Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 409 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1427 of 1638 3.06 REJECTED MATERIALS AND DEFECTIVE WORK: A. Materials furnished by the Contractor and condemned by the Engineer as unsuitable or not in conformity with the specifications shall forthwith be removed from the work by the Contractor, and shall not be made use of elsewhere in the work. B. Any errors, defects or omissions in the execution of the work or in the materials furnished by the Contractor, even though they may have been passed or overlooked or have appeared after the completion of the work, discovered at any time before the final payment is made hereunder, shall be forthwith rectified and made good by and at the expense of the Contractor and in a manner satisfactory to the Engineer. C. The Contractor shall reimburse the The Connecticut Light and Power Company d.b.a. Eversource Energy, hereinafter referred to as the “Owner” for any expense, losses or damages incurred in consequence of any defect, error, omission or act of the Contractor or its employees, as determined by the Engineer, occurring previous to the final payment. 3.07 SANITARY REGULATIONS: Sanitary conveniences for the use of all persons employed on the work, properly screened from public observation, shall be provided in sufficient numbers in such manner and at such locations as may be approved. The contents shall be removed and disposed of in a satisfactory manner as the occasion requires. The Contractor shall rigorously prohibit the committing of nuisances within, on or about the work. Any employees found violating these provisions shall be discharged and not again employed on the work without the written consent of the Engineer. The sanitary conveniences specified above shall be the obligation and responsibility of the Contractor. 3.08 SAFETY AND HEALTH REGULATIONS: This project is subject to the Safety and Health regulations of the U.S. Department of Labor set forth in 29 CFR, Part 1926, and to the Connecticut Department of Labor Division of Occupational Safety and Health (CONN-OSHA). The Contractor shall be familiar with the requirements of these regulations. 3.09 SITE INVESTIGATION: The Contractor acknowledges that it has satisfied itself as to the conditions existing at the site of the work, the type of equipment required to perform this work, the quality and quantity of the materials furnished insofar as this information is reasonably ascertainable from an inspection of the site, as well as from information presented by the drawings and specifications made a part of this contract. Any failure of the Contractor to acquaint itself with available information will not relieve it from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner assumes no responsibility for any conclusion or interpretation made by the Contractor on the basis 10/27/2016 01 11 00-3
  2. Page 410 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1428 of 1638 of the information made available by the Owner. 3.10 ELECTRIC SERVICE: A. The Contractor shall make all necessary applications and arrangements and pay for all fees and charges for electrical energy for power and light necessary for the proper completion of this contract during its entire progress. The Contractor shall provide and pay for all temporary wiring, switches, connections, and meters or provide generators, if required, at no additional cost to the Owner. See Section 01 57 19 – ENVIRONMENTAL PROTECTION for noise control requirements if a generator is used. B. There shall be sufficient electric lighting so that all work may be done in a workmanlike manner where there is not sufficient daylight. 3.11 HAZARDOUS WASTE: Should the Contractor, while performing work under this contract, uncover unforeseen hazardous materials, as defined in Connecticut Remediation Standard Regulations, it shall immediately notify the Engineer. The Contractor is not, and has no authority to act as, a handler, generator, operator or disposer of hazardous or toxic substances found or identified at the site, and the Owner shall undertake all such functions. END OF SECTION 10/27/2016 01 11 00-4
