Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 459 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1477 of 1638 Project Closeout Checklist Date Completion Verified FINAL CLEANING 1. All Construction Facilities Removed 2. All Construction Debris Removed 3. All Areas Swept/Cleared CLOSEOUT PROCEDURES 1. Written Certification Submitted that Work is Ready for Owner & Engineer Inspector 2. Inspection by Owner, Engineer, Contractor completed 3. Punch List of Nonconforming Items Prepared 4. Documents Required by Governing or Other Authorities Submitted (List Them) 5. Final Application for Payment Received 6. Contact Completion and Acceptance Certificate Submittal 7. Consent of Surety to Final Payment Submittal 8. Release and Waiver of Liens and Claims Submitted 9. Affidavit of Payment of Debts and Claims Submitted 10. Warranties/Guarantees Submitted 11. Other Required Releases and Waivers Submitted (List Them) 12. Permits Submitted (List Them) 13. Weekly Payrolls Submitted as Required by Law FINAL COMPLETION 1. All Items in Punch List Completed 2. All Other Required Documentation Submitted (List It) 09/15/2011 01 78 00-5 Verified By
  2. Page 460 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1478 of 1638 Project Closeout Checklist Date Completion Verified CORRECTION/WARRANTY PERIOD 1. Correction Period Start Date: End Date: 2. Specific Warranties Provided Item Warranty Duration Full name of persons signing their initials on this checklist: END OF SECTION 09/15/2011 01 78 00-6 Verified By
  3. Page 461 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1479 of 1638 SECTION 02 61 00.16 HANDLING, TRANSPORTATION, REUSE AND OFF-SITE DISPOSAL OF EXCAVATED MATERIALS PART 1 – GENERAL 1.01 DESCRIPTION: A. The Work of this Section consists of all labor, equipment, materials, and services for excavating, containerizing, handling, segregating, reusing, tracking, transporting, and offSite recycling and/or disposing of excavated material generated during the course of the Work. B. Furnish all labor, materials, equipment, and incidentals necessary to properly excavate, segregate, handle, reuse as on-site backfill, containerize, load, transport and recycle/dispose of excavated materials off-Site. Work includes preparing all shipping manifests and waste profiles, as required, and obtaining approval from recycle/disposal facilities for recycling and/or disposal, loading, and hauling of excavated materials, as required. The Engineer shall be responsible for analytical testing of soils for off-Site disposal, as required by the off-Site disposal/recycling facility and Engineer. C. The Contractor shall be responsible for the management of miscellaneous material accumulated from catch basins filter fabric cleaning (see Section 01 57 19 – ENVIRONMENTAL PROTECTION). D. The Contractor shall establish and maintain soil excavation area limits/perimeter using appropriate survey instrument layout techniques, as well as establish vertical control points in the vicinity of the soil excavation areas such that depths of excavation can be readily determined from instrument survey by the Contractor and approved by the Engineer. E. The Contractor shall excavate, segregate, handle and dispose of soils between 0-1 feet and 0-2 feet below existing grade in the specified area as shown on Sheet C002 to remove impacted material. Soil shall be handled, transported, and disposed of as PCB Remediation Waste. F. Contractor shall make all efforts to excavate in the dry and to minimize excavations of free liquids. The Contractor shall install sandbag dams prior to excavation in a manner that allows flow through one half of the stream, while leaving the other half of the streambed dry for excavation. Once one side of the stream has been excavated, the Contractor shall allow the Engineer to collect confirmatory samples to confirm the extent of the impacted material has been reached. Additional soil removal may be required based on the results of the confirmatory samples. After Engineer provides approval from confirmatory sampling, Contractor shall move sandbag dam to other side of stream to excavate the other half. Limits of soil excavation shall be within the Limits of Work 02 61 00.16-1
  4. Page 462 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1480 of 1638 shown on the Contract Plans. G. The Contractor shall backfill excavation and restore site as shown on Sheet C004 – Site Restoration Plan and Section 31 00 00 - EARTHWORK. 