Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Words on different pages
  1. Page 1 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1501 of 1638 A. Concrete inspection and testing shall be performed by the Engineer or by an inspection laboratory, designated by the Engineer, engaged and paid for by the Owner. Testing equipment shall be supplied by the laboratory, and the preparation of samples and all testing shall be performed by the laboratory personnel. Full assistance and cooperation, concrete for samples, and such auxiliary personnel and equipment as needed shall be provided by the Contractor. B. At least 4 standard compression test cylinders shall be made and tested and 1 slump test from each day's placement of concrete. A minimum of four compression test cylinders shall be made and tested for each 100 cubic yards of each type and design strength of concrete placed. One cylinder shall be tested at 7 days, and two at 28 days. The fourth cylinder from each set shall be kept until the 28 day test report on the second and third cylinders in the same set has been received. If the average compressive strength of the two 28 day cylinders does not achieve the required level, the Engineer may elect to test the fourth cylinder immediately or test it after 56 days. If job experience indicates additional cylinder tests or other tests are required for proper control or determination of concrete quality, such tests shall be made. C. The Engineer shall have the right to reject concrete represented by low strength tests. Rejected concrete shall be promptly removed and replaced with concrete conforming to the specification. The decision of the Engineer as to whether substandard concrete is to be accepted or rejected shall be final. END OF SECTION \\wse03.local\WSE\Projects\CT\NUSCO+Eversource\Durham - ER Spill Parson Lane\Remediation\8. Specifications\Division 03\03 05 00 Field Concrete.docx 06/05/2024 03 05 00-5
  2. Page 2 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1502 of 1638 SECTION 31 00 00 EARTHWORK PART 1 - GENERAL 1.01 WORK INCLUDED: A. The Contractor shall furnish all labor, materials, equipment and incidentals necessary to make excavations of normal depth in earth for the remedial activities, shall backfill to match surrounding grades and compact such excavations to the extent necessary, and perform miscellaneous grading as required to complete the work specified herein. 1.02 RELATED WORK: A. Section 01 11 00 – CONTROL OF WORK AND MATERIALS B. Section 01 57 19 – ENVIRONMENTAL PROTECTION C. Section 02 61 00.16 – HANDLING, TRANSPORTATION, REUSE AND DISPOSAL OF EXCAVATED MATERIAL 1.03 REFERENCES: American Society for Testing and Materials (ASTM) ASTM C131 Test Method for Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. ASTM C136 Method for Sieve Analysis of Fine and Coarse Aggregates. ASTM C330 Specification for Lightweight Aggregate for Structural Concrete. ASTM D1556 Test Method for Density of Soil in Place by the Sand Cone Method. ASTM D1557 Test Methods for Moisture-density Relations of Soils and Soil Aggregate Mixtures Using Ten-pound (10 Lb.) Hammer and Eighteen-inch (18") Drop. ASTM D2922 Test Methods for Density of Soil and Soil-aggregate in Place by Nuclear Methods (Shallow Depth). Connecticut Department of Transportation Standard Specification for Highways and Bridges (Form 817) State of Connecticut Department of Environmental Protection Remediation Standard Regulations 22a-133k-1 et seq. and related guidance. 04/27/2017 31 00 00-1
  3. Page 3 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1503 of 1638 1.04 SUBMITTALS: A. Samples of all materials proposed for the project shall be submitted to the Engineer for review. Size of the samples shall be as approved by the Engineer. 1.05 PROTECTION OF EXISTING PROPERTY: A. The work shall be executed in such manner as to prevent any damage to facilities at the Site and adjacent property and existing improvements, such as but not limited to existing above and below grade utility services scheduled to remain, streets, curbs, paving, service utility lines, structures, monuments, benchmarks, and other public or private property. Protect existing improvements from damage caused by settlement, lateral movements, undermining, washout and other hazards created by earthwork operations. B. In case of any damage or injury caused in the performance of the work, the Contractor shall, at its own expense, make good such damage or injury to the satisfaction of, and without cost to, the Owner. Damaged items shall be repaired or replaced to at least the condition that existed at the start of operations. The Contractor shall replace, at its own cost, existing benchmarks, observation wells, monuments, and other reference points, which are disturbed or destroyed. C. Buried drainage structures and pipes, which are subject to damage from construction equipment shall be clearly marked to indicate the hazard. Markers shall indicate limits of danger areas, by means which will be clearly visible to operators of trucks and other construction equipment and shall be maintained at all times until completion of project. 