Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 415 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1433 of 1638 in the proximity of telephone, gas, cable television and electric utilities, notify the utilities concerned by calling “Call Before You Dig” at telephone number: 1-800-9224455. C. The Contractor shall coordinate all work involving utilities and shall satisfy itself as to the existing conditions of the areas in which it is to perform their work. It shall conduct and arrange its work so as not to impede or interfere with the work of other contractors working in the same or adjacent areas. D. The Contractor shall excavate and backfill test pits as necessary to determine the exact location(s) of existing utility facilities that are near or have the potential to be impacted by the work of this contract. The size, depth and location of test pits shall be approved by the Engineer. 3.05 COORDINATION OF WORK: The General Contractor shall be responsible for coordinating its own work as well as that of any subcontractors. It shall be responsible for notification of the Engineer when each phase of work is expected to begin and the approximate completion date. 3.06 TIME FOR COMPLETION OF CONTRACT: The Bidder shall base their bid on completing the proposed work by the completion date per Agreement with Owner. 3.07 SIGNS: A. The Contractor shall install and maintain construction signs for the duration of the Project. Signs to be installed and maintained by the Contractor include, but not limited to: project signs, “Construction Area” signs, “No Trespassing/Keep Out” signs, or any other signage required by law/regulation or other Sections. B. The Contractor shall provide adequate support for the sign as determined by the Engineer. All supports, trim, and back of sign shall be painted with at least two coats of exterior paint. C. The project sign shall be coordinated with the Owner prior to fabrication and shall be maintained by the Contractor in good condition at all times for the duration of construction. The Contractor shall remove the sign upon completion of construction. 3.08 A. COMPLIANCE WITH PERMITS: The Contractor shall perform all work in conformance with requirements of the Permits, which appear in Section 01 31 43 – PERMITS. 10/27/2016 01 14 00-2
  2. Page 416 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1434 of 1638 3.09 A. 3.10 A. CONTRACTOR’S REPRESENTATIVE: The Contractor shall designate a representative who will be available to respond to emergency calls by the Owner at any time day and night and on weekends and holidays should such a situation arise. HOURS OF CONSTRUCTION ACTIVITY: The Contractor shall conduct all remediation activity between 7:00 a.m. and 5:00 p.m., Monday through Friday. Contractor to coordinate with Owner and Engineer to schedule indoor work. No truck or vehicle idling will be allowed before 7:00 a.m. at the site. No construction work shall be allowed on Saturdays, Sundays or Holidays without written authorization from the Owner. END OF SECTION 10/27/2016 01 14 00-3
  3. Page 417 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1435 of 1638 SECTION 01 14 19.16 DUST CONTROL PART 1 - GENERAL 1.01 DESCRIPTION: A. This Section specifies requirements for controlling dust generated during work of this Contract. Work activities requiring special attention to dust control include containerizing, loading, and removal of material from the site, earthwork, concrete cutting, and remediation activities. Dust generated during the course of the Work must be controlled and kept on-site. B. The Contractor is responsible for control of dust at all times during work of this Contract, 24 hours per day, 7 days per week, including non-working hours, weekends, and holidays. C. The Contractor is responsible for monitoring and providing data from dust control data loggers. D. During the progress of the work, the Contractor shall conduct its operations and maintain the area of his activities, including sweeping and sprinkling of streets as necessary, to minimize creation and dispersion of dust. The Contractor is responsible for dust monitoring during the work. The Engineer may perform air/dust monitoring for confirmation purposes. If dust exceeds action levels described in this Section, or determined to be a nuisance by the Engineer, the Contractor shall be responsible for implementing additional engineering controls (e.g. additional dust suppression agents, wind screens), as directed by the Engineer, and described in this Section at no additional cost to the Owner. E. The Contractor is responsible for daily clean-up of public roadways, adjacent driveways/parking lots, and walkways affected by work of this Contract. A wet spray power vacuum street sweeper shall be used on pavement, as required. Dry power sweeping is prohibited. The Contractor shall be responsible for supplying a water tank/truck for dust control if fire hydrants are unusable or inaccessible. 1.02 A. B. C. D. F. E. RELATED WORK: Section 01 14 00 – SPECIAL PROVISIONS Section 01 35 29 – HEALTH AND SAFETY PLAN Section 01 57 19 – ENVIRONMENTAL PROTECTION Section 02 61 00.16 – HANDLING, TRANSPORTATION, REUSE AND OFF-SITE DISPOSAL OF EXCAVATED MATERIALS Section 02 83 90 – ABATEMENT OF PCB-CONTAINING MATERIALS Section 31 00 00 – EARTHWORK 08/23/2011 01 14 19.16-1
