Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Words on different pages
  1. Page 473 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1491 of 1638 employed by a company performing PCB abatement for a minimum of 3 years and shall have completed OSHA hazardous materials worker training (40-hour HAZWOPER) and supervisor training. C. Regulatory Requirements: Comply with the referenced standards. D. Pre-Work Conference: Before the Work of this Section is scheduled to commence a conference shall be held by the Engineer’s Representative at the Site for the purpose of reviewing the Contract Documents, discussing requirements for the Work, reviewing the Work procedures, and documents required by this section. 1. The conference shall be attended by the Contractor, the PCB abatement subcontractor, the Owner, and the Engineer. 1.08 PROJECT CONDITIONS A. Non-liquid cleaning materials, PPE and similar protective materials resulting from decontamination shall be disposed according to 40 CFR 761 and as specified in this Section. B. Moveable equipment, tools, sampling equipment shall be decontaminated in accordance with 40 CFR 761 and as specified in this Section prior to removal from the work zone. C. The location of waste containers for the temporary storage of PCB-containing materials shall be approved by the Engineer. 1.09 PERSONAL PROTECTIVE CLOTHING AND EQUIPMENT A. Workers must wear protective suits, protective gloves, eye protection and a minimum of half-face respirator with HEPA filter cartridge for PCB abatement activities. Respiratory protection shall be in accordance with OSHA regulation 1910.134 and ANSI Z88.2. B. Workers must be trained as per OSHA and EPA requirements, have medical clearance and must have an up-to-date pulmonary function test (PFT) and respirator fit tested by a trained professional. 1. A personal air sampling program shall be in place as required by OSHA. 2. The use of respirators must also follow a complete respiratory protection program as specified by OSHA. 3. PPE specified in EPA’s Concrete Sampling Procedure (May, 2011) must be worn during all concrete sampling activities. 1.10 JOB CONDITIONS A. Posting of regulations: Display the following documents in the clean changing area, in public view, for the full duration of the work at each pool site with PCB-containing 02 83 90 - 4
  2. Page 474 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1492 of 1638 materials: 1. Instructions for removing injured persons from work area. 2. Emergency action plan at the work site. This plan shall also include directions to the nearest hospital and telephone numbers for hospital, doctor and Fire Department. PART 2 – PRODUCTS 2.01 ABATEMENT PRODUCTS A. Disposal Drums: Metal or fiberboard with locking ring tops, with warning labels as required by OSHA, CT DEEP, US DOT, and/or EPA. B. Respirators: 1.Type: Approved by the Mine Safety and Health Administration (MSHA), Department of Labor, or the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services. C. Vacuum Cleaners: 1. Type: Vacuums equipped with HEPA filters. D. Plastic Sheets: 1. Type: Minimum 10 mil., opaque, fire-retardant polyethylene sheets. E. Containers: 1. Containers used by the Contractor for storing and/or hauling PCB-Containing material shall be constructed of steel, in good condition and designed for the intended purpose of safe, secure storage of contaminated and hazardous materials during loading and transport. The containers shall have a secure cover that shall prevent a release of material from truck during transportation. The containers and covers shall be at no additional cost to the Owner and shall be approved by the Engineer prior to mobilization of trucks/containers. The containers must be approved by and labeled in accordance with the U.S Department of Transportation (DOT). The containers shall be sift proof and water resistant in accordance with the DOT. 2.02 GENERAL EQUIPMENT A. A sufficient supply of disposable mops, rags, and sponges for work area decontamination shall be available. 2.03 PERSONNEL PROTECTION A. Safety equipment (e.g., hard hats meeting the requirements of ANSI Standard Z89.1-1981, eye protection meeting the requirements of ANSI Standard Z87.1-1979, safety shoes 02 83 90 - 5
