Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Words on different pages
  1. Page 5 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 5 of 578 ANNUAL REPORT EVERSOURCE ENERGY LIST OF FIGURES Figure 1............................................................................................................................... Site Location Plan Figure 2.................................................................................................................AOPEC 4 Remediation Plan Figure 2A ................................ AOPEC 4 ETPH Remediation Area – Confirmatory Soil Sample Location Plan Figure 2B ........................ AOPEC 4 PCB/ETPH Remediation Area – Confirmatory Soil Sample Location Plan Figure 3................................................................................................... Groundwater Sample Location Plan Figure 4................................................................................. Groundwater Flow Direction – March 18, 2020 Figure 5............................................................................ Groundwater Flow Direction – December 4, 2020 Figure 6................................................................................................................. Proposed Project Schedule LIST OF TABLES Table 1 .................................................................. Summary of Confirmation Soil Sample Analytical Results Table 2A ................................................................. Summary of Groundwater Analytical Data – AOPEC #1B Table 2B.................................................................. Summary of Groundwater Analytical Data – AOPEC #1C Table 2C ..................................................................Summary of Groundwater Analytical Data – AOPEC #2A Table 2D ................................................................. Summary of Groundwater Analytical Data – AOPEC #2B Table 2E ..................................................................Summary of Groundwater Analytical Data – AOPEC #3A Table 2F .................................................................. Summary of Groundwater Analytical Data – AOPEC #3B Table 2G ................................................................. Summary of Groundwater Analytical Data – AOPEC #3C Table 2H ................................................................ Summary of Groundwater Analytical Data – AOPEC #3D Table 2I ................................................................... Summary of Groundwater Analytical Data – AOPEC #3F Table 2J.................................................................. Summary of Groundwater Analytical Data – AOPEC #3G Table 2K .................................................................... Summary of Groundwater Analytical Data – AOPEC #4 westonandsampson.com ii
  2. Page 6 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 6 of 578 ANNUAL REPORT EVERSOURCE ENERGY Table 2L .................................................................... Summary of Groundwater Analytical Data – AOPEC #5 Table 2M ................................................................ Summary of Groundwater Analytical Data – AOPEC #6B Table 3 .......................................................................................................... Groundwater Elevations – 2020 LIST OF APPENDICES Appendix A ................................................................................... Soil Laboratory Analytical Data – AOPEC 4 Appendix B ................................................................................................... Waste Disposal Documentation Appendix C ............................................................................................ Groundwater Sampling Data Sheets Appendix D .................................................................................... Groundwater Laboratory Analytical Data westonandsampson.com iii
  3. Page 7 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 7 of 578 ANNUAL REPORT Eversource Energy EXECUTIVE SUMMARY Eversource Energy Service Company retained Weston & Sampson Engineers, Inc. (Weston & Sampson) to provide Licensed Environmental Professional (LEP) services for the former Simsbury Area Work Center (the “Site”) located at 34 Hopmeadow Street in Simsbury, Connecticut. Weston & Sampson has prepared this 2020 Annual Report to document the status of Site investigations and remediations. This report is being submitted in accordance with the requirements set forth by the Connecticut Department of Energy and Environmental Protection (DEEP) in a letter sent to The Connecticut Light and Power Company (CL&P) dated February 26, 2002. This Annual Report summarizes activities which have occurred at the Site over the last year and