Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Words on different pages
  1. Page 20 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 20 of 824 ANNUAL REPORT Eversource Energy in the upgradient wells MW-200 and MW-201. Groundwater analytical data is summarized in Table 2. Per 22a-133k-3(g)(2)(A)(ii)) of RSRs, groundwater data from 4 sampling events over a 2year period reflective of seasonal variability for this AOPEC is required and not yet completed; therefore, additional groundwater monitoring data is needed before LEP verification can be demonstrated. In 2018, groundwater samples will be collected from two monitoring wells (MW-202 and MW-203) that surround this AOPEC in March, June, September and December 2018 and tested for ETPH. AOPEC #2B: This AOPEC involves former hydraulic lifts located inside the Substation Maintenance (SSM) building. CCA’s 2001 Phase II Environmental Site Assessment Report identified a single boring (B-3) with a previous ETPH detection of 1,900 mg/kg at 8 to 12 ft bgs which warranted further investigation in 2017. Six borings designated B306 to B310 and B310A were advanced inside the building in 2017 proximal to boring B-3 (Figure 5). A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample each was analyzed from borings B306 through B310, and the sampling interval generally targeted the 8 to 12 foot depth where the ETPH impacts had been previously identified in 2001. Multi-depth soil sampling from 6 to 8, 8 to 10, and 10 to 12 ft bgs was also completed at boring B310A in an attempt to vertically profile the degree of ETPH impacts identified at boring B310. All of the soil samples were tested for ETPH, and select soil samples were also tested for PCBs. The analytical results revealed ETPH detections in six soil samples (B307, B308, B310, B310A [6-8 ft], B310A [8-10 ft], B310A [10-12 ft]), and the ETPH concentrations at two locations (B310 [8-10 ft], and B31A [6-8 ft]) exceeded RSR criteria. PCBs were not detected in the soil samples analyzed. A hydrocarbon fingerprint analysis performed on the 6 to 8-foot soil sample from boring B310A to determine the type of petroleum hydrocarbon present. The fingerprint analysis indicated the type of petroleum was consistent with transformer oil. Two upgradient soil borings completed outside of the former SSM building in 2017 can also be utilized as an additional line of evidence to delineate the nature and extent of ETPH impacts at this AOPEC. They include borings B313 and B316 which were both completed into monitoring wells MW-200 and MW-201. One soil sample was analyzed for PCBs and ETPH from each of these borings at sample depths similar to the 8 to 12 foot depth interval that exhibited historical impacts, and no detections were noted at either boring. Soil analytical data is summarized in Table 1. ETPH was detected in two soil samples at concentrations above the RES DEC and one sample above the Industrial/Commercial DEC (I/C DEC). As discussed above in AOPEC #2A, the entire soil data set, including half the detection limit for samples with non-detect, was entered into the EPA spreadsheet to calculate the 95% UCL for ETPH in AOPEC #2B. The calculation spreadsheet is included in Appendix E. The calculated 95% UCL for this data set is 12,545 mg/kg, which is above the RES DEC and I/C DEC for ETPH. Based on the calculation, compliance with the DEC cannot be documented using the 95% UCL; westonandsampson.com 14
  2. Page 21 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 21 of 824 ANNUAL REPORT Eversource Energy therefore, other remedial options need to be evaluated and implemented to address the ETPH impacts identified at this AOPEC. Existing monitoring wells MW-6 and MW-T-3 were sampled in May 2017 to document groundwater quality relative to the former hydraulic lifts. An additional well, MW-310, was installed and sampled in September 2017. Groundwater samples were analyzed for ETPH. ETPH was not detected above the laboratory reporting limits in MW-6. However, concentrations of ETPH detected in MW-T3 (5.6 mg/L) and MW-310 (0.79 mg/L) exceed the SWPC. ETPH was also not detected in the upgradient wells MW-200 and MW-201; and therefore, is not a result of an upgradient source. Groundwater analytical data is summarized in Table 2. Further sampling is necessary to continue to monitor natural attenuation of the dissolved hydrocarbon plume. Therefore, additional groundwater monitoring at wells MW-6, MW310, and MW-T3 in March, June, September and December 2018 is proposed. Groundwater samples will be analyzed for ETPH. 4.1.3 AOPEC #3A, #3B, #3D and #3F: Former USTs AOPEC #3A: This AOPEC comprises former underground storage tanks (USTs) A1 and A1R1, which were reported to have contained heating oil/diesel fuel. Soil testing