A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Words on different pages
  1. Page 11 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 11 of 847 ANNUAL REPORT Eversource Energy In general, the borings advanced within the building at AOPEC #2A penetrated up to 6 inches of concrete, and the borings completed within AOPEC #3F penetrated 2 to 6 inches of asphalt. Underlying soils consisted of brown, fine to medium sand with little gravel and silt. Groundwater was encountered in each of the borings (except B602 to B605) at depths varying from 12 ft to 14 ft below ground surface (bgs). The water table was not intercepted at borings B602 to B605 as these were hand auger borings that only extended to 4 ft bgs. Evidence of a release, such as staining or odors, was not observed in any of the soil borings. A calibrated photoionization detector (PID) was used to screen soil for the presence of total volatile organic vapors (TVOVs) at approximate six-inch intervals throughout the Geoprobe sampling sleeves. No PID readings above background (0.0 parts per million) were observed in any of the borings advanced during this investigation. Two soil samples were retained for laboratory analysis from each AOPEC #2A boring. One duplicate sample (designated DUP-1) was also collected from sample location B606A for quality assurance/quality control (QA/QC) purposes. Weston & Sampson followed the DEEP “Guidance for Collecting and Preserving Soil and Sediment Samples for Laboratory Determination of Volatile Organic Compounds” during collection of VOC soil samples. Three soil intervals were sampled from each of the borings advanced in AOPEC #3F. Select samples from this AOPEC were activated for laboratory analysis, while the others were placed on hold pending results of the initial samples analyzed. All soil samples were stored on ice and shipped under chain-of-custody protocols to ConTest Analytical Laboratory (Con-Test, East Longmeadow, MA), a Connecticut-certified laboratory. Soil laboratory analytical results are summarized in Table 1. Figures 2 and 3 illustrate soil boring locations in AOPECs #2A and #3F, respectively. Boring logs are included in Appendix A and a copy of the soil analytical laboratory report is included in Appendix B. 3.2 Continued Groundwater Monitoring As proposed in the 2017 Annual Report, continued groundwater monitoring was performed throughout 2018. Groundwater samples were collected for laboratory analysis from twenty monitoring wells during the year. Monitoring well locations are shown on Figure 4, and laboratory analytical results are summarized in Table 2. A copy of the groundwater analytical laboratory report is included in Appendix C. Groundwater sampling data sheets are provided in Appendix D. Following notification to DEEP, the groundwater pump and treat system associated with AOPEC #3 was shut down in June 2003. From 2003 through 2006, groundwater monitoring for VOCs occurred annually at wells MW-4R, MW-11A, MW-15, and RW-1. In 2007, the monitoring program was slightly altered, with annual sampling for VOCs continuing at wells MW-11A, MW-15, and RW-1, and semiannual sampling at MW-4R. Based on a subsequent review in 2017, the sampling frequency and parameters were again modified in 2018. These modifications included the addition of other existing westonandsampson.com 6
  2. Page 12 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 12 of 847 ANNUAL REPORT Eversource Energy monitoring wells and/or parameters to 1) satisfy the need to obtain four sampling events over a 2-year period reflective of season variability and/or 2) analyze for constituents of concern not historically tested. Below is a summary table of the wells included in the current monitoring network, sampling frequency, and COC parameters: 2018 Groundwater Sampling Plan Well ID March June September MW-CCA-2 P, V, E P, V, E P, V, E MW-CCA-3 E, S, M E, S, M E, S, M MW-CCA-4 E, P, V, M, S E, S, M E, S, M MW-CCA-5 P, V, E P, V, E P, V, E MW-A1R1 S S S MW-TRW1 E, P, V, M MW-4R V, E MW-2A V, E MW-11A V, E MW-6 P, E, V, M, S P, E P, E MW-10 V, E MW-15 P, V, E P, V, E P, V, E MW-16 P, V, E, S, M P, V, E, S, M P, V, E, S, M MW-T3 P, E P, E P, E MW-T6 E, P, V, M MW-200 P, V, E P, V, E P, V, E MW-201 