Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Words on different pages
  1. Page 13 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1513 of 1638 sealed and properly labeled containers. All seed shall comply with applicable State and Federal laws. Seed that has become wet, moldy or otherwise damaged shall not be accepted. 2. 3. Grass seed for lawn areas shall conform to the following requirements, or approved equal: Common Names Proportion by Weight Germination Rate Purity Minimum Kentucky Bluegrass 40% 75% Min. 97% Min. Tall Fescue 20% 75% Min. 97% Min. Red Fescue 20% 75% Min. 97% Min. Perennial Rye 20% 75% Min. 97% Min. No Mow Lawn Mix or Low Fescue Mix shall be “No Mow Lawn Seed Mix” by Prairie Nursery Native Plants and Seed, or approved equal, shall be installed per manufacturer’s specifications for seeding rate and dispersal type, and shall conform to the following requirements: Hard Fescue (Festuca brevipila) Sheep Fescue (Festuca ovina) Chewings Fescue (Festuca rubra subs. Fallax) Red Fescue (Festuca rubra) Creeping Red Fescue (Festuca rubra var. rubra) E. MULCH (SEEDING ONLY): 1. Materials to be used in mulching seeded areas shall be free of weed seed and shall conform to the following requirements: 2. Straw Mulch shall consist of clean grain straw certified by state or national agency to be free of noxious weed seeds, seed bearing stalks, and/or other reproductive propagules as defined by rules and regulations of the Massachusetts Department of Agricultural Resources and/or the Massachusetts Department of Energy and Environmental Affairs. 3. Mulch shall not be derived from pasture hay containing reed canary grass, smooth brome and other introduced species. 4. Mulch shall arrive to the site in an air-dried condition. 32 91 19 - 4
  2. Page 14 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1514 of 1638 F. G. H. HYDROSEED MULCH, TACKIFIERS AND WATER RETENTION AGENTS: 1. Wood fiber mulch for Hydroseed application shall be a manufactured product of natural wood cellulose fibers with a non-toxic green marking dye incorporated to ensure uniform distribution. Mulch shall be packed in sealed original containers, clearly labeled with brand name and manufacturer. It shall have delivered moisture content less than 12 percent. 2. Hydroseed tackifier shall be a powdered starch-based product approved by the Engineer. Hydroseed tackifier shall be applied in conjunction with the hydroseed slurry in accordance with the manufacturer’s recommendations. 3. Moisture retention agent shall be a powdered starch-based product, approved by the Engineer, and shall be capable of retaining up to 400 times their weight in water. Moisture retaining agents shall be added to the hydroseed slurry in accordance with the manufacturer’s recommendations. Moisture retention agent shall be ‘HydroGel’, as manufactured by Finn Corporation, Fairfield, OH. 4. Contractor to submit mix ingredients prior to installation of hydroseed. 5. Seed-water mixture shall be applied within one hour after the seed is added to the hydro-seeder tank. SLOPE EROSION PROTECTION: 1. Erosion control blanket shall be 100 percent biodegradable mesh with 100 percent biodegradable straw or straw/coconut fill. Fill shall be held together by biodegradable fastening. Weight shall be 0.50 pounds per square yard. Erosion control blankets shall be applied parallel to direction of water flow. The erosion control blankets shall be by North American Green, Evansville, IN or approved equal. For slopes 4:1 or greater, erosion control blanket shall be composed of 70 percent straw 30 percent coconut fiber, Model SC150. For slopes less than 4:1, and for all marked swales, erosion control blanket shall be high velocity straw matting, Model S150. 2. Six-inch wire staples shall be placed in accordance with the manufacturer's recommendations to anchor the mesh material. Staples shall be biodegradable. WATER: 1. Water shall be furnished by the Contractor, unless otherwise specified, and shall be suitable for irrigation and free from ingredients harmful to plant growth and viability. The delivery and distribution equipment required for the application of water shall be the furnished by the Contractor, at no additional cost to the Owner. 32 91 19 - 5
