Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Words on different pages
  1. Page 7 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 7 of 824 ANNUAL REPORT Eversource Energy 1.0 1.1 INTRODUCTION Scope of this Report Weston & Sampson is providing assistance to Eversource Energy (Eversource) relating to the investigation and remediation of historical releases at its former Simsbury Area Work Center. The subject Site is located at 34 Hopmeadow Street in the Weatogue section of Simsbury, Connecticut, and encompasses sixty acres (Figure 1). Previously, an Environmental Condition Assessment Form (ECAF) was submitted simultaneously with a Form III Property Transfer Act filing for the Site, which was acknowledged as complete by the Connecticut DEEP on January 18, 2002. The DEEP subsequently notified CL&P on February 26, 2002, that an environmental professional licensed pursuant to Section 22a-133v of the Connecticut General Statutes (C.G.S.) may verify the investigation and remediation of the Site. CL&P (now d/b/a Eversource Energy) is the certifying party to the transfer and, while they no longer own or occupy the property, the buildings for the Simsbury Area Work Center operations continue to occupy the central portion of the Site, with the northern portion remaining undeveloped and the southern portion was recently redeveloped for mixed commercial and residential use. This report documents activities that have occurred throughout 2017. Included with this report is a summary of proposed continuing activities and a schedule for 2018. westonandsampson.com 1
  2. Page 8 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 8 of 824 ANNUAL REPORT Eversource Energy 2.0 BACKGROUND A variety of investigations have already been conducted at this Site. At the time of the ECAF filing, the following reports had been prepared: Conceptual Design of the Groundwater Recovery and Treatment Systems at the Simsbury Area Work Center Facility, Leggette, Brashears & Graham, Inc., September 1990. Phase I Environmental Site Assessment Report, CL&P Service Center Site, Carroccio-Covill & Associates, LLC (CCA), February 2001. Phase II Environmental Site Assessment Report, CL&P Service Center Site, CCA, LLC, November 2001. Subsequent to the completion of the December 2001 ECAF, additional investigation reports were completed: Phase II Environmental Site Assessment Addendum for the CL&P Service Center Site, CCA, LLC, December 12, 2001. Simsbury Area Work Center: 2002 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2003. Simsbury Area Work Center: 2003 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., July 2004. Simsbury Area Work Center: 2004 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., August 2005. Simsbury Area Work Center: 2005 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., May 2006. Simsbury Area Work Center: 2006 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2007. Simsbury Area Work Center: 2007 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2008. Simsbury Area Work Center: 2008 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2009. Simsbury Area Work Center: 2009 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., May 2010. westonandsampson.com 2
  3. Page 9 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 9 of 824 ANNUAL REPORT Eversource Energy Simsbury Area Work Center: 2010 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2011. Simsbury Area Work Center: 2011 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2012. Simsbury Area Work Center: 2012 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2013. Simsbury Area Work Center: Environmental Investigation Report - AOPECs #1A, #5, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., January 2014. Simsbury Area Work Center: 2013 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2014. Simsbury Area Work Center: Final Site Investigation Report - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., February 2015. Completion of Investigation Transmittal Form - AOPECs #1A, #7A, #7B, #7C, #8, and #9, Weston & Sampson Engineers, Inc., February 2015. Simsbury Area Work Center: 2014 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc. May 2015. Simsbury Area Work Center: 2015 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2016. Simsbury Area Work Center: 2016 Annual Environmental Summary Report, Weston & Sampson Engineers, Inc., April 2017. All of the reports and documents listed above have been submitted to DEEP. Copies of the Phase I, Phase II and Phase II Addendum reports were submitted to DEEP along with the 2002 Annual Environmental Summary Report in April 2003. In addition to the above noted reports, this annual report summarizes new soil and groundwater investigations, continuing groundwater monitoring activities, and ongoing remedial efforts. Pertinent current data have been included in this report. Historical data remains on file, and is available upon request. The following AOPECs were identified during the Phase I and Phase II ESA, along with the two diesel fuel spills in early 2006: westonandsampson.com 3
