Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Words on different pages
  1. Page 9 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 9 of 618 ANNUAL REPORT Eversource Energy The following AOPECs were identified during the Phase I Environmental Site Assessment (ESA), along with the two diesel fuel spills in early 2006: AOPEC #1: Current and former subsurface septic disposal systems; AOPEC #2: Current and former subsurface hydraulic vehicle lifts; AOPEC #3: Former underground storage tanks (USTs); AOPEC #4: Transformer storage areas and loading docks; AOPEC #5: Utility pole storage areas; AOPEC #6: Three stormwater discharge locations; AOPEC #7: The Site as a whole, due to historical agricultural use; AOPEC #8: Former railroad track along the eastern border of the Site, and railroad spur on the east side of the central portion of the Site; AOPEC #9: A “mound” (soil pile) located in the northeast corner of the southern portion of the Site; and AOPEC #10: Two diesel fuel spills north of the service center building. These AOPECs were organized, as appropriate, into sub-sets. The AOPECs, with descriptions and identified contaminants of concern (COC), are discussed in the following section of this report. Note that in some cases there are overlapping AOPEC locations. westonandsampson.com 2-3
  2. Page 10 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 10 of 618 ANNUAL REPORT Eversource Energy 3.0 2019 ACTIVITIES The 2018 Annual Report outlined continued assessment and remedial activities that were planned and proposed for 2019. These activities included soil and/or groundwater assessment activities associated with AOPECs #1B, #1C, #2A, #2B, #3A, #3B, #3C, #3D, #3F, #3G, #4, #5 and #6B, continued groundwater monitoring and flow analysis, and data evaluation. The following describes the results of the 2019 assessment activities. 3.1 Subsurface Investigation Previous soil investigations of the aforementioned AOPECs occurred in 2001, 2003, 2016, 2017 and/or 2018. Based on a review of these investigations, additional soil testing was deemed necessary in 2019 at five of these AOPECs to continue to evaluate these areas in accordance with DEEP’s Site Characterization Guidance Document (SCGD) in support of final LEP verification. 3.1.1 Soil Investigation – July 2019 On July 25 and 26, 2019, a Geoprobe drill rig operated by Cummins EnviroTech, Inc. (CEI) of East Lyme, CT was mobilized to the Site to advance soil borings in AOPECs #2B, #3B, #3C, #3F and #3G. A total of sixteen soil borings were advanced throughout AOPECs #2B, #3B and #3F in order to further delineate the horizontal and/or vertical extent of petroleum impacts to refine soil volume estimates prior to planned remedial excavation activities. One soil boring each was advanced in each tank grave in AOPECs #3C and #3G to provide supplemental analytical data to support the 2001 Phase II ESA investigation, which indicated that releases had not occurred from these former USTs. Additional COCs associated with these AOPECs were identified and were either 1) not tested during the 2001 Phase II ESA or 2) not previously addressed at an appropriate sampling depth to assess these APOECs (i.e. near estimated tank bottoms). Furthermore, confirmation sampling from the tank grave after the tanks were removed has not been found. Borings that were advanced adjacent to existing boring locations to obtain vertical delineation samples were designated with the same numerical identification scheme as the existing boring followed by the letter “A”. New delineation boring locations to obtain horizontal and vertical samples were designated with the same numerical identification scheme as the existing boring followed by the letter indicating the direction of the new boring from the existing boring, i.e. “W” for west, “E” for east, “N” for north and “S” for south. The upper four feet of each new soil boring not adjacent at an existing boring (7 total) was pre-cleared for subsurface utilities utilizing soil vacuum extraction technologies supplemented with air knife equipment. Information pertaining to these soil borings, including sampling depth and COCs, is summarized in the following table: westonandsampson.com 3-1