1.02 RELATED WORK: A. SECTION 01 14 19.16 – DUST CONTROL B. SECTION 02 83 90 – ABATEMENT OF PCB-CONTAINING MATERIALS C. SECTION 31 00 00 – EARTHWORK 1.03 RESPONSIBILITIES A. The Contractor shall perform the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. The Contractor shall identify and propose applicable disposal facilities for all materials to be removed and disposed of from the Site. The Contractor shall furnish, operate and maintain equipment/vehicle decontamination stations for the duration of excavation and soil disposal work. The Contractor shall develop and implement site-specific emergency response and health and safety protocols and procedures. The Contractor shall be responsible for submitting weight slips, completed manifests and other shipping documents to the Engineer within two weeks of shipment to a disposal facility. The Contractor shall advise the Engineer at least three working days in advance of the schedule for off-site disposal of excavated material. The Contractor shall prepare and submit to the Engineer for review the documents necessary to transport and dispose of excavated materials. These documents include but are not limited to waste profiles and manifests. The Contractor shall submit the executed transportation and disposal documents to the appropriate local, State and Federal agencies as well as the Engineer. The Contractor shall keep records of all waste streams for the purposes of tracking points of origin. The Contractor will develop and implement dust control measures and air monitoring per Specification Section 01 14 19.16 – Dust Control. C. Owner’s and Engineer’s Responsibilities: 1. 2. 3. The Owner shall be the designated Generator for the excavated materials identified for off-Site disposal. The Engineer shall perform disposal and confirmatory sampling of excavated materials. The Engineer shall review and approve all paperwork and manifests. 02 61 00.16-2
  5. Page 463 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1481 of 1638 1.04 SUBMITTALS: A. Submit to the Engineer, for review, no more than 14 days after issuance of the Notice to Proceed: B. Excavated Materials Management Plan (EMMP) for Construction in the Work Area. The EMMP shall include the following: 1. Plans and procedures for the segregation, storage/direct loading, and on-site management of excavated soils from the Site. The EMMP shall include a Site plan showing proposed locations of soil storage areas. Provide a schedule detailing the proposed sequence of stream damming, excavation, containerizing, and free liquids removal. 2. Details of containers used to store and/or transport excavated material. 3. All pertinent information relating to the transport of excavated material. information, at a minimum, shall include: The a. Name and address of all transporters. b. Transporter identification number (USEPA or Connecticut Department of Transportation Transporter) and expiration date. c. Proof of permit, license, or authorization to transport excavated material, when applicable, in all affected states. d. Dust control measures. 4. Propose appropriate TSCA facilities that will accept PCB Remediation Waste. The Contractor shall submit to the Engineer, approvals or letters of intent and facility information for each facility proposed, within 14 days of issuance of the Notice to Proceed. The Contractor shall submit names of two (2) facilities (primary and backup) for each category of excavated material, as specified herein. Disposal/recycling facilities listed in the EPA Superfund Program will not be accepted as disposal/recycling facilities for this Work. For each facility, the Contractor shall submit the following information: a. General Information i. ii. iii. iv. v. Facility Name Facility Address Name of Contact Person Title of Contact Person Telephone Number of Contact Person 02 61 00.16-3
  6. Page 464 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1482 of 1638 vi. Permit Number b. The facility shall specify the volume of material that can be accepted from the Site on a weekly and a total basis. c. The facility shall provide written confirmation that they are permitted to accept and will accept the excavated material and/or accumulated sediment of the general quality and quantity described by these Specifications. d. The facility shall provide a listing of all current and valid permits, licenses, letters of approval, and other authorizations to operate that they hold, pertaining to the receipt and management of the soils or materials specified in this Contract. e. The Contractor shall submit a complete list of the disposal facility’s permitted allowable contaminant levels and physical characteristic requirements for contaminated material, and list any required regulatory approvals for individual waste streams 5. Documentation of an emergency service agreement between the Contractor and a certified emergency response contractor. 1.05 REFERENCES: A. All regulations cited and those of other governing agencies in their most recent version are applicable. This Section refers to many requirements found in these references, but in no way, is intended to cite or reiterate all provisions therein or elsewhere. It is the Contractor's responsibility to know, understand, and abide by all such regulations and common practices. Other provisions contained in these references may from time to time during the execution of this Contract be enforced by the Owner. In the event of a conflict, the most stringent regulations shall govern. The following documents and/or publications are made part of this Section by reference herein: 1. “Hazardous Waste Operations and Emergency Response,” Federal Occupational Safety and Health Act (OSHA), 29 CFR 1910.120. 