  4. Page 10 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 10 of 824 ANNUAL REPORT Eversource Energy AOPEC #1: Current and former subsurface septic disposal systems; AOPEC #2: Current and former subsurface hydraulic vehicle lifts; AOPEC #3: Former underground storage tanks (USTs); AOPEC #4: Transformer storage areas and loading docks; AOPEC #5: Utility pole storage areas; AOPEC #6: Three stormwater discharge locations; AOPEC #7: The subject Site as a whole, due to historical agricultural use; AOPEC #8: Former railroad track along the eastern border of the subject Site, and railroad spur on the east side of the central portion of the subject Site; AOPEC #9: The “mound” (soil pile) located in the northeast corner of the southern portion of the subject Site; and AOPEC #10: Two diesel fuel spills north of the service center building. These AOPECs were organized, as appropriate, into sub-sets. The detailed AOPECs, with descriptions and identified contaminants of concern (COC), are discussed in the following section of this report. Note that in some cases there are overlapping AOPEC locations. westonandsampson.com 4
  5. Page 11 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 11 of 824 ANNUAL REPORT Eversource Energy 3.0 2017 ACTIVITIES The prior year (2016) Annual Environmental Summary Report outlined continued assessment and remedial activities that were planned and proposed for 2017. These activities included soil and groundwater assessment activities associated with AOPECs #1B, #1C, #2A, #2B, #3A, #3B, #3D, #3F and #4, continued groundwater monitoring and flow analysis, and continued data evaluation. The following describes the results of the assessment activities that occurred during 2017. 3.1 Soil Investigation Previous soil investigations of the aforementioned AOPECs occurred in 2001, 2003 and /or 2016. Based on review of these investigations, additional testing was deemed necessary to fully evaluate these areas under the Site Characterization Guidance Document (SCGD) in support of final LEP verification in accordance with the DEEPs’ Remediation Standard Regulations (RSRs). 3.1.1 Soil Investigation – April 2017 On April 19, 2017, Weston & Sampson mobilized to the Site a Geoprobe rig operated by Cummins EnviroTech, Inc. (CEI) of East Lyme, Connecticut to conduct soil investigations in AOPECs #1B, #1C, #2A, #2B, #3A, #3B, #3D and #3F. The borings completed as part of this sampling mobilization were designated with a 300-series identification. Information pertaining to soil borings including sampling depth and contaminants of concern (COCs) in each of these AOPECs is summarized in the table below. westonandsampson.com AOPEC Boring ID Sampling Interval (ft) COCs 1B B313*, B316* 8-10’ (both) PCBs, VOCs, ETPH 1C B331, B332 8-10’ (both) PCBs, VOCs, ETPH 2A B301 to B305, B317, B318, B313* PCBs, ETPH 2B 3A B306 to B310, B313* B314 and B315 9-11’ (B301, B303, B317) 8-10’ (B302, B304, B305) 11-13’ (B318) 8-10’ (B306 to B310) 11-13’ (both) PCBs, SVOCs, ETPH 3B B325 to B330 8-10’ (B325 and B329) 6-8’ (B326 and B327) 9-11’ (B328 and B330) PCBS, VOCs, ETPH, Total RCRA 8 Metals 5 PCBs, ETPH
  6. Page 12 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 12 of 824 ANNUAL REPORT Eversource Energy 3D B311, B312 4-6’ (B311), 10-12’ (B312) VOCs, SVOCs, ETPH 3F B319 to B324 8-10’ (B319, B322, B324) 9-11’ (B320, B323) 10-12’ (B321) VOCs, ETPH *Soil data utilized for multiple AOPECs ETPH = Extractable Total Petroleum Hydrocarbons VOCs = Volatile Organic Compounds SVOCs = Semi-Volatile Organic Compounds PCBs = Polychlorinated Biphenyl’s RCRA = Resource Conservation and Recovery Act In general, the borings advanced within a building (AOPECs #2A and #2B) commenced with up to 6 inches of concrete and borings completed outside the buildings commenced with 3 to 4 inches of asphalt. Underlying soils consisted of brown fine to medium sand with little gravel and transitioned to a silty sand between 12 