1.06 DRAINAGE: A. The Contractor shall provide, at its own expense, adequate drainage facilities to complete all work items in an acceptable manner. Drainage shall be done in a manner so that runoff or streamflow will not adversely affect construction procedures or cause excessive disturbance of underlying natural ground or abutting properties. 1.07 FROST PROTECTION AND SNOW REMOVAL: A. The Contractor shall, at its own expense, keep earthwork operations clear and free of accumulations of snow as required to carry out the work. B. The Contractor shall protect the subgrade beneath new structures and pipes from frost penetration when freezing temperatures are expected. PART 2 - PRODUCTS 2.01 A. MATERIALS: CONTROLLED FILL 04/27/2017 31 00 00-2
  4. Page 4 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1504 of 1638 Controlled fill shall be composed of sound tough, durable particles of crushed or uncrushed gravel, free from soft, thin elongated or laminated pieces, and other deleterious substances. Controlled fill shall be free of silt and clay balls. Material shall meet this gradation: Sieve Designation 3 ½ inch 3/4 inch No. 4 No. 200 Percent by Weight Passing Square Mesh Sieve 100 50-100 25-80 0-15 B. CRUSHED STONE Crushed Stone shall satisfy the requirements listed in CTDOT Specification Section M02.01.1 (Broken or crushed stone) unless otherwise specified or directed. Crushed Stone separated from the surrounding soil with Filter Fabric as specified herein may be used as Structural Fill where approved by the Engineer C. RIPRAP Riprap shall satisfy the requirements listed in CTDOT Specification Section M.12.02.1 (Standard Riprap) unless otherwise specified or directed. D. Utility trenches and test pits shall be backfilled with excavated material in the same general area it was excavated. PART 3 - EXECUTION 3.01 DISTURBANCE OF EXCAVATED AND FILLED AREAS DURING CONSTRUCTION: A. The Contractor shall take the necessary steps to avoid disturbance of subgrade during excavation and filling operations, including restricting the use of certain types of construction equipment and their movement over sensitive or unstable materials, dewatering and other acceptable control measures. B. All disturbed/backfilled areas within the streambed and drainage channel shall have Controlled Fill to within 4-inches of existing grades. The final 4-inches shall be backfilled with Crushed Stone to match existing grades and prevent ponding in the stream. C. Upon project completion, constructed access roads shall be removed as shown on Sheet C004 of the Contract Documents. Contractor shall install 6-inches of Loam and Seed to match surrounding grade. 04/27/2017 31 00 00-3
  5. Page 5 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1505 of 1638 3.02 EXCAVATION: A. GENERAL: 3.03 1. The Contractor shall perform all work of any nature and description required to accomplish the work as shown on the Drawings and as specified. 2. Excavations, unless otherwise required by the Engineer, shall be carried only to the depths and limits required for remediation work. If unauthorized excavation is carried out, it shall be backfilled with gravel borrow and compacted at the Contractor's expense as specified below, except as otherwise indicated. Excavations shall be kept in dry and good conditions at all times, and all voids shall be filled to the satisfaction of the Engineer. 3. The Contractor shall follow a construction procedure, which permits visual identification of stable natural ground. 4. The Contractor shall exercise great care to not damage existing structures or utilities scheduled to remain. The use and movement of construction equipment over buried utilities/structures and proximate on-site permanent/temporary structures is at the Contractor’s own risk. Damaged caused by the Contractor’s operations shall be repaired immediate at no additional cost to the Owner. 