Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Words on different pages
  1. Page 9 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 9 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT 1.0 RESPONSE/REMEDIAL ACTIONS On October 19, 2018, The Connecticut Light and Power Company dba Eversource Energy (Eversource) responded to a release of mineral oil dielectric fluid (MODF) after a utility pole (Utility Pole No. 1309) broke causing a bank of three customer-owned pole-mounted 100 kilovolt-amp (kVA) transformers to fall onto the roof of an industrial/commercial building at 27 Parsons Lane in Durham, Connecticut (the Site). The impact caused a puncture through the roof and one unit released oil into a restroom/utility room, impacting the concrete floor, roof materials, and four well water pressure tanks. The MODF then migrated to three floor drains in the concrete floor. The property owner's contractors disconnected the transformers from the pole and placed them on the ground outside the building. Primary bushings were subsequently removed, purportedly by vandals, from the two undamaged transformers causing additional MODF to be released, subsequently impacting the lawn “courtyard area” and a nearby catch basin. The total quantity of oil released from this incident was reported as approximately 100 gallons with approximately 33 gallons released inside the building and approximately 66 gallons released outside in the courtyard area. Although 100 gallons was reported, the transformers only hold approximately 33 gallons each for a total of 99 gallons. Eversource provided verbal notification of the release condition to the Connecticut Department of Energy and Environmental Protection (CT DEEP) at 9:00 AM on October 19, 2018. The CT DEEP subsequently assigned case number 2018-05541. At the time of notification, Eversource estimated and reported the volume of MODF released as approximately 35 gallons with an unknown PCB content (assumed 50-500 parts per million (ppm)). The volume released was subsequently updated to approximately 100 gallons. A Weston and Sampson Licensed Environmental Professional (LEP) visited the Site on October 19, 2018 to assess Site conditions and gather additional information about the spill incident. Between October 19 and 22, 2018, initial spill cleanup actions at the Site were performed by Clean Harbors Environmental Services (CHES) under the supervision of Eversource personnel. These actions included (1) removal and off-site storage of the three transformers (no oil was drained from these prior to transport), (2) removal of impacted roofing debris from inside the building, (3) triple-washing of the concrete floor and pressure tanks with Simple Green in the restroom/utility room, (4) flushing the drains with Simple Green and water in the restroom/utility room, (5) placement of oil-absorbent booms in an intermittent water course located on the western abutting property, and (6) soil excavation within a lawn “courtyard area” where the incident occurred. The oil-absorbent booms were installed for precautionary purposes even though no oil sheen or odor was observed in the water course. Excavation depths in the “courtyard area” ranged from 6 inches (in.) to 4 feet (ft.) beneath the ground surface (bgs.) The concrete floor beneath and behind the pressure tanks and the back-side of the tanks could not be decontaminated during these cleanup actions because accessing these areas required moving the tanks, moving the tanks required shutting off and disconnecting the building water supply, and prior coordination with the property owner and building tenants was needed. Copies of all manifests associated with these cleanup actions are included in Appendix A. On November 8, 2018, CHES performed additional soil excavation work in the in the lawn “courtyard area” in response to two verification sample locations (S14 and S29) exhibiting PCB concentrations approaching or exceeding 1 mg/kg. Eversource personnel performed oversight and cleanup verification sampling for these activities. Based upon detection of PCBs in a November 20, 2018 water sample collected from an 8-inch reinforced concrete pipe (RCP) that discharges into an intermittent water course, assessment of this water course began on December 5, 2018. On December 6, 2018 at 4:12 PM, Eversource provided email notification to Environmental Protection Agency Region 1 regarding the potential release condition westonandsampson.com 1-1
