Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Words on different pages
  1. Page 7 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 7 of 126
  2. Page 8 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 8 of 126
  3. Page 9 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 9 of 126 WESTON & SAMPSON ENGINEERS, INC. 712 Brook Street, Suite 103 Rocky Hill, CT 06067 tel: [phone removed] REPORT April 2023 TOWN OF Simsbury Connecticut Eversource Energy Final Site Investigation Report AOPEC#3A Former Simsbury Area Work Center 34 Hopmeadow Street
  4. Page 10 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 10 of 126 Final Site Investigation Report EVERSOURCE ENERGY TABLE OF CONTENTS Page TABLE OF CONTENTS ...................................................................................................................... i LIST OF FIGURES............................................................................................................................. ii LIST OF TABLES .............................................................................................................................. iii LIST OF APPENDICES ..................................................................................................................... iv 1.0 INTRODUCTION.......................................................................................................... 1-1 1.1 Project Objective ......................................................................................................1-1 1.2 Applicability ..............................................................................................................1-1 2.0 SITE INFORMATION AND INITIAL CONCEPTUAL SITE MODEL .............................. 2-1 2.1 Physical Description .................................................................................................2-1 2.2 Site History ...............................................................................................................2-1 2.3 Physiographic Setting ...............................................................................................2-1 2.4 Site Geology and Hydrogeology ...............................................................................2-1 2.5 Well Receptor Survey ...............................................................................................2-2 2.6 Fate and Transport ...................................................................................................2-2 2.7 Previous Investigation Summary ..............................................................................2-3 2.8 Site Wide Areas of Potential Environmental Concern (AOPECs) ..............................2-3 3.0 REGULATORY FRAMEWORK .................................................................................... 3-1 3.1 RSR Soil Criteria ......................................................................................................3-1 3.2 RSR Groundwater Criteria ........................................................................................3-2 4.0 CONCEPTUAL SITE MODEL ...................................................................................... 4-1 4.1 AOPEC #3A (Former Heating Oil/Diesel USTs):.......................................................4-1 4.1.1 Data Quality Assurance ........................................................................................4-1 5.0 SITE INVESTIGATION CONCLUSIONS ...................................................................... 5-1 6.0 LIMITATION OF WORK PRODUCT ............................................................................. 6-1 westonandsampson.com i
  5. Page 11 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 11 of 126 Final Site Investigation Report EVERSOURCE ENERGY LIST OF FIGURES Figure 1 ................................................................................................................ Site Location Plan Figure 2 ............................................................................................................................... Site Plan Figure 3 ................................................................. Groundwater Flow Direction - December 4, 2020 Figure 4 ..................................................... AOPEC-3A - Former Heating Oil & Diesel USTs Site Plan LIST OF TABLES Table 1 ...................................................................................... Summary of Site Aquifer Parameters Table 2 ..........................................................................................Private Drinking Water Well Survey Table 3 ................................................... Simsbury AWC Reported Spills (Search Period 1994-2017) Table 4 ........................................................................ Summary of Soil Analytical Data – AOPEC-3A Table 5 ......................................................... Summary of Groundwater Analytical Data – AOPEC-3A LIST OF APPENDICES Appendix A ................................................................... Water Quality Classifications – Simsbury, CT Appendix B ..................................................................................................................... Boring Logs Appendix C ............................................................................................... Laboratory Analytical Data westonandsampson.com ii