presents actions planned for the upcoming year. Specifically, nine Areas of Potential Environmental Concern (AOPECs) #1 through #9 were originally identified during the 2001 Phase I Environmental Site Assessment. AOPEC #10 was added as a result of two diesel fuel spills which occurred in early 2006. Subsequently, investigation activities have been completed and a LEP determined that no further actions were needed at AOPECs #7, #8, #9 and #10, and at portions of AOPECs #1 (#1A), #3 (#3E), and #6 (#6A). Final Site Investigation Reports and Completion of Investigation Transmittal Forms were prepared for these AOPECs and submitted to the DEEP in February 2015 and December 2018. Based on the results of additional activities performed in 2019 at AOPEC #3A, these investigations are now considered complete and no further actions are recommended. Submittal of a Final Investigation Report and Completion of Investigation Transmittal Form is anticipated to be prepared and submitted to DEEP in 2021 for AOPEC #3A. Based on the results of the remediation activities performed in 2020 at AOPEC #4 (transformer storage areas and loading docks), this remediation is now considered complete and no further actions are recommended except for post remediation groundwater monitoring. Remaining AOPECs #1B, #1C, #2A, #2B, #2C, #3B, #3C, #3D, #3F, #3G, and #5 are undergoing continued assessment and/or remediation activities, including soil assessment, groundwater monitoring, groundwater flow analysis, and data evaluation. westonandsampson.com ES-1
  4. Page 8 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 8 of 578 ANNUAL REPORT Eversource Energy 1.0 1.1 INTRODUCTION Scope of this Report Weston & Sampson is providing assistance to Eversource Energy Service Company on behalf of The Connecticut Light and Power Company dba Eversource Energy (CL&P) (collectively Eversource) for the investigation and remediation of historical releases at the former Simsbury Area Work Center (the “Site”). The sixty-acre property is located at 34 Hopmeadow Street in the Weatogue section of Simsbury, Connecticut (Figure 1). Previously, an Environmental Condition Assessment Form (ECAF) was submitted with a Form III Property Transfer Act filing for the Site, which was acknowledged as complete by the Connecticut Department of Energy and Environmental Protection (DEEP) on January 18, 2002. The DEEP subsequently notified CL&P on February 26, 2002, that an environmental professional licensed pursuant to Section 22a-133v of the Connecticut General Statutes may verify the investigation and remediation of the Site. CL&P is the certifying party to the transfer; however, they sold the property in December 2001 and have not occupied it since December 2016. The Site buildings have been repurposed for use by Curaleaf, the current property occupant. The southern portion was redeveloped for mixed commercial and residential use in circa 2016 and the northern portion remains undeveloped. This report documents activities that have occurred throughout 2020 and includes a summary of proposed activities and a schedule for 2021. westonandsampson.com 1-1
  5. Page 9 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 9 of 578 ANNUAL REPORT Eversource Energy 2.0 BACKGROUND A variety of investigations have been conducted at this Site. At the time of the ECAF filing (December 2001), the following reports had been prepared: • Conceptual Design of the Groundwater Recovery and Treatment Systems at the Simsbury Area Work Center Facility, Leggette, Brashears & Graham, Inc., September 1990. • Phase I Environmental Site Assessment Report, CL&P Service Center Site, Carroccio-Covill & Associates, LLC (CCA), February 2001. • Phase II Environmental Site Assessment Report, CL&P Service Center Site, CCA, LLC, November 2001. Subsequent to the submittal of the ECAF, additional investigation reports were completed: • Phase II Environmental Site Assessment Addendum for the CL&P Service Center Site, CCA, LLC, December 12, 2001. • Simsbury Area Work Center: 2002 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2003. • Simsbury Area Work Center: 2003 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., July 2004. • Simsbury Area Work Center: 2004 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., August 2005. • Simsbury Area Work Center: 2005 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., May 2006. • Simsbury Area Work Center: 2006 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2007. • Simsbury Area Work Center: 2007 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2008. • Simsbury Area Work Center: 2008 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2009. • Simsbury Area Work Center: 2009 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., May 2010. westonandsampson.com 2-1