  2. Page 10 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 10 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT to a waterway. Based upon the results of samples collected within the water course, a Screening Ecological Risk Assessment is being initiated in 2019. On December 27, 2018, the building water supply system was temporarily shut off and the four well water pressure tanks in the restroom/utility room were disconnected and turned over to CHES to be decontaminated by triple-washing with Simple Green. CHES also triple-washed the floor beneath and around the four tank locations and re-cleaned the floor in the restroom/utility room for a second time. The cinder blocks that supported the pressure tanks and the old copper piping connected to the pressure tanks were disposed off-site as a PCB-waste. After the decontamination work was completed, the tanks were relocated to a new area outside of the spill incident area and new copper piping was used to reconnect the pressure tanks. All work was performed under the supervision of Eversource. On February 11, 2019, CHES returned to the Site to decontaminate the concrete floor in the restroom/utility for a third time based on the floor sampling activities completed on January 9, 2019. The decontamination activities were performed under the supervision of Eversource. westonandsampson.com 1-2
  3. Page 11 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 11 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT 2.0 INVESTIGATION AND SAMPLING ACTIVITIES On October 19, 2018, Eversource collected the following samples for analytical testing as part of their initiation of response actions: The contents of the three transformers, two transformers containing trace residual oil, and one transformer containing rainwater accumulated from previous rain events were all sampled. The two oil samples were assigned sample ID’s “67H10124” and “67J8113,” and the water sample was assigned sample ID “67J8112.” Two floor drains located in the restroom area were found containing oil and sampled. The two floor drain samples were assigned sample ID’s “Floor Drain 1” and “Floor Drain 2.” A well water sample was collected from a sink tap in the restroom/utility room area. No oil sheen or odor was noted in the collected sample. The well water sample was assigned sample ID “Well Water.” Four aqueous and one sediment sample from five exterior manholes located near the release area were collected. The manholes are related to the Site septic or storm water conveyance system. These samples were assigned sample ID’s “MH1” through “MH5.” On October 22 and 24, 2018, Eversource collected the following samples for analytical testing following completion of the initial cleanup actions completed by CHES: Sediment from a 6th exterior manhole and a water sample from a catch basin located near the release area were sampled. Both structures are related to Site septic and storm water conveyance systems. These samples were assigned sample ID’s “MH6” and “CB1.” Thirty-three cleanup verification soil samples were collected from the soil excavation in the lawn “courtyard area.” These samples were assigned sample ID’s “S1” through “S31,” “S10 Duplicate,” and “S30 Duplicate.” On October 25, 2018, Weston and Sampson collected three samples of the pea gravel from the building roof where the transformers impacted the rooftop, eight concrete core-bore samples from random areas of the triple-washed concrete floor in the restroom/utility room, and three concrete core-bore samples from a section of exposed building foundation wall and footing located in the “courtyard area” soil excavation. The pea gravel roof samples were assigned sample ID’s “R-1” through “R-3,” the concrete core-bore samples from the concrete floor in the restroom/utility room were assigned sample ID’s “C1” through “C-8” and “DUP-1,” and the concrete core-bore samples from the building foundation wall and footing were assigned sample ID’s “C-32” through “C-34.” On October 30 and November 1, 2018, Weston & Sampson conducted a file review at the Durham Town Hall and CT DEEP file room to gather information about the Site’s stormwater drainage features, building floor drains, and septic features. Limited information and plans were found on both stormwater drainage and septic features, but no information was found regarding the building floor drains. Stormwater drainage from the paved parking lot area on the northeastern side of the Site discharges via a 12-inch (in.) RCP to an intermittent water course flowing on the westerly abutting property. No additional information was found regarding stormwater drainage, including the catch basin structure removed from the soil excavation within the lawn “courtyard area.” With regards to septic usage, the file review showed evidence of three septic tanks and two leach fields located on the western side of the Site. The current septic leach fields also replaced an older leach field in the same general area. File review information is provided in Appendix B. westonandsampson.com 2-1