  6. Page 12 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 12 of 126 Final Site Investigation Report EVERSOURCE ENERGY 1.0 INTRODUCTION 1.1 Project Objective Eversource Energy Service Company (Eversource) has retained Weston & Sampson Engineers, Inc. (Weston & Sampson) to provide Licensed Environmental Professional (LEP) assistance for the Former Simsbury Area Work Center (AWC) located at 34 Hopmeadow Street in Simsbury, Connecticut (the “Site”). See Figure 1 for Site location. Weston & Sampson has prepared this Final Site Investigation (FSI) Report to provide information relative to the completion of investigation (COI) for AOPEC #3A. The associated COI form is being submitted simultaneously with this document. 1.2 Applicability On January 18, 2002, an Environmental Condition Assessment Form (ECAF) was submitted with a Form III Property Transfer Act filing for the Site, which was acknowledged as complete by the Connecticut Department of Environmental Protection (a.k.a. Department of Energy and Environmental Protection, (CT DEEP) on January 18, 2002. On February 26, 2002, the CT DEEP subsequently notified The Connecticut Light and Power Company (CL&P) (d/b/a Eversource) that an environmental professional licensed pursuant to Connecticut General Statutes (CGS) Section 22a-133v may verify the investigation and remediation of the Site. Eversource is listed as the certifying party on the Form III filing. Site investigation activities have been performed in conformance with the CT DEEP Site Characterization Guidance Document (SCGD) dated September 2007, revised December 2010. A review of Site investigation activities performed prior to the SCGD was evaluated against the SCGD. Soil and groundwater results were compared to applicable CT DEEP Remediation Standard Regulations (RSRs) cleanup criteria, as appropriate. These criteria include soil (Direct Exposure Criteria and Pollutant Mobility Criteria), groundwater (Groundwater Protection Criteria), surface water (Surface Water Protection Criteria), and volatilization criteria (Groundwater Volatilization Criteria). westonandsampson.com 1-1
  7. Page 13 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 13 of 126 Final Site Investigation Report EVERSOURCE ENERGY 2.0 SITE INFORMATION AND INITIAL CONCEPTUAL SITE MODEL 2.1 Physical Description The Site parcel occupies approximately 60 acres. Site features are shown on Figure 2. The Site property is subdivided into three general areas: Section A is the northern undeveloped area, Section B is the middle area formerly occupied by Eversource (currently occupied by Curaleaf), and Section C is the southern area occupied by a residential development. The middle area of the Site is developed with two single-story buildings with associated loading docks and platforms, totaling approximately 49,589 square-feet. The buildings were formerly referred to as the west main service building and east main service building and are constructed of brick and steel atop a concrete slab-on-grade foundation. Although the structures appear to be one contiguous building, they are two separate structures which were constructed in 1960 and 1986. In addition, the Site is developed with three separate former garages/maintenance buildings. These structures total approximately 14,159 square-feet and are constructed of brick and steel atop concrete slab-on-grade foundations with concrete center platforms. They were constructed between 1960 and 1986. The northeastern portion of the property has been recently redeveloped into a self-storage facility. The northwestern portion of the property is currently landscaped or vegetated/overgrown fields. Tobacco barns were historically located at the boundaries of this portion of the Site. The southern portion has been developed residential use (zoned for Planning Area Development). No historical construction has been identified in this area of the Site. The combined northern and southern portions of the Site encompass approximately 40 acres. 