Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 315 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1333 of 1638 Attachment D: Safe Harbor Report Requirements Submit a report, as Attachment D, that synthesizes and analyzes the inf ormation listed below. Those providing synthesis and analysis need appropriate qualif ications and experience. A request f or a saf e harbor determination shall include: 1. Habitat Description and Map(s), including GIS mapping overlays, of a scale appropriate for the site, identifying: • wetlands, including wetland cover types; • plant community types; • topography; • soils; • bedrock geology; • f loodplains, if any; • land use history; and • water quality classif ications/criteria. 2. Photographs - The report should include photographs of the site taken f rom the ground and also all reasonably available aerial or satellite photographs and an analysis of such photographs. 3. Inspection - A visual inspection(s) of the site should be conducted, pref erably when the ground is visible, and described in the report. This inspection can be helpf ul in conf irming or f urther evaluating the items noted above. 4. Biological Surveys - The report should include all biological surveys of the site where construction activity will take place that are reasonably available to a registrant. A registrant shall notif y the Department’s Wildlif e Division of biological studies of the site where construction activity will take place that a registrant is aware of but are not reasonably available to the registrant. 5. Based on items #1 through 4 above, the report shall include a Natural Resources Inventory of the site of the construction activity. This inventory should also include a review of reasonably available scientif ic literature and any recommendations f or minimizing adverse impacts f rom the proposed construction activity on listed species or their associated habitat. 6. In addition, to the extent the following is available at the time a safe harbor determination is requested, a request for a safe harbor determination shall include and assess: • Inf ormation on Site Disturbance Estimates/Site Alteration inf ormation • Vehicular Use • Construction Activity Phasing Schedules, if any; and • Alteration of Drainage Patterns DEEP-APP-007D 1 of 1 Rev. 04/08/14
  2. Page 316 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1334 of 1638 LEGEND: Approximate Parcel Boundary Durham Wildlife Management Area Natural Diversity Database Area NOTES: 1. Parcel boundary for #27 Parson Lane approximated from Durham, CT online AxisGIS. 2. Natural Diversity Database Area version dated December 2019 downloaded from CTDEEP on 3/3/2020. 3. USGS topographic map acquired from Esri and its data suppliers (2019). [ 0 500 Feet Publish Date: 2020/03/03, 12:41 PM | User: dbaker Filepath: \\amesbury1\Greenleaf\GIS\WestonSampson\Eversource\DurhamCT\Durham_Eversource_NDDB_A_WMA.mxd Figure A Topographic Map for #27 Parson Lane
  3. Page 317 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1335 of 1638 M d id le fi e ld Main St (Ro u t e 1 7) Rd LEGEND: Proposed Sample Locations Proposed Sample Location Transects Approximate Parcel Boundary Durham Wildlife Management Area Natural Diversity Database Area NOTES: 1. Parcel boundary for #27 Parson Lane approximated from Durham, CT online AxisGIS. 2. Durham Wildlife Management Area approximated from Conneticut Hunting Areas, CTDEEP online ArcGIS. 3. Natural Diversity Database Area version dated December 2019 downloaded from CTDEEP on 3/3/2020. 4. Aerial imagery acquired from Esri and its data suppliers (2019). [ 0 500 Feet Publish Date: 2020/03/03, 12:39 PM | User: dbaker Filepath: \\amesbury1\Greenleaf\GIS\WestonSampson\Eversource\DurhamCT\Durham_Eversource_NDDB_B_WMA.mxd Figure B Sampling Locations for #27 Parson Lane