5. For excavations adjacent or above existing utilities, the Contractor shall utilize suitable light excavation methods (hand shovels, vacuum excavation, etc.) to expose subsurface utilities or structures to the remain. BACKFILL PLACEMENT AND COMPACTION: A. GENERAL: 1. Prior to backfilling, the Contractor shall compact the exposed natural subgrade. The degree of compaction is expressed as a percentage of the maximum dry density of the material at optimum moisture content as determined by ASTM Test D 1557, Method C. The minimum degree of compaction for fill placed shall be as follows: 2. 04/27/2017 Fill shall be placed in 6-inch lifts and compacted to 95% ASTM D-1557 maximum Density unless otherwise specified The Engineer reserves the right to test backfill for conformance to the specifications and the Contractor shall assist as required to obtain the information. Compaction testing will be performed by the Contractor or by an inspection laboratory designated by the Contractor, reviewed and approved by Engineer/Owner. If test results indicate work does not conform to specification requirements, the Contractor shall remove or correct the defective Work by recompacting where appropriate or replacing as necessary and approved by the Engineer, to bring the work into compliance, at no additional cost to the Owner. 31 00 00-4
  6. Page 6 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1506 of 1638 3.04 A. 3.05 3. Where horizontal layers meet a rising slope, the Contractor shall key each layer by benching into the slope. 4. The Contractor shall backfill excavated areas to match surrounding grade and provide positive runoff from backfilled areas. DISPOSAL OF SURPLUS MATERIALS: No excavated material shall be removed from the Site of the work or disposed of by the Contractor unless approved by the Engineer. RESTORATION A. The Contractor is responsible for restoring disturbed area from work of this contract, including restoring all remediation areas, access roads and existing driveway/pavement damaged during this project. B. Restoration shall include backfilling remedial related excavations in the stream and drainage channel to match surrounding grade. Excavations shall be backfilled to within 4inches of final grade using Controlled Fill. The drainage channel shall be backfilled to grades that create positive runoff towards the stream. The contractor shall backfill as close to existing grade as possible to prevent ponding. Controlled Fill materials shall be covered with a 4-inch layer of crushed stone. END OF SECTION 04/27/2017 31 00 00-5
  7. Page 7 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1507 of 1638 SECTION 31 23 19 DEWATERING PART 1 - GENERAL 1.01 WORK INCLUDED: This section specifies designing, furnishing, installing, maintaining, operating and removing temporary dewatering systems as required to control water flows; capturing and disposing of free draining liquids from excavated material; constructing, maintaining, observing and, except where indicated or required to remain in place, removing of equipment and instrumentation for control of the systems. 1.02 RELATED WORK: A. Section 00 31 43 - PERMITS B. Section 01 57 19 - ENVIRONMENTAL PROTECTION C. Section 02 61 00.16 – HANDLING, TRANSPORTATION, REUSE, AND DISPOSAL OF EXCAVATED MATERIAL D. Section 31 00 00 -EARTHWORK 1.03 A. 1.04 SYSTEM DESCRIPTION: Dewatering includes (1) diverting the stream flow, (2) collecting, removing and disposing of free draining liquids from excavated material, and (3) diverting existing stormwater discharges to a location downstream from designated excavation areas. QUALITY ASSURANCE: A. The Contractor is responsible for the adequacy of the dewatering systems including design and storage capacity for free draining liquids. B. The dewatering systems shall be capable of effectively diverting stream and stormwater flow so that all remediation area bottoms are firm and dry, and that said systems effectively capture, store and allow for the disposal of free draining liquids from excavated materials. C. The dewatering systems shall be capable of maintaining a dry and stable subgrade until soil removal is complete and the Engineer gives permission to backfill, after results from confirmatory samples are available. 07/06/2023 31 23 19-1
