Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Words on different pages
  1. Page 22 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 22 of 618 ANNUAL REPORT Eversource Energy A groundwater sample was collected from a newly installed well, MW-102, at this boring. Analytical results indicated that PCBs were not detected above laboratory detection limits (Table 2G). One VOC, chloroform, was detected at a concentration that does not exceed the GWPC. Total barium and chromium were detected in MW-102 at concentrations that do not exceed the GPWC. ETPH was detected at a concentration of 0.32 mg/L, which exceeds the GWPC and SWPC. Based on the ETPH concentration detected in the new well at this AOPEC, in order to meet quarterly monitoring requirements for RSR verification, MW-102 will be sampled on a quarterly basis in 2020 for ETPH. Based on the absence of PCBs in soil and groundwater, and low levels of metals in soil and groundwater, these parameters can be eliminated from future groundwater monitoring. VOCs were not present in soil, however, based on the detection of chloroform in groundwater, we recommend conducting additional quarterly monitoring of VOC analysis in order to rule out this constituent as a COC for this AOPEC. AOPEC #3D: This AOPEC comprises former UST L-14, which is reported to have contained heating oil. Soil testing within this AOPEC was not completed after the tank was removed. Investigations completed in 2001 revealed ETPH impacts in soils, but below RSR criteria. Additional testing has been necessary to demonstrate compliance with the RSRs for LEP verification. Two soil borings (B311 and B312) were advanced downgradient of the UST grave in 2017 to confirm the prior 2001 results and provide additional test data. One soil sample was analyzed from each boring, with the sampling interval targeting the depth of the former UST (estimated at 6 to 12 ft bgs). Soil samples were analyzed for VOCs, SVOCs, and ETPH. Results indicated that VOCs and SVOCs were not detected. ETPH was detected in each of the soil samples, but at concentrations below RSR criteria. Monitoring well MW-6 was used to evaluate groundwater in this AOPEC in 2017. A sample collected in May 2017 was tested and analyzed for ETPH. ETPH was not detected above laboratory reporting limits. Soil investigation activities are considered complete in AOPEC #3D, however, other COCs were detected in soil at concentrations below RSR criteria. These COCs were not previously monitored in groundwater from this AOPEC. In 2018, one round of sampling (March) was performed for wells MW-6 and MW-4R. Monitoring well MW-4R is located downgradient of this AOPEC. The samples were analyzed for ETPH, SVOCs and VOCs. VOCs and SVOCs were not detected. ETPH was detected, but at concentrations that do not exceed RSR criteria (Table 2H). Although favorable results were achieved in 2018, more data was needed to demonstrate RSR compliance for LEP verification. Therefore, in 2019, quarterly groundwater samples were collected from monitoring wells MW-4R and MW-6. ETPH and SVOCs or PAHs were collected quarterly at MW-6. VOCs were collected from MW-6 in June, September and December to obtain three more quarters of data for this well. Blind duplicate samples were collected from monitoring well MW-6 during the March, June and September events for QA/QC purposes. ETPH, VOCs, SVOCs or PAHs were collected in the March and June quarterly events for MW-4R. However, westonandsampson.com 4-8