within this AOPEC was not completed after the tanks were removed, and CCA’s 2001 Phase II Environmental Site Assessment Report documents the collection and analysis of a single groundwater sample from this AOPEC. Additional testing is needed to properly close out this AOPEC for LEP verification. Two soil borings designated B314 and B315 were completed within the footprint of this AOPEC in 2017 (Figure 6). A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample each was analyzed from the borings, and the sampling interval generally targeted the bottom depth of the UST which was estimated at 11 to 13 ft bgs. The soil samples were tested for VOCs, SVOCs and ETPH, and the analytical results revealed no detections for any compounds. Soil analytical data is summarized in Table 1. No groundwater sampling was conducted in 2017, as favorable groundwater data from four sampling events over a 2-year period exists for this AOPEC from 2014 for the primary COCs that is reflective of seasonal variability; however, historical sampling did not include SVOCs as a COC. Therefore, additional groundwater monitoring data is needed to document compliance with the RSRs. In 2018, quarterly groundwater sampling at existing well MW-A1R1 in March, June, September and December 2018 and test for SVOCs is proposed. AOPEC #3B: This AOPEC comprises former USTs J-10, J-11, J-12, and K-13. These four former USTs, located side by side in subsurface concrete block vaults to the east of the Substation Maintenance Building, contained non-PCB transformer oil (three tanks) and waste oil (one tank). Soil testing within this AOPEC was not completed after the tanks were removed, and historical groundwater data at monitoring well MW-T3 and recovery well westonandsampson.com 15
  3. Page 22 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 22 of 824 ANNUAL REPORT Eversource Energy TRW-1 exhibited intermittent thin layers of LNAPL in 2003, 2004, 2005, 2007, and 2009. LNAPL was not detected or recovered at either well during 2006, 2008, and 2010 through 2016. Natural attenuation monitoring is ongoing. Additional testing is needed to properly close out this AOPEC for LEP verification. Six soil borings designated B325 through B330 were completed within the footprint of this AOPEC in 2017 (Figure 7). A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above 1 ppm were noted. One soil sample each was analyzed from the borings, and the sampling interval generally targeted the depth of the USTs which was estimated at a range of 6 to 10 ft bgs. The soil samples were tested for PCBs, VOCs, ETPH, and total RCRA 8 metals. The analytical results revealed PCBs and VOCs were not detected above laboratory detection limits. Select total metals were detected at concentrations that do not exceed applicable criteria. ETPH was detected in each of the soil samples at concentrations ranging from 26 mg/kg to 1,000 mg/kg. The detected ETPH concentrations in samples B328 and B330 exceed RSR criteria. While soil results were found above RSR criteria, further investigations to delineate the nature and extent of soil impacts are not planned because the current level of testing at this AOPEC combined with testing at other surrounding AOPECs is considered sufficient for LEP verification. An evaluation of soil remedial options can commence for this AOPEC. Soil analytical data is summarized in Table 1. A groundwater sample was collected from existing monitoring well MW-6 in May 2017 and analyzed for ETPH. ETPH was not detected above the laboratory reporting limits in MW6. Groundwater analytical data is summarized in Table 2. As documented above, soil remediation is planned at this AOPEC, and post remediation groundwater monitoring will be needed. Equally important, there is no recent comprehensive groundwater data in AOPEC #3B. Therefore, one groundwater sampling event is proposed for completion in March 2018 at existing wells MW-T6, MW-6, MWTRW1, and MW-CCA4 to continue to track the natural attenuation of the dissolved hydrocarbon plume previously identified. Samples will be analyzed for ETPH, PCBs, VOCs, RCRA 8 metals. AOPEC #3D: This AOPEC comprises former UST L-14, which is reported to have contained heating oil. Soil testing within this AOPEC was not completed after the tank was removed. Previous investigations completed in 2001 revealed ETPH impacts in soils albeit below RSR criteria. Additional testing was deemed necessary in order to demonstrate compliance with the RSRs for LEP verification. Two soil borings designated B311 and B312 were advanced downgradient of the UST grave in 2017 to confirm the previous 2001 results and provide additional, more recent test data (Figure 8). A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample each was analyzed from the borings, and the sampling interval generally targeted the depth of the UST which was estimated at a range of 6 to 12 ft bgs. The soil samples were analyzed for VOCs, SVOCs, and ETPH. Results revealed VOCs and SVOCs were not detected. ETPH was detected in each of the soil samples at concentrations below RSR criteria. Soil analytical data is summarized in Table 1. westonandsampson.com 16