and 15 feet (ft) below ground surface (bgs). Groundwater was encountered in each of the borings at depths varying from 9 ft to 14 ft bgs. Evidence of a release such as staining or odors was not observed in any of the soil borings during this investigation. A calibrated photoionization detector (PID) was used to screen soil for the presence of total volatile organic vapors (TVOVs) at approximate six-inch intervals throughout the sampling sleeves. No PID readings above background [(0.0 parts-per-million (ppm)] were observed in any of the borings/samples advanced/collected during this investigation. One soil sample was retained from each boring for laboratory analysis. Weston & Sampson followed the DEEP “Guidance for Collecting and Preserving Soil and Sediment Samples for Laboratory Determination of Volatile Organic Compounds” during the collection of soil samples for VOC analysis. Two duplicate samples (designated DUP-1 and DUP-2) were also collected from sample locations B309 and B325, respectively, for quality assurance/quality control (QA/QC) purposes. The soil samples were stored on ice and shipped under chain-of-custody protocols to Con-Test Analytical Laboratory (Con-Test), a Connecticut-certified laboratory in East Longmeadow, Massachusetts. The samples were submitted for various chemical analysis as identified in the above table. Figures 2 through 9 illustrate soil boring locations by AOPEC and soil laboratory analytical results are summarized in respective tables for each AOPEC in Table 1. Boring logs are included in Appendix A. 3.1.2 Soil Investigation – September 2017 Additional soil investigation occurred on September 20, 2017, in select AOPECs including AOPECs #2A, #2B, and #4. Haz-Probe, Inc. (Haz-Probe) of Hampden, MA mobilized to the Site a Geoprobe rig to advance a single boring in AOPEC #2A and #2B adjacent to original boring locations B-6 in AOPEC #2A and B-310 in AOPEC #2B. Eight soil borings were advanced with a Geoprobe rig within AOPEC #4 including a single boring adjacent to previous borings B218, B219 and B220 and five new borings designated B503 through westonandsampson.com 6
  7. Page 13 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 13 of 824 ANNUAL REPORT Eversource Energy B507. Due to access constraints, three additional borings including one boring adjacent to previous boring B228 and two new borings designated B501 and B502 were advanced via Haz-Probe’s porta-probe. Any borings advanced adjacent to a previous boring used the same number nomenclature followed by the letter A designation. Each of the borings in AOPECS #2A and #2B were advanced to 16 feet ft bgs. Each boring in AOPEC #4 was advanced to 8 ft bgs. The interior borings contained 6 inches of concrete overlying light brown fine to medium sand with trace amounts of fine to coarse gravel and transitioned to a fine to coarse sand at approximately 12 ft bgs. A faint to moderate petroleum odor was observed in boring B-310A at a depth of 10 to 13 ft bgs. No staining was observed. Each of the borings advanced within AOPEC #4 (except B228A, B501 and B502) commenced with 6 inches of asphalt pavement followed by 6 inches of sub-base material which typically consisted of dark brown fine to medium sand, trace amount of fine to coarse gravel and trace pieces and/or chunks of asphalt. The underlying soil was generally brown and consisted of fine to medium sand to fine to coarse sand with trace fine to coarse gravel. Subsurface conditions at borings B228, B501 and B502 consisted of 2 inches of topsoil followed by brown fine to medium sand to fine to coarse sand and trace amounts of fine to coarse gravel. Odors, staining and groundwater were not encountered at any of the boring locations completed in AOPEC #4. Multi-depth soil samples were retained from each boring for laboratory analysis to aid in the delineation of the vertical extent of impacts. The following table summarizes the sampling intervals and COCs by location. AOPEC Boring ID 2A B6A 2B B310A 4 B218A, B219A, B220A, B228A, B501 to B507 Sampling Interval (ft) 6-8’ 8-10’ 10-12’ 12-14’ 6-8’ 8-10’ 10-12’ 12-13’ 1-3’ 3-5’ 6-8’ COCs ETPH PCBs via soxhlet extraction and/or ETPH PCBs via soxhlet extraction and/or ETPH ETPH = Extractable Total Petroleum Hydrocarbons PCBs = Polychlorinated Biphenyl’s A duplicate sample (DUP-1) was also collected from sample location B505 for QA/QC purposes. The soil samples were stored on ice and shipped under chain-of-custody protocols to Con-Test. Each of the soil sampling intervals with the exception of the deepest sampling interval (12-14’ for B6A and 12-13’ for B310A) were submitted for chemical analysis. The deeper samples were submitted to Con-Test but held for potential analysis pending the results of the shallower sampling intervals. Similarly, each of the first two sampling intervals for boring locations B218A, B219A, B220A and B228A were submitted westonandsampson.com 7