  4. Page 318 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1336 of 1638 Table 1 - Habitat Information for Species Listed in July 18, 2019 Preliminary NDDB Determination Species Identified in 2019 NDDB Preliminary Determination Connecticut Status (per 2015 list) Spotted Turtle (Clemmys guttata) Special Concern marshy meadows, bogs, swamps, ponds, Still pools. Eggs laid in open, drier sites ditches, or other small bodies of still water meadow, field or edge of road NYS DEC - https://www.dec.ny.gov/animals/7150.html Wood Turtle (Glyptemys insculpta) Special Concern hard bottomed streams or rivers, herbaceous vegetation for foraging Sandy substrate (sandbars, sand spits, beaches etc) for nesting Wikipedia - https://en.wikipedia.org/wiki/Wood_turtle#Ecology_and_behavior Northern Leopard Frog (Rana pipiens) Special Concern Occur primarily in or near water after breeding with good herbaceous cover, preferring more meadow-like habitat over forest cover ‑ variety of aquatic habitats, such as quiet or slow moving water along streams and Amphibiaweb - https://amphibiaweb.org/species/5126 rivers, wetlands associated with lakes or tidal areas, permanent or temporary pools American bittern (Botaurus lentiginosus) Endangered Extensive freshwater marshes are favored Bobolink (Dolichonyx oryzivorus) Special Concern Hayfields, meadows, wet meadows. Migrants stop over in fields and marshes, often feeding in rice fields Alder flycatcher (Empidonax alnorum) Special Concern Willows, alders, brushy swamps, swales Least Bittern (Ixobrychus exilis) Threatened King Rail (Rallus elegans) Endangerd Bronze Copper (Lycaena hyllus) Special Concern Hyssop Skullcap (Scutellaria integrifolia) NDDB Request March 2020 27 Parsons Lane, Durham, CT Endangerd General Habitat Fresh marshes, reedy ponds. Mostly freshwater marsh but also brackish marsh, in areas with tall, dense vegetation standing in water Will use a variety of habitats with shallow fresh or brackish water and dense cover. Important plants include cattails, bulrushes, spartina, and others. May be in brushy swamps with many willows, or in flooded rice fields Breeding Habitat Resource Link Marshes, reedy lakes. Breeds in freshwater Audubo - https://www.audubon.org/field-guide/bird/american-bittern marshes, mainly large, shallow wetlands with much tall marsh vegetation Hayfields, meadows. In migration, marshes. Original prime breeding areas were damp meadows and natural prairies with dense Audubon - https://www.audubon.org/field-guide/bird/bobolink growth of grass and weeds and a few low bushes Breeds in thickets of deciduous trees and shrubs, usually near water, as around Audubon - https://www.audubon.org/field-guide/bird/alder-flycatcher streams, ponds, or bogs Connecticut Specific Information https://portal.ct.gov/DEEP/Wildlife/Learn-About-Wildlife/Endangered-andThreatened-Species-Series (last updated February 18, 2020) "Connecticut lowlands, close to slow-moving bodies of water. They use shallow water bodies, including unpolluted bogs, pond edges, ditches, marshes, fens, vernal pools, red maple swamps, and slow-moving streams. Water bodies with a soft, murky bottom and abundant aquatic vegetation are preferred. Spotted turtles will seek out other wetlands if their habitat becomes unsuitable. Upland habitats also are used for nesting, aestivating, and travel corridors between wetlands." "aquatic and terrestrial habitats at different times of the year. Their habitats include rivers and large streams, riparian forests (adjacent to rivers), wetlands, hayfields, and other early successional habitats. Terrestrial habitat that is usually within 1,000 feet of a suitable stream or river is most likely used. Preferred stream conditions include moderate flow, sandy or gravelly bottoms, and muddy banks." Not listed "Freshwater and saltwater wetlands." Not listed Not listed Nest is well concealed in dense marsh growth Audubon - https://www.audubon.org/field-guide/bird/least-bittern "Emergent vegetation in freshwater marshes and occasionally saltwater or brackish." Nest site is in a clump of grass or sedges, usually about a foot above water or lan Audubon - https://www.audubon.org/field-guide/bird/king-rail "Freshwater marshes and brackish tidal marshes. " Their hosts are plants of the family Low, wet areas such as bogs, marshes, wet Polygonaceae, especially Water dock and meadows, ponds, herbaceous wetlands curled dock Butterflies and Moths of North America https://www.butterfliesandmoths.org/species/Lycaena-hyllus Not listed In New England, S. integrifolia has been found in fields, wet meadows, and the borders of wood and thickets, often in sandy soils and often near wetlands Native Plant Trust https://www.nativeplanttrust.org/documents/119/Scutellariaintegrifolia.pdf Same Not listed
  5. Page 319 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1337 of 1638