P, V, E P, V, E P, V, E MW-202 P, E P, E P, E MW-203 P, E P, E P, E MW-310 P, E P, E P, E P-PCBs, V-VOCs, E-ETPH, S- SVOCs, M-RCRA 8 Metals December P, V, E E, S, M E, S, M P, V, E S P, E P, V, E P, V, E, S, M P, E P, V, E P, V, E P, E P, E P, E The analytical results from 2018 revealed no detections of VOCs in any wells, except for MW-10 in AOPEC #3F. Chloroform was detected in this well at a concentration that does not exceed applicable DEEP Remediation Standard Regulation (RSR) criteria. Chloroform, nor any other VOCs, have historically been detected in this well. The continued trend of no observed VOCs in Site wells is similar to previous sampling rounds. ETPH was detected during multiple sampling events in most AOPECs, but at concentrations that generally do not exceed applicable RSR criteria. However, ETPH in samples MW-202 (AOPEC #2A), MW-310 and MW-T3 (AOPEC #2B), MW-T3 and MW-TRW-1 (AOPEC #3B), and MW-2A (AOPEC #3F) from the March 2018 sampling event did exceed the groundwater protection criteria (GWPC) and surface water protection criteria (SWPC) of 0.25 micrograms per liter (mg/L). PCBs, a COC in AOPECs #1B, #1C, #2A, #2B or #3B, were not detected. westonandsampson.com 7
  3. Page 13 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 13 of 847 ANNUAL REPORT Eversource Energy SVOCs were not detected in any of the wells analyzed in AOPECs #3A, #3B or #3D. One SVOC, benzo(b)fluoranthene, was detected in monitoring well MW-16 from AOPEC #5 during the March 2018 sampling event at a concentration (0.098 ug/L) that exceeds the GWPC (0.08 ug/L). Select total metals (barium or chromium) were detected in wells from AOPECs #3B, #5 and #6B at concentrations that do not exceed the GWPC or SWPC. 3.3 Groundwater Flow Analysis To determine groundwater flow directions, depth to water measurements were collected on a quarterly basis in March, June, September, and December 2018. Table 3 summarizes groundwater depth to water and calculated water surface elevations. Figures 5 and 6 illustrate groundwater flow directions for the June and December 2018 gauging events. In general, groundwater flows in a south-southwesterly direction across the Site, which is consistent with prior flow determinations. 3.4 Product Recovery No measurable oil (light nonaqueous phase liquid [LNAPL]), was detected in any of the monitoring wells located at the Site. LNAPL has not been detected in well TRW-1 since 2005, and well MW-T3 since 2009. Figures 7 and 8 illustrate the historic quarterly monitoring of apparent product thickness in wells MW-T3 and TRW-1, respectively. Historical cumulative product recovery for TRW-1 is shown on Figure 9. westonandsampson.com 8
  4. Page 14 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 14 of 847 ANNUAL REPORT Eversource Energy 4.0 AOPEC UPDATE AND PROPOSED ACTIVITIES Additional environmental investigations are planned in 2019 for AOPECs #2B, #3B, #3C, #3F and #3G. In addition, groundwater sampling is expected to continue at AOPECs #1B, #1C, #2A, #2B, #3A, #3B, #3C, #3D, #3F, #3G, #4 and #5 for RSR compliance demonstration. Soil and groundwater investigations at AOPECs #3E, #6A, and #10 are considered complete and no further action is required. A Final Site Investigation Report and Completion of Investigation Transmittal Form were prepared for these AOPECs and submitted to the DEEP in December 2018. Soil and groundwater investigations are also considered complete and no further action is required at AOPECs #1A, #7A, #7B, #7C, #8, and #9. A Final Site Investigation Report and Completion of Investigation Transmittal Form for these AOPECs were previously submitted to the DEEP in October 2014. The following presents the current status and proposed 2019 activities for each of the following AOPECs. 