Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 356 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1374 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN 1.0 INTRODUCTION & BACKGROUND 1.1 Introduction Weston & Sampson Engineers Inc. (Weston & Sampson), on behalf of The Connecticut Light and Power Company dba Eversource Energy (Eversource), has prepared this Remedial Action Plan (RAP) to perform remedial activities resulting from releases of polychlorinated biphenyl (PCB) containing mineral oil dielectric fluid (MODF) that occurred at 27 Parsons Lane in Durham, Connecticut (CT) in 2018. The releases affected a nearby stream on the northwestern corner of the 27 Parsons Lane property and a western abutting property at 105 Middlefield Road in Durham, CT. The CT DEEP assigned case number 2018-05541 form this release. The proposed remedial activities discussed in this RAP will address PCB impacts identified in the stream affecting both the 27 Parsons Lane and western abutting property at 105 Middlefield Road. Collectively these two properties will be referred to as the “Site” in this RAP. Because the release occurred on the 27 Parsons Lane property, the following subsections will sequentially discuss the 27 Parsons Lane property first and the 105 Middlefield Road property second. The RAP includes the removal and disposal of PCB-impacted sediment from a small drainage channel that conveys flow from an 8-inch (in.) clay outlet pipe, and from select areas of the stream that receives stormwater flow from the drainage channel. An Interim Remedial Action Report (IRAR) was prepared by Weston & Sampson in May 2019 and a Screening Level Ecological Risk Assessment (SLERA) report was prepared by Weston & Sampson’s eco-risk subconsultant Anchor QEA, LLC (Anchor) in December 2021. This RAP was prepared based on the findings from these two previous reports and provides the planned remedial actions to remove all contaminants that exceed the Environmental Protection Agency (EPA) Toxic Substance Control Act (TSCA) and Connecticut Department of Energy and Environmental Protection’s (CTDEEP) Remediation Standard Regulations (RSRs) located within the drainage channel and stream. 1.2 Site Location and Description The Site consists of two adjoining parcels at 27 Parsons Lane and 105 Middlefield Road totaling 18.14 acres located in the northern section of Durham, CT (see Figure 1 – Site Locus Map). The 27 Parsons Lane property is a 5.05-acre parcel of land located at the end of Parsons Lane (see Figure 2 – Existing Conditions Plan). It is improved with an irregular-shaped industrial/commercial building and small detached garage located in the central portion of the property. There is a mixture of dirt and paved parking areas on the southern, eastern, and western sides of the building, there are woodlands and an overgrown pond on the southern tip of the property, and there is a small stream on the northwestern corner of the property that is wooded and overgrown with dense vegetation. The parcel is identified by the Town of Durham Assessor as Parcel ID # 16-7. The 105 Middlefield Road property is a 13.09-acre parcel of land located on the east side Middlefield Road (see Figure 2 – Existing Conditions Plan). Much of the parcel is wooded and undeveloped except for the southwestern portion which contains a residential dwelling. The parcel contains several ponds (not included in the remediation areas), and the same stream mentioned above traverses across much of the property flowing generally in a northeast to southwest direction. The stream discharges into the Coginchaug River located approximately 2,600 feet (ft.) from the Site. The northern portion of the parcel 1-1 westonandsampson.com
  2. Page 357 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1375 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN borders the western side of the 27 Parsons Lane parcel, and it includes the area proposed for remediation. The parcel is identified by the Town of Durham Assessor as Parcel ID #15-12. The area surrounding the Site is a mixture of woodland and a combination of industrial, commercial and residential uses. The geographic coordinates for the approximate center of the Site are as follows: Latitude/Longitude: 41.4904268724463” North -72.6842386290727" West UTM Coordinates: 306,686.50 meters East 4,595,742.86 meters North 1.3 Site History Summary information about the Site history presented below begins by describing the two Site parcels and follows with how the release affected each parcel. The information will focus on the removal of PCBimpacted sediment from select areas including the drainage channel for the 8-in. clay outlet pipe and the stream involved in the release. The May 2019 IRAR and 2021 SLERA provide more complete details about the emergency response actions, remediation, and investigation which are briefly discussed below. The industrial/commercial building on the 27 Parsons Lane property has multiple tenants occupying different portions of the building performing a variety of activities including manufacturing, furniture production, sales and service of marine watercraft, and specialty construction trades. These (multitenant) activities have occurred for approximately the