2. “General Regulations for Hazardous Waste Management,” EPA, 40 CFR 260. 3. “Regulations for Identifying Hazardous Waste, Hazardous Waste Generators and Hazardous Waste Transporters,” EPA, 40 CFR 261, 262 and 263. 4. “Standards for Management of Specific Hazardous Wastes and Facilities,” EPA, 40 CFR 266. 5. Local regulations governing dust control, soil handling, and health & safety (see Section 01 35 29 – HEALTH AND SAFETY PLAN). 1.06 PERMIT REQUIREMENTS: A. The Contractor shall obtain all Federal, State, and local permits required for the transport and disposal of excavated material. The Contractor shall adhere to all permit 02 61 00.16-4
  7. Page 465 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1483 of 1638 requirements. B. The Contractor shall document that the disposal facilities proposed have all certifications and permits as required by Federal, State, and local regulatory agencies to receive and dispose of the excavated material. PART 2 – PRODUCTS 2.01 GENERAL: A. All Contractor personnel shall wear personal protective equipment and protective clothing consistent with the levels of protection for this Work as indicated in Section 01 35 29 - HEALTH AND SAFETY PLAN. 2.03 CONTAINER SHEETING: A. 10-mil (minimum) polyethylene sheeting shall be used for all container sheeting. 2.04 CONTAINERS: A. Containers used for hauling the excavated material shall be constructed of steel or aluminum, in good condition and designed for the intended purpose of safe, secure storage of hazardous material during loading and transport to an approved facility. The containers shall have a secure cover, which will prevent a release of material from truck during transportation and prevent infiltration of stormwater during periods of onsite storage. The container and covers shall be approved by the Engineer prior to mobilization of trucks/containers. The containers must be approved by and labeled in accordance with the U.S Department of Transportation (DOT). The containers shall lined, sift proof, and water resistant in accordance with the DOT regulations. PART 3 – EXECUTION 3.01 GENERAL: A. The Contractor shall handle and convey all materials to perform site work described in this Contract. B. The Engineer shall perform disposal characterization sampling and analytical testing of the excavated material and composite building materials. 3.02 TEMPORARY CONTAINERIZING OF EXCAVATED MATERIALS: A. All non-impacted excavated materials may be temporarily containerized onsite during the performance of the Work. Soil containers shall be watertight and lined with polyethylene sheeting and covered by polyethylene sheeting and done in the manner described in the Contractor’s approved EMMP which shall be reviewed and approved by the Engineer. The 02 61 00.16-5
  8. Page 466 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1484 of 1638 Contractor shall be responsible for remediation of any releases from the Contractor’s container storage area at no expense to the Owner. 3.03 DISPOSAL CHARACTERIZATION SAMPLING A. All disposal characterization sampling and analysis performed by the Engineer. B. A copy of all chemical analyses and a tabulated summary of the data will be sent to the Contractor. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. C. The Engineer may stop the Contractor’s work in a particular location at any time in order to have samples taken and analyzed. If necessary, the Contractor shall assist the Engineer in collecting samples. The work shall not resume in that area until directed by the Engineer. Stoppage of work for this reason, or until laboratory results are delivered to the Engineer, shall not be a cause for the Contractor to request additional compensation or an extension of time to the Contract or to other intermediate Contract deadlines. 3.04 CONFIRMATORY SAMPLING A. The Engineer shall perform post-excavation confirmatory sampling. The Contractor shall assist the Engineer with collecting the confirmatory samples. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. B. The Contractor shall not backfill the excavation nor move the temporary sandbag dam until the Engineer has given approval to do so. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. Contractor should anticipate a minimum of minimum of 5 days from the time of sampling to receipt of lab data. 3.05 EXCAVATED MATERIAL CATEGORIES: A. Impacted Soil Area 1. Excavate impacted soil to the limits indicated on the Drawings and confirmed through laboratory testing results. 2. Impacted soils designated for removal and off-Site disposal on Sheet C002 of the Drawings shall be excavated and disposed of as PCB Remediation Waste in accordance with the Environmental Protection Agency’s (EPA) Toxic Substances Control Act (TSCA) regulations (40 CFR 761) at a disposal facility permitted to accept PCB Remediation Waste per the TSCA regulations. 02 61 00.16-6