  4. Page 23 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 23 of 824 ANNUAL REPORT Eversource Energy Because ETPH impacts were detected in soils at this AOPEC in 2017, the groundwater sample collected from existing monitoring well MW-6 in May 2017 that was used to evaluate AOPEC #3C was also used to evaluate groundwater for this AOPEC. The sample was analyzed for ETPH, and the results revealed no detections above the laboratory reporting limits. Groundwater analytical data is summarized in Table 2. AOPEC #3F: This AOPEC comprises former USTs B-2 (leaded gasoline), C-3 (unleaded gasoline), D-4 (unleaded gasoline), and E-5 (diesel fuel). A groundwater pump and treat system associated with this AOPEC was historically operated at this AOPEC and was shut down in June 2003. Natural attenuation monitoring is ongoing. Additional testing is needed to properly close out this AOPEC for LEP verification. Six soil borings designated B319 to B324 were advanced at and downgradient of the UST grave (Figure 9). A calibrated PID was used to screen soil for the presence of VOCs in each of the borings, and no VOC readings above background were noted. One soil sample each was analyzed from the borings, and the sampling interval generally targeted the depth of the UST which was estimated at a range of 8 to 12 ft bgs. The soil samples were analyzed for VOCs and ETPH. Soil analytical results revealed that VOCs were not detected. ETPH was detected in all but one soil sample. The ETPH concentration detected in sample B321 (760 mg/kg) exceed RSR criteria. Soil analytical data is summarized in Table 1. ETPH was detected in one soil sample at a concentration above the RES DEC. The entire soil data set, including half the detection limit for samples with non-detect, was entered into the EPA spreadsheet to calculate the 95% UCL for ETPH in AOPEC #3F. The calculation spreadsheet is included in Appendix E. The calculated 95% UCL for this data set is 629.5 mg/kg, which is above the RES DEC for ETPH. Based on the calculation, compliance with the DEC cannot be documented using the 95% UCL; therefore, other remedial options need to be evaluated and implemented to address ETPH impacts at this AOPEC. A groundwater samples were collected from existing monitoring wells MW-10 and MW11A in March, MW-2A in July and MW-4R in September 2017. The samples from MW-10, MW-11A and MW-4R were analyzed for VOCs, while the sample from MW-2A was analyzed for ETPH. VOCs and ETPH were not detected in groundwater samples collected from AOPEC #3F. Groundwater analytical data is summarized in Table 2. As documented above, soil remediation is planned at this AOPEC, and post remediation groundwater monitoring will be needed. While post remediation monitoring is not anticipated to begin until 2019, one monitoring event is proposed in March 2018 at existing wells MW-2A, MW-10, MW-11A, and MW-4R to continue to track the natural attenuation of the dissolved hydrocarbon plume previously identified. Samples will be analyzed for ETPH and VOCs. westonandsampson.com 17
  5. Page 24 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 24 of 824 ANNUAL REPORT Eversource Energy 4.1.4 AOPEC #4: Transformer Storage Areas & Loading Docks This AOPEC is located at the northeast portion of the AWC parcel. Recent investigations performed in 2016 to evaluate subsurface soils and on the elevated concrete platforms formerly used for transformer storage revealed the presence of elevated ETPH and PCBs at concentrations exceeding RSR criteria. Further delineation to identify the vertical and horizontal extent of impacts was warranted for RSR compliance and LEP verification. Nine soil borings designated B218A through B220A, B228A, B501, and B504 through B507 were completed within the footprint of this AOPEC in 2017 (Figure 10). One soil sample each was analyzed from the borings, and the sampling interval generally targeted shallow soils ranging from 0 to 5 ft bgs. All of the soil samples were tested for ETPH, and a select number of samples were also tested for PCBs. The analytical results revealed no further PCB impacts, and the ETPH impacts were defined as being located within the top foot of soil. Soil analytical data is summarized in Table 1. New monitoring wells, MW-201 and MW-203, and existing well MW-CCA-5 were sampled in May 2017 to document water quality relative to AOPEC #4. Groundwater