  4. Page 418 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1436 of 1638 1.03 A. 1.04 REGULATORY REQUIREMENTS: Work of this Contract shall be conducted in a manner that will not result in excessive particulate matter emissions, nuisance dust conditions, PM 10 (particulate matter with an aerodynamic diameter less than or equal to 10 microns) emissions, or PM 10 concentrations exceeding the “Action Level” for dust at the Site of 120 µg/m 3 on 24-hour average basis. However, 15-minute spikes of 120 μg/m3 will require additional dust control via water hoses and/or misting. SUBMITTALS: A. Contractor shall submit a Dust Control Plan that outlines in detail the measures that will be implemented to comply with this Section, including suppression, wind screens and barriers, prevention, cleanup, and other measures. Plan shall be submitted to the Engineer within fifteen calendar days following the date of the Notice to Proceed. B. Contractor shall submit to the Engineer product literature and Safety Data Sheets for any dust suppression wetting agents and stabilizers that the Contractor proposes to use. 1.05 A. QUALITY CONTROL: The Contractor shall conduct air monitoring with a Mini RAM monitor, or equivalent, to ensure dust is being controlled at the site. The Contractor shall have, at a minimum, four Mini RAM monitors placed around the perimeter of the Site for the duration of Work at the Site. Locations shall be submitted as part of the Contractor’s Dust Control Plan. During the course of the Work, the Contractor shall be responsible for implementing engineering controls (e.g., wetting, calcium chloride) to minimize or eliminate fugitive dust emissions. If dust exceeds action levels described below or determined to be a nuisance by the Engineer (e.g. dust clouds), the Contractor shall be responsible for implementing additional engineering controls (e.g., additional dust suppression agents, wind screens), as directed by the Engineer. If additional wet suppression (water) and/or wind screens, barriers, or covers are required per the Engineer based on air/dust monitoring results, they shall be at no additional cost to the Owner. The Contractor is responsible for monitoring and providing data from dust control data loggers to the Engineer at the end of each day. PART 2 - PRODUCTS 2.01 DUST SUPPRESSION AGENTS: A. Dust suppression wetting agents shall be water soluble, non-toxic, non-reactive, nonvolatile, and non-foaming. B. Soil stabilizer shall be a sprayable organic or inorganic tackifier. 2.02 BARRIERS, SCREENS, AND COVERS: 08/23/2011 01 14 19.16-2
  5. Page 419 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1437 of 1638 A. Wind screens shall be a durable fabric mesh of 50 percent porosity, attached to temporary site fence. B. Wind barriers shall be solid wood fences, solid durable fabric attached to temporary site fence, or other solid barriers intended to block the passage of wind. C. Covers for containers shall be plastic tarps. 2.03 CALCIUM CHLORIDE: A. Calcium chloride shall conform to the requirements of AASHTO-M 144, Type I or Type II and Specification for Calcium Chloride, ASTM D98. The calcium chloride shall be packaged in moisture proof bags or in airtight drums with the manufacturer, name of product, net weight, and percentage of calcium chloride guaranteed by the manufacturer legibly marked on each container. B. Calcium chloride failing to meet the requirements of the aforementioned specifications or that which has become caked or sticky in shipment, may be rejected by the Engineer. 2.04 A. WATER: Water shall not be brackish and shall be free from oil, acid, and injurious alkali or vegetable matter. PART 3 - EXECUTION 3.01 A. CONSTRUCTION SITE DUST CONTROL – GENERAL: Wet suppression shall be used to provide temporary control of dust. Several applications per day may be necessary to control dust depending upon meteorological conditions and work activity. The Contractor shall apply wet suppression on a routine basis as necessary or required by the Engineer, to control dust. At a minimum, wet suppression shall be applied to excavated material, aggregate piles, and exposed soils and dirt. 1. Wet suppression consists of the application of water or a wetting agent in solution with water. Ensure wetting agent is not used on plantable soils. 2. Wet suppression equipment shall consist of sprinkler pipelines, tanks, tank trucks, or other devices capable of providing regulated flow, uniform spray, and positive shut-off. 3. Water may be sprinkler applied with equipment including a tank with gaugeequipped pressure pump and a nozzle-equipped spray bar. 08/23/2011 01 14 19.16-3