4.1 Status Summary and Proposed Actions 4.1.1 AOPEC #1B and #1C: Septic Leach Field AOPEC #1B: This AOPEC is located north of the former vehicle maintenance garage and serves the same building. The Phase II ESA investigation included the analysis of two soil samples (CCA-5 and TP-2) from this AOPEC. No detections of COCs were found in these samples. However, Weston & Sampson determined that additional testing was needed, as this septic system continued to be used after the previous testing was completed in 2001. Two borings (B313 and B316) were completed in this AOPEC and converted into groundwater monitoring wells (MW-200 and MW-201) in 2017. Boring B313 (MW-200) is located on the upgradient side of the septic leach field and boring B316 (MW-201) is located on the downgradient side. A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample was collected from each boring at 8 to10 ft bgs, which matched the previous testing depth completed by CCA in 2001. This depth is believed to be just below the septic system elevation. The samples were tested for PCBs, ETPH and VOCs. The analytical results revealed no detections of COCs above laboratory detection limits. Based on these findings, no further soil investigations are planned for this AOPEC. The new monitoring wells (MW-200 and MW-201) and existing well (MW-CCA-5) were sampled in May 2017 to document water quality in and downgradient of the septic leach field. Groundwater samples were analyzed for PCBs, ETPH, and VOCs. No COCs were detected above laboratory reporting limits. Based on the initial data, groundwater quality in this area appeared to have not been impacted by releases from the septic system. However, to meet RSR compliance, these monitoring wells were sampled during each quarter of 2018 and analyzed for the same COCs. PCBs and VOCs were not detected throughout the four quarters. ETPH was detected in each of the wells for two or more westonandsampson.com 9
  5. Page 15 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 15 of 847 ANNUAL REPORT Eversource Energy quarters at concentrations ranging from 0.084 mg/L to 0.21 mg/L. None of the detected ETPH concentrations exceed the GWPC or SWPC. Based on the 2017 and 2018 results, sampling for PCBs and VOCs will be discontinued at these three wells. However, continued monitoring in 2019 for ETPH is needed due to recurring detections. Therefore, Weston & Sampson proposes collecting one additional round of quarterly of groundwater samples from wells MW-200, MW-201 and MW-CCA5 for ETPH testing. AOPEC #1C: This AOPEC is located south of the former Substation Maintenance (SSM) building and the Construction, Testing, and Maintenance (CT&M) building, and serves both buildings. The Phase II ESA investigation analyzed two soil samples (CCA-2 and TP1) from this AOPEC. No detections of COCs were found in these samples. Additional testing was needed because the septic system continued to be used after the previous testing was completed in 2001. Two borings (B331 and B332) were advanced on the upgradient and downgradient sides of this AOPEC in 2017. A calibrated PID was used to screen soil for the presence of VOCs, and no readings above background were noted. One soil sample was collected from each boring at 8 to 10 ft bgs, which matched the previous testing depth completed by CCA in 2001 and is believed to be just below the septic system elevation. Soil samples were tested for PCBs, ETPH and VOCs. The analytical results revealed no detections of COCs above laboratory detection limits. Based on these findings, no further soil investigations are planned for this AOPEC. During 2017, existing monitoring wells MW-CCA2, MW-15, and MW-16 were sampled in May and July to document water quality upgradient and downgradient of the septic leach field. Groundwater samples were analyzed for PCBs, ETPH, and VOCs. VOCs and PCBs were not detected above laboratory reporting limits in any of the wells during May or July. ETPH was detected in each of the wells during the May event at a concentration below applicable RSR criteria. ETPH was not detected during the July sampling event. To meet RSR compliance requirements, these wells were sampled during each quarter of 2018 and analyzed for the same COCs. PCBs and VOCs were not detected throughout the four quarters. ETPH was detected in each of the wells for two or more quarters at concentrations ranging from 0.078 mg/L to 0.16 mg/L. None of the detected ETPH concentrations exceed the GWPC or SWPC. Based on the 2017 and 2018 results, sampling for PCBs and VOCs will be discontinued at these wells. However, continued monitoring in 2019 for ETPH is needed due to recurring detections. Therefore, Weston & Sampson proposes collecting one additional round of quarterly of groundwater samples from wells MW-15, MW-16, and MW-CCA2 for ETPH testing. westonandsampson.com 10