  3. Page 11 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 11 of 618 ANNUAL REPORT Eversource Energy AOPEC Boring ID Sampling Intervals (ft bgs) COCs 2B B39A and B310N 8-10; 10-12 ETPH 3B B325A, B326A, B327A, B328A, B3238E, B328S, B328W, B329A, B330A, B330W 10-12; 12-14 (B325A, B329A) 8-10; 10-12 (B326A, B327A) 6-8; 12-14 (B328A, B330A) 8-10; 10-12 (B328E, B328S, B328W) 8-10; 10-12; 12-14 (B330W) ETPH 3C B701 8-10 PCBs, VOCs, SVOCs, ETPH, TPH plus fingerprint analysis, Total and SPLP RCRA 8 Metals 3F B319A, B319W, B320A, B322A 12-14; 14-16 (B319A, B320A) 10-12; 12-14 (B319W, B322A) ETPH 9-10 PCBs, VOCs, SVOCs, ETPH, TPH plus fingerprint analysis, Total and SPLP RCRA 8 Metals 3G B702 ETPH = Extractable Total Petroleum Hydrocarbons VOCs = Volatile Organic Compounds SVOCs = Semi-Volatile Organic Compounds PCBs = Polychlorinated Biphenyls RCRA = Resource Conservation and Recovery Act SPLP = Synthetic Precipitation Leaching Procedure All borings were located in paved areas of the Site which contained approximately six inches of asphalt. Beneath the asphalt, underlying soils consisted of brown, fine to medium sand with little gravel and silt. Groundwater was encountered in each of the borings (except B310N, B319W B325A, B328S and B328W) at depths varying from 8 feet to 12 feet below ground surface (ft bgs). Evidence of a release, such as staining or odors, was not observed in any of the soil borings. westonandsampson.com 3-2
  4. Page 12 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 12 of 618 ANNUAL REPORT Eversource Energy A calibrated photoionization detector (PID) was used to screen soil for the presence of volatile organic vapors (VOVs) at approximately six-inch intervals throughout the Geoprobe sampling sleeves. No PID readings above background (0.0 parts per million) were observed in any of the borings advanced during this investigation. Multi-depth sampling was conducted at each boring advanced in AOPECs #2B, #3B and #3F. Sampling intervals were based on results of prior sampling intervals and are specific to each location. Up to three soil sampling intervals were collected from AOPECs #2B, #3B and #3F, however, only the first two were submitted for analysis. The third (deepest sampling interval) was submitted to the lab and placed on hold pending review of the analytical results of the upper two samples. Only one sample collected from the deepest sampling interval, BB330W 12-14’, was activated for analysis based on the shallower sample interval results. Each of the soil samples from these three AOPECs were stored on ice and shipped for ETPH analysis under chain-ofcustody protocols to Con-Test Analytical Laboratory (Con-Test), in East Longmeadow, MA, a Connecticut-certified laboratory. One soil sample was collected from each boring advanced in AOPECs #3C and #3G. The samples were collected at a depth at or below the estimated bottom depth of the former USTs and above the water table. As in the past, Weston & Sampson followed the DEEP “Guidance for Collecting and Preserving Soil and Sediment Samples for Laboratory Determination of Volatile Organic Compounds” during collection of VOC soil samples. The soils samples from each of these AOPECs was submitted to Con-Test to be analyzed for ETPH, PCBs, VOCs, SVOCs, TPH (including fingerprint analysis to evaluate the origin of the hydrocarbon), and total and SPLP RCRA 8 metals. Soil sample laboratory analytical results are summarized in Tables 1A through 1E. Soil sample laboratory analytical reports are provided in Appendix B. Figures 2 through 6 illustrate soil boring locations in AOPECs #2B, #3B, #3C, #3F and #3G, respectively. Boring logs are included in Appendix A. 3.1.2 Groundwater Investigation – July 2019 Additional groundwater assessment was also needed in AOPECs #3C and #3G. Accordingly, each boring advanced in these AOPECs (B701 and B702) was completed as a groundwater monitoring well designated as MW-101 (AOPEC #3G) and MW-102 (AOPEC #3C), respectively. Each monitoring well was constructed of 2-inch ID Schedule 40 threaded polyvinyl chloride (PVC) riser pipe and 0.010-inch (10-slot) PVC screen. The bottom of the well was capped with an end plug. With the well screen in place, a clean silica sand pack was installed in the annular space from the bottom of the boring to approximately 2 feet above the top of the well screen. A 1-foot bentonite chip seal was placed above the sand pack, followed by placement of backfill sand up to approximately 1 ft bgs. The monitoring wells were completed at the surface with a locking compression plug and a protective flushmounted road box that was cemented into place. Fifteen feet of screen was installed at monitoring well location MW-101 and ten feet of screen at MW-102. Based on field conditions at location MW-102 the extra screen was deemed necessary to provide adequate water in the well for sampling. Therefore, MW101 was installed to 19 ft bgs and MW-102 to 15 ft bgs. After completion of well installation, the wells were developed by CEI personnel using a peristaltic pump to remove fines and establish a hydraulic westonandsampson.com 3-3