2.2 Site History Historic use of the property included agricultural use from 1926 to 1958 by The American Sumatra Tobacco Corporation. The Hartford Electric Light Company occupied the Site from 1958 to 1982, when the utility consolidated into CL&P. CL&P owned the property until it was transferred in 2002 to Infinity IV, LLC. The Site was utilized as an AWC for office and warehouse space, fleet service, maintenance, construction testing, and for the storage of electrical equipment and utility poles from 1958 through early 2017 when Eversource vacated the Site. Curaleaf, manufacturers and distributors of cannabis, took occupancy of the Site in early 2020. 2.3 Physiographic Setting The regional topography slopes very gently from north to south towards a stormwater drainage swale located along the southern portion of the Site (Figure 2). Stormwater is conveyed from the on-site drainage swale southward approximately 1,200 feet (ft.) to Nod Brook (Class A surface water body), which discharges to the Farmington River (Class B surface water body). 2.4 Site Geology and Hydrogeology The Site surficial geology is comprised of sand and gravel overlying fine sediments. The sand and gravel consist of less than 20 ft. of horizontally deposited material overlying a thicker layer of thinly bedded fines (fine sand and silt, possibly clay) and is described as a fluvial melt-water terrace deposit (glacial outwash) over lake bottom sediments. Bedrock at the Site is mapped as the New Haven Arkose, a reddish poorly sorted arkose. Previous reports stated that depth to bedrock is greater than 50 ft. below westonandsampson.com 2-1
  8. Page 14 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 14 of 126 Final Site Investigation Report EVERSOURCE ENERGY ground surface (bgs). Bedrock was not encountered in Weston & Sampson’s Site investigation borings, which were advanced to a maximum depth of 15 ft. bgs. Groundwater at the Site is classified as GA and is typically observed between 8 to 16 ft. bgs. Based on the 2001 Phase II ESA, depth to water at monitoring well MW-A1R1 located within AOPEC 3A was measured at 13.51 ft. bgs, Groundwater levels recorded from MW-A1R1 during subsequent gauging events (through 2019) ranged from 9.15 to 14.75 ft. bgs. Hydraulic conductivity and transmissivity at the Site were determined in the field in May 1990 by Leggette, Brashears & Graham, Inc. (LBG). A summary of the field data and calculated average hydraulic conductivity for the Site is presented in Table 1. Based on the LBG field data, the estimated average hydraulic conductivity in the upper 13.5 ft. of overburden sandy aquifer is 1.57 x 10-1 centimeters per second (cm/sec). The estimated hydraulic conductivity of the lake bottom deposits is approximately 10-4 to 10-6 cm/sec based on published information1. As depicted in Figure 3, groundwater flow direction at the Site is to the south-southeast. The groundwater horizontal hydraulic gradient is approximately 0.002 ft./ft. 2.5 Well Receptor Survey Weston & Sampson conducted a private water supply well survey for the Site in 2023. This work was conducted in accordance with the Connecticut Department of Energy and Environmental Protection (CT DEEP) Water Supply Well Receptor Survey Guidance Document (September 2009, revised January 2015). The Site and surrounding properties are located in areas that are serviced by the Avon Water Company or the Aquarion Water Company. Properties at the Site are connected to municipal water. The survey included contacting the Aquarion Water Company and the Avon Water Company, a review of CT DEEP files for well completion reports and conducting a windshield survey of properties located within 500 ft. of the Site. A summary of the private drinking water well survey is presented in Table 2. Based on the results of the survey, nine private drinking water supply wells are present within 500 ft. of the Site boundary. The nearest area of contribution to a public water supply well is located greater than 1,500 ft. from the north of the property, which is hydraulically upgradient of the Site. A copy of the CT DEEP Water Quality Classifications Map for Simsbury, Connecticut is presented in Appendix A. As depicted on this map, the CT DEEP classifies the groundwater beneath the Site and in the general vicinity of the Site as “GA”. GA-classified groundwater indicates that the water resource is suitable for drinking and other domestic uses without prior treatment (CT DEEP, August 2010). 2.6 Fate and Transport Regulated materials were historically stored at the AWC and primarily consisted of petroleum products (i.e., hydraulic oil, motor oil, and dielectric fluid). These were historically located along the eastern portion of the Site where AOPECs #2, #3, and #4 are situated. Small quantities of petroleum (less than 100 gallons) were also stored at the AWC and in utility line trucks. All former above ground storage tanks (ASTs) and underground storage tanks (USTs) have been removed from the Site. Eversource Spill Reports were reviewed from a time period of 1994 to 2017 and are summarized in Table 3. The spills reported were petroleum based (dielectric fluid-PCB and non-PCB oils, motor oil, diesel fuel, and gasoline) and were promptly cleaned up. The spills occurred within AOPECs #3, #4, and #5 onto paved surfaces. Where catch basins were located within the area of the spill, the spill remedial response action included placing absorbent booms at the catch basins to create a berm and removal 1 Table 4.6, pg. 98, Applied Hydrogeology, 3rd Edition, C.W. Fetter, 1994. westonandsampson.com 2-2
