Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 464 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1482 of 1638 vi. Permit Number b. The facility shall specify the volume of material that can be accepted from the Site on a weekly and a total basis. c. The facility shall provide written confirmation that they are permitted to accept and will accept the excavated material and/or accumulated sediment of the general quality and quantity described by these Specifications. d. The facility shall provide a listing of all current and valid permits, licenses, letters of approval, and other authorizations to operate that they hold, pertaining to the receipt and management of the soils or materials specified in this Contract. e. The Contractor shall submit a complete list of the disposal facility’s permitted allowable contaminant levels and physical characteristic requirements for contaminated material, and list any required regulatory approvals for individual waste streams 5. Documentation of an emergency service agreement between the Contractor and a certified emergency response contractor. 1.05 REFERENCES: A. All regulations cited and those of other governing agencies in their most recent version are applicable. This Section refers to many requirements found in these references, but in no way, is intended to cite or reiterate all provisions therein or elsewhere. It is the Contractor's responsibility to know, understand, and abide by all such regulations and common practices. Other provisions contained in these references may from time to time during the execution of this Contract be enforced by the Owner. In the event of a conflict, the most stringent regulations shall govern. The following documents and/or publications are made part of this Section by reference herein: 1. “Hazardous Waste Operations and Emergency Response,” Federal Occupational Safety and Health Act (OSHA), 29 CFR 1910.120. 2. “General Regulations for Hazardous Waste Management,” EPA, 40 CFR 260. 3. “Regulations for Identifying Hazardous Waste, Hazardous Waste Generators and Hazardous Waste Transporters,” EPA, 40 CFR 261, 262 and 263. 4. “Standards for Management of Specific Hazardous Wastes and Facilities,” EPA, 40 CFR 266. 5. Local regulations governing dust control, soil handling, and health & safety (see Section 01 35 29 – HEALTH AND SAFETY PLAN). 1.06 PERMIT REQUIREMENTS: A. The Contractor shall obtain all Federal, State, and local permits required for the transport and disposal of excavated material. The Contractor shall adhere to all permit 02 61 00.16-4
  2. Page 465 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1483 of 1638 requirements. B. The Contractor shall document that the disposal facilities proposed have all certifications and permits as required by Federal, State, and local regulatory agencies to receive and dispose of the excavated material. PART 2 – PRODUCTS 2.01 GENERAL: A. All Contractor personnel shall wear personal protective equipment and protective clothing consistent with the levels of protection for this Work as indicated in Section 01 35 29 - HEALTH AND SAFETY PLAN. 2.03 CONTAINER SHEETING: A. 10-mil (minimum) polyethylene sheeting shall be used for all container sheeting. 2.04 CONTAINERS: A. Containers used for hauling the excavated material shall be constructed of steel or aluminum, in good condition and designed for the intended purpose of safe, secure storage of hazardous material during loading and transport to an approved facility. The containers shall have a secure cover, which will prevent a release of material from truck during transportation and prevent infiltration of stormwater during periods of onsite storage. The container and covers shall be approved by the Engineer prior to mobilization of trucks/containers. The containers must be approved by and labeled in accordance with the U.S Department of Transportation (DOT). The containers shall lined, sift proof, and water resistant in accordance with the DOT regulations. PART 3 – EXECUTION 3.01 GENERAL: A. The Contractor shall handle and convey all materials to perform site work described in this Contract. B. The Engineer shall perform disposal characterization sampling and analytical testing of the excavated material and composite building materials. 3.02 TEMPORARY CONTAINERIZING OF EXCAVATED MATERIALS: A. All non-impacted excavated materials may be temporarily containerized onsite during the performance of the Work. Soil containers shall be watertight and lined with polyethylene sheeting and covered by polyethylene sheeting and done in the manner described in the Contractor’s approved EMMP which shall be reviewed and approved by the Engineer. The 02 61 00.16-5