  3. Page 15 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1515 of 1638 I. J. K. INSECTICIDES: 1. No insecticides shall be used on-site without the Contractor notifying and obtaining prior approval of the Engineer. 2. Insecticides shall be EPA registered and approved for use in public open spaces. All insecticides shall be handled by State licensed applicators only, delivered in the original sealed manufacturer’s containers, and used in accordance with the manufacturer’s instructions. 3. Insecticide use shall be limited and selective, only to control specific insect infestations, as identified by the Contractor or the Owner’s Representative that may result in the disfigurement, decline, or death of plant materials. 4. Grub control insecticide shall be Proturf Insecticide III, as manufactured by A.M. Scotts & Sons, Inc.; Dursban Granules, as manufactured by Old Fox Chemical Corp., or ACMC; or approved equal. HERBICIDES: 1. No herbicides shall be used on-site without the Contractor notifying and obtaining prior approval of the Engineer. 2. All herbicides shall be EPA registered and approved for use in public open spaces. All herbicides shall be handled by State licensed applicators only, delivered in the original sealed manufacturer’s containers, and used in accordance with the manufacturer’s instructions. 3. Herbicide for post-emergent application shall be glyphosate contact, ‘Roundup’, as manufactured by Monsanto, Inc., or approved equal. 4. Herbicide use shall be limited and selective, only to control specific weed infestations that have been identified by the Contractor or the Owner’s Representative. FUNGICIDES: 1. No fungicides shall be used on-site without the Contractor notifying and obtaining prior approval of the Engineer. 2. Fungicides shall be EPA registered and approved for use in public open spaces. All fungicides shall be handled by State licensed applicators only, delivered in the original sealed manufacturer’s containers, and used in accordance with the manufacturer’s instructions. 3. Fungicide use shall be limited and selective, only to control specific fungal 32 91 19 - 6
  4. Page 16 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1516 of 1638 pathogenic disease infestations, as identified by the Contractor or the Owner’s Representative that may result in the disfigurement, decline, or death of plant materials. PART 3 - EXECUTION 3.01 GENERAL: A. All work shall be performed by skilled workers with a minimum of two years of seeded lawn construction AND a minimum of three prior meadow, prairie, or other non-lawn construction, and establishment experience and under the full-time supervision of a qualified foreman. B. Loam shall be a minimum of 6-inches compacted thickness. Any areas of deficient loam thickness shall be repaired at no cost to the Owner. C. Seeding operations shall not begin less than 4 days after the application of lime and fertilizer and the seedbed areas are reviewed and approved by the Engineer. And no later than 1 week after final site grading. D. Lime shall be applied to bring the pH to 6.5 or, without a soil test, at the rate of 2-3 tons of lime per acre. E. Loam shall be worked a minimum of 3-inches deep, thoroughly incorporating the lime and fertilizer into the soil. The loam shall then be raked until the surface is finely pulverized and smooth and compacted with rollers, weighing not over 100 pounds per linear foot of tread, to an even surface conforming to the prescribed lines and grades. Minimum depth shall be 6-inches after completion. Seeding shall be done when soil and weather conditions permit in early spring, until May 31, or from September 10 to October l5, unless otherwise approved. If it becomes necessary for seed to be sown after June 15, provisions shall be made for supplementary water and using mulch cover over seeded areas. F. If there is a delay in seeding, during which weeds grow, or soil is washed out, the Contractor shall eliminate the weeds by chemical or physical means, or replace the soil before sowing the seed, without additional compensation. G. Seed shall be sown at the approved rate, on a non-windy day by machine, or as approved by the Engineer. The site shall be prepared by loosening topsoil to a minimum depth of 3 inches. Seedbed be loosened to a point that there are spaces for seed to filter into, as approved by the Owners representative. F. The surface shall be kept moist by a fine spray until the seed shows uniform germination over the entire area. Wherever poor germination occurs in areas larger than 3 square feet, the Contractor shall reseed, roll, straw and water as necessary to obtain proper germination. 32 91 19 - 7
  5. Page 17 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1517 of 1638 G. If there is insufficient time in the planting season to complete soil preparations, fertilizing, and seeding, permanent seeding may be left until the following planting season, at the option of the Contractor, or on order of the Engineer. In that event, a temporary cover crop shall be sown. This cover crop shall be cut and watered as necessary until the beginning of the following planting season, at which time it shall be plowed or harrowed into the soil, the area shall be fertilized and the permanent seed crop shall be sown as specified. H. Protection of all newly loamed and graded areas is required and shall be accomplished by whatever means necessary such as mulch applied with a tackifier, or by other means approved by the Engineer. The Contractor shall be responsible for the prevention of siltation in areas beyond the limit of work and for all means of protection throughout the maintenance period at no additional cost to the Owner. 