Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Words on different pages
  1. Page 39 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 39 of 1638 TABLE 7 SUMMARY OF CLEANUP VERIFICATION SEDIMENT SAMPLE ANALYTICAL RESULTS - REMEDIATION AREA 5 27 PARSONS LANE & 105 MIDDLEFIELD ROAD DURHAM, CONNECTICUT SEPTEMBER AND OCTOBER 2024 SAMPLE LOCATION SAMPLE DEPTH (feet) DATE SAMPLED WORK ORDER NO. CS-1 0.5 9/26/2024 24I0706 CS-2 0.5 9/26/2024 24I0706 CS-3 0.5 9/26/2024 24I0706 CS-4 0.5 9/26/2024 24I0706 CS-5 0.5 9/26/2024 24I0706 CS-6 0.5 9/26/2024 24I0706 CS-7 1.0 9/26/2024 24I0706 CS-8 1.0 9/26/2024 24I0706 PARAMETER (Units)2 Polychlorinated Biphenyls by EPA Method 8082A (mg/kg) PCB-1016 PCB-1221 PCB-1232 PCB-1242 PCB-1248 PCB-1254 PCB-1260 PCB-1262 PCB-1268 Total PCBs Total Solids (%) by Standard Method 2540G BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL 83 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL<0.066 BRL 76 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL<0.065 BRL 77 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL<0.062 BRL 81 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL<0.061 BRL BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL<0.059 BRL BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL<0.060 BRL 82 85 83 84 Target Cleanup Standard3 NE NE NE NE NE NE NE NE NE 0.5 NE NOTES: 1. Analytical results compared to Connecticut Remediation Standard Regulations (January 1996; revised February 16, 2021). 2. Only compounds that were detected are provided in this table. For a complete list of analytes refer to laboratory report. 3. A cleanup standard of 0.5 mg/kg was established for this project to comply with TSCA regulations, CTDEEP RSR criteria, and per a July 21, 2022 CTDEEP interoffice memo prepared following the Department’s review of the 2021 SLERA report. mg/kg = milligrams per kilogram BOLD = compound detected at that concentration. BRL < # = Below Reporting Limit (reporting limit specified) BRL = All compounds below reporting limits -- = Not Applicable NE = Not Established by DEEP RES DEC = Residential Direct Exposure Criteria I/C DEC = Industrial/Commercial Direct Exposure Criteria GA PMC = GA Pollutant Mobility Criteria = Exceeds Target Cleanup Standard Prepared by: LMW Page 1 of 1 Reviewed by: JCW
  2. Page 40 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 40 of 1638 FINAL REMEDIAL ACTION REPORT Eversource Energy APPENDIX A Interim Remedial Action Report (IRAR) westonandsampson.com
  3. Page 41 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 41 of 1638 May 2019 Eversource Energy 27 Parsons Lane Sampling Report Durham, Connecticut Eversource Spill Number CWC-18-00543
  4. Page 42 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 42 of 1638 Eversource Energy PARSONS LANE INTERIM REMEDIAL ACTION REPORT TABLE OF CONTENTS Page EXECUTIVE SUMMARY ................................................................................................................... ES-1 TABLE OF CONTENTS ........................................................................................................................... i LIST OF FIGURES ................................................................................................................................. ii LIST OF APPENDICES ..........................................................................................................................iii 1.0 RESPONSE/REMEDIAL ACTIONS ............................................................................. 1-1 2.0 INVESTIGATION AND SAMPLING ACTIVITIES.......................................................... 2-1 2.1 Analytical Results - Eversource Samples .................................................................2-3 2.1.1 Transformer Oil and Water Samples ........................................................................2-3 2.1.2 Floor Drain Samples .................................................................................................2-4 2.1.3 Well Water Sample................................................................................................... 2-4 2.1.4 Exterior Manhole or Catch Basin Samples ...............................................................2-4 2.1.5 Post Excavation Soil Samples .................................................................................. 2-4 2.1.6 Wipe Sample Analytical Results ............................................................................... 2-4 2.2 Analytical Results - Weston & Sampson Samples ....................................................2-4 2.2.1 Roof Pea Gravel Analytical Results ..........................................................................2-5 2.2.2 Concrete Analytical Results - Restroom/Utility Room ............................................... 2-5 2.2.3 Concrete Analytical Results – Exterior Building Foundation Wall and Footing ..........2-5 2.2.4 Septic Analytical Results ..........................................................................................2-5 2.2.5 Soil Analytical Results - Active Septic Tank and 2 Leaching Fields ..........................2-5 2.2.6 Water Sample Analytical Results - Discharge From 8-in. RCP .................................2-5 2.2.7 Sediment Analytical Results ..................................................................................... 2-5 2.2.8 Surface Water Analytical Results .............................................................................2-5 3.0 DATA QUALITY ASSESSMENT/DATA USABILITY EVALUATION ............................. 3-1 4.0 SUMMARY & CONCLUSIONS ....................................................................................... 1 westonandsampson.com i