  6. Page 16 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 16 of 847 ANNUAL REPORT Eversource Energy 4.1.2 AOPEC #2A and #2B: Hydraulic Lifts (existing and former) AOPEC 2A: This AOPEC includes existing hydraulic lifts located inside the former vehicle service garage. The Phase II ESA investigation included soil samples obtained from borings B-6, B-7 and B-8. An ETPH detection of 1,500 mg/kg at 8 to 12 ft bgs from boring B-6 prompted further investigated in 2017 and 2018. In 2017, six interior borings were advanced proximal to boring B-6 (B301 to B305 and B6A), and five additional borings (B313, B316 to B319) were advanced outside of the garage to define the nature and extent of ETPH impacts in this AOPEC. Multi-depth sampling was performed at B6A to vertically profile the ETPH impacts previously identified at boring B-6. One soil sample was analyzed from borings B301 through B305, generally targeting the 8 to 12-foot depth interval where ETPH had previously been identified in 2001. The results identified ETPH in four samples, but at concentrations below RSR criteria. Select soil samples were also tested for PCBs. No PCBs were detected in these samples. In 2018, additional borings were advanced at and east of boring B-301, in which ETPH was previously detected at the RES DEC (500 mg/kg), to fully assess the nature and extent of impacts in this area. Borings were also advanced within a former chemical storage room that was not previously investigated prior to Eversource vacating the building. Multi-depth soil sampling from 8 to 10 and 10 to 12 ft bgs was completed at borings B601, B606 and B607 (vehicle lifts area) and from 0 to 2 and 2 to 4 ft bgs at borings B602 to B605 (chemical storage area) to identify potential releases. The samples collected near the former inground lifts were submitted for ETPH and PCB analysis. PCBs were not detected in any of the samples. ETPH was detected in samples from boring B601 and B606. The detected ETPH concentration in sample B606A from 8 to 10 ft bgs was 520 mg/kg, which exceeds the RES DEC and GA PMC. ETPH was detected at a concentration below RSR criteria from a deeper sample collected from boring B-606 at10 to 12 ft bgs (B606B). Samples collected from the four borings within the former chemical storage area were analyzed for PCBs VOCs, SVOCs, ETPH and Total RCRA 8 metals. PCBs were not detected in any of these samples. VOCs, SVOCs, ETPH and some total metals were detected throughout the samples, but at concentrations that do not exceed applicable RSR criteria. Groundwater samples collected from monitoring wells MW-202 and MW-203 were analyzed for ETPH in May 2017 to document water quality downgradient of the hydraulic lifts. ETPH was not detected above laboratory reporting limits. ETPH was also not detected in upgradient wells MW-200 and MW-201. To meet RSR compliance, MW-202 and MW-203, along with MW-CCA5 (located upgradient of this AOPEC) were sampled during each quarter of 2018 and analyzed for ETPH. ETPH was detected in each sample at concentrations ranging from 0.091 mg/L to 0.30 mg/L. Only the ETPH concentration of 0.30 mg/L in well MW-202 from March 2018 exceeded the GWPC and SWPC (both 0.25 mg/L). Groundwater samples were also analyzed for PCBs at MW-CCA5 all four quarters, MW-202 during the second quarter (June), and MW-203 during the first quarter (March). PCBs were not detected in any of the sampling events. westonandsampson.com 11
  7. Page 17 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 17 of 847 ANNUAL REPORT Eversource Energy Monitoring for ETPH and PCBs will be continued in 2019. Additional data is needed for ETPH due to reoccurring detections and the exceedance of the GWPC and SWPC at MW202 in March 2018. Additional data is needed for PCBs at MW-203 to meet quarterly monitoring requirements for RSR verification. Accordingly, Weston & Sampson proposes collecting one round of groundwater samples for ETPH testing at monitoring wells MWCCA5, MW-202 and MW-203 in 2019. Quarterly groundwater samples from MW-203 will also be collected and tested for PCBs. AOPEC #2B: This AOPEC includes