3.02 A. 3.03 LOAM TESTING REQUIREMENTS Loam (vegetative support layer) samples shall be collected from in-place loam at a minimum of every 1,000 cubic yards and analyzed for grain size (ASTM D422), pH (ASTM D6276) and organic content (ignition test). SURFACE PREPARATION: A. If approved by the Engineer, the entire site area to be seeded shall be treated with an approved herbicide, in accordance with the manufacturer’s instructions, not less than 7 days before the start of seeding operations. B. If approved by the Engineer, grub control insecticide shall be spread on the surface of the seedbed, in accordance with the manufacturer’s instructions, after the seedbed has been properly graded, not less than 24 hours before the start of seeding operations. 3.04 BROADCAST SEEDING, PROTECTION: PLACING MULCH AND SLOPE EROSION A. The seed mix shall be broadcast at 6 pounds per 1000 square feet, as recommended by the seed supplier, or as directed by the Engineer. Seed shall be divided into 2 equal amounts and uniformly distributed in 2 applications at right angles to each other. Seed shall then be raked lightly into the soil to a depth of l/4 inch. B. Seed shall be directly firmed into the soil with a roller that will apply pressure between 75 and 100 pounds per linear foot of width. C. Hay or Straw Mulch shall be used based on time of seeding as previously specified over all seeded areas, as designated on the plans, or as otherwise directed. If mulch is to be used, it shall be loosely spread to a uniform depth at a rate of 4-1/2 tons per acre to provide ¼ inch of cover, or as otherwise directed. The seed and mulch shall then be firmed into 32 91 19 - 8
  6. Page 18 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1518 of 1638 the soil with a roller that will apply a pressure between 75 and 100 pounds per foot of width. D. Hay or Straw Mulch may be applied by mechanical apparatus, if in the judgment of the Engineer, the apparatus spreads the mulch uniformly and forms a suitable mat to control slope erosion. The apparatus shall be capable of spreading at least 80 percent of the hay or straw in lengths of 6-inches or more, otherwise it shall be spread by hand without additional compensation. E. Slope erosion control blankets shall be placed as indicated or as directed by the Engineer. 3.05 HYDROSEEDING: A. The application of lime, fertilizer, grass seed and mulch may be accomplished in a single operation with the use of approved hydroseeding equipment. The materials shall be mixed with water in the machine and kept in an agitated state in order that the materials may be uniformly suspended in the water. The slurry shall be of such consistency that it can be sprayed from a hydroseed gun or through at least 200 feet of 1 ½ inch diameter hose. The spraying equipment shall be so designed that when the solution is sprayed over an area, the resulting deposits of lime, fertilizer, grass seed, and mulch shall be equal to the specified quantities. B. Prior to the start of hydroseeding, the Contractor shall furnish to the Engineer, in writing, the weights of limestone, fertilizer, grass seed, mulch, tackifier (as required) and moisture retention agent (as required) per 100 gallons of water to be used. This statement should also specify the number of square yards of seeding that can be covered with the solution specified above. If the results of hydroseeding operations are unsatisfactory, the Contractor will be required to abandon this method and to apply the lime, fertilizer, grass seed and mulch by other means. C. Seed shall be incorporated with the mulching material to obtain a minimum hydroseeded sown coverage of 200 pounds of the specified seed mix per acre, as recommended by the seed suppliers, or as directed by the Engineer. D. Wood fiber mulch shall be uniformly spread over certain selected seeded areas at the minimum rate of 1,400 pounds per acre unless otherwise directed. Mulch shall be placed by spraying from an approved spraying machine with pressure sufficient to cover the entire area in a single operation. E. The Contractor shall immediately cleanup hydroseed oversprays from plant materials, pavements, furnishings, etc., to the satisfaction of the Engineer. 3.06 A. TURF MAINTENANCE: The Contractor shall maintain and protect the entire seeded area, as necessary to ensure dense healthy growth, until completion of the guarantee period and final acceptance of 32 91 19 - 9