  3. Page 466 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1484 of 1638 Contractor shall be responsible for remediation of any releases from the Contractor’s container storage area at no expense to the Owner. 3.03 DISPOSAL CHARACTERIZATION SAMPLING A. All disposal characterization sampling and analysis performed by the Engineer. B. A copy of all chemical analyses and a tabulated summary of the data will be sent to the Contractor. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. C. The Engineer may stop the Contractor’s work in a particular location at any time in order to have samples taken and analyzed. If necessary, the Contractor shall assist the Engineer in collecting samples. The work shall not resume in that area until directed by the Engineer. Stoppage of work for this reason, or until laboratory results are delivered to the Engineer, shall not be a cause for the Contractor to request additional compensation or an extension of time to the Contract or to other intermediate Contract deadlines. 3.04 CONFIRMATORY SAMPLING A. The Engineer shall perform post-excavation confirmatory sampling. The Contractor shall assist the Engineer with collecting the confirmatory samples. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. B. The Contractor shall not backfill the excavation nor move the temporary sandbag dam until the Engineer has given approval to do so. The Engineer will expedite sampling and will send sampling results to the Contractor within 24 hours of receipt from the lab. Contractor should anticipate a minimum of minimum of 5 days from the time of sampling to receipt of lab data. 3.05 EXCAVATED MATERIAL CATEGORIES: A. Impacted Soil Area 1. Excavate impacted soil to the limits indicated on the Drawings and confirmed through laboratory testing results. 2. Impacted soils designated for removal and off-Site disposal on Sheet C002 of the Drawings shall be excavated and disposed of as PCB Remediation Waste in accordance with the Environmental Protection Agency’s (EPA) Toxic Substances Control Act (TSCA) regulations (40 CFR 761) at a disposal facility permitted to accept PCB Remediation Waste per the TSCA regulations. 02 61 00.16-6
  4. Page 467 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1485 of 1638 B. 3.06 The Contractor shall be responsible for the management of miscellaneous material accumulated from catch basins filter fabric cleaning (see Section 01 57 19 – ENVIRONMENTAL PROTECTION). Dispose of the material based on characterization sampling with the impacted excavated materials identified above. WEIGHT AND MEASUREMENT: A. The Contractor shall provide certified tare and gross weight slips for each load received at the accepted Disposal Facility and these shall be attached to each returned manifest. 3.07 WASTE PROFILES AND MANIFESTS: A. The Contractor shall prepare and submit to the Engineer for review all waste profile applications and questionnaires, and coordinate with disposal facilities and all Federal and State Environmental Agencies. B. The Contractor shall also provide certified tare and gross weight slips for each load received at the designated facility which shall be attached to each returned manifest. C. The Contractor shall submit to the Engineer, prior to receiving progress payment, documentation certifying that all materials were transported to, accepted, and disposed of, at the selected disposal facility. The documentation shall include the following, as a minimum. 3.08 1. Documentation shall be provided for each load from the site to the disposal facility, including all manifests and any other transfer documentation as applicable including but not limited to Certificates of Disposal for each manifested load transported to the Disposal Facility. 2. All documentation for each load shall be tracked by the original manifest document number that was assigned by the Engineer at the site. TRANSPORT OF EXCAVATED MATERIAL/DEBRIS: A. The Contractor shall not be permitted to transport materials off-site until all storage, disposal, or recycling facility documentation has been received, reviewed, and approved by the Owner and Engineer. B. The Contractor shall transport materials from the site to the storage, disposal, reuse or recycling facility in accordance with all United State Department of Transportation (DOT), USEPA, and applicable state and local regulations. C. The Hauler(s) shall be licensed in all states affected by transport. D. The Contractor shall be responsible for ensuring that free liquid is properly transported. “Wet material” shall not be loaded for transport. The Contractor shall dewater “wet 02 61 00.16-7
  5. Page 468 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1486 of 1638 material”, and properly dispose of dewatering in accordance with local, State, and Federal regulations. The Contractor shall dispose of any free liquids that may result during transportation at no additional cost to the Owner. E. All excavated materials transported upon public roadways shall be covered to minimize fugitive dust, and where necessary truck tire and undercarriage decontamination shall be employed to minimize tracking of soils onto public roadways. F. The Contractor shall coordinate truck traffic (staging, queuing, transportation) with the Engineer and Owner prior to the start of the remedial work. 3.09 DISPOSAL: A. Dispose of all unsuitable materials at an approved facility in accordance with all Federal, State and local regulations. B. The Engineer shall perform analyses on the material as necessary to fulfill any disposal testing requirements of the approved Facility. C. The Contractor shall provide to the Engineer copies of all weight slips, both tare and gross, for every load weighed and disposed of at the approved facility. The slips shall be tracked by the original manifest document number that was assigned by the Owner’s Representative/Engineer at the site. The Engineer shall make payments based upon receipt of these weight slips. 