Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Words on different pages
  1. Page 1 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 1 of 186 VIA CERTIFIED MAIL February 25, 2020 Mr. David Ringquist Remediation Division Bureau of Water Protection and Land Reuse Connecticut Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 RE: Status Report Former CL&P Operations Center 176 Cumberland Avenue Wethersfield, Connecticut REM ID: 11169 Dear Mr. Ringquist: Apex Companies, LLC, on behalf of Eversource Energy (Eversource), has prepared the attached Status Report for environmental activities that have been conducted at the former Connecticut Light and Power Company (CL&P) facility located at 176 Cumberland Avenue in Wethersfield, Connecticut. The report summarizes the activities conducted in 2019. Should you have any questions regarding the information presented, please contact either of the undersigned at [phone removed]. Sincerely, Apex Companies, LLC Apex Companies, LLC Donna L. Kask Senior Project Manager David B. Sherman, LEP Program Manager ecc: Ms. Amy Voisine-Shea, Eversource Mr. David Lansey, ABC Properties/Fisher Associates WATER RESOURCES • ENVIRONMENTAL SERVICES • INDUSTRIAL HYGIENE • SAFETY • AIR QUALITY • SUSTAINABILITY AND CLIMATE CHANGE Apex Companies, LLC • [phone removed] • www.apexcos.com
  2. Page 2 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 2 of 186 2019 ANNUAL STATUS REPORT Former CL&P Operations Center 176 Cumberland Avenue Wethersfield, Connecticut REM ID: 11169 February 2020 Apex Project No.: 6089-015 Prepared for: Eversource Energy P.O. Box 270 Hartford, CT 06141-0270 Prepared by: Apex Companies, LLC 58H Connecticut Avenue South Windsor, CT 06074-3452 WATER RESOURCES • ENVIRONMENTAL SERVICES • INDUSTRIAL HYGIENE • SAFETY • AIR QUALITY • SUSTAINABILITY AND CLIMATE CHANGE Apex Companies, LLC • [phone removed] • www.apexcos.com
  3. Page 3 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 3 of 186 TABLE OF CONTENTS 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 INTRODUCTION .............................................................................................................1 SITE BACKGROUND .....................................................................................................1 SOIL REMEDIATION ......................................................................................................2 GROUNDWATER MONITORING WELL REPLACEMENT .............................................2 GROUNDWATER MONITORING ACTIVITIES .............................................................3 5.1 Groundwater Sampling Results ........................................................................4 5.2 Data Quality and Usability .................................................................................4 CHANGE OF LICENSED ENVIRONMENTAL PROFESSIONAL (LEP) OVERSIGHT ... 5 FUTURE ACTIVITIES .....................................................................................................6 REFERENCES ................................................................................................................6 FIGURES Figure 1: Figure 2: Site Location Map Site Plan TABLES Table 1: Groundwater Analytical Results – Detected Analytes APPENDICES Appendix A: Appendix B: Well Sampling Records Laboratory Analytical Reports – Groundwater https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx TOC-1
  4. Page 4 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 4 of 186 1.0 INTRODUCTION Apex Companies, LLC (Apex), on behalf of Eversource Energy Service Company (Eversource), has prepared the following Status Report for environmental activities conducted at the former Connecticut Light and Power Company (CL&P) facility located at 176 Cumberland Avenue in Wethersfield, Connecticut (the Site). This report summarizes monitoring activities conducted in 2019. 2.0 SITE BACKGROUND On October 4, 2012, the Connecticut Department of Energy and Environmental Protection (CTDEEP) issued a letter to Wethersfield, LLC acknowledging receipt of a Form III and an Environmental Condition Assessment Form (ECAF) in support of a transfer of the property from Wethersfield, LLC to the Capitol Region Education Council (CREC). Wethersfield, LLC was the Certifying Party for the transfer, and Eversource is currently monitoring the completion of certain remediation activities at the Site. Note that while Eversource is performing certain environmental activities at the Site, Eversource is not the Certifying Party per the Connecticut Transfer Act. Responsibility for oversight of assessment and remediation at this Site has been delegated to a Connecticut Licensed Environmental Professional (LEP) under CGS Section 22a-134x. A Schedule for Investigation and Remediation letter was submitted to CTDEEP on December 17, 2012. The Site was initially developed in the mid-1950s by CL&P (a subsidiary of Northeast Utilities (NU, now