  3. Page 411 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1429 of 1638 SECTION 01 12 16 SCOPE AND SEQUENCE OF WORK PART 1 – GENERAL 1.01 WORK INCLUDED: The work under this contract includes the construction of temporary access roads down a slope to access a stream, placing of environmental protections, construction of temporary dams in the stream to achieve working in dry conditions, excavation and disposal of sediment from up to 2ft below grade in the streambed, up to 1ft below grade in a drainage channel, and concrete patching work inside a building. Work includes the handling and disposal of polychlorinated biphenyl (PCB) contaminated stream sediments and concrete, and site restoration. The stream and associated work is located at 27 Parsons Lane, Durham CT. Part of the Remediation area in the stream is located at 105 Middlefield Road, Durham CT. 1.02 EXISTING CONDITIONS The Contractor shall note the project involves the handling of hazardous materials impacted with PCBs. PCB-Contaminated materials include stream sediments and the concrete floor as shown on Sheets C002 – Site Preparation and Remediation Plan and C003 – Interior Restoration Plan. See Section 00 31 32 – SUBSURFACE DATA for additional information. PART 2 - PRODUCTS Not Used PART 3 - EXECUTION 3.01 GENERAL: A. The Contractor shall be responsible for scheduling its activities and the activities of any subcontractors involved, to meet the completion date, or milestones, established for the contract. Scheduling of the work shall be coordinated with the Owner and Engineer. B. The Construction Sequence Requirements shall be used by the Contractor to form a complete schedule for the Project, which shall be coordinated with the Owner and Engineer. Prior to performing any work at the Site, the Contractor shall submit a detailed plan to the Engineer for review. The plan shall describe the proposed sequence, methods, and timing of the work. 04/18/2013 01 12 16-1
  4. Page 412 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1430 of 1638 C. The schedule shall consist of a Gantt Chart showing the sequence of work described herein including permitting, submittal preparation, Site mobilization, Site work (site preparation, remediation, drainage work, site restoration, etc.), project closeout, demobilization, and chart contract completion. 3.02 A. CONSTRUCTION SEQUENCE REQUIREMENTS: The remediation work shall be completed in one (1) contiguous phase. The work of this project shall begin upon receipt of the “Notice to Proceed” from the Owner. A PreConstruction Meeting shall be scheduled by the Owner and must be attended by the Contractor and any Sub-Contractors. The following outlines the sequence of work to be performed at the site: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 04/18/2013 Obtain remediation permits and develop and submit required project-specific plans/submittals, including, but not necessarily limited to, excavated materials management plan, health and safety plan, dust control plan, etc. Install temporary fencing and wind screens, erosion and sedimentation controls, and suitable engineering controls as shown on Sheet C002 to prevent the spread of contamination during stream remediation work. Perform GPS elevation surveys of access road locations and remediation areas prior to work beginning. No work shall be performed until results of the survey are provided to the Owner. Construct two gravel access roads as shown on Sheet C002 and as detailed on Sheet D001. Construct sandbag dam at each stream remediation area shown on Sheet C002 and detailed on Sheet D001. Install bypass piping onto active stormwater conveyance pipes shown on sheet C002 and detailed on Sheet D001. Once half of remediation area in the stream is dry, remove all dry soils to 1ft below ground surface in streambed as shown on Sheet C002. Any liquids collected with removed soils should be decanted, segregated from solids, and stored in 55-gallon drums. Allow Engineer to collect confirmatory soil samples from excavation. Leave sandbag dam in place until confirmatory sample results are available. Once Engineer and Owner give approval, complete restoration work in the dry stream as specified on Sheet C004. Once restoration of half the stream has been completed, shift sandbag dam to access other half of stream. Once this half of remediation area is dry, remove all dry soils to 1ft below ground surface in streambed as shown on Sheet C002. Collect and segregate any liquids into 55-gallon drums. Repeat step 7. Remove soils in drainage channel to 2ft below ground surface as shown on Sheet C002. Allow engineer to collect confirmatory samples from excavation. Collect and segregate any liquids into 55-gallon drums. While confirmatory samples are being analyzed leave sandbag dam in place, complete interior restoration. 01 12 16-2
  5. Page 413 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1431 of 1638 14. 15. 04/18/2013 a. Patch concrete and floor drains as specified in sheet C004. Backfill remaining excavated area per Section 31 00 00 - EARTHWORK. Restore any disturbed areas with loam and seed to match preexisting conditions site per Sheet C004. END OF SECTION 01 12 16-3