3.10 LOGS, REPORTS, AND RECORDKEEPING: A. The Contractor shall maintain daily logs and reports covering the work to be performed for this Section of the Contract. The format shall be developed by the Contractor to include daily logs, weekly reports, and a phase out report. Contractor shall provide Engineer with copies of all logs and reports on a weekly basis in a Microsoft Excel spreadsheet format. B. Weekly Reports shall include, at a minimum, the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. A summary of the work performed during the week Area (Site specific) of work being performed Equipment being utilized by employees Type of work performed References to manifests and waste profiles Container locations Details and documentation of excavated materials management Protective clothing being worn by employees Contractor’s Project Manager’s signature and date C. Phase Out Report shall include, at a minimum, the following: 02 61 00.16-8
  6. Page 469 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1487 of 1638 1. 2. 3. 4. Summary of work performed under this Section of the Contract Copies of all manifests and waste profiles Laboratory reports Contractor’s Project Manager’s signature and date END OF SECTION 02 61 00.16-9
  7. Page 470 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1488 of 1638 SECTION 02 83 90 ABATEMENT OF PCB-CONTAINING MATERIALS PART 1 - GENERAL 1.01 SUMMARY: A. This section specifies the procedures for removal and disposal of existing polychlorinated biphenyl (PCB) containing concrete with PCB detections greater than 1 milligram per kilogram (mg/kg) as identified through sampling by the Engineer and as specified herein, or as required by the Engineer. The concrete floor in the bathroom/utility room will be sawcut and removed down to full depth (approximately 4-8 inches thick) to remove existing floor drains covers in the bathroom. Upon removal of floor drain covers of the sampling activities, the Contractor will restore the concrete floor will be restored to pre-existing conditions, and all related waste materials (concrete) will be disposed of as PCB Remediation Waste in accordance with the Environmental Protection Agency’s (EPA’s) Toxic Substances Control Act (TSCA) regulations (40 CFR 761) at a disposal facility permitted to accept PCB Remediation Waste per the TSCA regulations. 1.02 SCOPE OF WORK The scope of work identified herein shall be performed in accordance with the requirements of this Section, USEPA Performance-Based cleanup standards, all applicable Federal, State, and local regulations, and related sections of the project specifications. Any disputes with the quantities or sequential work methods of this Section shall be reviewed prior to commencement of work or the Contractor performs such work at risk of non-payment. The Contractor shall perform the following at the Site in accordance with this specification: A. Remove and restore three sections of bathroom concrete down full depth (approximately 4-8 inches thick) and dispose of the waste material as PCB Remediation Waste at a permitted disposal facility. B. Remove and dispose of PCB Remediation Waste in the stream and drainage channel as shown on Sheet C002 of these Contract Documents and dispose of the waste material at a permitted disposal facility. 1.03 REFERENCES A. TSCA (Toxic Substances Control Act, 40 CFR 761) B. CERCLA (Federal “Superfund”) C. DEEP (CT Department of Energy and Environmental Protection) D. OSHA (Occupational Safety and Health Administration) CFR Title 29. 02 83 90 - 1
  8. Page 471 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1489 of 1638 E. EPA (Environmental Protection Agency) F. CDC (Center for Disease Control): Air Pollution and Respiratory Health. 1.04 DEFINITIONS A. Authorized Personnel: Owner or the Engineer’s Representative, and all other personnel who are authorized officials of any regulating agency, be it State, local, Federal, or Private entity who possess legal authority for enforcement or inspection of the work. B Clearance Criteria: A visual inspection of all removal surfaces, performed by the Engineer, conforming to all standards set forth by all authorities having jurisdiction, mentioned in the references. C. Fixed Object: Mechanical equipment, electrical equipment, fire detection systems, alarms, and all other fixed equipment, fixtures or other items which cannot be removed from the work area. D. HEPA: High Efficiency Particulate Absolute filtration efficiency of 99.97 percent down to 0.3 microns. Filtration provided on specialized vacuums and air filtration devices to trap particles. E. PCB Remediation Waste: As defined in TSCA Regulations 40 CFR Part 761.3. F. PPE: Personal Protective Equipment. G. Work Area, Work Zone: refers to the areas of work for the performance of the Work of this Section including, but not limited to, demarcated and/or separated locations where non-trained, non-certified personnel are not permitted to be present during the work. 1.05 REGULATIONS, FEES, AND PERMITS A. All legally imposed charges made by local authorities for the work of this Section involving the coordination, inspection, and approval services of all bureaus administering all applicable codes and regulations shall be provided hereunder at no additional cost to the Owner. B. The Contractor shall give the proper authorities all required notices or information relating to work and pay all fees necessary to obtain all official licenses, permits and certificates. 1.06 SUBMITTALS A. Quality Control Submittals: 1. Worker’s Qualifications Data: a. Name of each person who will be performing the Work and their employer’s name, business address and telephone number. 02 83 90 - 2