  2. Page 23 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 23 of 618 ANNUAL REPORT Eversource Energy MW-4R was dry in September and December, therefore groundwater samples were not collected from this well during these quarters. VOCs and PAHs/SVOCs were not detected above laboratory detection limits in any of the samples collected from MW-6 (Table 2H). ETPH was detected in each of the samples collected from MW-6 (including in the duplicate samples) at concentrations ranging from 0.15 mg/L to 9.1 mg/L. The detected ETPH concentrations from MW-6 in March and June (including the duplicate samples) exceed the GWPC and SWPC. The detected ETPH concentrations in MW-6 from September and December 2019 did not exceed the GWPC or SWPC. VOCs and SVOCs/PAHs were not detected in the March or June sampling quarters from MW-4R. ETPH was detected in both the March and June sampling quarters at MW-4R. The March ETPH concentration of 0.26 mg/L exceeded the GWPC and SWPC. Based on the cumulative data, VOCs and SVOCs/PAHs are in compliance in well MW-6, as four quarters have been met for VOCs (March 2018, June 2019, September 2019 and December 2019) and SVOCs/PAHs (March 2018, March 2019, June 2019, September 2019 and December 2019). Accordingly, these parameters can be discontinued from future monitoring at MW-6. Although recent favorable results were achieved in September and December 2019 for ETPH at MW-6, more favorable ETPH data is needed at this well before we can discontinue testing at this well and close out this AOPEC. Similarly, additional ETPH, VOC and PAH data are needed at MW-4R before sampling can be discontinued. For these reasons, Weston & Sampson proposes continuing quarterly monitoring for ETPH at both wells in 2020, and quarterly monitoring for VOCs and PAHs at MW-4R in 2020. Weston & Sampson also proposes performing an ETPH fingerprint analysis on groundwater samples retrieved from both wells in 2020 to evaluate if the petroleum detections are related to this AOPEC (i.e. are they fuel oil related hydrocarbons) or if they are related to other nearby source areas (i.e. from AOPEC 3F). AOPEC #3F: This AOPEC comprises former USTs B-2 (leaded gasoline), C-3 (unleaded gasoline), D-4 (unleaded gasoline), and E-5 (diesel fuel). A groundwater pump and treat system was historically operated at this AOPEC beginning in 1990 and was shut down in June 2003. Natural attenuation monitoring is ongoing. Additional testing has been needed to demonstrate compliance with the RSRs for LEP verification. In 2017, six soil borings (B319 through B324) were advanced at and downgradient of the UST graves (Figure 5). One soil sample was analyzed from each boring, with the sampling interval targeting the depth of the former USTs (estimated at 8 to 12 ft bgs). Soil samples were analyzed for VOCs and ETPH. Analytical results indicated that VOCs were not detected (Table 1D). ETPH was detected in all but one soil sample. ETPH in sample B321 10-12 ft bgs (760 mg/kg) exceeded RSR criteria. Additional delineation sampling was conducted in early 2018 at AOPEC #3F. Ten borings (B608 through BB617) were advanced around previous boring B321 (Figure 5). Multi-depth samples from 8 to 10, 10 to 12 and 12 to 14 ft bgs were collected from each of the borings. Select samples were submitted for ETPH analysis, while others were placed on hold pending receipt of the laboratory results. ETPH was detected in most of the soil samples at concentrations ranging from 12 mg/kg to 2,000 mg/kg (Table 1D). The detected ETPH concentration of 2,000 mg/kg westonandsampson.com 4-9
  3. Page 24 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 24 of 618 ANNUAL REPORT Eversource Energy from sample B613C (12-14 ft bgs) exceeds RSR criteria. No other ETPH exceedances were present. Groundwater samples were collected from monitoring wells MW-10 and MW-11A in March, MW2A in July, and MW-4R in September 2017 (Figure 7). The samples from MW-10, MW-11A and MW-4R were analyzed for VOCs, while the sample from MW-2A was analyzed for ETPH. VOCs and ETPH were not detected in any of the groundwater samples. Groundwater monitoring continued in 2018 to track natural attenuation. Wells MW-2A, MW-10, MW-11A, and MW-4R were sampled in March for VOCs and ETPH. One VOC, chloroform, was detected in well MW-10 at a concentration below RSR criteria (Table 2I). This compound was not previously detected in this well or the other three wells. ETPH was detected in all four wells, but only exceeded RSR criteria in MW-2A. Figures 13 and 14 illustrate BTEX trends in MW-4R and MW-11A from this AOPEC. In 2019, additional soil sampling was performed for this AOPEC to further delineate ETPH impacts in efforts to help refine