  8. Page 14 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 14 of 824 ANNUAL REPORT Eversource Energy for chemical analysis and third sampling interval was submitted to Con-Test but analysis was held pending results of the preceding sampling intervals. The same approach occurred for samples collected from boring locations B501 to B507. Only the first sampling interval was submitted for chemical analysis. The remaining intervals were submitted to Con-Test and held for analysis pending results of the shallow sample. Figures 4, 5 and 10 depict additional soil boring locations in AOPECs #2A, #2B and #4 and soil laboratory analytical results are summarized in Table 1. Boring logs are included in Appendix A. 3.1.3 Groundwater Investigation As part of the April 2017 subsurface investigation, four new groundwater monitoring wells including MW-200 through MW-203 were installed at boring locations B313, B316, B317 and B318, respectively. Monitoring wells MW-200 and MW-201 were completed to 18 ft bgs, MW-202 to 19 ft bgs and MW-203 to 20 ft bgs. Each of the newly installed groundwater monitoring wells were constructed of 2-inch ID Schedule 40, threaded, polyvinyl chloride (PVC) riser pipe and 0.010-inch (10-slot) screen 10-feet in length. The bottom of the well was capped with an end plug. With the well screen in place, a clean silica sand pack was installed in the annular space from the bottom of the boring to approximately 2-feet above the top of the well screen. A 1-foot bentonite chip seal was placed above the sand pack, followed by placement of more sand up to approximately 1 ft bgs. The monitoring wells were completed at the surface with a locking compression plug and a protective flush-mounted road box that was cemented into place. After completion of well installation activities, each of the wells was developed by Weston & Sampson personnel using a whale pump to remove cuttings, clean the well screen, and establish a hydraulic connection between the well and the adjacent water-bearing strata. Based on soil sample results from the April 2017 soil investigation, Weston & Sampson mobilized to the Site CEI on August 23, 2017 to advance a boring adjacent to previous boring location B6 (designated B6A) in AOPEC #2A and recent boring B310 (designated B310A) in AOPEC #2B in order to retrieve a soil sample for petroleum fingerprint analysis. Additionally, new boring B310A was completed as a groundwater monitoring well. Soil samples collected from the 8 to 10 ft bgs from each boring were submitted to Con-Test for fingerprint analysis to identify the type of petroleum detected in these areas. Groundwater monitoring wells MW-310A was completed to 20 ft bgs and constructed in a similar manner to wells MW-200 through MW-203 described above. Similarly, MW-310A was developed by Weston & Sampson personnel using a whale pump to remove cuttings, clean the well screen, and establish a hydraulic connection between the well and the adjacent water-bearing strata. Well completion logs are included in Appendix A. 3.2 Continued Groundwater Monitoring As proposed in the prior (2016) Annual Environmental Summary Report, continued groundwater monitoring was conducted during 2017. Additional groundwater monitoring was conducted throughout 2017 in accordance with the plan documented in the December 27, 2016 Proposal for Property Transfer Act Environmental Site Assessment Service. Groundwater samples were collected for laboratory westonandsampson.com 8