last 20 years. Before circa 2003, the building was operated by the W.A Parsons Company, a manufacturing company that specialized in designing and fabricating metal boxes for use in covering switches for electrical systems, fire alarms and telephones (and other products). This business developed the property in 1949 and occupied the property for over 50 years. The initial PCB oil release at 27 Parsons Lane was a weather-related incident involving a broken utility pole supporting a bank of three customer-owned pole-mounted transformers that fell onto the roof of the industrial/commercial building centrally located on the property (see Figure 2 – Existing Conditions Plan). The impact caused a puncture through the roof of the building, and one transformer released most of its oil content into a restroom/utility room inside the building. Three floor drains inside the bathroom/utility room were affected, two drains emptied into a nearby (outdoor) catch basin in a lawn “courtyard area” that discharged to a small stream on the northwestern corner of the parcel, and one drain discharged into the building’s active septic system. The property owner’s contractor relocated the three transformers onto the ground outside the building. The primary bushings from the two undamaged transformers were subsequently removed, purportedly by vandals, causing these transformers to release their oil contents onto a grass lawn “courtyard area” and into the same courtyard catch basin that discharged to the stream on the northwestern corner of the parcel. The total quantity of oil released from this incident was reported as approximately 100 gallons with approximately 33 gallons (one transformer) having been released inside the building and approximately 67 gallons (two transformers) having been released outside in the courtyard area. Notification of the releases to the Connecticut 1-2 westonandsampson.com
  3. Page 358 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1376 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN Department of Energy and Environmental Protection (CT DEEP) was completed on October 19, 2018. Analysis of the oil collected from the transformers revealed total PCB concentrations exceeding 50 milligrams per kilogram (mg/kg) subsequently making the release regulated by EPA under TSCA. Spill cleanup actions occurred between October 19 and 22, and November 8, 2018, and they were performed by a licensed spill cleanup contractor (Clean Harbors Environmental Services (CHES)) under the supervision of Eversource personnel. These actions included removal and disposal of the impacted catch basin and surrounding impacted soils in the lawn “courtyard area,” decontamination of the concrete floor and floor drains in the restroom/utility room with a detergent solution, and placement of oil-absorbent booms at the outfall of an 8-in. clay pipe that was connected to the impacted catch basin. The 8-in. clay pipe outfalls into an approximate 15-foot (ft.) long drainage channel before intersecting with a stream on the northwestern side of the parcel. The stream flows downgradient to the southwest onto the adjoining property at 105 Middlefield Road. The area of the release on the property at 105 Middlefield Road has always been wooded and undeveloped. The residential dwelling located on the southwestern portion of the parcel was built in the late 1700’s according to Durham Assessors records. 1.4 Sensitive Area Receptors Global information system (GIS) mapping for Durham depicts wetlands and a pond on the southern portion of the 27 Parsons Lane parcel, but it does not depict wetlands in the vicinity of the proposed remediation areas on both the 27 Parsons Lane and 105 Middlefield Road parcels. Anchor working as a subcontractor to Weston & Sampson for this project, conducted an evaluation of wetland conditions at the Site on March 9, 2023 in accordance with the U.S. Army Corps of Engineers’ (USACE) 1987 Federal Manual and the 2012 Regional Supplement for the Northcentral and Northeastern Regions. During the Site visit, no wetland conditions were observed in the vicinity of the remedial area on both the 27 Parsons Lane and 105 Middlefield Road parcels. These findings corroborate the GIS information mentioned above. The on-Site stream involved in the PCB remediation is considered a sensitive area receptor. Eversource submitted to CTDEEP a Request for Natural Diversity Data Base (NDDB) State Listed Species Review on April 3, 2023 (filing #97254). CTDEEP’s review concluded there were no extant populations of Federal or State Endangered, Threatened or Special Concern species (RCSA Sec. 26-306) within the project area. CTDEEP performed a previous NDDB review for the project in 2020 related to additional stream assessment activities undertaken in 2021. The project area was much larger and extended to where the (impacted) stream drained into the Coginchaug River and Durham Wildlife Management Area located approximately 2,600 ft. southwest of the Site. Because of the larger study area, CTDEEP concluded in the previous review there was known/documented extant population of State Special Concern Rana pipiens (Northern Leopard Frog) in the project area (specifically off-Site in the Coginchaug River and Durham Wildlife Management Area). CTDEEP requested as a recommended protection strategy to perform the assessment field work during the dormant period of the Northern Leopard Frog (November 1 through April 1). The same protective requirements aren’t needed for the proposed stream remediation 1-3 westonandsampson.com