soil volume estimates in advance of anticipated further remedial activities. Four borings were advanced, including returning to three former boring locations (B319A, B320A and B322A) to obtain additional vertical samples, and one new boring (B319W) located west of former boring B319 to obtain horizontal and vertical data to delineate ETPH impacts observed at boring B613C from 12 to- 14 ft bgs (Figure 5). Multi-depth sampling was conducted at these new boring locations at and below the 12 to- 14 ft bgs sampling interval. Results revealed ETPH was detected in half of the samples at concentrations that do not exceed the RES DEC, I/C DEC or GA PMC (Table 1D). Based on these results, the horizontal extent of ETPH impacts has been defined. Given the anticipated future remediation in this AOPEC, monitoring wells MW-2A, MW-10, MW11A, and MW-4R were sampled in the March 2019 sampling quarter to track ETPH concentrations. Additionally, analysis for VOCs, PAHs and total lead were included, as the USTs were used for gasoline and diesel fuel storage. VOCs, PAHs and total lead were not detected in any of the wells (Table 2I). ETPH was not detected above laboratory detection limits in MW-2A. ETPH was detected in monitoring wells MW-4R (0.26 mg/L), MW-10 (0.37 mg/L) and MW-11A (0.30 mg/L). The detected concentrations exceed the GWPC and SWPC. In 2020, Weston & Sampson proposes collecting one round (March) of groundwater samples for ETPH at monitoring wells MW-2A, MW-10, MW-11A, and MW-4R to continue tracking ETPH concentration trends pending remediation. Weston & Sampson recommends discontinuing sampling these wells for VOCs, PAHs and total lead, given that these compounds were not detected in any of the wells in 2019. However, these parameters should be included in post remediation sampling. AOPEC #3G: This AOPEC comprises a possible unknown UST, as shown on an historic Site map. The Phase II ESA Report documents completion of one boring (B-45) in this AOPEC, with soil analysis of two samples for VOCs, SVOCs, PCBs, ETPH, and RCRA 8 metals (Figure 6). Based on the Phase II ESA Report, the only parameter detected was SPLP barium at a concentration of 0.42 mg/L, which is below the GA PMC (Table 1E). westonandsampson.com 4-10
  4. Page 25 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 25 of 618 ANNUAL REPORT Eversource Energy In 2019, additional soil and groundwater investigations were performed for this AOPEC to support the findings of the Phase II ESA. A soil sample from boring B-702 was collected from 8 to- 10 ft bgs at the presumed bottom depth of the former UST. PCBs, VOCs, SVOCs and ETPH were not detected above laboratory detection limits (Table 1E). ETPH was detected at a concentration (9.9 mg/kg) that does not exceed the RES DEC, I/C DEC or GA PMC. A fingerprint analysis to identify the type of ETPH was unsuccessful, as the laboratory results did not match any of the reference standards. Three total and one leachable metal were detected at concentrations that did not exceed the RES DEC or GA PMC. Based on these soil results, further soil assessment is not needed. A groundwater sample was collected from a newly installed well, MW-101, at boring B-702. Analytical results indicated that PCBs were not detected above laboratory detection limits (Table 2J). One VOC, 2-butanone (MEK), was detected at a concentration that did not exceed the GWPC, SWPC or the RES volatilization criteria (VC) or I/C VC. Total barium, chromium and lead were detected in MW-101 at concentrations that did not exceed the GWPC or SWPC. ETPH was detected at a concentration of 0.30 mg/L, which exceeds the GWPC and SWPC. Based on the ETPH concentrations detected in the new well at this AOPEC, in order to meet quarterly monitoring requirements for RSR verification, MW-101 will need to be sampled and analyzed for ETPH on a quarterly basis in 2020. Based on the absence of PCBs in soil and groundwater, and low levels of metals in soil and groundwater, these parameters can be eliminated from future monitoring of this well. VOCs were not present in soil. However, based on the detection of MEK in groundwater, we recommend additional quarterly monitoring of VOC analysis in order to rule out this constituent as a COC for this AOPEC. 