  5. Page 13 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 13 of 618 ANNUAL REPORT Eversource Energy connection between the well and adjacent water-bearing strata. The wells were pumped until the water was visibly clear of fines. Sampling of the two newly installed wells was incorporated into the scheduled groundwater monitoring for the remainder of AOPECs being evaluated. Monitoring well MW-101 was sampled during the September 2019 quarterly sampling event and monitoring well MW-102 was sampled during the December 2019 quarterly sampling event, as this well was dry in September. Prior to sampling, Weston & Sampson gauged the groundwater monitoring wells for water level. The wells were sampled per Environmental Protection Agency (EPA) low flow sampling procedures (September 2017). After sampling field parameters (i.e. turbidity, temperature, conductivity, pH, oxidation reduction potential, and dissolved oxygen) stabilized, the groundwater samples were collected. Each of the groundwater samples were analyzed for the following: VOCs; ETPH; PCBs; and Total RCRA 8 metals The groundwater samples were placed into laboratory prepared glassware, stored on ice, and shipped under chain of custody protocols to Con-Test for analysis. The groundwater sampling data sheets are included in Appendix C. Groundwater laboratory analytical reports are provided in Appendix D. 3.2 Continued Groundwater Monitoring As proposed in the 2018 Annual Report, continued groundwater monitoring was performed in 2019. Groundwater samples were collected for laboratory analysis from 21 monitoring wells during the year. Monitoring well locations are shown on Figure 7. Following notification to DEEP, the groundwater pump and treat system associated with AOPEC #3 was shut down in June 2003. From 2003 through 2006, groundwater monitoring for VOCs occurred annually at wells MW-4R, MW-11A, MW-15, and RW-1. In 2007, the monitoring program was slightly altered, with annual sampling for VOCs continuing at wells MW-11A, MW-15, and RW-1, and semiannual sampling at MW-4R. Based on a subsequent review in 2017, the sampling frequency and parameters were again modified in 2018 to include the addition of other existing monitoring wells and/or parameters to 1) satisfy the need to obtain four quarterly sampling events over a two-year period to capture seasonal variability and/or 2) analyze for COCs not historically tested. The sampling frequency and parameters were again modified in 2019 based on a review of the 2018 data and included a reduction of monitoring from quarterly to annually for select wells and the elimination of certain parameters. These modifications were made on an AOPEC basis to either 1) work toward achieving compliance or 2) continue to track contaminant trends for AOPECs pending remediation. Below is a summary table of the wells included in the current monitoring network, sampling frequency, and COC parameters: westonandsampson.com 3-4
  6. Page 14 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 14 of 618 ANNUAL REPORT Eversource Energy 2019 Groundwater Sampling Plan Well ID March June September December MW-CCA1 P MW-CCA2 E MW-CCA3 E E E E MW-CCA4 E E E E MW-CCA5 E MW-A1R1 S S S S MW-TRW1 E MW-4R E, V, S E, V, S E, V, S E, V, S MW-2A V, S, Pb V, S, Pb V, S, Pb V, S, Pb MW-11A V, S, Pb V, S, Pb V, S, Pb V, S, Pb MW-6 E, V, S, Pb E, V, S E, V, S E, V, S MW-10 V, S, Pb V, S, Pb V, S, Pb V, S, Pb MW-15 E MW-16 E E E E MW-T3 E MW-T6 E MW-200 E MW-201 E MW-202 E MW-203 E, P P P P MW-310 E P-PCBs, V-VOCs, E-ETPH, S- SVOCs, M-RCRA 8 Metals, Pb-Total Lead 3.3 Groundwater Flow Analysis To determine groundwater flow directions, depth to water measurements were collected in March, September, and December 2019. Depth to groundwater measurements in June were only collected from wells that were sampled. Table 3 summarizes groundwater depth to water and calculated water surface elevations. Figures 8 and 9 illustrate groundwater flow contour lines and directions based upon the March and December 2019 gauging events. In general, groundwater flows in a south-southwesterly direction across the Site, which is consistent with prior flow determinations. 3.4 Product Recovery No measurable oil (light nonaqueous phase liquid [LNAPL]), was detected in any of the monitoring wells located at the Site. LNAPL has not been detected in well TRW-1 since 2005, and well MW-T3 since 2009. Figures 10 and 11 illustrate the historic quarterly monitoring of apparent product thickness in wells MWT3 and TRW-1, respectively. Historical cumulative product recovery for TRW-1 is shown on Figure 12. westonandsampson.com 3-5