  5. Page 43 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 43 of 1638 Eversrouce Energy PARSONS LANE INTERIM REMEDIAL ACTION REPORT TABLE OF CONTENTS (Cont.) LIST OF TABLES Table 1 ................................................................ Transformer Sample Analytical Results (Eversource) Table 2 ................................................................. Floor Drain Sample Analytical Results (Eversource) Table 3 .................................................................. Well Water Sample Analytical Results (Eversource) Table 4 ......................................... Manhole and Catch Basin Sample Analytical Results (Eversource) Table 5 .................................................. Post Excavation Soil Sample Analytical Results (Eversource) Table 6 .............................. Well Water Pressure Tanks Wipe Sample Analytical Results (Eversource) Table 7 ...........................................Roof Pea Gravel Sample Analytical Results (Weston & Sampson) Table 8 ................ Restroom/Utility Room Concrete Sample Analytical Results (Weston & Sampson) Table 9 ............. Foundation Wall/Footing Concrete Sample Analytical Results (Weston & Sampson) Table 10 ............................................ Septic System Sample Analytical Results (Weston & Sampson) Table 11 ......................................... 8-in. RCP Water Sample Analytical Results (Weston & Sampson) Table 12 ........................ Sediment Sample Below 8-in. RCP Analytical Results (Weston & Sampson) Table 13 .................................................... Sediment Sample Analytical Results (Weston & Sampson) Table 14 ............................................ Surface Water Sample Analytical Results (Weston & Sampson) westonandsampson.com ii
  6. Page 44 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 44 of 1638 Eversrouce Energy PARSONS LANE INTERIM REMEDIAL ACTION REPORT TABLE OF CONTENTS (Cont.) LIST OF FIGURES Figure 1 .......................................................................................................................... Site Locus Map Figure 2 ......................................................................................................................................Site Plan Figure 3…. ....................................... Manhole, Catch Basin, Septic Water and Soil Sample Locations Figure 4…. ............................................................................... Post Excavation Soil Sample Locations Figure 5…. ......................................................................................Roof Pea Gravel Sample Locations Figure 6…. ......................................................... Concrete Sample Locations - Restroom/Utility Room Figure 7…. ......................................................... Concrete Sample Locations - Exterior Wall & Footing Figure 8….Sediment and Surface Water Sampling Plan – Stream Transects 1-4 and Outfall 1-3 Locations Figure 9…. ............... Sediment and Surface Water Sampling Plan – Stream Transects 5-8 Locations LIST OF APPENDICES Appendix A...................................................................................................... Disposal Documentation Appendix B ........................................................................................................ File Review Information Appendix C ........................................................................................................Analytical Data Reports westonandsampson.com iii
  7. Page 45 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 45 of 1638 PARSONS LANE INTERIM REMEDIAL ACTION REPORT EXECUTIVE SUMMARY On October 19, 2018, The Connecticut Light and Power Company dba Eversource Energy (Eversource) responded to a release of mineral oil dielectric fluid (MODF) at 27 Parsons Lane in Durham, Connecticut (the Site). A broken pole caused a bank of three customer-owned pole-mounted transformers to fall onto the roof of an industrial/commercial building. The impact caused a puncture through the roof and one unit released most of its oil content into a restroom/utility room inside the building. The MODF impacted the concrete floor, roof materials, and the exterior of four well-water pressure tanks within the room. The MODF also migrated to three floor drains. The property owner's contractors disconnected the transformers from the broken pole and placed them on the ground outside the building. The primary bushings from the two undamaged transformers were subsequently removed, purportedly by vandals, causing these transformers to release their oil contents impacting the lawn “courtyard area” and a nearby catch basin. The total quantity of oil released from this incident was reported as approximately 100 gallons with approximately 33 gallons released inside the building and approximately 66 gallons released outside in the courtyard area. On behalf of Eversource, Weston & Sampson Engineers, Inc. (Weston & Sampson) prepared this report summarizing the response/remedial actions and the results of sampling performed by Eversource and Weston & Sampson. A summary of the response/remedial actions and analytical results from the sampling is provided below in chronological order. Eversource retained Clean Harbors Environmental Services (CHES) to perform initial response/remedial actions at the