Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Words on different pages
  1. Page 8 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 8 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT 2.2.3 Groundwater Classification According to the Water Quality Classifications Map Madison, CT (CTDEEP 2018), the Site is located in a “GA” area and partially located within a final aquifer protection area (Level A), where groundwater is classified as “GA” and where CTDEEP anticipates reclassifying the groundwater as “GAA” in the future. Designated uses for groundwater classified as GA include existing private and potential public or private supplies of water suitable for drinking without treatment, and baseflow for hydraulically connected surface water bodies. The GAA groundwater classification is designated for use as existing or potential public water supply suitable for drinking without treatment and baseflow for hydraulically connected surface water bodies. A final aquifer protection area contributes groundwater to active public water supply wells or well fields that serve more than 1,000 people and are set in sand and gravel aquifers. 2.2.4 Geology According to the Surficial Materials Map of Connecticut (Stone et al., 1992), the Site is situated at the boundary of two surficial geologic units. This first unit is described as a sand unit composed of coarse to fine sands, commonly occurring in well-sorted layers. The coarse layers may contain granule to pebble size gravel; the fine layers may consist of the fine sands, silts, and clays associated with delta foreset beds, distal fluvial deposits, and/or windblown sediment. The second unit is described as a thin till, generally 10-15 feet thick, which can contain a looser, coarsergrained ablation till, a denser, finer-grained lodgement till, or both. Surficial geology at the Site has been investigated and described by several consultants, including Geologic Company, Leggette, Brashears, & Graham, Inc. (LBG), and Weston & Sampson. The boring logs prepared by Geologic Company and LBG describe the presence of glacial till to a depth of approximately 15 feet below grade (fbg). Soil descriptions from the three companies are generally consistent with the ablation till unit described by Stone et al. (1992), with the exception that Geologic Company reported the presence of cobbles in many of the boring locations. LBG’s 1990 recovery well and monitoring well logs indicated the till described in different locations as clay and fine sand or sand and gravel. These logs also describe small-scale layering in several of the borings. The blow counts recorded on the boring logs prepared by Geologic Company and LBG, and the layering described in LBG’s logs, support the conclusion that the ablation till is the predominant surficial geologic unit at the Site. According to the Bedrock Geologic Map of Connecticut (Rogers, 1985), the bedrock underlying the Site is the Waterford Group, a light to dark medium-grained gneiss. Based on the findings of the 2019 and 2021 subsurface investigations performed by GES, and historical Site findings, overburden soils within the investigation areas are present at depths ranging from 8-18 fbg with bedrock encountered at approximately 14-15 fbg. During the 2021 supplemental subsurface investigation, weathered bedrock was observed at bedrock well locations BR-1 and BR-2 at approximately 18 to 33 fbg (BR-1) and 14 to 27 fbg (BR-2). Competent bedrock was observed at 33 fbg (BR-1) and 27 fbg (BR-2). Page 3
  2. Page 9 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 9 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT 2.2.5 Hydrogeology Overburden groundwater flow based on measurements collected between December of 2022 and September of 2023 after permanent shutdown of the groundwater recovery and treatment system is interpreted to be primarily to the south. A hydraulic gradient of 0.02 feet per foot (ft/ft) was calculated based on data collected September 25, 2023. A Groundwater Monitoring Map illustrating groundwater flow direction and gradient on September 25, 2023 is included as Figure 3. Historical depth to groundwater varies across the Site with seasonal fluctuations of approximately 2 feet. Water table interpretations are defined by two areas, utilizing monitoring well MW-13 as the benchmark. 3 Site Background 3.1 Description of Release Petroleum constituents were present in soil and groundwater at the Site due to a release(s) from historical USTs that were formerly utilized for refueling fleet vehicles. A release from the UST system was first identified during a soil gas survey and monitoring well installation and sampling event completed in August 1989. Impacted soil was encountered during excavation along the vent line of the 10,000-gallon unleaded gasoline UST E5 on August 29, 1989. An excavation along the end of UST E5 revealed evidence of a release under the UST. The release was reported to CTDEEP and spill #1989-03058 and LUST ID #31668 were assigned to the Site. Removal of UST E5 and excavation of surrounding soil was conducted on August 31, 1989. Additional information related to the volume of soil removed, remaining soil quality, or regulatory involvement was not reported. 3.2 Previous Remedial Activities The groundwater recovery and treatment system, which previously operated at the Site was installed in 1991. Between 1992 and 1998, a soil venting and portable air sparging system was operated at select wells to reduce the adsorbed-phase and dissolved-phase impacts associated with monitoring wells outside of the recovery well network. According to the January 1999 Status Report prepared by Northeast Utilities Service Company (a predecessor Eversource company), the sparge/vent system removed 410 gallons of gasoline throughout its operation. The system was deactivated for the winter on October 20, 1998, and due to low vapor-phase recovery was ultimately removed from the Site. The groundwater recovery and treatment system malfunctioned in November 2022 and remained offline in anticipation of initiating the RAP activities. 4 Remedial Goals The remedial goal was to reduce contaminant concentrations in soil to levels below RSR numeric criteria such that active groundwater remediation will not be required to achieve compliance with the applicable RSR groundwater criteria. Post remedial groundwater monitoring, consisting of Page 4