  4. Page 12 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 12 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT On November 8, 2018, both Eversource and Weston & Sampson conducted Site activities summarized below: o Eversource performed supplemental cleanup verification soil sampling activities after additional PCB impacted soils were removed from the lawn “courtyard area.” The soil removal work was focused on previous verification sample locations S14 and S29 which exhibited PCB concentrations approaching or exceeding 1 mg/kg. Four (new) verification samples were collected and assigned sample ID’s “SB32” through “SB35.” o Weston & Sampson performed dye testing activities on three floor drains in the restroom/utility room to determine drainage patterns and outfall location(s). Test results revealed the floor drains were connected to the catch basin structure that was removed during the soil excavation within the lawn “courtyard area,” to the on-Site septic system, and to an 8-in. RCP that directly discharged into the intermittent water course located on the abutting property to the west. On November 20, 2018, Weston & Sampson collected a second sample from the active septic tank; Eversource previously collected a sample from the same tank on October 19, 2018. Weston & Sampson also collected a sample from water discharging out of the 8-in. RCP, and from sediment directly below the pipe outfall. The septic sample was assigned sample ID “SP-1,” the water sample was assigned sample ID “SW-1,” and the sediment sample was assigned sample ID “SD-1.” Weston & Sampson’s sampling activities on November 20, 2018 also included collection of subsurface soil samples around the active septic tank and two leach fields. Samples were collected at the bottom depth of the tank and leach fields which was determined to be between 6 to 7 ft. bgs. based on observed Site conditions and file review information discussed above. Seven soil samples were collected and assigned sample ID’s “GP-1” through “GP-6” and “DUP-4.” On December 5, 2018, Weston & Sampson performed stream assessment activities on the intermittent water course flowing on the westerly abutting property. The sampling activities were completed based on the previous sampling activities completed on November 20, 2018 that showed detections of PCBs in the water sample discharging out of the 8-in. RCP and from sediment directly below the pipe outfall. A total of twenty-nine sediment and nine surface water samples were collected for analytical testing. Three sediment samples were collected in the dried-up flow channel between the pipe outfall to the unnamed water course located adjacent to the Site. The sample IDs were assigned “Outfal-1,” “Outfal2” and “Outfal-3,” and they were spaced less than five feet apart within the channel to be consistent with Subpart O grid sampling requirements in 40 CFR 761(b). An additional twenty-six sediment and nine surface water samples were collected within the unnamed water course that flows adjacent to the Site at 8 transect locations. Sampling at each transect included collection of three sediment samples and one surface water sample. Sediment samples were collected from the edge of water on both sides of the channel and from the middle of the channel, and surface water samples were collected at the midpoint of the stream channel. Transect #1 was a background sample located upstream of where the dried-up flow channel empties into the unnamed water course. Transects #2, #3 and #4 were placed at approximate 5-ft. intervals downstream of the confluence of where the dried-up flow channel empties into the unnamed water course. The approximate 5-ft. spacing was designed according to Subpart O grid sampling in 40 CFR 761(b). Transects #4 through #7 were placed downstream of Transect #3 at locations where (1) oil sheens were observed, (2) obstructions in the stream could have collected oil, or (3) where sharp bends existed in the unnamed water course where oil may have accumulated. Transect #8 was the furthest downstream location that was more than a ½-mile away. Two blind duplicate sediment samples and one blind duplicate surface water sample was collected for quality assurance/quality control (QA/QC) purposes. The transect sediment samples were assigned sample westonandsampson.com 2-2
  5. Page 13 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 13 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT ID’s “T1” through “T8,” and they were also given an “E” (East), “W” (West) or “C” (Center) designation to further describe the sampling location. The duplicate sediment samples were designated sample ID’s “DUP-SE1” and “DUP-SE2.” CT DEEP requested a reporting limit of 0.1 mg/kg for the sediment PCB analyses to satisfy CT DEEP requests to evaluate for ecological screening levels. The surface water samples were assigned sample ID’s “T1-SW” through “T8-SW” and “DUP-SW.” On December 27, 2018, Eversource collected twelve wipe samples from the four decontaminated well water pressure tanks. Three wipe samples were collected from the top, middle and bottom of each tank. The wipe samples were assigned sample ID’s “Tank 1” through “Tank 4,” and they were also given an “Top,” “Middle” or “Bottom” designation to further describe the sampling location. On January 9, 2019, Weston & Sampson returned to the Site to perform additional concrete floor sampling activities in the restroom/utility room. Sampling activities were performed in accordance with Subpart O requirements under Title 40 CFR Section 761.61(b), and the grid sampling was designed to incorporate the previous eight sampling locations performed on the floor on October 25, 2018. Twentyfive concrete new core-bore samples were collected and assigned sample ID’s “C-9” through “C-31,” “DUP-2” and “DUP-3.” On