  9. Page 15 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 15 of 824 ANNUAL REPORT Eversource Energy analysis from sixteen monitoring wells during the year. Monitoring well locations are shown on Figures 2 through 14, and laboratory analytical results are summarized in respective tables for each AOPEC in Table 2. A copy of the groundwater analytical results is included in Appendix C, and a copy of the groundwater monitoring data sheets is included in Appendix D. The groundwater pump and treat system associated with AOPEC #3 was shut down in June of 2003, following notification to the DEEP. From 2003 through 2006, groundwater monitoring for VOCs occurred annually at wells MW-4R, MW-11A, MW-15, and RW-1. In 2007, the monitoring program was slightly altered. Annual sampling for VOCs was continued at wells MW-11A, MW-15, and RW-1, and semi-annual sampling (instead of annual sampling) for VOCs was begun at MW-4R. Sampling frequency in 2017 was generally consistent with 2016 (March, July, September, and December), however, an additional event was conducted in May. It should be noted that VOC groundwater sample collected during the June event was compromised (frozen) which required it to be resampled in July. Well ID MW-CCA-1 MW-CCA-2 MW-CCA-5 March V, E, M MW-4R DRY 2017 Groundwater Sampling Plan May June/July V, E, M P, V, E P, V, E P, V, E MW-2A MW-11A V MW-6 E MW-10 V MW-15 P, V, E MW-16 P, V, E MW-T3 E MW-200 P, V, E MW-201 P, V, E MW-202 E MW-203 E MW-310 P-PCBs, V-VOCs, E-ETPH, M-RCRA 8 Metals September V, E, M December V, E, M V No sample snow cover E P, V, E P, V, E E The analytical results from 2017 revealed no detections of VOCs at wells MW-4R, MW-11A, and MW-15. These findings repeat a trend of no observed impacts at wells MW-11A and MW-15 in previous sampling years, and they also document an apparent improving trend at MW-4R, as several VOCs were detected at this well in prior sampling years. MW-15 was also analyzed for PCBs and ETPH. ETPH was detected in only the May event at a concentration of 0.099 milligrams per liter (mg/L), which is below the applicable RSR criteria. Groundwater samples collected from monitoring well MW-CCA-1 located adjacent to the stormwater discharge outfall comprising AOPEC #6B have historically shown low levels of VOCs, ETPH and select metals. To remain in compliance with the RSRs, quarterly groundwater monitoring is conducted at this well, and the samples are analyzed for VOCs, ETPH, and Resource Conservation and Recovery Act regulated metals (RCRA 8 metals). No VOCs were detected above laboratory reporting limits. ETPH westonandsampson.com 9
  10. Page 16 of 824

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 125 Page 16 of 824 ANNUAL REPORT Eversource Energy was detected in March (0.13 mg/L) at a concentration below the applicable RSR criteria. Total barium was detected in July [(74 micrograms per liter (ug/L)], September (79 ug/L), and December (67 ug/L) at a level that does not exceed applicable RSR criteria. In addition to the wells discussed above and as presented in the table above, wells MW-CCA-2, MWCCA-5, MW-2A, MW-6, MW-10, MW-16, MW-T3, MW-200, MW-201, MW-202, MW-203 and MW-301, were sampled for various compounds in 2017. No VOCs, or PCBs were detected in the analyzed samples. ETPH was detected during the May event in MW-CCA-2 (0.16 mg/L) and MW-16 (0.11 mg/L) at a concentration below the applicable RSR criteria. However, concentrations of ETPH detected in MWT3 (5.6 mg/L) during May and MW-310 (0.79 mg/L) during the September events exceed the surface water protection criteria (SWPC) established in the Connecticut DEEP Request for Approval of Criteria for Additional Polluting Substances and Certain Alternative Criteria Form, updated April 2018. 3.3 Groundwater Flow Analysis To determine groundwater flow directions, depth to water measurements were collected on a quarterly basis in March, June/July, September, and December 2017. Table 3 summarizes groundwater depth to water and calculated water surface elevations, and Figures 13 and 14 illustrate groundwater flow directions for the March and September 2017 gauging events. In general, groundwater flows in a southsouthwesterly direction across the Site, which is consistent with prior flow determinations. 3.4 Product Recovery During July 2017, 1.05 feet of product was measured in MW-16 with an oil/water interface probe; however, no other evidence (sheen or odor) was observed in the field, nor were ETPH, VOCs, or PCBs detected in the analyzed groundwater sample. Therefore, the measured product is believed to be the result of an error with the probe. No other measurable oil (light, nonaqueous phase liquid [LNAPL]), were detected in any of the monitoring wells located at the Site, including in the former transformer oil UST area. LNAPL has not been detected in well MW-T3 since 2009 and well TRW-1 since 2005. Figures 8 and 9 illustrate the historic quarterly monitoring of apparent product thickness in monitoring wells MWT3 and TRW-1, respectively. Historical cumulative product recovery for well TRW-1 is shown on Figure 10. westonandsampson.com 10

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)