  6. Page 320 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1338 of 1638 SLERA AND RELATED CORRESPONDENCE (December 2021)
  7. Page 321 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1339 of 1638 9 Water Street, First Floor Amesbury, Massachusetts 01913 [phone removed] December 3, 2021 Drew Blicharz Eversource Energy Services Company 107 Selden Street Berlin, Connecticut 06037 Re: Additional Stream Sediment Sampling Results and Screening Level Ecological Risk Assessment (SLERA) Associated with 27 Parsons Lane, Durham, Connecticut; Eversource Spill Number CWC-18-00543 Dear Mr. Blicharz, Anchor QEA, LLC prepared this letter on behalf of The Connecticut Light and Power Company dba Eversource Energy (Eversource), as part of the ongoing investigation of a release of mineral oil dielectric fluid at 27 Parsons Lane in Durham, Connecticut (the Site; Figure 1). Sampling in 2018 identified polychlorinated biphenyls (PCBs) from the release in the sediment of an unnamed intermittent stream at the Site. Details of the 2018 sampling program are presented in the 2019 Interim Remedial Action Report (WSE 2019).1 Additional data collected in 2021 to support this Screening Level Ecological Risk Assessment (SLERA) defined the nature and extent of the PCB impacts to the stream and the downgradient Coginchaug River. Background The unnamed stream flows northeast to southwest, extends approximately 2,600 feet from the western property boundary of the Site, and traverses a few residential properties before discharging to the Coginchaug River, which runs within and adjacent to the Durham Wildlife Management Area. Most of the stream’s riparian habitat is wooded, and both its flow and depth are seasonally variable. According to the Connecticut Natural Diversity Database (NDDB), there is a population of northern leopard frogs (Rana pipiens), a species of special concern, in the vicinity of the Coginchaug River. Northern leopard frogs prefer open, grassy habitat along river floodplains with wetland and meadow-type cover. In accordance with the March 16, 2020, NDDB determination letter,2 the 2021 field investigations were conducted during the frog’s dormant period of November 1 to April 1 and the river was accessed on foot. Weston & Sampson Engineers, Inc. (WSE), 2019. Parsons Lane Interim Remedial Action Report. Durham, CT. 2019. Krukar, G., 2020. Letter to Amy Nelson of Anchor QEA. Regarding: NDDB Determination No.: 202003906. Soil Sampling in Durham Meadows Wildlife Management Area near 27 Parson Lane, Durham, CT. March 16, 2020. 1 2 \\athena\Amesbury\Projects\WestonSampson\Eversource\DurhamCT\SLERA Letter\Revised\Confidential_RevDurhamSLERA-Final.docx
  8. Page 322 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1340 of 1638 December 3, 2021 Page 2 The 2021 field investigation was a collaborative effort between Weston & Sampson and Anchor QEA to further evaluate sediment quality along the length of the intermittent stream from the Site to the stream’s confluence with the Coginchaug River. The 2019 work plan, which was modified as requested by the Connecticut Department of Energy and Environmental Protection (CT DEEP), specified the following objectives of the additional sampling: 1) to assess risk to aquatic receptors in the unnamed stream; 2) to assess potential impacts to aquatic resources associated with the Coginchaug River (which had not been evaluated previously); and 3) to further define the horizontal and vertical extent of PCBs within the sediment. This letter summarizes the recently collected 2021 data and the risk screening results based on the 2018 and 2021 data. Data Collection The 2021 sampling event in the unnamed stream and in the Coginchaug River was conducted on March 17, 19, and 24, 2021, by Weston & Sampson with oversight from Anchor QEA (Figures 2-5). The work, which followed the 2019 work plan3, targeted areas of depositional sediment, including the following: Eleven new single-point surface sediment locations, designated SED-1 to SED-11 One sample location along 2018 Transect 4, designated Reoccupy T4-E Eighteen sample locations at the western, center, and eastern portions of the stream along six new stream transects, designated Transects 4-1, 4-2, 5-1, 5-2, 6-1, and 7-1 In concurrence with CT DEEP, the 2021 sampling