  3. Page 475 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1493 of 1638 meeting the requirements of ANSI Standard Z41.1- 1967, disposable PVC gloves or other work gloves), shall be provided to all workers and authorized visitors. B. Non-skid footwear shall be provided to all abatement workers. Disposable clothing shall be adequately sealed to the footwear to prevent body contamination. PART 3 - EXECUTION 3.01 EMERGENCY PLANNING A. Description: The Contractor shall prepare an emergency preparedness plan detailing at least the information required in this Section and in any applicable Federal, State or local regulations. PCB-specific emergency planning measures shall be submitted with the sitespecific Health and Safety Plan. C. Telephone numbers of all emergency response personnel shall be prominently posted in the clean area, along with the location of the nearest telephone. 3.02 NOTIFICATION A. Notify the Engineer’s Representative a minimum of 5 working days prior to the start of PCB abatement work. 3.03 EMPLOYEE PROTECTION A. Comply with all applicable Occupational Safety and Health Administration (OSHA) Requirements. 3.04 WORK AREA PROTECTION A. Protection of Existing Construction: Perform PCB abatement work without damage or contamination of adjacent areas and existing construction. B. Perform abatement activities within a designated work area and prevent migration of PCB waste materials (including dust) outside of the work area. Work shall be conducted within a negative pressure enclosure equipped with a 3-stage decontamination chamber. Work will not be allowed to commence until all control systems are in place and operable. Equipment used for producing a negative pressure work area shall have a filtering device that is at least 99.97% efficient at a 0.3-micron pore size. Filters meeting these standards are referred to as High Efficiency Particulate Absolute (HEPA) filters. All HEPA units shall exhaust to the outside of the building. 3.05 PCB-CONTAINING MATERIAL ABATEMENT A. General 1. Perform abatement of PCB Remediation Waste in accordance with this Section, Drawings, and with an EPA Performance-Based Clean-Up. 02 83 90 - 6
  4. Page 476 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1494 of 1638 2. Use procedures and equipment as required to limit occupational and environmental exposure to PCB’s when PCB Remediation Waste is removed in accordance with referenced standards. 3. Concrete designated for disposal per this Section shall be removed via surface cut in a straight line by a concrete saw or equivalent method, to the full depth of material, and carefully removed in a manner to prevent cross-contamination with non-contaminated areas of the building. Concrete sawing shall be performed using wet methods, a saw equipped with a HEPA-shroud or a combination thereof to minimize dust generation. Concrete removal using a hydraulic hammer or smaller mechanical/pneumatic (demo) hammers or hand tools will be permitted using wet methods. 4. The Contractor shall decontaminate tools and equipment (shovels, excavator buckets, etc.) used to abate/remove PCB Remediation Waste in accordance with TSCA 40 CFR 761.79 prior to removal from the work zone. The cleaning materials shall be appropriately disposed of as PCB Remediation Waste in accordance with TSCA regulations at a licensed disposal facility. Cleaning/decontamination shall be done in a manner to prevent cross-contamination with other equipment and areas. The Contractor shall remove and dispose cross-contaminated materials at no additional cost to the Owner. 5. The Contractor shall dispose of any materials used in the negative pressure enclosure (poly sheeting, tape, wood, HEPA filters, etc.) used to abate/remove PCB Remediation Waste in accordance with TSCA 40 CFR 761.79 prior to removal from the work zone. The materials shall be appropriately disposed of as PCB Remediation Waste in accordance with TSCA regulations at a licensed disposal facility. Deconstruction shall be done in a manner to prevent cross-contamination with other equipment and areas. The Contractor shall remove and dispose cross-contaminated materials at no additional cost to the Owner. 3.06 CERTIFICATION OF COMPLETION A. Schedule visual clearance inspection with the Engineer when work area is ready for final inspection. 3.07 DISPOSAL OF PCB WASTES A. PCB Remediation Waste from the bathroom concrete & piping shall be placed in fully enclosed, sealed, and locked roll-off containers for transportation and disposal as PCB Remediation Waste under a manifest to a disposal facility permitted to accept PCB Remediation Waste per the TSCA regulations. The PCB Remediation Waste must be transported by a licensed hauler and shipped to an EPA approved disposal facility. Waste manifests must show chain of custody. B. The Contractor shall provide waste manifests, certified tare and gross weight slips for each load received at the accepted facility and provide to the Engineer and Owner within 21 days of obtaining final signatures. 02 83 90 - 7