known as Eversource Energy)) primarily for use as a call/data center. Additional uses included vehicle maintenance and equipment warehousing. Records indicate that CL&P and other NU companies (collectively NU) occupied the Site from the mid-1950s until 2006. These records also indicate that the Site was owned by a series of real estate companies for which NU was a tenant. Town of Wethersfield records document that Wethersfield, LLC purchased the property in 1998, and CREC is the current property owner. The Site has been redeveloped by CREC for use as a school (CREC Discovery Academy). The redevelopment plan involved the preservation of certain portions of the Site structure and demolition of other portions of the site building. Construction was completed at the Site in the fall of 2015, and the school has been open since then. The subject property is located in a mixed commercial and residential area of Wethersfield. The Site is bordered to the east and south primarily by residential properties. It is bordered to the northeast by office buildings, to the northwest by the Wilbur Cross Highway, and is primarily undeveloped and wooded to the west. The geographic location of the Site and its immediate surroundings are included on Figure 1. According to the CTDEEP Water Quality Classification Map of Connecticut, groundwater beneath the Site is classified as GA, which is defined as groundwater that is suitable for drinking without treatment. A Site Plan depicting pertinent site features is included as Figure 2. https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 1 of 6
  5. Page 5 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 5 of 186 A Remedial Action Plan (RAP) was prepared by Apex and submitted to CTDEEP in April 2013. The RAP described site conditions, remedial goals, and remedial activities to be performed to address soil and groundwater impacts. As detailed in the RAP, Apex performed a review of remediation alternatives and determined that two remedial technologies were the most applicable and cost effective for remediating soil and groundwater at this Site: 1) excavation and off-site disposal of impacted soil, and 2) monitored natural attenuation of impacted groundwater. 3.0 SOIL REMEDIATION Soil excavation activities as outlined in the RAP were conducted by True Blue Environmental, Inc. of Wallingford, Connecticut on July 17, 2013 and were overseen by an Apex environmental scientist. Excavation activities were conducted in the vicinity of monitoring well AP-11, which was located in a former loading dock area on the western side of the original site building. Based on prior sampling results, extractable total petroleum hydrocarbons (ETPH) were identified as the contaminant of concern. The completed excavation measured 10 feet by 10 feet, centered on monitoring well AP-11, and extended to 12 feet below grade (fbg). A total of 69.75 tons of impacted soil was disposed of offsite at the Ted Ondrick Company, LLC facility in Chicopee, Massachusetts. Confirmatory soil samples were collected by Apex personnel from 8 to 10 fbg on all four sidewalls and from the bottom of the excavation. The samples were submitted to Con-Test Analytical Laboratory (Con-Test) in East Longmeadow, Massachusetts and analyzed for ETPH. The results of the laboratory analytical data indicate that there were no detections of ETPH above the laboratory reporting limits (RLs) in any of the post-excavation samples. Following receipt of the sampling results, the excavation was backfilled to grade with clean fill. Based on the laboratory results, excavation of the impacted area was successful, and soil remediation is complete. A letter report dated August 27, 2013 was submitted to CTDEEP to document the soil remediation activities. 4.0 GROUNDWATER MONITORING WELL REPLACEMENT During redevelopment and related construction activities of the school, many groundwater monitoring wells were destroyed and required replacement. In September 2014, replacement wells AP-6R and AP-11R were installed. Subsequently, during June 2015, nine additional replacement groundwater monitoring wells (AP-1R, AP-2R, AP-3R, AP-4R, AP-9R, AP-12R, AP13R, AP-15R, and AP-101R) were installed as described in the 2015 Annual Status Report. Since installation of the replacement wells in 2015, two of these wells (AP-13R and AP-15R) have been reported as dry/and or did not contain enough groundwater for sampling during the annual groundwater sampling events. Two new shallow bedrock wells (AP-13R-BR and AP-15R-BR) were installed at these locations on August 17, 2018. Monitoring well AP-13R-BR was installed in a small landscaped area adjacent to well AP-13R. Monitoring well AP-15R was over-drilled to https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 2 of 6