former hydraulic lifts located inside the Substation Maintenance (SSM) building. The Phase II ESA investigation included one sample from each of four borings (B-1, B-2, B-3, B-4). ETPH was detected at 1,900 mg/kg in boring B3 from 8 to 12 ft bgs, warranting further investigation. In 2017, six interior borings (B306 to B310 and B310A) were advanced proximal to boring B-3. Multi-depth sampling was performed at boring B310A to vertically profile the ETPH impact previously identified in boring B-3. One soil sample was analyzed from borings B303 through B310, generally targeting the 8 to 12-foot depth interval where the ETPH impacts had been identified in 2001. All soil samples were tested for ETPH, with select soil samples also tested for PCBs. ETPH was detected in six soil samples collected from twofoot intervals between 6 and 12 ft bgs in borings B307, B308, B310, and B310A. ETPH concentrations at two locations (B310 at 8-10 ft, and B31A at 6-8 ft) exceeded RSR criteria. PCBs were not detected in any of the soil samples analyzed. A fingerprint analysis was performed on the 6 to 8-foot soil sample from boring B310A to determine the type of petroleum hydrocarbon present. The fingerprint indicated a transformer oil profile, and AOPEC 3B which abuts this AOPEC to the east is associated with past transformer oil releases from USTs. Two upgradient soil borings completed outside of the former SSM building in 2017 were used to further delineate the nature and extent of ETPH impacts at this AOPEC. These borings, B313 and B316, were completed into monitoring wells MW-200 and MW-201. One soil sample was analyzed for ETPH and PCBs from each boring at depths within the 8 to 12 ft bgs interval. No detections of ETPH or PCBs were identified in either boring. Existing monitoring wells MW-6 and MW-T3 were sampled in May 2017 to document groundwater quality in the vicinity of the former hydraulic lifts. An additional well, MW-310, was installed and sampled in September 2017. Groundwater samples were analyzed for ETPH. ETPH was not detected above laboratory reporting limits in MW-6. However, concentrations of ETPH detected in MW-T3 and MW-310 exceeded the SWPC. ETPH was also not detected in the upgradient wells MW-200 and MW-201; and therefore, demonstrated it is not a result of an upgradient source. Groundwater monitoring was performed in 2018 to continue to track natural attenuation of ETPH in AOPEC #2B. Monitoring well MW-201 was sampled and analyzed for ETPH and PCBs during all four quarters. MW-6, MW-310 and MW-T3 samples were analyzed for ETPH in the first quarter only. Monitoring well MW-6 was additionally analyzed for PCBs in the first quarter. PCBs were not detected in any of the samples analyzed. ETPH was westonandsampson.com 12
  8. Page 18 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 18 of 847 ANNUAL REPORT Eversource Energy detected in each of the samples, with the concentrations in MW-310 and MW-T3 from March 2018 continuing to exceed RSR criteria. In 2019, additional soil sampling is planned for this AOPEC to further delineate ETPH impacts. The purpose of this work is to refine soil volume estimates in advance of anticipated future remedial activities. If soil remediation is planned in 2019, quarterly groundwater sampling at monitoring wells MW-6, MW-201, MW-310 and MW-T3 will be suspended. However, Weston & Sampson recommends performing a one-time monitoring event for ETPH in March 2019 at MW-6, MW-310 and MW-T3 to continue tracking groundwater quality in this area. If soil remediation is not planned in 2019, these wells will continue to be sampled on a quarterly basis. 