focused on sediment because PCBs had not been previously detected in surface water there. Depositional sediment areas were targeted for sampling in accordance with CT DEEP’s comments on the 2019 Work Plan. Sediments were collected with handheld equipment, including Lexan tubes for the finer grained material in the Coginchaug River and a hand auger for the coarser material in shallow areas of the unnamed stream. Two sample intervals (0.0 to 0.5 foot and 0.5 to 1.0 foot) were attempted at each sediment sampling location except for Reoccupy T4-E where only the 0.5- to 1.0-foot interval was sampled. Sample locations are shown in Figures 2 through 5. Samples were analyzed for PCB Aroclor by EPA method 8082 with 3540C Soxhlet extraction, for grain size via ASTM 6913, and for total organic carbon via EPA method 9060. Subsurface samples collected from the 0.5- to 1.0-foot intervals were analyzed, and the results reported in Attachment 1. Additional sediment samples were collected in the vicinity of the outfall to refine the nature and extent of PCB impacts for remediation purposes, as shown in Figure 2. Samples identified with “N” and “S” were collected from outside of the stream channel. 3 WSE. 2019. Ecological Risk Assessment Work Plan. 27 Parsons Lane, Durham, CT. Eversource Spill Number CWC-18-00543.
  9. Page 323 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1341 of 1638 December 3, 2021 Page 3 Ecological Screening Results Analytical data for 2018 and 2021 surface and subsurface samples are provided as Attachment 1. Data from the surface sediment samples representing the assumed biologically active zone (0- to 0.5-foot interval) were compared with ecological screening levels, and the results are presented in Table 1. The “N” and “S” Outfall Area samples collected outside of the main stream channel were conservatively included in this screening. Connecticut does not have risk-based sediment screening levels. Freshwater sediment screening levels used in this study include the total PCB threshold effect concentration (TEC) of 0.0598 milligram per kilogram (mg/kg) and the probable effect concentration (PEC) of 0.676 mg/kg developed by MacDonald et al. (2000).4 The TEC is a concentration below which adverse effects to the benthic community from exposure to PCBs are unlikely, and the PEC is a concentration above which effects are likely. Concentrations between the TEC and the PEC indicate some probability that adverse effects will occur, but the effects may not be significant. The use of consensus-based values in this assessment provides a strong weight of evidence by incorporating the results from several different methods and datasets. Additionally, the New York State Department of Environmental Conservation (NYSDEC) Class A Freshwater Sediment Guidance Value of 0.1 mg/kg provides a benchmark for the protection of both aquatic life and animals higher up the food chain that may bioaccumulate PCBs from food sources (NYSDEC 2014).5 According to NYSDEC, if the concentration of a contaminant in sediment is below the sediment guidance value that defines Class A, the contaminant can be considered to present little or no potential risk to aquatic life. This benchmark is similar to those of other states (e.g., Washington’s sediment cleanup objectives value of 0.11 mg/kg). Only Aroclor 1254 and Aroclor 1260 were detected in 2018 and 2021. Total PCB Aroclors were calculated as the sum of detected Aroclor concentrations. If no Aroclors were detected in a sample, the maximum reporting limit was used as the total. Reporting limits for non-detect results are less than the PCB TEC, indicating that non-detect results are conservative and protective of ecological receptors. The sampling locations were grouped into five reaches (shown in Figure 1); a summary of the screening results follows. 4 MacDonald, D.D., C.G. Ingersoll, and T.A. Berger, 2000. “Development and evaluation of consensus-based sediment quality guidelines for freshwater systems.” Archives of Environmental Contamination and Toxicology 39:20-31. 5 NYSDEC (New York State Department of Environmental Conservation), 2014. Screening and Assessment of Contaminated Sediment. Prepared by New York State Department of Environmental Conservation Division of Fish, Wildlife and Marine Resources Bureau of Habitat. June 2014.