  6. Page 10 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 10 of 578 ANNUAL REPORT Eversource Energy • Simsbury Area Work Center: 2010 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2011. • Simsbury Area Work Center: 2011 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2012. • Simsbury Area Work Center: 2012 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2013. • Simsbury Area Work Center: Environmental Investigation Report - AOPECs #1A, #5, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., January 2014. • Simsbury Area Work Center: 2013 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2014. • Simsbury Area Work Center: Final Site Investigation Report - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., February 2015. • Completion of Investigation Transmittal Form - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., February 2015. • Simsbury Area Work Center: 2014 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc. May 2015. • Simsbury Area Work Center: 2015 Annual Report, Weston & Sampson Engineers, Inc., April 2016. • Simsbury Area Work Center: 2016 Annual Report, Weston & Sampson Engineers, Inc., April 2017. • Simsbury Area Work Center: 2017 Annual Report, Weston & Sampson Engineers, Inc., April 2018. • Completion of Investigation Transmittal Form - AOPECs #3E, #6A and #10, Weston & Sampson Engineers, Inc., December 2018. • Simsbury Area Work Center: 2018 Annual Report, Weston & Sampson Engineers, Inc., April 2019. • Simsbury Area Work Center: 2019 Annual Report, Weston & Sampson Engineers, Inc., April 2020. All of the reports and documents listed above have been submitted to DEEP. Copies of the Phase I, Phase II and Phase II Addendum reports were submitted to DEEP along with the 2002 Annual Environmental Summary Report in April 2003. westonandsampson.com 2-2
  7. Page 11 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 11 of 578 ANNUAL REPORT Eversource Energy This Annual Report summarizes new soil and groundwater investigations, continuing groundwater monitoring activities, and on-going remedial efforts. Pertinent current data have been included in this report. Historical data remains on file and is available upon request. The following AOPECs were identified during the Phase I Environmental Site Assessment (ESA), along with the two diesel fuel spills in early 2006: • AOPEC #1: Current and former subsurface septic disposal systems; • AOPEC #2: Current and former subsurface hydraulic vehicle lifts; • AOPEC #3: Former underground storage tanks (USTs); • AOPEC #4: Former transformer storage areas and loading docks; • AOPEC #5: Former utility pole storage areas; • AOPEC #6: Three stormwater discharge locations; • AOPEC #7: The Site as a whole, due to historical agricultural use; • AOPEC #8: Former railroad track along the eastern border of the Site, and railroad spur on the east side of the central portion of the Site; • AOPEC #9: A “mound” (soil pile) located in the northeast corner of the southern portion of the Site; and • AOPEC #10: Two diesel fuel spills (2006) north of the service center building. These AOPECs were organized, as appropriate, into sub-sets. The AOPECs, with descriptions and identified contaminants of concern (COC), are discussed in the following section of this report. Note that in some cases there are overlapping AOPEC locations. westonandsampson.com 2-3
  8. Page 12 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 12 of 578 ANNUAL REPORT Eversource Energy 3.0 2020 ACTIVITIES The 2019 Annual Report outlined continued assessment and remedial activities that were planned and proposed for 2020. These activities included anticipated remediation at four AOPECs (#2B, #3B, #3F, and #4) to address extractable total petroleum hydrocarbon (ETPH) impacts and the completion of a PerformanceBased PCB cleanup at AOPEC #4 to address the presence of polychlorinated biphenyls (PCBs) in shallow soil greater than 1 milligram per kilogram (mg/kg). The 2019 annual report also included groundwater assessment activities associated with AOPECs #1B, #1C, #2A, #2B, #3B, #3C, #3D, #3F, #3G, #4, #5 and #6B, continued groundwater monitoring and flow analysis, and data evaluation. Additional activities including inspection, repair, redevelopment, and survey of existing groundwater monitoring wells was proposed in June 2020, after the 2019 Annual Report had been submitted to DEEP. The following describes the results of the 2020 assessment activities. 