4.1.3 AOPEC #3A, #3B, #3D and #3F: Former USTs AOPEC #3A: This AOPEC comprises former underground storage tanks (USTs) A1 and A1R1, which were reported to have contained heating oil/diesel fuel. Soil testing within this AOPEC was not completed after the tanks were removed, and the Phase II ESA Report documents the collection and analysis of one groundwater sample. Additional testing is needed to properly close this AOPEC for LEP verification. Two soil borings (B314 and B315) were completed within the footprint of this AOPEC in 2017, with one soil sample collected and analyzed from each boring. The sampling interval targeted the bottom depth of the USTs, which was estimated at 11 to 13 ft bgs. Soil samples were tested for VOCs, SVOCs and ETPH. The analytical results revealed no detections of any compounds. No groundwater sampling was conducted in 2017, as prior favorable groundwater data for the primary COCs (ETPH and VOCs) from four sampling events over a 2-year period exists for this AOPEC. However, historical sampling did not include SVOCs as a COC. Therefore, four quarters of groundwater monitoring was conducted at well MW-A1R1 in 2018. Due to low water table conditions, a sample could not be retrieved during the September quarterly event. The March, June and December samples were submitted for SVOC analysis. No SVOCs were not detected for any of the sampling quarters. Additional sampling at MW-A1R1 is needed in 2019 to eliminate the September 2018 data gap. Only one SVOC sampling event would be needed if favorable results are reported in September 2019. However, more sampling events would be needed if concentrations are detected. For this reason, Weston & Sampson recommends SVOC testing of MW-A1R1 on a quarterly basis in March, June, September and December 2019. Sampling would be discontinued upon receipt of SVOC results indicating RSR groundwater compliance. AOPEC #3B: This AOPEC comprises former USTs J-10, J-11, J-12, and K-13. These USTs were located side by side in subsurface concrete block vaults east of the Substation Maintenance Building. Three of the USTs contained non-PCB transformer oil and one UST contained waste oil. Soil testing within this AOPEC was not completed following removal of the tanks. Historical groundwater data at monitoring well MW-T3 and recovery well TRW-1 exhibited intermittent thin layers of LNAPL in 2003, 2004, 2005, 2007, and 2009. LNAPL was not detected at either well during 2006, 2008, and 2010 through 2018. westonandsampson.com 13
  9. Page 19 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 19 of 847 ANNUAL REPORT Eversource Energy Additional testing is needed to properly close this AOPEC for LEP verification. Six soil borings (B325 through B330) were completed within the footprint of this AOPEC in 2017. One soil sample was analyzed from each of the borings, with the sampling interval generally targeting the depth of the former USTs (estimated at 6 to 10 ft bgs). The soil samples were tested for PCBs, VOCs, ETPH, and total RCRA 8 metals. Analytical results revealed PCBs and VOCs were not detected above laboratory detection limits. Select total metals were detected at concentrations that do not exceed applicable RSR criteria. ETPH was detected in each of the soil samples at concentrations ranging from 26 mg/kg to 1,000 mg/kg. ETPH in samples B328 (9-11 ft bgs) and B330 (9-11 ft bgs) exceed RSR criteria. Similar to AOPEC 2B, additional soil sampling is planned for this AOPEC in 2019 to further delineate ETPH impacts and refine soil volume estimates in advance of anticipated future remedial activities. A groundwater sample was collected from monitoring well MW-6 in May 2017 and analyzed for ETPH. ETPH was not detected above laboratory reporting limits. However, following a review of AOPEC #3B data prior to the 2018 sampling year, it was determined that a groundwater data gap existed for this AOPEC. Therefore, wells MW-T6, MW-6, MWTRW1 and MW-CCA4 were monitored to track natural attenuation of ETPH in this area. One quarter of groundwater samples (March) were collected from MW-T6, MW-6, and MWTRW1, and four quarters of samples were collected from MW-CCA4. Samples were analyzed for ETPH, PCBs, VOCs, SVOCs and/or RCRA 8 metals. PCBs, VOCs and SVOCs were not detected in any of the samples. Total chromium was detected in sample MW-6 at a concentration that does not exceed the GWPC. ETPH was detected in samples collected from each of the wells at concentrations ranging from 0.081 mg/L to 4.7 mg/L. ETPH detected in samples from wells MW-T3 (4.7 mg/L) and MW-TRW1 (1.2 mg/L) from the March event exceeded the GPWC and SWPC. AOPEC #3C: This AOPEC comprises former UST F-6, which is reported to have contained waste oil. The Phase II ESA Report documents two soil samples collected from one boring in this AOPEC, which were submitted for analysis of