Site under the supervision of Eversource personnel. Their work occurred between October 19 and 22, 2018, and included the following actions: o Removal and off-site storage of the three transformers; o Removal of impacted roofing debris from inside the building which was placed in a rolloff container for proper off-site disposal; o Decontamination triple-washing of the concrete floor and pressure tanks by washing three times with a detergent solution and then water; o Decontamination of the drains in the restroom/utility room with a detergent solution and water that was captured by absorbent booms that were subsequently removed and properly disposed off-site; o Collection of aqueous decontamination wastes (i.e., detergent solution and water) and proper off-site disposal; o Placement of oil-absorbent booms in an intermittent water course located on the western abutting property; and o Excavation of soil within a lawn “courtyard area” where the incident occurred and proper off-site disposal. Eversource collected the following samples concurrent with the initial response/remedial actions completed by CHES between October 19 and 22, 2018: o The contents of the three transformers were sampled and tested for polychlorinated biphenyls (PCBs). Two transformers had some trace residual oil remaining, and the third transformer contained rainwater accumulated from a previous rain event. Analysis of the two oil samples identified total PCB concentrations of 210 and 230 milligrams per westonandsampson.com ES-1
  8. Page 46 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 46 of 1638 PARSONS LANE INTERIM REMEDIAL ACTION REPORT kilogram (mg/kg) of Aroclor 1254. The water sample had a PCB concentration of 0.11 milligrams per liter (mg/L) of Aroclor 1254. o Oil was found in two floor drains located in the restroom/utility room area and subsequently sampled and tested for PCBs. The analyses identified total PCB concentrations of 16 mg/kg of Aroclor 1254 in both samples. o A well water sample was collected from a sink tap in the restroom/utility room area and tested for PCBs and extractable total petroleum hydrocarbons (ETPH). The results revealed PCBs were not detected with a reporting limit of 0.20 micrograms per liter (µg/L) and ETPH was detected at 0.11 mg/L. o Seven aqueous or sediment samples were collected from seven exterior manholes or catch basins associated with Site septic or stormwater drainage features. Sediment samples were collected when found in the manhole and water samples were collected when no sediments were found. Each of the samples were analyzed for PCBs, and select samples were analyzed for ETPH. PCBs were not detected in any of the samples and reporting limits for these results were less than 0.20 mg/kg for sediments and less than 0.27 µg/L for water. The one sediment sample tested for ETPH (MH2) had a concentration of 8,100 mg/kg and the three aqueous samples tested for ETPH had concentrations ranging from 1.3 to 7.8 mg/L. Eversource collected thirty-three cleanup verification soil samples from the soil excavation in the lawn “courtyard area” between October 22 and 24, 2018 and submitted them to the laboratory to be tested for PCBs. Grid sampling was performed following Subpart O procedures under Title 40 CFR Section 761.61(b). PCBs were detected in only six of the verification samples with a maximum concentration of 2.5 mg/kg. Laboratory reporting limits for all samples that were nondetect for PCBs were less than 0.11 mg/kg. Weston & Sampson collected the following samples at the Site on October 25, 2018: o Three samples were collected from the exterior roofing pea gravel located in the area where the transformers fell and punctured the building rooftop and tested for PCBs. Aroclor 1254 was detected in one of the three samples at a concentration of 0.097 mg/kg and PCBs were not detected in the other samples (reporting limits less than 0.077 mg/kg). o Nine concrete samples were collected from the concrete floor in the restroom/utility room and tested for PCBs. PCBs were detected in six of the concrete samples, and all samples with detected concentrations were below 1 mg/kg total PCBs. Laboratory reporting limits for all samples that were non-detect for PCBs were less than 0.095 mg/kg. o Three concrete samples were collected from a section of the exposed building foundation wall and footing located at the soil excavation limits in the “courtyard area” and tested for PCBs for verification purposes. PCBs were detected in one of the samples at 0.12 mg/kg and the reporting limits for the other two samples were less than 0.090 mg/kg. Weston & Sampson conducted a file review at the Durham Town Hall and CT DEEP file room to gather information about the Site’s stormwater drainage features, building floor drains, and septic features on October 30 and November 1, 2018. Stormwater drainage from the paved parking lot area on the northeastern side of the Site discharges via a 12-inch (in.) RCP to an intermittent water course flowing on the westerly abutting property. There is evidence of three westonandsampson.com ES-2