  7. Page 15 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 15 of 618 ANNUAL REPORT Eversource Energy 4.0 AOPEC UPDATE AND PROPOSED ACTIVITIES No further soil investigations are planned in 2020. Groundwater sampling is expected to continue at AOPECs #2A, #2B, #3B, #3C, #3D, #3F, #3G, #4 and #5 for CT DEEP Remediation Standard Regulations (RSR) compliance demonstration or contaminant trend purposes. Soil and groundwater investigations are considered complete and no further action is required at AOPECs #1A, #7A, #7B, #7C, #8, and #9. A Final Site Investigation Report and Completion of Investigation Transmittal Form for these AOPECs were previously submitted to the DEEP in February 2015. Soil and groundwater investigations at AOPECs #3E, #6A, and #10 are also considered complete and no further action is required. A Final Site Investigation Report and Completion of Investigation Transmittal Form were prepared for these AOPECs and submitted to the DEEP in December 2018. Based upon review of recent and historical results, soil and groundwater investigations at AOPECs #1B, #1C, #3A and #6B are now considered complete and no further action is required. A Final Site Investigation Report and Completion of Investigation Transmittal Form will be prepared for these AOPECs and submitted to the DEEP in 2020. The following presents the current status and proposed 2020 activities for each of the following AOPECs. 4.1 Status Summary and Proposed Actions 4.1.1 AOPEC #1B and #1C: Septic Leach Field AOPEC #1B: This AOPEC is located north of the former vehicle maintenance garage and serves the same building. The Phase II ESA investigation included the analysis of two soil samples (CCA5 and TP-2) from this area. No detections of COCs were found in these samples. However, Weston & Sampson determined that additional testing was needed, as this septic system continued to be used after the previous testing was completed in 2001. Two borings (B313 and B316) were completed in this AOPEC and converted into groundwater monitoring wells (MW-200 and MW-201) in 2017 (Figure 7). Boring B313 (MW-200) is located on the upgradient side of the septic leach field and boring B316 (MW-201) is located on the downgradient side. A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample was collected from each boring at 8 to 10 ft bgs, which matched the previous testing depth completed by CCA in 2001. This depth is believed to be just below the septic system elevation. The samples were tested for PCBs, ETPH and VOCs. The analytical results revealed no detections of COCs above laboratory detection limits. Based on these findings, no further soil investigations are planned for this AOPEC. The new monitoring wells (MW-200 and MW-201) and existing well (MW-CCA5) were sampled in May 2017 to document water quality in and downgradient of the septic leach field. Groundwater samples were analyzed for PCBs, ETPH, and VOCs. No COCs were detected westonandsampson.com 4-1
  8. Page 16 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 16 of 618 ANNUAL REPORT Eversource Energy above laboratory reporting limits. Based on the initial data, groundwater quality in this area appeared to have not been impacted by releases from the septic system. However, to meet RSR compliance, these monitoring wells were sampled during each quarter of 2018 and analyzed for the same COCs. PCBs and VOCs were not detected throughout the four quarters (Table 2A). ETPH was detected in each of the wells for two or more quarters at concentrations ranging from 0.084 mg/L to 0.21 mg/L. None of the detected ETPH concentrations exceed the RSR Groundwater Protection Criteria (GWPC) or Surface Water Protection Criteria (SWPC). Based on the 2017 and 2018 results, sampling for PCBs and VOCs was discontinued at these three wells. One additional round of quarterly groundwater samples from wells MW-200, MW201 and MW-CCA5 was collected on March 2019 to monitor for ETPH. Results revealed that ETPH was not detected above laboratory detection limits in any of the groundwater samples (Table 2A). Based on these results, combined with four previous rounds of groundwater sampling from these wells, groundwater compliance has been achieved and further groundwater monitoring is not deemed necessary at this time. However, closure of this AOPEC cannot be achieved until the system is no longer in use. Once the system is no longer in use and either removed/abandoned in