  4. Page 359 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1377 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN work because CTDEEP didn’t identify any NDDB-listed species within the proposed limits of the stream remediation in its April 3, 2023 NDDB review letter. In 2022, a Weston & Sampson subcontracted herpetologist conduct a Site visit to review habitat conditions in the field and assess the suitability of the targeted remediation areas for the NDDB-listed leopard frog. The herpetologist did not observe the NDDB-listed frog or suitable habitat (open, grassy habitats either along the floodplain of a large stream or river, or in wetlands around the margins of large lakes) within the proposed remediation areas. These observations corroborate the findings of the April 3, 2023 NDDB review. 1.5 Geology According to the “Bedrock Geological Map of the Connecticut,” (Rodgers, 1985), the bedrock underlying the Site is described as the “Portland Arkose Formation”, a reddish-brown arkose (brownstone). Bedrock outcrops were not observed on Site or the western abutting parcel. According to the “Surficial Materials Map of the Connecticut,” (Stone et al., 1992), the surficial geology underlying the Site is described as thick till, areas where till is greater than 10 to 15 feet thick. 1.6 Groundwater Classification According to the CTDEEP, groundwater quality beneath the Site is classified as GA/GAA area that may not meet current standards. The Site is not located in a mapped Aquifer Protection Area. 1.7 Hydrogeology The overall direction of groundwater flow at the Site is in a southwesterly direction towards the Coginchaug River based on field observations and topographic maps. Flow on the 27 Parsons Lane parcel may have a westerly component, and flow on the 105 Middlefield Road parcel may have an easterly component. 1.8 Previous Studies There have been two published environmental studies for the PCB MODF release, the May 2019 IRAR and the December 2021 SLERA report. Summary information about each report pertaining to PCBimpacted sediment found in the drainage channel that conveys flow from an 8-inch (in.) clay outlet pipe and from select areas of the stream is summarized below. These two reports should be reviewed for additional information. Interim Remedial Action Report (IRAR) prepared by Weston & Sampson, dated May 2019 The 2019 IRAR documents various assessment activities undertaken by Eversource to investigate the nature and extent of the PCB MODF release, including the pipe drainage channel and the stream. Four drainage channel sediment samples and twenty-six stream sediment samples were collected and tested for PCBs. The sampling activities were performed upstream, within the release area, and more than ½mile downstream of the release area near the Coginchaug River and the Durham Wildlife Management Area. The table below presents a summary of the analytical results for these sediment samples. 1-4 westonandsampson.com
  5. Page 360 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1378 of 1638 EVERSOURCE ENERGY Sample Description REMEDIAL ACTION PLAN Sample Analyses Quantity Pipe Drainage Channel Sediment Stream Sediment PCBs = Polychlorinated Biphenyls mg/kg = milligrams per kilogram BRL = Below Reporting Limit 4 26 PCBs PCBs Results (mg/kg) 3.6 – 9.6 BRL – 2.4 Screening Level Ecological Risk Assessment (SLERA) Report prepared by Anchor QEA, LLC (a subcontractor to Weston & Sampson), dated December 2021 The 2021 SLERA report was prepared based on the findings contained in the IRAR which identified PCB impacts in drainage channel sediments and the stream. A SLERA is a conservative assessment that provides a high level of confidence in determining a low probability of adverse risk to human health and the environment. Its purpose is to assess the need, and if required, the level of effort necessary to conduct a detailed or “baseline” ecological risk assessment for a particular area. Additional sediment sampling activities were completed in March 2021 in the drainage channel and stream as part of the SLERA to further define the nature and extent of the PCB impacts to sediment in the pipe drainage channel, and the stream. In total, twenty-one drainage channel sediment samples, and fifty-four stream sediment samples were collected and tested for PCBs. Stream sampling activities were performed within and more than ½-mile downstream of the release area extending into the Coginchaug River and the Durham Wildlife Management Area. The table below presents a summary of the analytical results for these samples. Sample Description Sample Analyses Quantity Pipe Drainage Channel Sediment Stream Sediment PCBs = Polychlorinated Biphenyls mg/kg = milligrams per kilogram BRL = Below Reporting Limit 21 54 PCBs PCBs Results (mg/kg) BRL – 15 BRL – 1.2 Sampling plans for the pipe drainage channel and the stream are presented as Figures 3 – 7 and tabulated analytical data for the same areas are summarized in Tables 1 and 2. Eversource, Weston & Sampson, and Anchor concluded from the IRAR and SLERA that remediation of PCB-impacted sediment is needed for the drainage channel and the stream on the 27 Parsons Lane parcel, and in select localized downgradient portions of the stream on the abutting 105 Middlefield Road property. 1-5 westonandsampson.com