  9. Page 472 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1490 of 1638 b. Documentation of completion of appropriate PCB/Hazardous Waste training program and supervisors with appropriate PCB/Hazardous Waste supervisor training. 2. Waste Transporter Permit: One copy of the transporter’s current waste transporter permit. 3. Disposal facility permits to accept PCB Remediation Waste. B. Pre-Abatement Submittals: Prior to the commencement of any site activities regarding the work of this Section, the Contractor shall submit to the Engineer the following submittals: 1. Work Plan identifying PCB-Containing concrete, piping and soil removal methodology. Include removal techniques and tools, containment procedures to prevent cross-contamination of other substrates and soil (HEPA vacuums, polyethylene sheeting, etc.), dust monitoring equipment details, means to store saw-cut materials onSite and decontamination procedures. 2. Primary and secondary disposal facilities for the PCB Remediation Waste. 3. Certification signed by the Contractor stating the Contractor has read and understands the specification requirements, the requirements of the PCB regulations at 40 CFR 761 for proper handling, removal and disposal of PCB Remediation Waste. C. PCB Work Closeout Submittals: 1. Disposal Site Receipts: Copy of waste shipment record, certified weight slips and disposal site receipt showing the PCB Remediation Waste and PCB Containing materials have been properly disposed of. 1.07 QUALITY ASSURANCE A. Contractor shall provide and assure that the quality of work practices and procedures are consistent with the below listed agencies. Contractor shall utilize the latest edition, including all addenda, revisions and supplements for all regulatory agencies, codes, etc., including but not limited to: 1. Environmental Protection Agency (EPA). 2. Occupational Safety and Health Administration. 3. State of Connecticut codes, regulations, and laws. 4. All local codes, ordinances, and bylaws. B. Worker’s Qualifications: The persons performing PCB abatement and their supervisor shall be personally experienced in PCB abatement work and shall have been regularly 02 83 90 - 3
  10. Page 473 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1491 of 1638 employed by a company performing PCB abatement for a minimum of 3 years and shall have completed OSHA hazardous materials worker training (40-hour HAZWOPER) and supervisor training. C. Regulatory Requirements: Comply with the referenced standards. D. Pre-Work Conference: Before the Work of this Section is scheduled to commence a conference shall be held by the Engineer’s Representative at the Site for the purpose of reviewing the Contract Documents, discussing requirements for the Work, reviewing the Work procedures, and documents required by this section. 1. The conference shall be attended by the Contractor, the PCB abatement subcontractor, the Owner, and the Engineer. 1.08 PROJECT CONDITIONS A. Non-liquid cleaning materials, PPE and similar protective materials resulting from decontamination shall be disposed according to 40 CFR 761 and as specified in this Section. B. Moveable equipment, tools, sampling equipment shall be decontaminated in accordance with 40 CFR 761 and as specified in this Section prior to removal from the work zone. C. The location of waste containers for the temporary storage of PCB-containing materials shall be approved by the Engineer. 1.09 PERSONAL PROTECTIVE CLOTHING AND EQUIPMENT A. Workers must wear protective suits, protective gloves, eye protection and a minimum of half-face respirator with HEPA filter cartridge for PCB abatement activities. Respiratory protection shall be in accordance with OSHA regulation 1910.134 and ANSI Z88.2. B. Workers must be trained as per OSHA and EPA requirements, have medical clearance and must have an up-to-date pulmonary function test (PFT) and respirator fit tested by a trained professional. 1. A personal air sampling program shall be in place as required by OSHA. 2. The use of respirators must also follow a complete respiratory protection program as specified by OSHA. 3. PPE specified in EPA’s Concrete Sampling Procedure (May, 2011) must be worn during all concrete sampling activities. 1.10 JOB CONDITIONS A. Posting of regulations: Display the following documents in the clean changing area, in public view, for the full duration of the work at each pool site with PCB-containing 02 83 90 - 4

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)