place, final assessment can be conducted to assess for releases. AOPEC #1C: This AOPEC is located south of the former Substation Maintenance (SSM) building and the Construction, Testing, and Maintenance (CT&M) building, and serves both buildings. The Phase II ESA investigation analyzed two soil samples (CCA2 and TP-1) from this AOPEC. No detections of COCs were found in these samples. Additional testing was needed because the septic system continued to be used after the previous testing was completed in 2001. Two borings (B331 and B332) were advanced on the upgradient and downgradient sides of this AOPEC in 2017. A calibrated PID was used to screen soil for the presence of VOCs, and no readings above background were noted. One soil sample was collected from each boring at 8 to 10 ft bgs, which matched the previous testing depth completed in 2001 and is believed to be just below the septic system elevation. Soil samples were tested for PCBs, ETPH and VOCs. The analytical results revealed no detections of COCs above laboratory detection limits. Based on these findings, no further soil investigations are planned for this AOPEC. During 2017, existing monitoring wells MW-CCA2, MW-15, and MW-16 were sampled in May and July to document water quality upgradient and downgradient of the septic leach field (Figure 7). Groundwater samples were analyzed for PCBs, ETPH, and VOCs. VOCs and PCBs were not detected above laboratory reporting limits in any of the wells during May or July. ETPH was detected in each of the wells during the May event at a concentration below applicable RSR criteria. ETPH was not detected during the July sampling event. To meet RSR compliance requirements, these wells were sampled during each quarter of 2018 and analyzed for the same COCs. PCBs and VOCs were not detected throughout the four quarters (Table 2B). ETPH was detected in each of the wells for two or more quarters at concentrations ranging from 0.078 mg/L to 0.16 mg/L. None of the detected ETPH concentrations exceed the GWPC or SWPC. Based on the 2017 and 2018 results, sampling for PCBs and VOCs was discontinued at these wells. One additional round of quarterly groundwater samples from wells MW-15, MW-16 and westonandsampson.com 4-2
  9. Page 17 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 17 of 618 ANNUAL REPORT Eversource Energy MW-CCA2 was collected in March 2019 to monitor for ETPH. Results revealed that ETPH was not detected above laboratory detection limits in any of the groundwater samples (Table 2B). Based on these results, combined with four previous rounds of groundwater sampling from these wells, groundwater compliance has been achieved and further groundwater monitoring is not deemed necessary at this time. However, closure of this AOPEC cannot be achieved until the system is no longer in use. Once the system is no longer in use and either removed/abandoned in place, final assessment can be conducted to assess for releases. 4.1.2 AOPEC #2A and #2B: Hydraulic Lifts (existing and former) AOPEC #2A: This AOPEC includes existing hydraulic lifts located inside the former vehicle service garage. The Phase II ESA investigation included soil samples obtained from borings B6, B-7 and B-8. An ETPH detection of 1,500 mg/kg at 8 to 12 ft bgs from boring B-6 prompted further investigated in 2017 and 2018. In 2017, six interior borings were advanced proximal to boring B-6 (B301 through B305 and B6A), and five additional borings (B313, and B316 through B319) were advanced outside of the garage to define the nature and extent of ETPH impacts in this AOPEC. Multi-depth sampling was performed at B6A to vertically profile the ETPH impacts previously identified at boring B-6. One soil sample was analyzed from borings B301 through B305, generally targeting the 8 to 12-foot depth interval where ETPH had previously been identified in 2001. The results identified ETPH in four samples, but at concentrations below RSR criteria. Select soil samples were also tested for PCBs. No PCBs were detected in these samples. In 2018, additional borings were advanced at and east of boring B-301, in which ETPH was previously detected at 500 mg/kg (equivalent to the RSR Residential Direct Exposure Criteria [RES DEC]), to fully assess the nature and extent of impacts in this area. Borings were also advanced within a former chemical storage room that was not previously investigated prior to Eversource vacating the building. Multi-depth soil sampling was completed at borings B601, B606 and B607 (vehicle lift area) and at borings B602 to B605 (chemical storage area) to identify potential