  6. Page 420 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1438 of 1638 4. Water shall be dispersed through the nozzle under a minimum pressure of 20 pounds per square inch, gauge pressure. 5. The Contractor shall provide the necessary means to retain on-site all water runoff generated by dust control and dispose of such water in accordance with the requirements of the appropriate regulatory agencies. The Contractor shall be responsible for providing water, a means of disposal, necessary permits, and all appurtenances required to control dust. Coordinate with the requirements of Section 01 57 19 – ENVIRONMENTAL PROTECTION B. Calcium chloride shall be used to control dust instead of wet suppression when freezing conditions exist. Calcium chloride shall be uniformly applied by a mechanical spreader at 1 ½ pounds per square yard, unless otherwise required by the Engineer. Ensure vegetation or soil to be used for vegetation is not treated. C. The use of petroleum products for dust suppression is prohibited in this Contract. D. Provide wind screens and wind barriers in locations where they would be effective in minimizing wind erosion and spread of dust. Locations shall be submitted as part of the Contractor’s Dust Control Plan. The Contractor shall keep wind screens and barriers in good repair for the life of the Contract. E. The Contractor is responsible for daily clean-up of paved areas affected by the work of this Contract. A wet spray power vacuum street sweeper shall be used on paved areas. Dry power sweeping is prohibited. 3.02 AIR MONITORING A. The Contractor is responsible for performing air monitoring for particulate dust at the perimeter of the site, as required to verify work is not resulting in generation of nuisance dust or exceedance of the action levels for PM10 (particulate matter with an aerodynamic diameter less than or equal to 10 microns) emissions, PM10 concentrations exceeding 120 μg/m3 on 24-hour average basis, or 15-minute spikes of 120 μg/m 3. The Engineer may also conduct air monitoring for quality assurance purposes. Should dust emissions exceed the NAAQS, then the Contractor shall stop all work and implement appropriate additional controls as needed to control the dust. Work may not proceed until all such controls are inspected/reviewed by the Engineer/Owner. B. Perimeter air monitoring shall be provided on a continuous basis at a minimum of four dust monitors positioned at north, south, east, and west perimeter of the site using realtime measurement instruments (Mini RAM or equal) with continuous data logging capabilities. Contractor shall coordinate air monitoring locations with the Engineer and shall move monitoring locations as required as the work progresses. The Contractor shall provide air monitoring data to the Engineer at the end of each day. 08/23/2011 01 14 19.16-4
  7. Page 421 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1439 of 1638 C. The Contractor shall perform baseline dust monitoring prior to initiation of any remediation work. Baseline monitoring shall be performed for an appropriate length of time to evaluate pre-construction conditions. D. The Contractor is responsible for monitoring air quality in the breathing zone within the limits of work. Monitoring shall be performed during those activities where there is the potential for exposure to the general public or on-site workers to impacted materials. E. Perimeter and work zone air monitoring procedures shall be described in the Contractor’s dust control plan. The Contractor shall submit copies of the air monitoring results daily to the Engineer. 3.03 PUBLIC ROADWAY DUST CONTROL: A. Vehicles leaving the site shall have no mud and dirt on the vehicle body or wheels. Any foreign matter on the vehicle body or wheels shall be physically removed prior to vehicle’s entering of a public roadway. Contractor shall not permit any truck to leave the site with exterior mud or dirt that has the potential to be deposited on public roadways. B. Haul truck cargo areas shall be securely and completely covered during material transport on public roadways. C. Vehicle mud and dirt carryout, material spills, and soil wash-out onto public roadways and walkways and other paved areas shall be cleaned up immediately. D. The Contractor is responsible for daily clean-up of public roadways and walkways affected by work of this Contract. A wet spray power vacuum street sweeper shall be used on paved roadway. Dry power sweeping is prohibited. 3.04 CONTROL OF EARTHWORK DUST: A. During batch drop operations (i.e., earthwork with front-end loader, clamshell bucket, or backhoe) the free drop height of excavated or aggregate material shall be reduced as much as practical to minimize the generation of dust. B. To prevent spills during transport, freeboard space shall be maintained between the material load and the top of the truck cargo bed rail. 3.05 INTERIOR RESTORATION DUST CONTROL MEASURES: A. The Contractor shall use water sprinkling, temporary enclosures, respirators, and other suitable methods to limit dust rising and scattering in the air to the lowest practical level. Sufficient water shall be supplied during concrete cutting to meet Federal, State, and local air-quality regulations and to minimize dust during floor drain removal and debris handling. Refer to Section 02 83 90 – Abatement of PCB-Containing Materials for additional information. 08/23/2011 01 14 19.16-5
  8. Page 422 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1440 of 1638 END OF SECTION 08/23/2011 01 14 19.16-6