  3. Page 10 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 10 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT quarterly sampling events, will be initiated following the installation of replacement monitoring wells. 5 Remedial Action Soil excavation was selected as the recommended remedial approach as proposed in the RAP. This approach was selected because the extent of soil impacts was well defined, readily accessible using standard construction equipment, and capable of meeting the previously stated remedial goals. The following activities were completed in advance of soil excavation by qualified contractors retained by Eversource and/or GES. Geosearch, Inc. of Sterling, Massachusetts was contracted to abandon recovery wells RW-1, RW-2, RW-3, RW-4. Each recovery well was chlorinated and then sealed using a tremie-pipe. In addition, the groundwater recovery and treatment system discharge line was grouted and sealed. Recovery well abandonment logs are included as Appendix A. N|V|5 of Temple Terrance, Florida was contracted to complete a hazardous material assessment of the two groundwater recovery and treatment sheds. The assessment was completed by a Connecticut certified asbestos inspector, and included inspection and testing for asbestos containing materials and/or lead. A copy of the assessment report is included as Appendix B. True Blue Environmental Inc. of Wallingford, Connecticut (True Blue) dismantled and removed the groundwater recovery and treatment equipment, carbon media, and shed structures. The equipment and shed structures were disposed as construction debris and the carbon media was transported to Ondrick Materials & Recycling, LLC of Chicopee, Massachusetts (Ondrick) with outbound soil. True Blue, under the direction of GES, completed test pits across the targeted excavation area. Soil samples were collected and analyzed by Eurofins Environment Testing New England of North Kingston, Rhode Island (Eurofins) for waste and reuse classification purposes. Waste classification analyses were specified by Ondrick and reuse analyses included volatile organic compounds (VOCs) via Environmental Protection Agency (EPA) Method 8260. A copy of the Eurofins laboratory reports is included as Appendix C. A photographic log illustrating RAR activities is included as Appendix D. 5.1 Excavation True Blue conducted the remedial excavation between June 27 and September 22, 2023 under the direction of a GES supervisor. Soil was excavated to the bedrock surface from two target areas: Excavation Area A, which was completed in a series of cells, and Excavation Area B. The proposed extent of excavations was based on investigations completed by Weston & Sampson in 2019 and GES in 2022 as detailed in the RAP. The actual extent of excavation was based on field observations during the soil removal process. Deep and shallow confirmatory endpoint soil Page 5
  4. Page 11 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 11 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT samples were collected from the final excavation sidewalls to evaluate post-excavation conditions. In Excavation Area A, soil from grade to a depth of approximately 8 feet, that was evaluated through visual, olfactory, and photoionization detector screening methods and laboratory analysis and determined to meet the definition of natural soil was stockpiled for reuse as backfill. Field screening methods were employed to segregate and transport any soil exhibiting nuisance characteristics including staining and/or odor to Ondrick. A total of 14 soil samples were collected and analyzed by Eurofins for VOCs via EPA Method 8260. Laboratory results indicated VOCs were not detected. A summary of the Soil Reuse Laboratory Analytical Data (VOCs) is provided on Table 1. A copy of the Eurofins laboratory reports is included as Appendix C. Soil between approximately 8 fbg to the top of bedrock (approximately 15 fbg) was excavated and transported to Ondrick. The extent of the Area A excavation expanded to the limits illustrated on Figure 4. In Excavation Area B, two test pits, Test Pit D and Test Pit E, were advanced to the top of bedrock located between 9.5 feet and 12.5 feet below grade. Impacted soil, evaluated through field screening and laboratory analyses, was not encountered. The location of the test pits are illustrated on Figure 3. A total of 4,679.02 tons of gasoline-impacted soil was transported to Ondrick for recycling. Copies of the soil manifests are included as Appendix E. A photographic log illustrating RAR activities is included as Appendix D. 5.2 Dewatering Dewatering was only necessary during storm events, during which stormwater collected within the excavation. Dewatering sumps were installed and maintained as the excavation progressed. Stormwater was pumped into fractionation tanks for temporary storage. Approximately 143,000 gallons of stormwater was recovered and transported by True Blue to Tradebe Environmental Services, of Bridgeport, Connecticut and/or Recycling NE, LLC for treatment during remedial excavation activities. Copies of the water disposal documentation are included as Appendix F. 5.3 Backfill & Compaction Backfill consisted of either ¾ inch washed stone or 2-inch processed stone placed from the bedrock contact to approximately 9 feet below grade. Filter fabric was placed over the ¾ inch washed stone and backfilled with the stockpiled clean soil. Additional 2-inch processed stone was used to complete backfill to grade. Compaction was achieved using a vibratory roller compaction machine in no more than 2-foot lifts. Asphalt repaving was completed as final restoration, on November 30, 2023. 6 Confirmatory Soil Sampling Results Confirmatory post-excavation endpoint soil samples were collected at approximate 20 foot intervals and submitted to Eurofins for analyses of VOCs using EPA Method 8260. A total of 51 samples from 26 locations were collected from the excavation sidewalls at deep and shallow Page 6
