Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Words on different pages
  1. Page 11 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 11 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report 1.0 INTRODUCTION Weston & Sampson Engineers, Inc. (Weston & Sampson), on behalf of Eversource Energy Service Company (Eversource), has prepared this Remedial Action Report (RAR) for the Eversource Berlin Campus Settling Basin Remediation. The Settling Basin is located at 107 Selden Street in Berlin, Connecticut (the “Site”). A Locus Map is provided in Figure 1 and Figure 2 shows Site features prior to remediation. Remediation work was performed as described in the Remedial Action Plan (RAP) prepared for the Site, and the United States Environmental Protection Agency (EPA) Approval of the RAP, dated June 27, 2019. Figure 3 shows the excavation areas as described in the RAP. The EPA Approval for the RAP and approved modification requests are included in Appendix A. Figure 4 shows the final extent of remedial excavations and verification sample locations. Weston & Sampson submitted the RAP to EPA and Connecticut Department of Energy and Environmental Protection (CT DEEP) in January 2019. The RAP detailed the planned remedial actions and was prepared based on the findings from previous investigations performed at the Site between 2010 and 2018. The remedial goals for impacted soil at the Site were to achieve compliance with the (1) Federal Polychlorinated Biphenyl (PCB) regulations found in Chapter 40 of the Code of Federal Regulations Part 761 (40 CFR Part 761), (2) applicable remedial criteria in the CT DEEP Remediation Standard Regulations (RSRs), Sections 22a-133k-1 through 22a-133k-3 of the Regulations of Connecticut State Agencies (RCSA), (3) conditions of the Consent Order - COWSPCB 16-002 issued by CT DEEP on December 26, 2018 (Consent Order), and (4) Significant Environmental Hazard (SEH) requirements in Connecticut General Statutes (CGS) Section 22a-6u. Any modifications and associated submittals to the RAP and EPA Approval were approved by EPA and the CT DEEP prior to initiating any changes in the proposed work and are presented below: • February 12, 2020, EPA Submittal, and March 10, 2020, Email Correspondence – Required Submittal under PCB Cleanup and Risk-Based Disposal under 40 CFR 761-61(a) and (c). As required under Condition 11a in the PCB Cleanup and Risk-Based approval, Weston & Sampson submitted pre-verification sample results for soil located within the proposed sheet pile area along the stream. This submittal also served as notice to EPA under Condition 1a of the EPA Approval for PCB contaminated soil in the newly delineated area. Specifically, this notification applies to analytical results from catch basins and piping and the identification of PCB-contaminated soil that was not described in the EPA Approval. • September 15, 2020, EPA Submittal – Notification and Modification Request under EPA Approval General Condition 1a and 16. Weston & Sampson provided notification of two newly identified conditions at the Site, including: 1) the identification of debris consisting of brick, black viscous (non-flowing) tar material, gray ash, metal, concrete masonry units, wood (small pieces of timber and plywood), ceramic tile, felt material and charred materials within the excavations performed beneath the Campus Access Drive with some of the debris impacted by PCBs; and 2) the identification of soil impacted with PCBs at concentrations ≥50 mg/kg (milligrams per kilogram) in soil beneath the Campus Access Drive. Previous site characterization was not performed within the road and borings advanced on either side of the road were used to design remedial actions. Characterization soil samples collected from borings on both sides of the road identified total PCBs at concentrations <10 mg/kg. • October 21, 2020, EPA Submittal and November 9 and 16, 2020, Email Correspondence This Request was provided to EPA and CT DEEP by Weston & Sampson to notify them of westonandsampson.com 1-1
  2. Page 12 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 12 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report conditions not previously identified at the Site within excavations performed beneath the Campus Access Drive as part of the Berlin Settling Basin remediation. The conditions included (1) soil impacted with PCBs at concentrations ≥50 milligram per kilogram (mg/kg) and (2) debris within the excavations with some of the debris impacted by PCBs. These areas were not previously identified during site characterization because soil borings were not completed within the roadway and samples on both sides of the roadway indicated concentrations of PCBs were <10 mg/kg. The modification requested was to extend the area to be covered by an Environmental Use Restriction (EUR). Specifically, the area of soils containing PCBs >1 mg/kg but ≤10 mg/kg to be rendered inaccessible would extend beneath Campus Access Drive. This submittal provides additional information requested by EPA and CTDEEP following their review of the Request. • December 10, 2020, EPA Submittal – This submittal related to the Modification and Notification Request submitted on September 15, 2020, above. The request provided a Notification of the discovery of a new area of soils containing PCBs ≥50 mg/kg and two areas of PCB-containing debris at locations not previously identified. The Modification requested an expansion of the EUR for the Site to cover additional