  9. Page 423 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1441 of 1638 SECTION 01 22 00 MEASUREMENT AND PAYMENT 1. 2. GENERAL A. The following subsections describe the measurement of and payment for the work to be done under the items listed in the Bid Form. B. All work performed as described in these Contract Documents will be paid for under one or more of the items listed in the Bid Form. All other activities required in connection with performance of the work, whether described in the Contract Documents or mandated by applicable codes, permits and laws, will not be separately paid for unless specifically provided for in the form of general bid, but will be considered incidental to performance of the overall project. C. Each Unit or Lump-Sum price stated in the Bid Form shall constitute full compensation as herein specified for each item of work completed in accordance with the Contract Drawings and Specifications. D. The payment items listed herein and in the Bid Form are intended to provide full payment for the work shown on the Contract Drawings and specified herein. Any work called for or implied in the Contract Documents but not listed as a payment item shall be considered incidental to the overall project. E. Unless otherwise noted, each item shall be furnished, installed, and/or performed in accordance with the technical specification section whether a specific applicable payment item exists or not. ITEM 1 - REMEDIATION The lump sum price for Item 1 shall constitute full compensation for furnishing all labor, material, tools, and equipment necessary for mobilization/demobilization and to complete Site preparation and miscellaneous Site work as described in and required by the Contract Documents including, but not limited to: all permits and approvals required to complete Work, all submittals/plans, temporary facilities, temporary utility connection and use, constructing and maintaining temporary fencing, access roads, and gates as necessary, installing and maintaining environmental protection controls, clearing and grubbing within the Limits of Work as specified, signage/traffic control, erosion and dust/air monitoring and control, odor and noise control, catch basin inlet protection, rodent control, preparing and implementing a health and safety plan, preparing and submitting As-Built Documents, cleaning up, and all other work shown on the Drawings and called for in the specifications, except for the work included in Item 2. The lump sum price for Item 1 shall constitute full compensation for furnishing all labor, materials, tools and equipment to complete the remediation of the stream, drainage 02/21/2017 01 22 00-1
  10. Page 424 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1442 of 1638 channel, and interior bathroom areas including excavation, temporary bypass piping, concrete saw cutting and dust control, site restoration, and all incidental work for remediating the site, complete, as shown on the Drawings and called for in the specifications. 3. ITEM 2 – REMOVAL, TRANSPORT & DISPOSAL OF PCB REMEDIATION WASTE TO TSCA LANDFILL The unit price for Item 2 shall be measured per ton for the removal, transport and disposal of removed soil and concrete identified as shown on Sheet C002 and C003 as U.S. EPA Remediation Waste PCB to TSCA Landfill in accordance with 40 CFR 761, complete, based on certified weight slips from the applicable shipping documentation. The unit price for this item shall constitute full compensation for furnishing all labor, material, tools, and equipment required to size, handle, containerize (or direct load), segregate, load and legally haul by a licensed common carrier and off-site disposal at an applicable facility (TSCA landfill) of removed material considered a U.S. EPA Remediation Waste as shown on the drawings, called for in the specifications and field verified via confirmatory sampling by the Engineer. Contractor price shall include full compensation for all local, state and federal taxes associated with the transportation and disposal. 4. ITEM 3 – REMOVAL, TRNASPORT, & DISPOSAL OF PCB REMEMDIATION WASTE LIQUIDS TO TSCA FACILITY The unit price for Item 3 shall be measured per ton for the removal, transport and disposal of removed free liquids from excavated soil as described in Section 31 23 19 – Dewatering as U.S. EPA Remediation Waste PCB to TSCA Landfill in accordance with 40 CFR 761, complete, based on certified weight slips from the applicable shipping documentation. The unit price for this item shall constitute full compensation for furnishing all labor, material, tools, and equipment required to extract liquids, containerize, load, and legally haul by a licensed common carrier and off-site disposal at an applicable facility (TSCA landfill) of removed liquids considered a U.S. EPA Remediation Waste as called for in the specifications. Contractor price shall include full compensation for all local, state and federal taxes associated with the transportation and disposal. 5. ITEM 4 – REMOVAL, TRNASPORT, & DISPOSAL NON-RCRA HAZARDOUS WASTE DESIGNATED CR02 OILY WASTEWATER The unit price for Item 4 shall be measured per ton for the removal, transport and disposal of removed free liquids from excavated soil as described in Section 31 23 19 – Dewatering as non-RCRA regulated hazardous waste designated as CR02 Oily 02/21/2017 01 22 00-2

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)