  5. Page 12 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 12 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT locations to demonstrate RSR compliance. The deep sample collection points were near the bedrock and soil interface with shallow samples collected from several feet above the bedrock and soil interface. Laboratory results of confirmatory samples demonstrate compliance to the RSRs at each of the 51 sampling locations. Forty samples did not contain VOCs above the respective laboratory reporting limits, with 11 samples containing one or more VOC detections. These detections ranged from 0.00418 milligrams per kilogram (mg/kg) of Trichlorofluoromethane at CS-25S to 0.385 mg/kg of Acetone at CS-7D. Acetone is a recognized laboratory contaminant. A summary of the Compliance Soil Laboratory Analytical Data (VOCs) is provided on Table 2 and illustrated on Figure 4. A copy of the Eurofins laboratory reports is included as Appendix C. 7 Data Quality Assessment / Data Usability Evaluation In accordance with CTDEEP Reasonable Confidence Protocol (RCP) procedures, a Data Quality Assessment (DQA) and a Data Usability Evaluation (DUE) have been completed for the soil analytical data associated with this remediation. The Data Quality Objectives (DQOs) were to produce representative data of sufficient quantity and quality for site closure/verification purposes. The samples collected during remedial excavation activities were property preserved, submitted with an accurate and complete chain of custody, and analyzed within the recommended method holding times. Eurofins followed the CT RCP guidelines for laboratory preparation and reporting standards that produced data that were in compliance with CT RCP criteria. No data was reported outside of the CT RCP criteria. All laboratory data quality objectives were met. Therefore, based on the data evaluation performed in the DQA, the data is useable for the intended purpose. 8 Future Site Activities 8.1 Monitoring Well Replacement Two replacement monitoring wells will be installed by a Connecticut licensed driller. Each well will be constructed as 2-inch monitoring wells set with a pre-packed screen from approximately 15 to 5 feet below grade. Each well will be completed to grade with riser pipe, plug and road box embedded in a concrete pad. The replacement monitoring wells will be designated with the following identifications, MW-1R and MW-13R, which reflect the proximity to former parent wells MW-1 and MW-13. The replacement wells will be located within the backfilled excavation; therefore, soil samples will not be collected. Each monitoring well will be developed until relatively free of sediment. An updated Site Map showing current site features is included as Figure 5. 8.2 Post Remediation Groundwater Monitoring Post-remediation groundwater monitoring will be performed on a quarterly basis for a period of one year, which will begin in 2024. The first post-remedial groundwater sampling event will include sixteen groundwater monitoring wells: MW-1R, MW-2, MW-3, MW-4, MW-5, MW-6, MW-7, MWPage 7
  6. Page 13 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 13 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT 8, MW-12, MW-13R, MW-15, MW-16, MW-17, MW-18, MW-19 and MW-23 as shown on Figure 5. Samples will be collected from the wells using low flow sampling methods and will be analyzed for VOCs by EPA method 8260. A sub-set of these monitoring wells may be sampled during subsequent groundwater sampling events. An annual report will be prepared and will include the replacement monitoring well installation details in addition to sample results. 8.3 Schedule Activity Target Completion Monitoring Well Replacement 4 th Quarter 2023 Post Remedial Groundwater Sampling (Quarterly) 2024 UST Closure Report 2025 9 Conclusions Excavation of gasoline impacted soil was selected because the extent of soil impacts was well defined and readily accessible through standard construction means and methods. Removal of gasoline impacted soil was successfully achieved as demonstrated by the confirmatory sampling results. Therefore, no additional remediation in response to LUST ID # 31668 is warranted as results support soil compliance with the RSRs. Post-remedial groundwater sampling will be conducted following the installation of two replacement wells (MW-1R and MW-13R) to document groundwater compliance with the RSRs. A UST closure report will be prepared once groundwater compliance with the RSRs has been achieved. Page 8
  7. Page 14 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 14 of 1094 Remedial Action Report Madison Area Work Center 135 New Road, Madison, CT Figures
  8. Page 15 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 15 of 1094
  9. Page 16 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 16 of 1094
  10. Page 17 of 164

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 118 Page 17 of 1094

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)