  6. Page 6 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 6 of 186 install well AP-15R-BR. Details of the August 2018 well installation were described in the 2018 Annual Status Report. The replacement well locations are depicted on Figure 2. 5.0 GROUNDWATER MONITORING ACTIVITIES An annual groundwater monitoring event was conducted on July 30-31, 2019. Groundwater samples were collected from 11 monitoring wells: AP-1R, AP-2R, AP-3R, AP-4R, AP-6R, AP-9R, AP-11R, AP-12R, AP-13R-BR, AP-15R-BR and AP-101R. Prior to sampling, each monitoring well was gauged with an electronic interface probe (IP) capable of detecting non-aqueous phase liquid (NAPL) and depth to water to an accuracy of 0.01 feet. The purpose of the gauging is to collect data regarding depth to water and the thickness of the saturated zone in each well prior to sampling and to determine the potential presence of any light or dense NAPL (LNAPL or DNAPL). Measurable NAPL was not detected in on-site monitoring wells during the groundwater monitoring event. Depth to groundwater ranged from 3.10 feet (AP3R) to 15.15 feet (AP-11R). Well AP-13R was dry and, therefore, was not sampled. For the annual groundwater monitoring event, Apex personnel performed low-flow sampling in general accordance with the United States Environmental Protection Agency (USEPA) Low Stress Purging and Sampling of Groundwater Samples from Monitoring Wells Revised September 19, 2017). As required by the purging and sampling protocol, groundwater was monitored during well purging using a water quality meter with a flow through cell for the following parameters: temperature, specific conductivity, pH, oxidation-reduction potential (ORP), dissolved oxygen (DO), and turbidity. Once each of these parameters stabilized, or if parameter readings did not stabilize after a minimum of 60 minutes of purging, a groundwater sample was collected. However, well AP-12R did not have sufficient water column and, therefore, field parameter readings were unable to be collected and a sample was collected from well AP-11R before a minimum of 60 minutes of purging was achieved because of insufficient groundwater recharge. Parameter stabilization occurred at well AP113R-BR; however, insufficient groundwater recharge occurred during sampling. Therefore, sample collection was completed once the well was allowed recharge. In addition, the following parameters did not stabilize during the purging activities: • • • • • ORP in wells AP-6R, AP-9R, and AP-15R-BR; DO in wells AP-1R, AP-4R, AP-9R, and AP-101R; Turbidity in wells AP-1R, AP-4R, AP-6R, AP-9R, and AP-15R-BR; Specific conductivity in wells AP-1R, AP-2R, AP-6R, and AP-15R-BR: and pH in AP-15R-BR. The collected groundwater samples were immediately placed in laboratory-provided glassware and submitted to Con-Test for analysis in accordance with one or more of the following analytical methods: • • Volatile organic compounds (VOCs) (EPA Method 8260); Semi-volatile organic compounds (SVOCs) (EPA Method 8270); https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 3 of 6
  7. Page 7 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 7 of 186 • • • ETPH by the Connecticut Method (CT ETPH); Total Remediation Standard Regulations (RSRs) metals 1 (EPA Method 6020/7470); and Dissolved RSR metals (EPA Method 6020). Well sampling records documenting well purging and monitoring activities are provided in Appendix A. 5.1 Groundwater Sampling Results VOCs and SVOCs were not detected above laboratory reporting limits in any of the groundwater samples collected during the 2019 sampling event. ETPH concentrations ranged from below laboratory reporting limits to 0.28 milligrams per liter (mg/L) in AP-12R. ETPH concentrations in wells AP-1R (0.26 mg/L) and AP-12R (0.28 mg/L) were above the GWPC, the recommended Surface Water Protection Criteria, and Residential and Industrial/Commercial Volatilization Criteria of 0.25 mg/L. All other detected ETPH concentrations were below applicable CTDEEP criteria. Certain metals (arsenic, barium, chromium, copper, nickel, lead, and zinc) were detected in one or more samples during the 2019 sampling events. Zinc was detected at concentrations ranging from below laboratory reporting limits to 0.290 mg/L in AP-12R. Zinc concentrations in wells AP12R (0.290 mg/L) and AP-15R-BR (0.160 mg/L) were above the recommended Surface Water Protection Criteria of 0.123 mg/L. All other detected metal concentrations were below applicable CTDEEP criteria. A summary of recent and historical groundwater analytical results for the parameters presented above is included as Table 1. The 2019 laboratory analytical reports are included in Appendix B. 5.2 Data Quality and Usability Laboratory analytical quality assurance/quality control (QA/QC) was conducted in general accordance with the Laboratory Quality Assurance and Quality Control Guidance – Reasonable Confidence Protocols (CTDEEP, 2007). The laboratory reports were reviewed for nonconformances related to site specific compounds of concern. Specific qualifications are presented in the case narrative summaries in the attached laboratory reports in Appendix B. A data quality assessment was conducted for Con-Test laboratory reports 19H0182 and 19G1720, representing the groundwater samples collected during groundwater monitoring activities. Field-based QA/QC included trip blanks, matrix spike/matrix spike duplicate (MS/MSD), and a field duplicate. 1 Metals listed in the Connecticut RSRs, as follows: antimony, arsenic, barium, beryllium, cadmium, chromium, copper, lead, mercury, nickel, selenium, silver, thallium, vanadium and zinc https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 4 of 6