releases. The samples collected near the former in-ground lifts were submitted for ETPH and PCB analysis. PCBs were not detected in any of the samples. ETPH was detected in samples from boring B601 and B606. The detected ETPH concentration in sample B606A from 8 to 10 ft bgs was 520 mg/kg, which exceeds the RES DEC and GA aquifer Pollutant Mobility Criteria (GA PMC). ETPH was detected at a concentration below RSR criteria from a deeper sample collected from boring B-606 at 10 to 12 ft bgs (B606B). Samples collected from the four borings within the former chemical storage area were analyzed for PCBs, VOCs, SVOCs, ETPH and Total RCRA 8 metals. PCBs were not detected in any of these samples. VOCs, SVOCs, ETPH and some total metals were detected throughout the samples, but at concentrations that do not exceed applicable RSR criteria. Groundwater samples collected from monitoring wells MW-202 and MW-203 were analyzed for ETPH in May 2017 to document water quality downgradient of the hydraulic lifts (Figure 7). ETPH was not detected above laboratory reporting limits. ETPH was also not detected in upgradient wells MW-200 and MW-201. westonandsampson.com 4-3
  10. Page 18 of 618

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 136 Page 18 of 618 ANNUAL REPORT Eversource Energy To meet RSR compliance, MW-202 and MW-203, along with MW-CCA5 (located upgradient of this AOPEC) were sampled during each quarter of 2018 and analyzed for ETPH. ETPH was detected in each sample at concentrations ranging from 0.091 mg/L to 0.30 mg/L (Table 2C). Only the ETPH concentration of 0.30 mg/L in well MW-202 from March 2018 exceeded the GWPC and SWPC. Groundwater samples were also analyzed for PCBs at MW-CCA5 all four quarters, at MW-202 during the second quarter (June), and at MW-203 during the first quarter (March). PCBs were not detected in any of the sampling events. To meet quarterly monitoring requirements for RSR verification, MW-203 was sampled in each quarter in 2019 and analyzed for PCBs. PCBs were not detected above laboratory detection limits in any of the samples (Table 2C). Based on the planned remediation in this AOPEC, monitoring wells MW-202, MW-203 and MW-CCA5 were sampled in March 2019 to track ETPH concentrations until remediation is performed. ETPH was not detected above laboratory detection limits in samples MW-202 and MW-CCA5, but was detected in sample MW-203 at a concentration of 0.22 mg/L. The detected ETPH concentration does not exceed the GWPC or SWPC. In 2020, Weston & Sampson proposes collecting one round of groundwater samples in March for ETPH at monitoring wells MW-CCA5, MW-202 and MW-203 to continue tracking ETPH concentration trends pending remediation. AOPEC #2B: This AOPEC includes former hydraulic lifts located inside the Substation Maintenance (SSM) building. The Phase II ESA investigation included one sample from each of four borings (B-1, B-2, B-3, B-4). ETPH was detected at 1,900 mg/kg in boring B-3 from 8 to 12 ft bgs, warranting further investigation (Figure 2, Table 1A). In 2017, six interior borings (B306 through B310 and B310A) were advanced proximal to boring B-3. Multi-depth sampling was performed at boring B310A to vertically profile the ETPH impact previously identified in boring B-3. One soil sample was analyzed from borings B303 through B310, generally targeting the 8 to 12-foot depth interval where the ETPH impacts had been identified in 2001. All soil samples were tested for ETPH, with select soil samples also tested for PCBs. ETPH was detected in six soil samples collected from two-foot intervals between 6 and 12 ft bgs in borings B307, B308, B310, and B310A. ETPH concentrations at two locations (B310 at to 10 ft, and B310A at 6 to 8 ft) exceeded RSR criteria. PCBs were not detected in any of the soil samples analyzed. A fingerprint analysis was performed on the 6 to 8-foot soil sample from boring B310A to determine the type of petroleum hydrocarbon present. The fingerprint indicated a transformer oil profile. AOPEC 3B, which abuts this AOPEC to the east, is associated with past transformer oil releases from USTs. Existing monitoring wells MW-6 and MW-T3 were sampled in May 2017 to document groundwater quality in the vicinity of the former hydraulic lifts. An additional well, MW-310, was installed and sampled in September 2017. Groundwater samples were analyzed for ETPH. ETPH was not detected above laboratory reporting limits in MW-6. However, concentrations of ETPH detected in MW-T3 and MW-310 exceeded the SWPC. westonandsampson.com 4-4

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)