  7. Page 19 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1519 of 1638 the project, or for 60 days, whichever is longer. If lawns are planted in late summer or during the fall, maintenance shall continue through the following spring for at least 30 days. Maintenance shall include watering as specified, liming, fertilizing, removal of stones, control of weeds, insect pests and fungal pathogens, and regular mowing. Defective work shall be corrected as soon as possible after it becomes apparent and weather and season permit. B. The first cutting of lawn areas shall be done when the grass is between 2 ½ - 3 inches in height. The lawn shall be cut no shorter than 2 inches in height and shall be regularly mowed as necessary to maintain the above-prescribed conditions. All cuttings shall be removed from the lawn during the maintenance period and disposed of off-site. C. The Contractor shall be responsible to regularly water seeded areas with the equivalent of 1-inch minimum of rainfall per week, or as necessary to develop and sustain dense, green growth. D. Six weeks after turf has established, and only during the months of April, May, or September, the Contractor shall apply fertilizer as specified above, at one half the rate recommended by the initial soils laboratory tests, or as directed by the Engineer. E. The Contractor shall be responsible for securing all seeded areas from physical damage as necessary, including warning signs, barriers, temporary fencing, or other means of protection, through the guarantee period until final acceptance. All damaged areas shall be repaired to reestablish healthy vigorous growth of turf to the satisfaction of the Engineer, at no additional cost to the Owner. All temporary barriers shall remain the property of the Contractor and shall be removed by the Contractor upon final acceptance by the Engineer. F. Pavement shall be kept clean and clear of cuttings and debris at all times during the maintenance period to the satisfaction of the Engineer. 3.07 INSPECTION AND PRELIMINARY ACCEPTANCE: A. At the beginning of the planting season following that in which the permanent grass crop is sown, seeded areas will be inspected. Any section not showing dense, vigorous growth shall be promptly reseeded by the Contractor at no additional cost to the Owner. The seeded areas shall be watered, weeded, cut and otherwise maintained by the Contractor, as many times as necessary, in accordance with these specifications, until they are accepted. B. The Contractor shall provide written notice to the Engineer not less than 10 days before the anticipated date of inspection for preliminary acceptance. The Engineer shall recommend preliminary acceptance of the work of this Section only after completion and re-inspection of all necessary repairs, renewals, or replacements. C. Inspection and acceptance of seeded areas may be requested and granted in part, provided 32 91 19 - 10
  8. Page 20 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1520 of 1638 the areas for which acceptance is requested are relatively substantial in size, and with clearly definable boundaries. Acceptance and use of these areas by the Owner shall not waive any other provisions of this Contract. 3.08 GUARANTEE: A. Seeded areas shall be guaranteed until final acceptance of the project, or, in the case of late summer or fall planting, the guarantee period shall extend through the following spring. B. When the work is accepted in part, the guarantee period shall extend from each partial acceptance to the terminal date of the last guarantee period. All guarantee periods terminate at one time. C. Guarantee shall not apply to the replacement of seeded lawns resulting from the removal, loss, or damage due to occupancy of the project in any part; vandalism or acts of neglect on the part of others; physical damage by animals, vehicles, etc.; and Acts of God, including but not limited to, catastrophic fire, hurricanes, riots, war, etc. D. In the instance of curtailment of water by local water authorities (when supply was to be furnished by the Owner), the Contractor shall furnish all necessary water by water tanker, the cost of which will be approved and paid for by the Owner. 3.09 FINAL INSPECTION AND FINAL ACCEPTANCE: A. At the end of the guarantee period, the Contractor shall provide written notice to the Engineer not less than 10 days before the anticipated date of final inspection for final acceptance. B. The Engineer shall recommend final acceptance of the work of this Section only after completion and re-inspection of all necessary repairs, renewals or replacements. END OF SECTION 32 91 19 - 11
  9. Page 21 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1521 of 1638 Appendix A Remedial Action Plan (RAP) dated March 2024
  10. Page 22 of 84

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1522 of 1638 FINAL REMEDIAL ACTION REPORT Eversource Energy APPENDIX H Permitting Information westonandsampson.com

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)