  8. Page 8 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 8 of 186 No VOCs were detected in the trip blanks. The sample from well AP-3R was used as the MS/MSD. A field duplicate sample (DUP) was collected from well AP-13R-BR. No VOCs or SVOCs were detected in the parent or duplicate samples. The Relative Percent Difference (RPD) between the parent and duplicate samples was calculated to assess sample precision. The parent/duplicate RPDs were all within acceptable limits. • • • • • ETPH was detected in the parent sample at 0.17 mg/L and in the duplicate sample at 0.19 mg/L; RPD 12%. Barium was detected in the parent sample at 0.160 mg/L and in the duplicate sample at 0.170 mg/L; RPD 6%. Chromium was detected in the parent sample at 0.0025 mg/L and in the duplicate sample at 0.0029 mg/L; RPD 16%. Copper was detected in the parent sample at 0.0073 mg/L and in the duplicate sample at 0.0062 mg/L; RPD 15%. Arsenic was not detected in the parent sample (Laboratory Reporting Limit 0.00080 mg/L); however, it was detected in the duplicate sample at 0.00086 mg/L; RPD 8%. Non-conformances for the submitted samples and/or laboratory QA/QC samples were noted and are summarized below. • All water reporting limits specified on the chain of custody were met except select analytes, where the most protective criteria are not met since the laboratory cannot achieve the required RCP calibration criteria at these levels. All non-conformances are associated with analytes that were not detected in any of the groundwater samples and are not considered to be constituents of concern for the site. Effective analytical accuracy and precision were demonstrated via acceptable recoveries of surrogates, LCS, and/or LCS duplicate samples. Based upon the project-specific QC sample results, the project data set overall satisfies the project’s data quality objectives. Accordingly, the data is deemed usable for its intended purpose of monitoring and evaluating Site groundwater quality. Detailed results of all internal laboratory QC samples and field-based QA/QC samples submitted for laboratory analysis are presented in the laboratory analytical reports provided as Appendix B. 6.0 CHANGE OF LICENSED ENVIRONMENTAL PROFESSIONAL (LEP) OVERSIGHT Professional environmental consulting services on this project have been provided by Mr. Eric Henry of Apex Companies, LLC (Apex). Mr. David Sherman of Apex will continue to provide LEP oversight for assessment and remediation of the parcel. Mr. Sherman is a Connecticut Licensed Environmental Professional, and his contact information is: https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 5 of 6
  9. Page 9 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 9 of 186 Mr. David Sherman, LEP, LSP Apex Companies, LLC 58H Connecticut Avenue South Windsor, CT 06074 Phone [phone removed] extension 6005 Fax: [phone removed] Email: [email removed] 7.0 FUTURE ACTIVITIES Future activities in 2020 include continued groundwater sampling at all monitoring well locations to be evaluated for VOCs, SVOCs, ETPH and metals. Analysis of EPH via the Massachusetts method will also be included in the monitoring plan. The data collected in 2020 will be evaluated to determine if compliance monitoring can be initiated. A Status Report summarizing the activities conducted in 2020 will be submitted to CTDEEP by February 28, 2021. 8.0 REFERENCES Remedial Action Plan, Apex, April 2013 Low Stress (low flow) Purging and Sampling Procedure for the Collection of Groundwater Samples from Monitoring Wells (United States Environmental Protection Agency, EPA, September 2017) Remediation Standard Regulations, CTDEEP, June 2013 Technical Support Document: Recommended Criteria for Common Additional Pollution Substances and Certain Alternative Criteria, CTDEEP, December 2015 Laboratory Quality Assurance and Quality Control Guidance – Reasonable Confidence Protocols, CTDEEP, July 2007 https://apexcos.sharepoint.com/sites/SouthWindsorCT/Shared Documents/CLIENTS/NU files/6089-015 Wethersfield Cumberland Avenue/Reports/2019 Status Report/2019 Wethersfield Status Report_Final.docx Page 6 of 6
  10. Page 10 of 186

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 101 Page 10 of 186 FIGURES

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)