samples from MW-201 and MW-CCA-5 were analyzed for PCBs, VOCs, and ETPH while the sample from MW-203 was analyzed for ETPH. No compounds were detected above the laboratory reporting limits. Groundwater analytical data is summarized in Table 2. Soil remediation is planned at this AOPEC to address the shallow PCB and ETPH impacts, and post remediation groundwater monitoring will be needed. Groundwater monitoring data from this AOPEC is limited. Therefore, one monitoring event in March 2018 at existing wells MW-CCA4, MW-CCA5, MW-201, and MW-203 is planned and groundwater samples will be tested for ETPH and PCBs. 4.1.5 AOPEC #5: Utility Pole Storage Areas Treated wooden utility poles were previously stored on racks in the eastern portion of the facility. Previous environmental evaluations assessed some of the pole storage areas; however, not all of these areas were investigated, and additional COCs were found that were not included in prior investigations. Based on this information, additional soil investigations of this AOPEC were conducted in 2016 to address these data gaps. SVOCs were detected in soil at concentrations that do not exceed applicable criteria. One soil sample exhibited a total arsenic concentration that exceeded RSR criteria, and a second soil sample exhibited a leachable arsenic concentration (a Synthetic Leaching Precipitate Procedure [SPLP] result) that exceeded RSR criteria. Existing monitoring well MW-16 was sampled in May and July 2017 to document water quality relative to the former utility pole storage area. The May groundwater sample was analyzed for PCBs, VOCs, and ETPH. The July sample was analyzed for ETPH. PCBs and VOCs were not detected above the laboratory reporting limit. ETPH was detected in MW-16 (0.11 mg/L) during the May event at a concentration below the applicable RSR westonandsampson.com 18
  6. Page 25 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 25 of 824 ANNUAL REPORT Eversource Energy criteria. However, ETPH was not detected during the July event. Groundwater analytical data is summarized in Table 2. Total arsenic was identified in one soil sample above the RES DEC and I/C DEC; while SPLP arsenic was detected in one sample at a concentration above the pollutant mobility criteria for GA groundwater (GA PMC). The entire soil mass analysis data set, including half the detection limit for samples with non-detect, was entered into the EPA spreadsheet to calculate the 95% UCL for total arsenic in AOPEC #5. In order to demonstrate compliance with the GA PMC, Section 22a-133k-2(e)(2) states that the 95% UCL must be calculated using a representative data set of no less than twenty samples. Therefore, to calculate the 95% UCL for SPLP arsenic in AOPEC #5, a total of twenty-five data points, including half the detection limit for samples with non-detect, was entered into the EPA spreadsheet. The calculation spreadsheets for both total and SPLP arsenic are included in Appendix E. The calculated 95% UCL for total arsenic is 7.323 mg/kg, which is below the RES DEC and I/C DEC and demonstrates compliance with the criteria in this AOPEC. In addition, the calculated 95% UCL for SPLP arsenic is 0.0267 mg/L, which is below the GA PMC and demonstrates compliance with this criterion. No further soil investigation is warranted or proposed for AOPEC #5. Groundwater monitoring data from this AOPEC is limited. Therefore, additional groundwater monitoring at wells MW-CCA3, MW-CCA4 and MW-16 in March, June, September and December 2018 is proposed. Groundwater samples will be analyzed for ETPH, SVOCs (including pentachlorophenol [PCP]) and RCRA 8 metals plus hexavalent and trivalent chromium, and copper. 4.1.6 AOPEC #6B: Stormwater Discharge Locations AOPEC #6B: Stormwater originating from impervious areas on the eastern side of the Site discharges through a headwall at the southern portion of the Site. Soil investigations are considered complete at this AOPEC; however, additional groundwater investigations were needed because past sampling of well MW-CCA-1 has produced frequent data gaps due to insufficient water, and there have been detections of barium and lead exceeding applicable RSR criteria in previous years (2012 and 2013), and infrequent detections of VOCs and ETPH. Groundwater samples were obtained quarterly from monitoring well MW-CCA-1 (Figure12) in March, July, September, and December 2017 and analyzed for VOCs, ETPH, and total RCRA 8 metals. No VOCs were detected during the quarterly monitoring above laboratory reporting limits. ETPH (0.13 mg/L) was detected in March at a concentration below the applicable RSR criteria. Total barium was detected in July (74 ug/L), September (79 ug/L), and December (67 ug/L) at a level that does not exceed applicable RSR criteria. No other metals were detected during the quarterly monitoring. Groundwater analytical data is summarized in Table 2. Four consecutive quarters of favorable groundwater sampling at MW-CCA-1 were obtained in 2017. All COCs were well below the applicable groundwater criteria, thus documenting compliance with the RSRs at AOPEC #6B. Monitoring at this location can westonandsampson.com 19