  8. Page 8 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1508 of 1638 D. 1.05 A. The dewatering systems shall be designed so that diverting stream and stormwater flow does not adversely affect downstream conditions. Contractor shall make all efforts necessary to prevent ponding, scouring, or unplanned diversion of the stream. SUBMITTALS: In accordance with Section 01 33 23, Contractor shall submit a plan indicating how it intends to prevent free liquids from being transported with PCB Remediation Waste soil. The plan shall include proposed means and methods for stream and stormwater diversion and procedures for removing free liquids from stream and drainage channel sediment that has been removed and containerized. PART 2 - PRODUCTS: NOT APPLICABLE PART 3 - EXECUTION 3.01 DEWATERING OPERATIONS: A. All water diverted from the stream or stormwater discharges shall be recharged downstream in a manner that will not result in undue interference with other work or damage to adjacent properties, pavements and other surfaces, buildings, structures and utilities. Suitable temporary pipes, flumes, or channels that can adequately handle flow created from the 100-year storm shall be provided. B. All free draining liquids collected from the removal of PCB Remediation Waste sediment shall be disposed of in accordance with all relevant local, state, and federal regulations. B. Dewatering facilities shall be located where they will not interfere with utilities or normal site operations. C. Dewatering procedures to be used shall be as described below: 1. A sandbag dam shall be constructed through the centerline of the stream to a height approximately 3-feet above the current water level, or high enough to prevent flowing water during a storm from overtopping the dam. Dam shall be constructed so that streamflow is diverted to one-half of the stream, leaving the other half of the stream with no active flow. Contractor shall adjust dam during excavation to prevent flow from undermining the integrity and effectiveness of the dam. Dam shall only be adjusted to divert flow from other-half of stream once Engineer gives approval. 2. Stormwater flows from three discharges as shown on Sheet C002 and D001 of the Contract Documents shall be diverted to a point downstream of the furthest south remediation area. Stormwater flowing from these discharges is not to enter the drainage channel or any point upstream of planned remediation areas. Contractor shall provide all pipes, channels, fittings, and other required materials to adequately convey flow resulting from a 100-year to the stormwater discharge plunge pool downstream of the furthest south remediation area. 07/06/2023 31 23 19-2
  9. Page 9 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1509 of 1638 3. Contractor shall furnish all materials, tools, and labor required to remove excess free liquids from containerized PCB Remediation Waste sediment. Excess free liquids resulting from the removal of sediment from the streambed or drainage channel shall be segregated and containerized for transport and disposal. Contractor shall not use drying agents or tackifiers on the containerized soil without permission from the Engineer or Owner. Soil shall not be transported for disposal without permission from the Engineer that sufficient excess free liquids have been removed from the soil. D. The Contractor shall be responsible for repair of any damage caused by its dewatering operations, at no cost to the Owner. END OF SECTION P:\CT\NUSCO+Eversource\Durham - ER Spill Parson Lane\Remediation\8. Specifications\Division 31\31 23 19 - Dewatering.docx 07/06/2023 31 23 19-3
  10. Page 10 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1510 of 1638 SECTION 32 91 19 LOAMING & SEEDING PART 1 - GENERAL 1.01 WORK INCLUDED: A. This Section includes furnishing all labor, materials, equipment, seed and incidental materials necessary to accomplish all loaming, grass and plant seeding and related work, complete in place, maintained, and accepted, in accordance with the Contact Drawings and Specifications. All grassed areas disturbed by the Contractor's operations shall be repaired as herein specified. B. The Contractor shall bear the responsibility and cost of furnishing and applying water or any other substances, as necessary to ensure the sustainability of grass seeded areas, as part of the work of this contract. C. Contraction shall backfill all disturbed areas as shown on Sheet C004 of the Contract Drawings. Excavated areas in the streambed and drainage channel shall be backfilled with Controlled Fill to within 4-inches of existing grade. Contractor shall install 4-inches of Crushed stone to match surrounding grades to prevent ponding. D. Upon project completion, constructed access roads shall be removed as shown on Sheet C004 of the Contract Documents. Contractor shall install 6-inches of Loam and Seed to match surrounding grade. 1.02 A. 1.03 RELATED WORK: Section 31 00 00 - EARTHWORK SUBMITTALS: In accordance with requirements of general specifications, the Contractor shall submit the following to the Engineer for review and approval: 32 91 19 - 1

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)