  6. Page 361 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1379 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN 2.0 REMEDIAL ACTION PLAN 2.1 Remedial Objectives and Approach PCB concentrations in Site sediment exceed EPA TSCA and CTDEEP RSR criteria. The objective of this RAP is to complete targeted remediation of PCB-impacted sediment in the drainage channel for the 8in. clay pipe and the stream located on the 27 Parsons Lane and 105 Middlefield Road parcels to reduce contaminant concentrations below TSCA and RSR criteria. Accomplishing this work will allow for the closure of the MODF spill incident. The remedial approach will involve removing the PCB-impacted sediment by mechanical equipment and disposing of the remediation waste off-site at a permitted disposal facility. Verification sampling will be performed in the removal areas and the samples will be analyzed for PCBs to measure the effectiveness of the remedial actions. This process (i.e. remove impacted sediment followed by sampling and testing) will be repeated if verification sample results reveal residual PCB impacts exceeding specified cleanup goals. Once favorable test data is received for the removal areas, the remedial actions will be considered complete allowing for the backfilling and restoration of the drainage channel and stream to match pre-existing conditions. All work will be performed using industry-accepted practices and will comply with applicable local, state, and federal permit requirements. Eversource is targeting the completion of this work during the summer to coincide with the dry time of year to minimize the complications associated with excessive stream flow events, and generation of wastewater requiring off-site disposal at a permitted disposal facility. The goal of the RAP is to accomplish the remedial activities at the Site in accordance with applicable federal and state regulations, be protective of the northern leopard frog (an NDDB-identified species of concern in the vicinity of the work area) and avoid the need for an engineered control or land use restriction. The work performed in this RAP will comply with TSCA’s Performance Based PCB Cleanups in accordance with Title 40 CFR Section 761.61(b). Grid verification sampling of the removal areas will be performed in accordance with 40 CFR 761.61 Subpart O. A cleanup standard of 0.5 mg/kg will be established for this project to comply with TSCA regulations, CTDEEP RSR criteria specified in Connecticut General Statutes (CGS) Sections 22a-133k-1 through 22a-133k-3, and satisfy recommendations provided in a July 21, 2022 CTDEEP interoffice memo prepared following the Department’s review of the 2021 SLERA report. 2.2 Site Features and Location of Remedial Actions There are two areas proposed for remediation which include the drainage channel for the 8-in. clay pipe and the stream. Additional information about each remediation area is summarized below, a single plan showing an overhead view of the proposed remediation areas is provided as Figure 8, and additional details about each remediation area are depicted on Figures 9 - 11. • Remediation of Impacted Drainage Channel for 8-in. Clay Pipe: The full length of the drainage channel extending from the 8-in. clay outfall pipe to the confluence of the stream is proposed for remediation. This remediation area is depicted on Figure 9, and it is located on the 27 Parsons Lane parcel. 2-1 westonandsampson.com
  7. Page 362 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1380 of 1638 EVERSOURCE ENERGY • REMEDIAL ACTION PLAN Remediation of Impacted Stream: Four localized sections of the stream are proposed for remediation. These locations are where oil sheens had previously been observed, where obstructions in the stream could have collected oil, or where sharp bends existed in the water course where oil may have accumulated. The four sections of stream are sequentially described from north to south, and additional information on each section is presented below. 1. Section 1: The first stream section proposed for remediation is where the stream is intersected by the drainage channel for the 8-in. clay pipe. This remediation area is depicted on Figure 9, and it is located on the 27 Parsons Lane parcel. 2. Section 2: The second stream section proposed for remediation is approximately 5-10 ft. south and downstream of the first stream section described above. This remediation area is depicted in Figure 9, and it is located on the 27 Parsons Lane parcel. 3. Section 3: The third stream section proposed for remediation is approximately 25-30 ft. west and downstream of the second stream section described above. This remediation area is depicted on Figure 10, and it is located on the 105 Middlefield Road parcel. 