  7. Page 26 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 26 of 824 ANNUAL REPORT Eversource Energy be terminated and preparation of a Final Site Investigation Report and COI Transmittal Form for submission to DEEP is recommended to formerly close out AOPEC #6B. westonandsampson.com 20
  8. Page 27 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 27 of 824 ANNUAL REPORT Eversource Energy 5.0 SUMMARY OF PROPOSED ACTIVITIES Remediation, monitoring and gauging activities are planned at the Site for 2018. These activities include soil and groundwater remediation, continued groundwater monitoring and flow analysis, and data evaluation. Specifically, the following actions will be conducted in 2018: Remediation Remediation at the Site is anticipated at four AOPECS including AOPEC #2B, #3B, #3F and #4. Soil remediation is warranted at each of these AOPECs to address ETPH impacts. ETPH impacts at AOPEC #2B are located at depth of 6 to 10 ft bgs, at AOPEC #3B at a depth of 9 to 11 ft bgs, at AOPEC #3F at depth of 10 to 12 ft bgs, and AOPEC #4 within the top one foot of soil. Additionally, based on the presence of PCBs greater than 1 mg/kg in one soil sample collected from AOPEC #4, a PerformanceBased PCB cleanup performed in accordance with Title 40 CFR Section 761.61(b) is also planned. Closure documentation, including the collection of remediation confirmation samples, will be provided in a separate report. Groundwater remediation may also be needed at select AOPECs pending the findings of additional groundwater investigations planned for the Site in 2018 and after soil remediation at select AOPECs are completed. Continued Groundwater Monitoring: Groundwater monitoring activities are expected to continue in 2018 at AOPECs #1B, #1C, #2A, #2B, #3A, #3B, #3D, #3F, #4 and #5. The following groundwater sampling activities and laboratory analyses are planned at the Site in 2018: Wells MW-200, MW-201, CCA-5 will be sampled on a quarterly basis and tested for VOCs, PCBs and ETPH; Wells MW-15, MW-16, CCA-2 will be sampled on a quarterly basis and tested for VOCs, PCBs and ETPH; Wells MW-202 and MW-203 will be sampled on a quarterly basis and tested for ETPH; Wells MW-310 and MW-T3 will be sampled on an annual basis (March) and tested for ETPH; Well MW-A1R1 will be sampled on a quarterly basis and tested for SVOCs; Wells MW-T6, MW-6, MW-TRW1 and MW-CCA4 will be sampled on a quarterly basis and tested for ETPH, PCBs, VOCs and RCRA 8 metals; Well MW-6 will be sampled on an annual basis (March) and tested for SVOCs; westonandsampson.com 21
  9. Page 28 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 28 of 824 ANNUAL REPORT Eversource Energy Wells MW-2A, MW-10, MW-11A, MW-4R will be sampled on an annual basis (March) and tested for ETPH and VOCs; Well MW-203 will be sampled on an annual basis (March) and tested for PCBs; Wells MW-CCA4 and MW-16 will be sampled on a quarterly basis and tested for SVOCs and RCRA 8 metals plus hexavalent and trivalent chromium and copper; and Well MW-CCA3 will be sampled on a quarterly basis and tested for ETPH, SVOCs, RCRA 8 metals plus hexavalent and trivalent chromium and copper. Continued Groundwater Flow Analysis: To further document groundwater flow directions, groundwater elevation monitoring will continue. It is proposed that monitoring wells, MW-A1R1, MW-CCA-1, MW-CCA-2, MW-CCA-3, MW-CCA-4, MW-CCA5, MW-CCA-6, MW-4R, MW-5, MW-6, MW-8, MW-10, MW-11A, MW-15, MW-T1, MW-T2, MW-T3, MWT5, MW-T6, RW-1, TRW-1, MW-North, MW-South, MW-SA-NORTH(R) and MW-SA-SOUTH(R) will be monitored semi-annually to demonstrate the direction of groundwater flow. New groundwater monitoring wells MW-301A, MW-200, MW-201, MW-202 and MW-203 installed in 2017 will now be included in the above monitoring network as well. Continued Product Recovery: Based on historical detections of LNAPL in product recovery wells TRW-1 and MW-T3, product recovery, if needed, will continue at these wells in 2018. 5.1 Proposed Schedule Figure 22 presents the proposed project schedule for the upcoming year. This schedule outlines anticipated quarterly and annual sampling events for 2018. The annual environmental summary report will be submitted during the second quarter of 2019. westonandsampson.com 22
  10. Page 29 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 29 of 824 FIGURES

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)