  9. Page 47 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 47 of 1638 PARSONS LANE INTERIM REMEDIAL ACTION REPORT septic tanks and two leach fields located on the western side of the Site. The current septic leach fields appear to have replaced an older leach field in the same general area. Eversource retained CHES to return to the Site on November 8, 2018 to perform additional soil excavation in the lawn “courtyard area” to address two verification sample locations that exhibited PCB concentrations approaching or exceeding 1 mg/kg. The soil removal activities were performed under the supervision of Eversource personnel. On November 8, 2018, both Eversource and Weston & Sampson conducted the following Site activities that are summarized below: o Upon completion of the additional soil excavation work described above, Eversource collected five additional cleanup verification soil samples from the new excavation area on November 8, 2018 and submitted them to the laboratory to be tested for PCBs. Grid sampling was performed following Subpart O procedures under Title 40 CFR Section 761.61(b). PCBs were not detected in any of the new verification samples. Laboratory reporting limits for all samples that were non-detect for PCBs were less than 0.097 mg/kg. o Weston & Sampson performed dye testing activities on three floor drains in the restroom/utility room to determine drainage patterns and outfall location(s). Dye test results revealed the floor drains were connected to the catch basin structure that was removed during the soil excavation within the lawn “courtyard area,” to the on-Site septic system, and to an 8-inch RCP that directly discharged into the intermittent water course located on the abutting property to the west. Weston & Sampson collected the following samples at the Site on November 20, 2018: o One septic waste sample was collected from the active septic system and tested for PCBs. The results revealed no detections for PCBs above the method detection limit, and the laboratory reporting limit was less than 0.47 µg/L. o One water sample was collected from the effluent discharging out of an 8-inch (in.) RCP and tested for PCBs. PCBs were detected at a concentration of 0.96 µg/L. o One sediment sample was collected directly beneath the same 8-in. RCP discussed above and tested for PCBs. PCBs were detected in the sample at a concentration of 3.6 mg/kg. o Seven soil samples were collected from around the active septic tank and leach fields and tested for PCBs. PCBs were not detected in any of the soil samples and reporting limits were less than 0.092 mg/kg. Weston & Sampson collected twenty-nine sediment samples from the intermittent water course and outfall drainage path created by the 8-inch (in.) reinforced concrete pipe (RCP) on December 5, 2018 and submitted them to the laboratory to be tested for PCBs. The sediment samples were collected along eight transects (one upstream and seven downstream) within the stream path. PCBs were not detected in the upstream transect and reporting limits were less than 0.039 mg/kg. PCBs were detected in the downstream sediments at five of seven transects, and as far downstream as Transect #7 at concentrations ranging from 0.036 to 9.6 mg/kg. However, PCBs were not detected in the furthest downstream transect and reporting limits were less than 0.052 mg/kg at this location. PCB impacts to the intermittent water course require further evaluation but the impacted area has been delineated. westonandsampson.com ES-3
  10. Page 48 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 165 Page 48 of 1638 PARSONS LANE INTERIM REMEDIAL ACTION REPORT Weston & Sampson collected nine surface water samples in the intermittent water course from eight sediment sampling transect locations on December 5, 2018 and submitted them to the laboratory to be tested for PCBs. PCBs were not detected in any of the surface water samples and the reporting limits were less than 0.20 ug/L. Eversource retained CHES to return to the Site on December 27, 2018 to decontaminate the four well water pressure tanks in the restroom/utility room and the floor beneath and around the four tank locations with a detergent solution. They also re-cleaned the floor in the restroom/utility room for a second time. All work was performed under the supervision of Eversource. Upon completion of the tank decontamination activities, Eversource collected twelve wipe samples from the four well water pressure tanks (three wipe samples per tank) on December 27, 2018 and submitted them to the laboratory to be tested for PCBs. PCBs were detected in one sample at a concentration of 0.29 micrograms per wipe (µg/wipe). Laboratory reporting limits for all other wipe samples that were non-detect for PCBs were less than 0.20 µg/wipe. Weston & Sampson collected twenty-six concrete samples from the concrete floor in the restroom/utility room on January 9, 2019 and submitted them to the laboratory to be tested for PCBs. The samples were collected following Subpart O sampling procedure under Title 40 CFR Section 761.61(b). PCBs were detected in twenty-two concrete samples, and two samples exhibited concentrations that exceeded 1 mg/kg total PCBs. Eversource has retained Weston & Sampson to plan and implement a Screening Level Ecological Risk Assessment (SLERA) based upon the results from samples collected from the flow channel that receives discharge from the 8-in. RCP, and from the intermittent water course on the westerly abutting property. The SLERA will specifically address potential ecological risk, including characterizing the nature and extent of any downstream impacts. This work was initiated in April 2019 and is still in progress. Eversource is also evaluating additional decontamination or remedial efforts to address the floor drains in the restroom/utility room, and the 8-in. RCP on the western side of the Site. westonandsampson.com ES-4

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)