4.1.4 AOPEC #4: Transformer Storage Areas & Loading Docks This AOPEC is located at the northeast portion of the former CL&P area work center parcel. Investigations performed in 2016 to evaluate subsurface soils and the elevated concrete platforms formerly used for transformer storage indicated the presence of ETPH and PCBs at concentrations exceeding RSR criteria. Accordingly, further delineation to identify the vertical and horizontal extent of impacts was warranted for RSR compliance and LEP verification. Nine soil borings (B218A through B220A, B228A, B501, and B504 through B507) were completed within the footprint of this AOPEC in 2017. One soil sample was analyzed from each of the borings, with the sampling interval generally targeting shallow soils ranging from 0 to 5 ft bgs. All samples were tested for ETPH, with a select number of samples also tested for PCBs. The analytical results revealed no PCB impacts. ETPH impacts were defined as being located within the top foot of soil. New monitoring wells MW-201 and MW-203, and existing well MW-CCA5 were sampled in May 2017 to document groundwater quality relative to AOPEC #4 (Figure 7). Groundwater samples from MW-201 and MW-CCA5 were analyzed for PCBs, VOCs, and ETPH, while the sample from MW-203 was analyzed for ETPH. No compounds were detected above laboratory reporting limits. Overall, there was limited recent and historical groundwater data for AOPEC #4, and additional information was needed for an LEP to verify this AOPEC. In 2018, monitoring wells MW-201, MW- westonandsampson.com 4-11
  5. Page 26 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 26 of 618 ANNUAL REPORT Eversource Energy 203, MW-CCA4 and MW-CCA5 were sampled quarterly for ETPH. PCBs were also monitored quarterly in wells MW-201 and MW-CCA5, and during the first quarter (March) in wells MW-203 and MW-CCA4. PCBs were not detected in any of the samples. ETPH was detected in all but two samples at concentrations that do not exceed RSR criteria (Table 2K). Based on the planned PCB and ETPH remediation in this AOPEC, monitoring wells MW-CCA5 and MW-203 were sampled in March 2019 to track ETPH concentrations. Monitoring well MW203 was additionally analyzed for PCBs. ETPH was detected above laboratory detection limits in MW-203 at a concentration that did not exceed the GWPC or SWPC (Table 2K). ETPH was not detected above the laboratory detection limit in sample MW-CCA5. PCBs were not detected above laboratory detection limits in the sample collected from MW-203. In 2020, Weston & Sampson proposes collecting one round of groundwater samples for ETPH at monitoring wells CCA5, MW-203 and MW-CCA4 to continue tracking ETPH concentration trends pending remediation. Based on the lack of PCB detections in 2018 and 2019, Weston & Sampson recommends discontinuing testing for PCBs until after remediation is complete. 4.1.5 AOPEC #5: Utility Pole Storage Areas Treated wooden utility poles were previously stored on racks in the eastern portion of the facility. Previous environmental evaluations assessed some of the pole storage areas, but not all areas were investigated. Additional COCs were also identified that were not included in prior investigations. Based on this, additional soil investigations were conducted in 2016 to address these data gaps. SVOCs were detected in soil, but at concentrations that did not exceed applicable RSR criteria. One soil sample exhibited a total arsenic concentration that exceeded RSR criteria, and a second soil sample exhibited leachable arsenic (SPLP results), also exceeding RSR criteria. Monitoring well MW-16 was sampled in May and July 2017 to document groundwater quality in the former utility pole storage area. The May groundwater sample was analyzed for PCBs, VOCs, and ETPH. The July sample was analyzed for ETPH. PCBs and VOCs were not detected above laboratory reporting limits. ETPH was detected during the May event, but at a