4. Section 4: The fourth stream section proposed for remediation is approximately 40-45 ft. south and downstream of the third stream section described above. This remediation area is depicted on Figure 10, and it is located on the 105 Middlefield Road parcel. 2.3 Characteristics and Quantities of PCB Remediation Waste The proposed stream remediation activities will be accomplished through excavation and off-site disposal at a permitted disposal facility. As described in Section 2.2, there are 2 locations on the Site that require excavation to reduce PCB concentrations in sediment to below applicable TSCA and CTDEEP criteria. Each location outlined below summarizes the nature and extent of PCB impacts and describes how Weston & Sampson determined the proposed excavation areas and associated quantities. Confirmatory sampling will be performed at all excavation areas to verify that all PCBimpacted sediment with TSCA or CTDEEP exceedances have been removed. • Remediation of Impacted Drainage Channel for 8-in. Clay Pipe: Weston & Sampson proposes a 2.0 ft. excavation depth for the full length (approximately 15 linear ft.) of the drainage channel. The (northerly and southerly) width of the removal activities within the drainage channel will generally match the nearest (assessment) sample locations exhibiting PCB-impacts below the 0.5 mg/kg cleanup standard and includes sample ID’s OF-1N, OF-1S, OF-2S, OF-3N, and OF3S respectively. The eastern and western limits correspond to the full length of the approximate 15 ft. drainage channel. The removal activities will abate PCB exceedances previously identified at sample ID’s SD-1, Outfall-1, Outfall-2, OF-2N and Outfall-3. We estimate approximately 8.0 cubic yards (CY) of sediment will be generated from the remedial activities completed for the drainage channel. • Remediation of Impacted Stream: Weston & Sampson proposes a 1.0 ft. excavation depth for all four stream sections proposed for remediation. Additional details for each stream section are 2-2 westonandsampson.com
  8. Page 363 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1381 of 1638 EVERSOURCE ENERGY REMEDIAL ACTION PLAN presented below. We estimate approximately 7.0 CY of sediment will be generated from the remedial activities completed for the four stream remediation areas. 1. Section 1: The length of the excavation will cover approximately 15 linear ft. of the stream channel, and the width of the excavation will extend one ft. beyond/into each side of the eastern and western-facing stream embankments. The activities will remove PCB exceedances previously identified at sample locations T2-C and T2-E. 2. Section 2: The length of the excavation will cover approximately 7 linear ft. of stream channel, and the width of the excavation will extend one ft. beyond/into each side of the northern and southern-facing stream embankments. The activities will remove the PCB exceedance previously identified at sample location T4-E. 3. Section 3: The length of the excavation will cover approximately 5 linear ft. of stream channel, and the width of the excavation will extend one ft. beyond/into each side of the eastern and western-facing stream embankments. The activities will remove the PCB exceedance previously identified at sample location T4-1C and T4-1W. 4. Section 4: The length of the excavation will cover approximately 5 linear ft. of stream channel, and the width of the excavation will extend one ft. beyond/into each side of the eastern and western-facing stream embankments. The activities will remove the PCB exceedance previously identified at sample location SED-2. Final removal limits and quantities of excavated sediment may vary from the above volume estimates based on confirmatory (1.5 meter) grid verification sampling completed in accordance with 40 CFR 761.61 Subpart O. 2.4 Conceptual Remedial Plan This section outlines a conceptual remedial plan for the excavation and off-site disposal of PCB impacted sediment located in the drainage channel for the 8-in. clay pipe and the stream located on the 27 Parsons Lane and 105 Middlefield Road parcels. 2.4.1 • • • • Prepare Site-specific Health and Safety Plan (HASP), Prepare and submit to the Army Corp of Engineers (ACOE) a Self-Verification Notification form for planned remedial activities impacting a drainage channel and associated stream, Submit a permit application to the Town of Durham Conservation Commission (DCC) for planned remedial activities impacting a drainage channel and associated stream; and Submit notification to Call Before You Dig prior to commencement of any excavation activities. 2.4.2 • Planning and Permitting Site Preparation Evaluate Site access for remediation materials and equipment (including wastewater management equipment), 2-3 westonandsampson.com