  6. Page 414 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1432 of 1638 SECTION 01 14 00 SPECIAL PROVISIONS PART 1 - GENERAL Not Used PART 2 - PRODUCTS Not Used PART 3 - EXECUTION 3.01 A. 3.02 WATER FOR CONSTRUCTION PURPOSES: The Contractor shall coordinate with the Town of Durham for use and payment of a nearby hydrant (if available) for the purposes of dust control for the duration of the project. Contractor cannot run water lines across the street but may use the hydrant to fill water truck after coordination and approval form the Town. If a hydrant is not available for use, the Contractor shall provide water tanks/truck at no additional cost to the Owner. DIMENSIONS OF EXISTING STRUCTURES: Where the dimensions and locations of existing structures are of critical importance, the Contractor shall verify such dimensions and locations in the field before site remediation activities. 3.03 OCCUPYING PRIVATE PROPERTY: The Contractor shall not enter upon nor occupy with workers, equipment or materials any property outside of the public highways or Owner’s easements, except with the written consent of the property owner or property owner’s agent. Contractor shall confirm with Owner that access to 27 Parsons Lane and 105 Middlefield Road parcel is available before work begins. 3.04 EXISTING UTILITY LOCATIONS – CONTRACTOR’S RESPONSIBILITY: A. It is not warranted that all existing utilities and services are shown, or that shown locations are correct. The Contractor shall be responsible for hiring a private utility locator and having the utility companies locate their respective utilities on the ground prior to excavating. B. To satisfy the requirements of Connecticut law, Section 16-345-4(a)(1), the Contractor shall, at least 48 hours, exclusive of Saturdays, Sundays and holidays, prior to excavation 10/27/2016 01 14 00-1
  7. Page 415 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1433 of 1638 in the proximity of telephone, gas, cable television and electric utilities, notify the utilities concerned by calling “Call Before You Dig” at telephone number: 1-800-9224455. C. The Contractor shall coordinate all work involving utilities and shall satisfy itself as to the existing conditions of the areas in which it is to perform their work. It shall conduct and arrange its work so as not to impede or interfere with the work of other contractors working in the same or adjacent areas. D. The Contractor shall excavate and backfill test pits as necessary to determine the exact location(s) of existing utility facilities that are near or have the potential to be impacted by the work of this contract. The size, depth and location of test pits shall be approved by the Engineer. 3.05 COORDINATION OF WORK: The General Contractor shall be responsible for coordinating its own work as well as that of any subcontractors. It shall be responsible for notification of the Engineer when each phase of work is expected to begin and the approximate completion date. 3.06 TIME FOR COMPLETION OF CONTRACT: The Bidder shall base their bid on completing the proposed work by the completion date per Agreement with Owner. 3.07 SIGNS: A. The Contractor shall install and maintain construction signs for the duration of the Project. Signs to be installed and maintained by the Contractor include, but not limited to: project signs, “Construction Area” signs, “No Trespassing/Keep Out” signs, or any other signage required by law/regulation or other Sections. B. The Contractor shall provide adequate support for the sign as determined by the Engineer. All supports, trim, and back of sign shall be painted with at least two coats of exterior paint. C. The project sign shall be coordinated with the Owner prior to fabrication and shall be maintained by the Contractor in good condition at all times for the duration of construction. The Contractor shall remove the sign upon completion of construction. 3.08 A. COMPLIANCE WITH PERMITS: The Contractor shall perform all work in conformance with requirements of the Permits, which appear in Section 01 31 43 – PERMITS. 10/27/2016 01 14 00-2
  8. Page 416 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1434 of 1638 3.09 A. 3.10 A. CONTRACTOR’S REPRESENTATIVE: The Contractor shall designate a representative who will be available to respond to emergency calls by the Owner at any time day and night and on weekends and holidays should such a situation arise. HOURS OF CONSTRUCTION ACTIVITY: The Contractor shall conduct all remediation activity between 7:00 a.m. and 5:00 p.m., Monday through Friday. Contractor to coordinate with Owner and Engineer to schedule indoor work. No truck or vehicle idling will be allowed before 7:00 a.m. at the site. No construction work shall be allowed on Saturdays, Sundays or Holidays without written authorization from the Owner. END OF SECTION 10/27/2016 01 14 00-3