concentration below applicable RSR criteria. ETPH was not detected during the July event. Prior groundwater monitoring data from this AOPEC was limited, therefore, quarterly groundwater sampling was performed at wells MW-CCA3, MW-CCA4 and MW-16 in 2018 (Figure 7). Groundwater samples were analyzed for ETPH, SVOCs, RCRA 8 metals, hexavalent and trivalent chromium, and copper. Results indicated a detection of benzo(b)fluoranthene from MW-16 in the March sampling event at a concentration exceeding the GWPC (Table 2L). ETPH was detected throughout the samples, but at concentrations not exceeding RSR criteria. Total barium was detected in one well (MW-CCA3) for all three quarters sampled (no sample was collected in September due to dry conditions). Barium detected in MW-CCA3 did not exceed RSR criteria. Total copper, hexavalent and trivalent chromium were not detected. Based on the 2018 results, total RCRA 8 metals and total copper, hexavalent and trivalent chromium were eliminated from further testing in 2019. ETPH and SVOCs were monitored in westonandsampson.com 4-12
  6. Page 27 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 27 of 618 ANNUAL REPORT Eversource Energy 2019 on a quarterly basis in wells MW-CCA3, MW-CCA4, and MW-16 due to recurring detections of these compounds in these wells. SVOCs were not detected in any of the 2019 quarterly events in MW-16, however, ETPH was detected in the September 2019 sampling round but at a concentration that did not exceed the GWPC or SWPC (Table 2L). Based on these results, compliance for ETPH and SVOCs has been achieved in MW-16, as data obtained for four quarters over a two-year period demonstrates no exceedances of these compounds in this well. ETPH and SVOCs were not detected in the March or June 2019 quarters at MW-CCA3. This well could not be sampled in September and December 2019 because it was dry. Although favorable results exist for the May and June quarters, additional quarters are needed to meet compliance for September and December. Therefore, Weston & Sampson recommends collecting quarterly samples to be tested for ETPH and PAHs in 2020 at MW-CCA3. Also, a change from SVOC analysis to PAH analysis is deemed appropriate, as the one SVOC previously detected at this AOPEC, benzo(b)fluoranthene, is included in the reduced PAH laboratory method analytical list. SVOCs were not detected above laboratory detection limits in June, September or December 2019 at MW-CCA4. ETPH was detected in this well in the June 2019 sampling event, but at a concentration that did not exceed the GWPC or SWPC. ETPH was not detected above laboratory detection limits in the September or December 2019 quarters. Because MW-CCA4 was not sampled in March 2019, to achieve compliance for this well we propose collecting a sample in March 2020 to be analyzed for ETPH and PAHs. 4.1.6 AOPEC #6B: Stormwater Discharge Locations Stormwater originating from impervious areas on the eastern side of the Site discharges through a headwall in the southern portion of the Site. Soil investigations are considered complete at this AOPEC. However, additional groundwater investigations were needed because past sampling of well MW-CCA1 has been hampered by insufficient water, detections of barium and lead exceeding applicable RSR criteria in 2012 and 2013, and intermittent detections of VOCs and ETPH. Groundwater samples were obtained from monitoring well MW-CCA1 in March, July, September and December 2017, and analyzed for VOCs, ETPH, and total RCRA 8 metals (Figure 7). No VOCs were detected above laboratory reporting limits during the quarterly monitoring. ETPH was detected in March, but at a concentration below applicable RSR criteria. Total barium was detected in July, September, and December, but at levels not exceeding applicable RSR criteria. No other metals were detected during the quarterly monitoring. Favorable groundwater data for VOCs, ETPH and metals exists for this AOPEC from the four sampling events completed in 2017. Groundwater was tested for PCBs in 2001, 2002 and 2003, with all results below detection limits. However, because CL&P operations continued at the Site until 2017, and no PCB groundwater data had been generated since 2003, more current PCB data was needed before this AOPEC could be closed out. Accordingly, MW-CCA1 was sampled in March 2019 and tested for PCBs. Results revealed that PCBs were not detected (Table 2M). Based on all historical data, it is the opinion of the LEP that the investigation of this AOPEC is westonandsampson.com 4-13
