previously, JDS Uniphase was listed as a small quantity generator (SQG, greater than 100 kilograms, less than 1,000 kilograms per month) in 2002 and 2004. Facility Index System/Facility Registry System (FINDS): JDS Uniphase was listed in the FINDS database for the Property address. This database is an inventory of facilities monitored or regulated by EPA. The FINDS listing for JDS Uniphase is a result of the hazardous waste activities monitored under RCRA. Enforcement & Compliance History Information (ECHO): The listing is associated with JDS Uniphase Corp operations. No violations were identified. CT MANIFEST: Hazardous wastes were manifested by JDS Uniphase in 2007 and 2002 under EPA ID CTR000502229. Hazardous wastes identified by the database record include F002 ignitable wastes, F003 spent nonhalogenated solvents (Flammable Liquid N.O.S.), D001 ignitable wastes (hydrogen Project No.: 195602175 4.3

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)