3.1 Well Inspection and Repair In recent years, several monitoring wells have been observed and noted to be in deteriorated condition and in need of repairs. Many of the monitoring wells are in high traffic areas and are completed as flush-mount curb boxes. As part of 2020 activities, Eversource requested Weston & Sampson conduct a well inspection and evaluate the condition of each of the flush mount monitoring wells located within asphalt paved areas to determine which ones needed repairs. Weston & Sampson performed the inspection concurrently with the June 2020 groundwater sampling event. On November 14, 15 and 16, 2020, Cummins EnviroTech, Inc. (CEI) of East Lyme, CT was mobilized to the Site to repair select wells. As needed, CEI trimmed the top of cracked or broken PVC risers and installed new road boxes as needed. One well, MW-7, which is not in the monitoring network, was observed to be in poor condition. Therefore, Weston & Sampson directed CEI to abandon this well in place to eliminate the likelihood of this well from serving as a potential migration pathway for surface contaminants. CEI removed the road box and concrete collar, pulled the well up approximately 3 to 4 feet and cut the PVC to be flush, filled the well screen with concrete, followed by silica sand and a two foot top cap of concrete, and finished the ground surface with cold patch. 3.2 Montioring Well Redevelopment and Surveying Weston & Sampson returned to the Site on November 19 and 20, 2020 to redevelop each of the repaired monitoring wells and any other monitoring wells that are typically gauged or sampled within paved areas of the Site. The following 19 monitoring wells were redeveloped:MW-2A, MW-6, MW-10, MW-11A, MW-15, MW-16, MW-101, MW-202, MW-203, MW-CCA4, MW-CCA5, MW-CCA6, MW-T1, MW-T2, MW-T3, MW-T5, MW-T6, MW-SA-SOUTH and MW-SA-NORTH. Weston & Sampson utilized a Waterra inertial pump and/or bailer using surging techniques to evacuate water, sediments and any entrained contaminants that potentially entered the well from the previous deteriorated well cap conditions or debris (e.g., PVC shavings) from well repairs. Weston & Sampson attempted to redevelop three additional wells, MW-4R, MW-8, and MW-CCA-3; however, they were found to be dry and could not be redeveloped. Weston & Sampson survey staff also conducted a well survey to locate each of the monitoring wells within the gauging or monitoring network and to obtain updated well top of casing elevation data. westonandsampson.com 3-1
  9. Page 13 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 13 of 578 ANNUAL REPORT Eversource Energy 3.3 AOPEC #4 Remediation As stated in the 2019 Annual Report, remediation of AOPEC #4 was planned for 2020 to address PCB impacts exceeding EPA criteria at one localized area and shallow ETPH impacts exceeding DEEP Remediation Standard Regulations (RSR) Residential Direct Exposure Criteria (RES DEC) and GA Pollutant Mobility Criteria (GA PMC) standards across a larger area of this AOPEC. The PCB excavation was completed as a Performance-Based cleanup in accordance with Title 40 CFR Section 761.61(b) and confirmatory sampling fulfilled the requirements of 40 CFR 761.61 Subpart O This AOPEC is located north of the former vehicle maintenance garage building and along the fence line (See Figure 2). Eversource mobilized Strategic Environmental Services, Inc. of Glastonbury, CT (SES) to perform the remedial activities on November 30, December 1, 2, 3, 4 and 7, 2020. SES’s work was overseen by Weston & Sampson field staff. After the planned excavation limits were achieved, Weston & Sampson collected confirmation samples for analytical testing. Details of the remedial activities by contaminant type including excavation dimensions, confirmatory sampling and analytical results and waste disposal documentation are included in the following sections. Analytical laboratory reports are included in Appendix A and analytical data is summarized in Table 1. 3.3.1 ETPH Remediation Sampling and Analytical Results Summary Initially, SES saw-cut and removed the asphalt layer within the proposed excavation area and placed the asphalt debris into triaxle dump trucks. The asphalt was transported to Recycled Concrete Products of Connecticut (Broad Brook, CT) where it was recycled. SES used a Hydrema excavator and Bobcat skid steer to conduct the soil excavation and removal work. Soil removed from the excavation was loaded into trucks and roll offs for off-Site disposal. The L-shaped ETPH remediation area measured 180 feet (ft.) long by 20 ft. wide and 3 ft. deep at its longest stretch and 32 ft. long by 22 ft. feet wide by 2 ft. deep for the remaining portion which overlaps the PCB removal areas discussed in Section 3.3.2. Evidence of impacts such as staining or odors was not observed in soils. Based on the size of the excavation, confirmation sidewall and bottom soil samples were generally collected at a frequency of approximately one every 20 ft (Figure 2A). Weston & Sampson collected a total of 37 confirmation soil samples, designated