  7. Page 28 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 28 of 618 ANNUAL REPORT Eversource Energy now complete. westonandsampson.com 4-14
  8. Page 29 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 29 of 618 ANNUAL REPORT Eversource Energy 5.0 SUMMARY OF PROPOSED ACTIVITIES Monitoring and gauging activities are planned at the Site in 2020. These activities include continued groundwater monitoring and flow analysis, and data evaluation. Remediation is also planned at this Site, however dates for this work is yet to be determined. Additional information regarding these proposed activities are presented below: Continued Groundwater Monitoring in 2020: Groundwater monitoring activities are expected to continue at AOPECs #2A, #2B, #3B, #3C, #3D, #3F, #3G, #4, and #5. The following sampling activities and laboratory analyses are planned in 2020: 2020 Groundwater Sampling Plan Well ID March June September MW-CCA3 E, P E, P E, P MW-CCA4 E, P MW-CCA5 E MW-TRW1 E MW-4R E, V, P E, V, P, EFP E, V, P MW-2A E MW-11A E MW-6 E E, EFP E MW-10 E MW-T3 E MW-T6 E MW-202 E MW-203 E MW-310 E MW-101 E, V E, V E, V MW-102 E, V E, V E, V V-VOCs, E-ETPH, P-PAHs, EFP-ETPH Fingerprint December E, P E, V, P E E, V E, V Continued Groundwater Flow Analysis in 2020: To further document groundwater flow directions, groundwater elevation monitoring will continue. It is proposed that monitoring wells MW-A1R1, MW-CCA1, MW-CCA2, MW-CCA3, MW-CCA4, MW-CCA5, MW-CCA6, MW-4R, MW-5, MW-6, MW-8, MW-10, MW-11A, MW-15, MW-T1, MW-T2, MW-T3, MW-T5, MW-T6, RW-1, TRW-1, MW-North, MW-South, MW-SA-NORTH(R), MW-SA-SOUTH(R), MW-301A, MW200, MW-201, MW-202 and MW-203 will be gauged semi-annually for groundwater flow determinations. Continued Product Recovery in 2020: Based on historical detections of LNAPL in product recovery wells TRW-1 and MW-T3, product recovery, if needed, will continue at these wells in 2020. westonandsampson.com 5-1
  9. Page 30 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 30 of 618 ANNUAL REPORT Eversource Energy Completion of Site Investigations in 2020 In 2020, pursuant to Section 22a-133v of the Connecticut Remediation Standard Regulations Weston & Sampson’s LEP will file a “Final Investigation Report” and “Completion of Investigation Transmittal Form” for AOPEC’s #3A and #6B to formally close out these AOPECs for further investigation and/or remediation. Proposed Schedule in 2020 Figure 15 presents the proposed project schedule for the upcoming year. This schedule outlines anticipated quarterly and annual sampling events. The annual environmental summary report will be submitted during the second quarter of 2020. Anticipated Remediation Remediation in the future is anticipated at the Site at four AOPECs (#2B, #3B, #3F, and #4) to address ETPH impacts. Impacts at AOPEC #2B are located at a depth of 6 to 10 ft bgs, at AOPEC #3B at a depth of 9 to 11 ft bgs, at AOPEC #3F at a depth of 10 to 12 ft bgs, and in AOPEC #4 within the top one foot of soil. Based on the presence of PCBs greater than 1 mg/kg in one soil sample collected from AOPEC #4, a Performance-Based PCB cleanup conducted in accordance with Title 40 CFR Section 761.61(b), is also planned. Closure documentation, including the collection of remediation confirmation samples, will be provided in a separate report. Groundwater remediation may also be needed at some AOPECs based on the results of groundwater investigations in 2019, and/or following soil remediation at select AOPECs. westonandsampson.com 5-2
  10. Page 31 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 31 of 618 FIGURES

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)