February 11, 2019, after CHES decontaminated the concrete floor in the restroom/utility room for a third time, Weston & Sampson performed limited concrete floor sampling activities at the two specific locations that exhibited PCB concentrations above 1 mg/kg identified from activities completed on January 9, 2019. Sampling was performed in accordance with Subpart O requirements under Title 40 CFR Section 761.61(b). Two new concrete core-bore samples were collected at the same two locations and assigned sample ID’s “C-21A” and “C-24A.” Weston & Sampson has been retained to implement a Screening Level Ecological Risk Assessment (SLERA) on the intermittent water course flowing on the westerly abutting property because previous sampling has indicated that the oil spill has impacted the water course. This SLERA will specifically address potential ecological risk, including characterizing the nature and extent of any downstream impacts. This work was initiated in April 2019 but is not yet complete. 2.1 Analytical Results - Eversource Samples Between October 19 and December 27, 2018 Eversource collected a well water sample from a sink tap in the restroom/utility room area with the pressure tanks, seven aqueous or sediment samples from seven nearby exterior manholes or catch basins associated with Site septic or stormwater drainage features, thirty-seven cleanup verification soil samples were collected from the soil excavation in the lawn “courtyard area,” and twelve wipe samples from the four well water pressure tanks. All samples were submitted to Con-Test Analytical Laboratory (Con-Test) in East Longmeadow, Massachusetts, a Connecticut-certified laboratory, for PCB analysis by Environmental Protection Agency (EPA) Method 8082. The PCB analyses on all solid matrices were performed using soxhlet extraction. The well water sample and four of the manhole samples were also analyzed for ETPH. Sample locations are shown on Figures 3 and 4 and the data are summarized in Tables 1 through 6. Analytical data reports are provided in Appendix C. 2.1.1 Transformer Oil and Water Samples Analysis of the oil samples collected from the two transformers that contained oil (sample ID’s “67H10124” and “67J8113”) revealed total PCB concentrations of 210 and 230 milligrams per kilogram (mg/kg). Analysis of the water sample collected from the third transformer containing rainwater (sample ID “67J8112”) revealed a PCB concentration of 0.11 milligrams per liter (mg/L). The PCB type in all three westonandsampson.com 2-3
  6. Page 14 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 14 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT samples was Aroclor 1254. Based on the oil results, Eversource subsequently presumed the rainwaterfilled transformer also contained oil with a PCB concentration of 230 mg/kg. 2.1.2 Floor Drain Samples Analysis of the floor drain oil samples (sample ID’s “Floor Drain 1” and “Floor Drain 2”) revealed total PCB concentrations of 16 mg/kg in both samples, and the PCB type was Aroclor 1254. 2.1.3 Well Water Sample Analysis of the water sample (sample ID “Well Water”) revealed no detections for PCBs above the method detection limit, and an ETPH detection of 0.11 mg/L. 2.1.4 Exterior Manhole or Catch Basin Samples Analysis of the manhole samples (sample ID’s “MH1” through “MH6” and “CB1”) revealed no detections of PCBs above the method detection limit in any sample. ETPH was detected in samples MH1 (7.8 milligrams per liter [mg/L]), MH2 (8,100 mg/kg), MH4 (4.5 mg/L), and MH5 (1.3 mg/L). 2.1.5 Post Excavation Soil Samples Analysis of the post excavation soil samples (sample ID’s “S1” through “S31”, “SB32” through “SB34,” “S10 Duplicate,” and “S30 Duplicate”) revealed six samples (“S10,” “S10 Duplicate,” “S14,” “S29,” “S30” and “S31”) with PCB detections ranging from 0.11 ppm to 2.5 ppm. Aroclor 1254 was the PCB type reported in the six samples with detections, and S14 also had a trace detection of Aroclor 1260 reported. Remediation of soils corresponding to verification samples “S14” and “S29” was completed on November 8, 2018 by CHES. 2.1.6 Wipe Sample Analytical Results Analysis of the wipe samples (sample ID’s “Tank 1” through “Tank 4”, with “Top,” “Middle” or “Bottom” designations) revealed one sample (Tank 1 Bottom) with a PCB detection of 0.29 µg/wipe. PCBs were not detected in the remaining wipe samples collected. 2.2 Analytical Results - Weston & Sampson Samples Between October 25 and February 11, 2018, Weston & Sampson collected three samples of the building roofing pea gravel where the transformers impacted the rooftop, thirty-six concrete core-bore samples from the concrete floor in the restroom/utility room, three concrete core-bore samples from a section of exposed building foundation wall and footing located in the “courtyard area” soil excavation, a septic waste sample, seven soil samples from around a septic tank and leach field, one water sample discharging out of an 8-in. RCP, a sediment sample directly beneath the 8-in. RCP, twenty-nine stream sediment samples, and nine stream surface water samples. All samples except for the septic sample were submitted to Con-Test in East Longmeadow, Massachusetts, a Connecticut-certified laboratory, for PCB analysis by EPA Method 8082. The septic sample was analyzed by Phoenix Environmental Laboratory, Inc. in Manchester, Connecticut, also a Connecticut-certified laboratory, because Con-Test does not test septic samples. The PCB analyses on all solid matrices were performed using soxhlet extraction. Sample locations are shown on Figures 3, and 5 through 9 and the data are summarized in Tables 7 through 14. Analytical data reports are provided in Appendix C. westonandsampson.com 2-4