  9. Page 15 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 15 of 126 Final Site Investigation Report EVERSOURCE ENERGY of sediment and materials from the catch basin outfall. Given the nature of each spill, response, and cleanup, it is likely that the environmental impact due to these spills was minimal. A release of petroleum products has been documented for AOPECs #3A through 3H (former USTs). Petroleum product has been recovered from the subsurface in some of these areas (AOPEC #3B) and groundwater monitoring has been performed within all the AOPEC #3 areas. 2.7 Previous Investigation Summary Numerous investigations were previously conducted at the Site. At the time of the ECAF filing, the following reports had been prepared: • • • Conceptual Design of the Groundwater Recovery and Treatment Systems at the Simsbury Area Work Center Facility, LBG, September 1990. Phase I Environmental Site Assessment Report, CL&P Service Center Site, Carroccio-Covill & Associates, LLC (CCA), February 2001. Phase II Environmental Site Assessment Report, CL&P Service Center Site, CCA, November 2001. After submittal of the ECAF, the following additional reports were completed: • • • • • • Phase II Environmental Site Assessment Addendum for the CL&P Service Center Site, CCA, December 12, 2001. Simsbury Area Work Center: 2002 through 2021 Annual Environmental Summary Reports (20 submittals), Weston & Sampson, prepared April 2003 through April 2022. Final Site Investigation Report - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., February 2015. Completion of Investigation Transmittal Form - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson, February 2015. Final Site Investigation Report - AOPECs #3E, #6A and #10, Weston & Sampson Engineers, Inc., December 2018. Completion of Investigation Transmittal Form - AOPECs #3E, #6A and #10, Weston & Sampson, December 2018. Each of the reports listed above were previously submitted to CT DEEP. Copies of the Phase I, Phase II and Phase II Addendum reports were submitted to CT DEEP with the 2002 Annual Environmental Summary Report in April 2003. 2.8 Site Wide Areas of Potential Environmental Concern (AOPECs) As detailed in previous CT DEEP submittals, numerous AOPECs have been identified throughout the Site. A list of these AOPECs, along with their current status, is presented below. Details regarding Site investigations performed for AOPEC #3A are provided in Section 4.0. • AOPECs #1A, 1B and 1C - Current and Former Subsurface Septic Disposal Systems: A FSI Report was submitted for AOPEC #1A in February 2015 and the investigation work is considered complete. Investigations at #1B and 1C are on-going. westonandsampson.com 2-3
  10. Page 16 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 152 Page 16 of 126 Final Site Investigation Report EVERSOURCE ENERGY • AOPECs #2A and 2B - Current and Former Subsurface Hydraulic Vehicle Lifts: Investigations for these AOPECs are on-going. • AOPECs #3A through 3H - Former Petroleum Product USTs: A FSI Report was submitted for AOPEC #3E in December 2018 and the investigation work is considered complete. Investigations at 3B, 3C, 3D, 3F and 3G are on-going. Details regarding investigations performed in AOPEC #3A are provided in Section 4.0. • AOPEC #4: Transformer Storage Areas and Loading Docks: Soil remediation was completed in December 2020. Post-remediation compliance groundwater monitoring in this AOPEC is ongoing. • AOPEC #5: Utility Pole Storage Areas: Investigation in this AOPEC is on-going. • AOPECs #6A and 6B - Stormwater Discharge Locations: A FSI Report was submitted for AOPEC #6A in December 2018 and the investigation work is considered complete. Investigation of AOPEC #6B is on-going. • AOPECs #7A, 7B, and 7C - Historical Agricultural Use: A FSI Report was submitted for these AOPECs in February 2015 and the investigation work is considered complete. • AOPECs #8 - Former Railroad Track and Spur: A FSI Report was submitted for this AOPEC in February 2015 and the investigation work is considered complete. • AOPEC #9 - Soil Pile: A FSI Report was submitted for this AOPEC in February 2015 and the investigation work is considered complete. • AOPECs #10A and 10B - Diesel Spills: A FSI Report was submitted for these AOPECs in December 2018 and the investigation work is considered complete. westonandsampson.com 2-4

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)