  10. Page 324 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1342 of 1638 December 3, 2021 Page 4 One additional surface sediment sample was collected in the unnamed stream north of the Parsons Lane Outfall Area (Reach 1); Aroclors were not detected in this sample above the laboratory reporting limits. In the ecological risk screening dataset, 12 surface sediment samples including 1 field duplicate were collected in the Parsons Lane Outfall Area (Reach 2) between 2018 and 2021. Aroclor 1254 was detected in 11 samples, and Aroclor 1260 was detected in 6 samples. As shown in Table 1, total PCB Aroclor concentrations exceed the PEC in four 2018 samples (SD-1, Outfall-1, Outfall-2, and Outfall3) and one 2021 sample (OF-2N). The maximum total PCB Aroclor concentration of 15 mg/kg at OF-2N is 22 times greater than the PEC. Thirty-three surface sediment samples including three field duplicates in the risk screening dataset were collected in the unnamed stream between the Outfall Area and Middlefield Road (Reach 3). Aroclor 1254 was detected in 28 samples, and Aroclor 1260 was detected in 13 samples. Total PCB Aroclor concentrations exceed the TEC in four 2018 surface sediment samples (T2-E, T2-C, T4-E, and T5-E) and five 2021 samples (T4-1C, T4-1W, SED-2, the field duplicate for T4-2E, and T4-2W). Total PCB concentrations in three 2018 samples (T2-E, T2-C, and T4-E) and four 2021 samples (T4-1C, T4- 1W, SED-2, and T4-2W) also exceeds the NYSDEC Class A screening level (Table 1). Concentrations in two 2018 samples (T2-E and T2-C) and one 2021 sample (T4-1C) are greater than the PEC, with a maximum exceedance factor of 3.6. Ten surface sediment samples including two field duplicates were collected in the unnamed stream from Middlefield Road to the Coginchaug River confluence (Reach 4). Aroclor 1254 was detected in six samples, and Aroclor 1260 was detected in four samples. Total PCB Aroclor concentrations exceed the TEC in one 2018 sample (field duplicate for T7-E). No samples exceed the NYSDEC Class A screening level or the PEC. Seven surface sediment samples including one field duplicate were collected in the Coginchaug River (Reach 5) in 2021. Samples were collected at the river’s confluence with the unnamed stream and both upstream and downstream of this confluence. Aroclor 1254 was detected in seven samples, and Aroclor 1260 was detected in three. Total PCB Aroclor concentrations exceed the TEC in five samples (confluence samples SED-8 and SED-9; downstream samples SED-6 and SED-7; and the field duplicate for upstream sample SED-11). There are no exceedances of the PEC. Only samples from Reaches 2 and 3 exceed the NYSDEC Class A screening level of 0.1 mg/kg or the PEC of 0.676 mg/kg. The average total PCB Aroclor concentration of 2.1 mg/kg in Reach 2 (Parsons Lane Outfall Area) is the highest of all areas in 2021. However, this average is highly skewed due to OF-2N, near Outfall 2, which is the only 2021 sample in the Reach 2 risk dataset that exceeds any screening levels. Reach 3 (the Outfall Area to Middlefield Road) had the next highest average concentration, 0.13 mg/kg. Transects 4-1 and 4-2, near the Site, and SED-2, between these transects,

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)