VOCs, PCBs, ETPH, and SPLP RCRA 8 metals. Based on the Phase II ESA Report, none of the selected compounds were detected above regulatory criteria. Further assessment of soil and groundwater is needed at this AOPEC to support the Phase II ESA. Weston & Sampson recommends the advancement of a single soil boring, with completion as a groundwater monitoring well in the center of the former tank grave. Collection, analysis and evaluation of the soil and groundwater samples will be used to determine additional data needs, if any. AOPEC #3D: This AOPEC comprises former UST L-14, which is reported to have contained heating oil. Soil testing within this AOPEC was not completed after the tank was removed. Investigations completed in 2001 revealed ETPH impacts in soils, but below RSR criteria. Additional testing was deemed necessary to demonstrate compliance with the RSRs for LEP verification. westonandsampson.com 14
  10. Page 20 of 847

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 130 Page 20 of 847 ANNUAL REPORT Eversource Energy Two soil borings (B311 and B312) were advanced downgradient of the UST grave in 2017 to confirm the prior 2001 results and provide additional test data. One soil sample was analyzed from each boring, with the sampling interval targeting the depth of the former UST (estimated at 6 to 12 ft bgs). Soil samples were analyzed for VOCs, SVOCs, and ETPH. Results indicated that VOCs and SVOCs were not detected. ETPH was detected in each of the soil samples, but at concentrations below RSR criteria. Monitoring well MW-6 was used to evaluate groundwater in this AOPEC in 2017. A sample collected in May 2017 was tested and analyzed for ETPH. ETPH was not detected above laboratory reporting limits. Soil investigation activities are considered complete in AOPEC #3D, however other COCs were detected in soil at concentrations below RSR criteria. These COCs were not previously monitored in groundwater from this AOPEC. In 2018, one round of sampling (March) was performed for wells MW-6 and MW-4R and the samples were analyzed for ETPH, SVOCs and VOCs. VOCs and SVOCs were not detected. ETPH was detected, but at concentrations that do not exceed RSR criteria. Monitoring well MW-4R is located downgradient of this AOPEC. Although sampling activities completed in 2018 were favorable, more data is needed to demonstrate RSR compliance for LEP verification. Accordingly, Weston & Sampson proposes the collection of quarterly groundwater samples from monitoring wells MW-4R and MW-6, and testing for ETPH, VOCs, and SVOCs. AOPEC #3F: This AOPEC comprises former USTs B-2 (leaded gasoline), C-3 (unleaded gasoline), D-4 (unleaded gasoline), and E-5 (diesel fuel). A groundwater pump and treat system was historically operated at this AOPEC beginning in 1990 and was shut down in June 2003. Natural attenuation monitoring is ongoing. Additional testing is needed to properly close out this AOPEC for LEP verification. Six soil borings (B319 to B324) were advanced at and downgradient of the UST graves. One soil sample was analyzed from each boring, with the sampling interval targeting the depth of the former USTs (estimated at 8 to 12 ft bgs). Soil samples were analyzed for VOCs and ETPH. Analytical results indicated that VOCs were not detected. ETPH was detected in all but one soil sample. ETPH in sample B321 10-12 ft bgs (760 mg/kg) exceeded RSR criteria. Additional delineation sampling was conducted in early 2018 at AOPEC #3F. Ten borings (B608 to BB617) were advanced around previous boring B321. Multi-depth samples from 8 to 10, 10 to 12 and 12 to 14 ft bgs were collected from each of the borings. Select samples were submitted for ETPH analysis, while others were placed on hold pending receipt of the laboratory results. ETPH was detected in most of the soil samples at concentrations ranging from 12 mg/kg to 2,000 mg/kg. The detected ETPH concentration of 2,000 mg/kg from sample B613C (12-14 ft bgs) exceeds RSR criteria. No other ETPH exceedances are present. Groundwater samples were collected from monitoring wells MW-10 and MW-11A in March, MW-2A in July, and MW-4R in September 2017. The samples from MW-10, MW-11A and westonandsampson.com 15

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)