  5. Page 477 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1495 of 1638 C. All PCB waste shall be carefully loaded into roll-off containers and onto trucks or other appropriate vehicles for transport. Before and during transport, care shall be exercised to ensure that no unauthorized persons have access to the material. All transportation vehicles shall be appropriately placarded, as necessary, in accordance with 40 CFR 761. D. Transporters of the waste are prohibited from “back hauling” any freight after the disposition of the Owner’s waste stream until decontamination of the vehicle and/or trailer is completed. 3.08 WASTE MANAGEMENT AND DISPOSAL A. The Contractor shall be responsible for all packaging, labeling, transport, disposal and record-keeping associated with the PCB remediation waste streams in accordance with all Federal, State and Local regulations. The Contractor shall prepare all shipping documentation. B. The Contractor shall prepare and submit to the Engineer for review all waste profile applications and questionnaires, and coordinate with disposal facilities and all applicable Federal and State Environmental Agencies. C. The Contractor shall ensure that the person transporting the waste holds a valid permit issued in accordance with appropriate Federal, State, and Local regulations. D. The Contractor shall provide to the transporter at the time of transfer appropriate shipping records as required by the Federal, State and Local regulations with a copy to the Engineer. E. The Contractor shall obtain the Owner’s signature on all waste manifests prior to shipping materials off-site. F. The Contractor shall furnish all generator copies of the Hazardous Waste Manifests to the Owner for submittal to the appropriate regulatory agencies and to retain for the Owner’s records. G. Contractor shall maintain proper follow up procedures to assure that waste materials have been received by the designated disposal facility in a timely manner and in accordance with all Federal, State and Local regulations. H. The Contractor shall submit to the Engineer, prior to receiving progress payment, documentation certifying that all materials were transported to, accepted, and disposed of, at the selected disposal facility(ies). The documentation shall include the following, as a minimum. 1. Documentation shall be provided for each load from the Site to the disposal facility, including all manifests and any other transfer documentation as applicable. 2. All documentation for each load shall be tracked by the original manifest document number that was assigned by the Engineer at the Site. 02 83 90 - 8
  6. Page 478 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1496 of 1638 3. All ORIGINAL signatures (including signatures of Owner and disposal facility’s representative) associated with shipment of any material from the Site within 21 days of obtaining the final signature. 3.09 RESTORATION A. Remove temporary decontamination facilities, temporary enclosures and restore area designated for these facilities to its original condition or better. B. After removing floor drain covers, Contractor shall pour concrete in sawcut area to match surrounding conditions. See specification section 03 05 00 – Field Concrete for additional information. C. Where existing construction is damaged or contaminated, restore work to its original condition or better. END OF SECTION 02 83 90 - 9
  7. Page 479 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1497 of 1638 SECTION 03 05 00 FIELD CONCRETE PART 1 - GENERAL 1.01 A. 1.02 A. 1.03 A. WORK INCLUDED: This Section covers concrete and all related items necessary to place and finish the concrete work. RELATED WORK: Section 31 00 00, EARTHWORK REFERENCES: The following standards form a part of this specification: American Concrete Institute (ACI) ACI 304 Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete. ACI 305 Recommended Practice for Hot Weather Concreting ACI 306 Recommended Practice for Cold Weather Concreting ACI SP-66 ACI Detailing Manual ACI 318 Building Code Requirements for Reinforced Concrete ASTM International (ASTM) ASTM A615 Deformed and Plain Billet-Steel Bars for Concrete Reinforcement ASTM C33 Concrete Aggregates ASTM C94 Ready-Mixed Concrete ASTM C143 Test for Slump of Portland Cement Concrete ASTM C150 Portland Cement ASTM C260 Air Entraining Admixtures for Concrete 06/05/2024 03 05 00-1
  8. Page 480 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1498 of 1638 1.04 ASTM C494 Chemical Admixtures for Concrete ASTM C595 Standard Specification for Blended Hydraulic Cements SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF SECTION 01 33 23 SUBMITTALS, SUBMIT THE FOLLOWING: Statement of materials constituting the design of mixes for each size aggregate as required by ASTM C94 shall be submitted to the Engineer within one week following award of the Contract. PART 2 - PRODUCTS 2.01 CONCRETE: A. All concrete, reinforced or non-reinforced, shall have a 28 day compressive strength of 3000 psi unless otherwise noted on the design drawings. A minimum of 5.5 sacks of cement per cubic yard and a maximum water cement ratio of 6.9 gallons per sack shall be used. B. Concrete shall conform to ASTM C94. The Contractor shall be responsible for the design of the concrete mixtures. Slump shall be a maximum of 4-inches and a minimum of 2-inches, determined in accordance with ASTM C143. C. Admixtures shall be as specified in subsection 2.05. No additional admixtures shall be used unless approved by the Engineer. D. No additional water, except for the amount indicated by the design mix shall be added to the concrete without the prior permission of the Engineer. 2.03 A. CEMENT: The cement shall be an approved brand of American manufactured Portland Cement, Type IL conforming to ASTM C595. The brand name and type of cement proposed for use shall be submitted to the Engineer for approval immediately following award of contract. Only one color of cement, all of the same manufacture, shall be used for the work. 06/05/2024 03 05 00-2