  7. Page 15 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 15 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT 2.2.1 Roof Pea Gravel Analytical Results Analysis of the three pea gravel roof samples (sample ID’s “R-1,” “R-2” and R-3”) revealed one sample (“R-1”) with a total PCB concentration of 0.097 mg/kg, and the PCB type was Aroclor 1254. 2.2.2 Concrete Analytical Results - Restroom/Utility Room Analysis of the thirty-six concrete core-bore samples (sample ID’s “C-1” through “C-31,” and “DUP-1” through “DUP-3”) revealed 30 samples with detectable concentrations of PCBs, and 2 samples (“C-21” and “C-24”) with total PCB concentration exceeding 1 mg/kg. Two PCB types were also detected in the concrete samples, including Aroclor 1254 and Aroclor 1260. CHES performed additional decontamination efforts in the restroom/utility room area and re-testing of at these two sample locations (“C-21A” and “C-24A”) shows reduced total PCB concentrations of 0.39 mg/kg and 0.35 mg/kg, respectively. 2.2.3 Concrete Analytical Results – Exterior Building Foundation Wall and Footing Analysis of the three foundation wall and footing samples located in the “courtyard area” soil excavation (sample ID’s “C-32” through “C-34” revealed 1 sample (“C-33”) with a total concentration of 0.12 mg/kg, and the PCB type was Aroclor 1254. 2.2.4 Septic Analytical Results Analysis of the septic sample (sample ID “SP-1”) revealed no detections for PCBs above the method detection limit. 2.2.5 Soil Analytical Results - Active Septic Tank and 2 Leaching Fields Analysis of the seven soil samples from around the septic tank and leach field (sample ID’s “GP-1” through “GP-6” and “DUP-4”) revealed no PCB detections in any of the samples. 2.2.6 Water Sample Analytical Results - Discharge From 8-in. RCP Analysis of the water sample from the 8-in. RCP (sample ID “SW-1”) revealed PCBs at a concentration of 0.96 micrograms per liter (µg/L). 2.2.7 Sediment Analytical Results Analysis of the 30 sediment samples (sample ID’s “SD1,” “Oufall-1” through “Outfall-3,” and transects “T1” through “T8” with “E” [East], “W” [West] or “C” [Center] designations) revealed 13 samples with detectable concentrations of PCBs, 6 samples (sample ID’s “SD1,” “Outfall-1,” “Outfall-2,” “Outfall-3,” “T2-C” and “T2-E”) exhibited total PCB concentration exceeding 1 mg/kg, and the PCB type in all samples with detections was Aroclor 1254. 2.2.8 Surface Water Analytical Results Analysis of the nine surface water samples (sample ID’s “T1-SW” through “T8-SW” and “DUP-SW”) revealed no PCB detections in any of the samples. westonandsampson.com 2-5
  8. Page 16 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 16 of 740 PARSONS LANE INTERIM REMEDIAL ACTION REPORT 3.0 DATA QUALITY ASSESSMENT/DATA USABILITY EVALUATION Samples collected by Eversource and Weston & Sampson were analyzed following the CT DEEP Reasonable Confidence Protocol (RCP). A review of the quality assurance/quality control (QA/QC) data collected as part of the analysis indicates that the sample results are usable for their intended purpose which included: Verification of remedial activities; and Characterization of potential impacts to environmental media. westonandsampson.com 3-1
  9. Page 17 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 17 of 740 Eversource Energy PARSONS LANE INTERIM REMEDIAL ACTION REPORT 4.0 SUMMARY & CONCLUSIONS PCB impacts remain at the following areas that will require additional investigation and potential remediation: o o o o the floor drains in the restroom/utility room; the 8-in. RCP on the western side of the Site; the flow channel on the western abutting property that receives discharge from the 8-in. RCP; and the intermittent water course on the western abutting property that receives discharge from the flow channel. Eversource maintains the response actions involving the impacted building roofing debris, the concrete floor in the restroom/utility room, the four well water pressure tanks, the area where the property owner's contractors disconnected the transformers and placed them on the ground outside the building, and the Site septic and stormwater drainage features (excluding the 8-in. RCP discussed above) are considered complete to close out these areas and no additional investigation or remedial actions are warranted. westonandsampson.com 4-1
  10. Page 18 of 131

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 161 Page 18 of 740 FIGURES

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)