  9. Page 417 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1435 of 1638 SECTION 01 14 19.16 DUST CONTROL PART 1 - GENERAL 1.01 DESCRIPTION: A. This Section specifies requirements for controlling dust generated during work of this Contract. Work activities requiring special attention to dust control include containerizing, loading, and removal of material from the site, earthwork, concrete cutting, and remediation activities. Dust generated during the course of the Work must be controlled and kept on-site. B. The Contractor is responsible for control of dust at all times during work of this Contract, 24 hours per day, 7 days per week, including non-working hours, weekends, and holidays. C. The Contractor is responsible for monitoring and providing data from dust control data loggers. D. During the progress of the work, the Contractor shall conduct its operations and maintain the area of his activities, including sweeping and sprinkling of streets as necessary, to minimize creation and dispersion of dust. The Contractor is responsible for dust monitoring during the work. The Engineer may perform air/dust monitoring for confirmation purposes. If dust exceeds action levels described in this Section, or determined to be a nuisance by the Engineer, the Contractor shall be responsible for implementing additional engineering controls (e.g. additional dust suppression agents, wind screens), as directed by the Engineer, and described in this Section at no additional cost to the Owner. E. The Contractor is responsible for daily clean-up of public roadways, adjacent driveways/parking lots, and walkways affected by work of this Contract. A wet spray power vacuum street sweeper shall be used on pavement, as required. Dry power sweeping is prohibited. The Contractor shall be responsible for supplying a water tank/truck for dust control if fire hydrants are unusable or inaccessible. 1.02 A. B. C. D. F. E. RELATED WORK: Section 01 14 00 – SPECIAL PROVISIONS Section 01 35 29 – HEALTH AND SAFETY PLAN Section 01 57 19 – ENVIRONMENTAL PROTECTION Section 02 61 00.16 – HANDLING, TRANSPORTATION, REUSE AND OFF-SITE DISPOSAL OF EXCAVATED MATERIALS Section 02 83 90 – ABATEMENT OF PCB-CONTAINING MATERIALS Section 31 00 00 – EARTHWORK 08/23/2011 01 14 19.16-1
  10. Page 418 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1436 of 1638 1.03 A. 1.04 REGULATORY REQUIREMENTS: Work of this Contract shall be conducted in a manner that will not result in excessive particulate matter emissions, nuisance dust conditions, PM 10 (particulate matter with an aerodynamic diameter less than or equal to 10 microns) emissions, or PM 10 concentrations exceeding the “Action Level” for dust at the Site of 120 µg/m 3 on 24-hour average basis. However, 15-minute spikes of 120 μg/m3 will require additional dust control via water hoses and/or misting. SUBMITTALS: A. Contractor shall submit a Dust Control Plan that outlines in detail the measures that will be implemented to comply with this Section, including suppression, wind screens and barriers, prevention, cleanup, and other measures. Plan shall be submitted to the Engineer within fifteen calendar days following the date of the Notice to Proceed. B. Contractor shall submit to the Engineer product literature and Safety Data Sheets for any dust suppression wetting agents and stabilizers that the Contractor proposes to use. 1.05 A. QUALITY CONTROL: The Contractor shall conduct air monitoring with a Mini RAM monitor, or equivalent, to ensure dust is being controlled at the site. The Contractor shall have, at a minimum, four Mini RAM monitors placed around the perimeter of the Site for the duration of Work at the Site. Locations shall be submitted as part of the Contractor’s Dust Control Plan. During the course of the Work, the Contractor shall be responsible for implementing engineering controls (e.g., wetting, calcium chloride) to minimize or eliminate fugitive dust emissions. If dust exceeds action levels described below or determined to be a nuisance by the Engineer (e.g. dust clouds), the Contractor shall be responsible for implementing additional engineering controls (e.g., additional dust suppression agents, wind screens), as directed by the Engineer. If additional wet suppression (water) and/or wind screens, barriers, or covers are required per the Engineer based on air/dust monitoring results, they shall be at no additional cost to the Owner. The Contractor is responsible for monitoring and providing data from dust control data loggers to the Engineer at the end of each day. PART 2 - PRODUCTS 2.01 DUST SUPPRESSION AGENTS: A. Dust suppression wetting agents shall be water soluble, non-toxic, non-reactive, nonvolatile, and non-foaming. B. Soil stabilizer shall be a sprayable organic or inorganic tackifier. 2.02 BARRIERS, SCREENS, AND COVERS: 08/23/2011 01 14 19.16-2

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)