  9. Page 481 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1499 of 1638 2.04 AGGREGATES A. Except as otherwise noted, the aggregate shall conform to the requirements of ASTM C33. B. Maximum size aggregate shall be 3/4-inch. 2.05 ADMIXTURES: A. All concrete (unless otherwise directed) shall contain an air entraining agent. Air entrained concrete shall have air content by volume of 4 to 8 percent for 3/4-inch aggregate. B. Air entraining agent shall be in accordance with ASTM C260 and shall be Darex AEA, as manufactured by W.R. Grace & Company; Placewel (air entraining Type), as manufactured by Johns Manville; Sika AER as manufactured by Sika Chemical Company; or an approved equal product. C. Water reducing agent shall be WRDA, manufactured by W.R Grace & Company; Placewel (non-air entraining Type), as manufactured by Johns Manville; Sika Plastiment as manufactured by Sika Chemical Company; or an approved equal product. D. Water reducing agent-retarder shall be "Daratard,” manufactured by W.R. Grace & Company; Sika Plastiment as manufactured by Sika Chemical Company; or an approved equal product. 2.06 A. WATER: Water for concrete shall be potable, free of deleterious amounts of oil, acid, alkali, organic matter and other deleterious substances. PART 3 - EXECUTION 3.01 PREPARATION: A. Before placing concrete, forms and the space to be occupied by the concrete shall be thoroughly cleaned and reinforcing steel and embedded metal shall be free from dirt, oil, mill scale, loose rust, paint or the material which would tend to reduce the bond. B. Earth, concrete, masonry, or other water permeable material against which concrete is to be placed shall be thoroughly saturated with water immediately before concrete is placed. C. No concrete shall be placed until the consolidation of the ground and the arrangement and details of forms and reinforcing have been inspected and approved by the Engineer. 06/05/2024 03 05 00-3
  10. Page 482 of 482

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 1500 of 1638 3.03 FILL CONCRETE: A. Fill concrete shall be placed in those locations as indicated on the design drawings. Fill concrete shall consist of materials as previously specified, with a minimum 28-day compressive strength of 3000 psi. B. Before fill concrete is placed, the following procedures shall be used to prepare surfaces; all dirt, scum and laitance shall be removed by chipping and washing. The clean, roughened base surface shall be saturated with water, but shall have no free water on the surface. A coat of 1:2 cement-sand grout, approximately 1/8-inch thick, shall be well scrubbed into the thoroughly dampened concrete base. The concrete fill shall be placed immediately, before the grout has dried or set. C. Fill concrete shall be brought to grades that matches existing conditions of surrounding floor. 3.04 CONCRETE PLACING DURING COLD WEATHER: A. Concrete shall not be placed on frozen ground, and no frozen material or material containing ice shall be used. Materials for concrete shall be heated when temperature is below 40oF, or is expected to fall to below 40oF, within 73 hours, and the concrete after placing shall be protected by covering, heat, or both. B. All details of Contractor's handling and protecting of concrete during freezing weather shall be subject to the approval of the Engineer. All procedures shall be in accordance with the provisions of ACI 306. 3.05 CONCRETE PLACING DURING HOT WEATHER: A. Concrete just placed shall be protected from the direct rays of the sun and the forms and reinforcement just prior to placing shall be sprinkled with cold water. The Contractor shall make every effort to minimize delays, which will result in excessive mixing of the concrete after arrival on the job. B. During periods of excessively hot weather (90oF or above), ingredients in the concrete shall be cooled insofar as possible and cold mixing water shall be used to maintain the temperature of the concrete at permissible levels all in accordance with the provisions of ACI 305. Any concrete with a temperature above 90oF, when ready for placement, will not be acceptable, and will be rejected. 3.06 FIELD QUALITY CONTROL: 06/05/2024 03 05 00-4

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)