  9. Page 467 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1485 of 1638 B. 3.06 The Contractor shall be responsible for the management of miscellaneous material accumulated from catch basins filter fabric cleaning (see Section 01 57 19 – ENVIRONMENTAL PROTECTION). Dispose of the material based on characterization sampling with the impacted excavated materials identified above. WEIGHT AND MEASUREMENT: A. The Contractor shall provide certified tare and gross weight slips for each load received at the accepted Disposal Facility and these shall be attached to each returned manifest. 3.07 WASTE PROFILES AND MANIFESTS: A. The Contractor shall prepare and submit to the Engineer for review all waste profile applications and questionnaires, and coordinate with disposal facilities and all Federal and State Environmental Agencies. B. The Contractor shall also provide certified tare and gross weight slips for each load received at the designated facility which shall be attached to each returned manifest. C. The Contractor shall submit to the Engineer, prior to receiving progress payment, documentation certifying that all materials were transported to, accepted, and disposed of, at the selected disposal facility. The documentation shall include the following, as a minimum. 3.08 1. Documentation shall be provided for each load from the site to the disposal facility, including all manifests and any other transfer documentation as applicable including but not limited to Certificates of Disposal for each manifested load transported to the Disposal Facility. 2. All documentation for each load shall be tracked by the original manifest document number that was assigned by the Engineer at the site. TRANSPORT OF EXCAVATED MATERIAL/DEBRIS: A. The Contractor shall not be permitted to transport materials off-site until all storage, disposal, or recycling facility documentation has been received, reviewed, and approved by the Owner and Engineer. B. The Contractor shall transport materials from the site to the storage, disposal, reuse or recycling facility in accordance with all United State Department of Transportation (DOT), USEPA, and applicable state and local regulations. C. The Hauler(s) shall be licensed in all states affected by transport. D. The Contractor shall be responsible for ensuring that free liquid is properly transported. “Wet material” shall not be loaded for transport. The Contractor shall dewater “wet 02 61 00.16-7
  10. Page 468 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1486 of 1638 material”, and properly dispose of dewatering in accordance with local, State, and Federal regulations. The Contractor shall dispose of any free liquids that may result during transportation at no additional cost to the Owner. E. All excavated materials transported upon public roadways shall be covered to minimize fugitive dust, and where necessary truck tire and undercarriage decontamination shall be employed to minimize tracking of soils onto public roadways. F. The Contractor shall coordinate truck traffic (staging, queuing, transportation) with the Engineer and Owner prior to the start of the remedial work. 3.09 DISPOSAL: A. Dispose of all unsuitable materials at an approved facility in accordance with all Federal, State and local regulations. B. The Engineer shall perform analyses on the material as necessary to fulfill any disposal testing requirements of the approved Facility. C. The Contractor shall provide to the Engineer copies of all weight slips, both tare and gross, for every load weighed and disposed of at the approved facility. The slips shall be tracked by the original manifest document number that was assigned by the Owner’s Representative/Engineer at the site. The Engineer shall make payments based upon receipt of these weight slips. 3.10 LOGS, REPORTS, AND RECORDKEEPING: A. The Contractor shall maintain daily logs and reports covering the work to be performed for this Section of the Contract. The format shall be developed by the Contractor to include daily logs, weekly reports, and a phase out report. Contractor shall provide Engineer with copies of all logs and reports on a weekly basis in a Microsoft Excel spreadsheet format. B. Weekly Reports shall include, at a minimum, the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. A summary of the work performed during the week Area (Site specific) of work being performed Equipment being utilized by employees Type of work performed References to manifests and waste profiles Container locations Details and documentation of excavated materials management Protective clothing being worn by employees Contractor’s Project Manager’s signature and date C. Phase Out Report shall include, at a minimum, the following: 02 61 00.16-8

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)