CS-E1 through CS-E29, CS-30, CS-33, CS-39, CS-43, CS-47, and CS-65, including two duplicate samples (DUP-E1 and DUP-E2) for quality assurance quality control (QA/QC) purposes. The letter “E” in the sample nomenclature represents a sample collected from only the ETPH-impacted area of the excavation; the remaining samples without the “E” designation indicate that the sample was collected for a dual purpose to address both ETPH and PCBs. Samples were submitted to Phoenix Environmental Laboratories, Inc. (Phoenix) located in Manchester, CT and analyzed for ETPH via the CT ETPH 8015D method. The open excavation was protected with erosion controls and temporary fencing connected to the existing fencing along the northern boundary of the excavation. ETPH was detected in 5 of the 37 ETPH confirmation soil samples at concentrations ranging from 73 to 180 milligram per kilogram (mg/Kg) which were below the 500 mg/Kg GA PMC and RES DEC. Consequently, the soil excavation successfully met the remedial goal, and no further excavation was needed to address EPTH impacts. 3.3.2 PCB Remediation Sampling Analytical Results Summary Based on the presence of PCBs greater than 1 mg/kg in one soil sample collected from AOPEC #4, a Performance-Based PCB cleanup in accordance with Title 40 CFR Section 761.61(b) was performed westonandsampson.com 3-2
  10. Page 14 of 578

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 141 Page 14 of 578 ANNUAL REPORT Eversource Energy and confirmatory sampling fulfilled the requirements of 40 CFR 761.61 Subpart O. As mentioned previously, the PCB-impacted soil area overlapped a portion of the ETPH-impacted area. This area of the excavation measured 32 ft. long by 22 ft. wide and 2 ft. deep. Following Subpart O requirements, Weston & Sampson collected a total of 56 confirmation soil samples, designated CS-30 to CS-82 including three duplicate samples (DUP-1, DUP-2 and DUP-3) for QA/QC purposes. Sidewall confirmation grab samples were collected at a depth of 1.0 ft bgs and bottom confirmation grab samples were collected at a depth of 2.0 ft bgs. All three blind duplicate samples were consistent with their parent samples (i.e., PCBs < detection limits). Figure 2B depicts the PCB/ETPH remediation area and associated confirmation sample locations. Samples were submitted to and analyzed by Phoenix for PCBs via EPA 8082A with Soxhlet extraction method 3540C and reported using DEEP RCP methods. PCBs were not detected in any of the soil samples above detection limits. Based on these results, no further excavation is needed to address PCB impacts. 3.3.3 Waste Disposal Documentation and Restoration Prior to the remedial excavation, SES prepared and implemented a sampling plan which included test pit excavations within the proposed ETPH and PCB remediation areas for pre-disposal characterization (Appendix B). Two composite soil samples were collected from four test pits in the ETPH area, and one composite sample was collected from two test pits in the PCB area. The analytical results were then used to determine suitable disposal facilities for the soil. Conducting pre-disposal characterization ahead of the remedial work also allowed for the live loading of excavated soil, resulting in a cleaner and more efficient process. After receipt of the pre-disposal analytical data, SES prepared waste profiles for Clean Earth of Connecticut (Plainville, CT) for the disposal of non-PCB impacted soils and US Ecology’s Wayne Landfill (Belleville, MI) for PCB-impacted soils. Twenty-three truckloads of non-PCB impacted soil (564.68 tons) was transported by SES to Clean Earth for disposal. PCB-impacted soils were live loaded into three roll offs (46.16 tons) with one trucked directly to Wayne Landfill. The other two roll offs were transported to Red Technologies in Portland, CT where they were subsequently off-loaded into a railcar and then transported to the Wayne Landfill. Disposal documentation, including waste disposal characterization laboratory analytical data and waste manifests, are provided in Appendix B. Restoration of the Site was performed by SES under the supervision of Eversource and included backfilling and compacting the excavation with certified clean gravel obtained from Wapping Sand & Gravel in Broad Brook, CT and processed stone provided by Herb Holden Trucking from a virgin quarry source in Westfield, MA (Appendix A). The excavation footprint will be repaved in the Spring of 2021. 3.4 Continued Groundwater Monitoring As proposed in the 2019 Annual Report, continued groundwater monitoring was performed in 2020. Groundwater samples were collected for laboratory analysis from 16 monitoring wells during the year. westonandsampson.com 3-3

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)