  9. Page 364 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1382 of 1638 EVERSOURCE ENERGY • • • • • • • • • • Perform periodic inspections of the work area before remediation by a certified herpetologist in search of State NDDB-listed leopard frog. Remove dense ground vegetation and trees within the work area as needed, Measure, locate and mark out the remedial work areas, Mobilize and set up storage/staging areas for contractor equipment, materials and anticipated wastes used/generated for project, Install stormwater and sedimentation controls (straw bales and silt fence) around the perimeter of the work area and implement temporary seeding and erosion control blankets to any disturbed areas, Install temporary chain link fence with dust screens, two temporary access roads, and a construction entrance pad, Install materials (including sandbags, stakes, and poly sheeting) within the stream to bifurcate (split) the stream into two separate, parallel stream flow channels, Install geotextile/erosion control matting on stream banks to help prevent erosion/washout. Install bypass piping for existing stormwater outlets, route the discharge past all remediation areas, and install a stormwater discharge plunge pool and level spreader at the outlet for the bypass piping to minimize erosion, and Remove staged/stored materials and equipment within excavation areas. 2.4.3 • • • • • • • • • • REMEDIAL ACTION PLAN Site Remediation and Restoration Complete remediation of PCB-impacted sediment from the drainage channel for 8-in. clay pipe and from four sections of the stream using mechanical vacuum excavation equipment, Remediation of the drainage channel and all four stream sections shall be performed simultaneously to maximize work efficiency and minimize disturbance to the stream. Perform backfilling of excavations and subsequent stream restoration activities, Remediation, verification sampling, and complete stream restoration within the stream shall be completed in the first (bifurcated) stream flow channel before moving to the other side of the flow channel, Perform periodic inspections of the work area during remediation and restoration by a certified herpetologist in search of State NDDB-listed leopard frog. Manage and collect free draining liquids from remediation waste solids (sediment), Load-out and transport PCB remediation waste solids and liquids off-site to a permitted disposal facility, Remove stormwater and sedimentation controls, temporary fencing, access roads, construction entrance pad, stream bifurcation materials, bypass piping, energy dissipator plunge pool and level spreader, Decontaminate excavation equipment, and Demobilize equipment and materials from the Site. 2-4 westonandsampson.com
  10. Page 365 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1383 of 1638 EVERSOURCE ENERGY 2.4.4 • • REMEDIAL ACTION PLAN Documentation Each excavation area will be field measured and photo documented. Daily field notes will also be recorded. Prepare necessary remediation close-out documents (a.k.a. Supplemental Remedial Action Report (RAR)). 2.5 Expected Efficiency Remediation of the drainage channel and all four stream sections shall be performed simultaneously to maximize work efficiency and minimize disturbance to the stream. Bifurcating flow in the stream channel versus capturing and bypassing the entire stream flow around the remediation area will decrease the total footprint of the work area disturbance, reduce the federal and municipal permitting process, and help achieve completion of the remediation field work faster. Remediation will be completed during dry summer months which will minimize the duration of remediation dewatering and the amount of wastewater for disposal, and help accelerate the project completion. Lastly, analysis of cleanup verification samples will be expedited as quickly as possible to help accelerate the project completion. 2.6 Demonstrated Effectiveness The remediation of PCB-impacted sediment from the drainage channel and stream, the decontamination of equipment used in the remedial activities performed in accordance with 40 CFR 761.79 (c)(2)(i), and the confirmatory grid verification sampling completed in accordance with 40 CFR 761.61 Subpart O is expected to remove all PCB impacts with EPA and Site-specific state exceedances and reduce the overall mass of contaminants contributing to PCB impacts to sediment located in the drainage channel and stream. 2.7 Spill and Accidental Discharge Controls Potential spill and accidental discharge risks associated with implementation of the remedial action are primarily mechanical/physical failures of machinery and/or fueling incidents. Standard operating procedures to ensure that the implementation of the remedy does not result in spills or accidental releases will include daily inspection of hydraulic lines and reservoirs, and general inspection of equipment which contains fuel, oils and lubricants. Absorbent materials and containers will be kept on Site during remedy implementation to contain incidental spills and/or accidental discharges from excavation and trucking equipment. 2.8 Waste Management There are expected to be two classifications of wastes produced from the remedial activities discussed in this RAP: PCB remediation waste and mixed solid waste (MSW). Additional information about these wastes is presented below. Eversource will be the generator for all waste materials generated from the project. • Sediment removed from the proposed remediation areas will be managed and disposed of as a PCB remediation waste in accordance with Title 40 CFR Section 761.61(b). Two matrices of PCB remediation waste, including solids and liquids, are expected to be generated for this project. 2-5 westonandsampson.com

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)