areas where soil containing PCBs ≤10 mg/kg would be left in place. o Modification and Notification Request – Supplemental Information submitted on October 21, 2020. This supplemental submittal included data and figures describing additional sampling that was performed to delineate impacts within the previously unidentified area with soils containing PCBs ≥50 mg/kg. It also described remedial actions that would be performed to remove soil containing PCBs >10 mg/kg using sheet pile for a deep excavation (subsequently identified as excavation area E30). o Final Conditions Figure with Cross-Section Location and Final Roadway CrossSection submitted on November 13, 2020. These figures addressed questions from EPA concerning remediation and final conditions in this area. EPA approved the modification request in an email dated November 29, 2020. This submittal of supplemental information provides additional information gathered from the Site since the October 21, 2020, letter, and requests that no additional verification samples be required to verify the completion of the excavation at E30. This RAR summarizes the remedial and construction activities performed, which included the excavation and offsite disposal of soil and concrete containing PCBs >10 mg/kg. Soil that exceeded other applicable RSR remedial criteria for non-PCB Chemicals of Concern (COC) were removed with the PCB-impacted soil. Soil containing PCBs ≤10 mg/kg were consolidated within a portion of the excavation area and capped. This RAR provides the information required by the EPA Approval, which includes: • • • • • A description of cleanup and disposal activities (Section 2); Sample data tables and figures showing the location of verification samples collected during remediation of PCBs (Table 1 and Figure 4); Soil analytical data for other COC to demonstrate compliance for other COC as required in the Consent Order, are provided (Table 2) as are analytical results for Synthetic Precipitation Leachate Procedure (SPLP) testing (Table 3); Photographic documentation of remedial activities (Appendix B); Copies of laboratory analytical reports for waste characterization and verification samples with required supporting documentation (Appendix C); westonandsampson.com 1-2
  3. Page 13 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 13 of 2201 EVERSOURCE ENERGY • • • Berlin Settling Basin Remedial Action Report The quantity of PCB wastes disposed (Section 3); Copies of manifests for disposal of PCB wastes (Appendix D); and A summary of the PCB cleanup and disposal costs (Section 3). Other information pertinent to the Site remediation also included in this RAR are as follows: • • • • • • 1.1 Dust monitoring data (Appendix E); Post-treatment analytical data for dewatering effluent prior to discharge to a Wastewater Pollution Control Facility (WPCF) (Appendix F); Analytical data for clean backfill materials used during Site restoration (Appendix G); Pertinent SEH documents (Appendix H); and A Use Restriction, map showing the restrictions and certification of a recording of a notation on the land records (Appendix I). A certification of documents letter signed by a duly authorized representative, as required by the Final Consent Order – COWSPCB 16-002 (Appendix J). Site Description and Background Investigations originally focused on an approximately 8,000 square-foot stormwater settling basin located on the Eversource Berlin Campus at 107 Selden Street in Berlin, Connecticut. The Site location is shown in Figure 1 – Site Locus Map. Geographic coordinates for the Site are: Latitude/Longitude: UTM Coordinates: 41 38’ 58" North / 72 43’ 30" West Zone 18 675,239.9 meters Northing 4,574,883.6 meters Easting Pre-remediation conditions are shown in Figure 2 and post-remediation conditions are shown in Figure 5. The Site is currently vacant and contains the structures and piping associated with the newly installed drainage system, as well as piping abandoned in place from the former drainage basin. The remediation eliminated the settling basin, and the area now slopes from a parking lot located to the west down to an unnamed stream to the east. The location of the former settling basin and portions of surrounding areas were fenced off to isolate the area previously identified as being impacted by SEH conditions involving PCBs in shallow soil. However, because this SEH condition was permanently addressed during performance of the remediation, the fencing was subsequently removed. Grass pavers consisting of permeable plastic grid mat filled with sand and completed with grass turf were installed over a portion of the excavation to create an overflow parking lot for Eversource personnel. The area of the Site that is subject to the Use Restriction and will eventually be subject to an EUR is delineated by split rail fencing installed following completion of Site restoration activities (Figure 5). To the north of the settling basin is an access road (Campus Access Drive), wetlands, and additional parking lots. As shown in Figure 4, remedial activities extended to include a portion of the access road but not into the wetlands. To the west is an asphalt-paved equipment storage and laydown area and a parking garage for the Eversource Berlin Campus. To the south of the settling basin is forested undeveloped land and to the east is an unnamed stream. The newly constructed drainage system, which discharges into the unnamed stream, was constructed as described in the RAP, with permits issued by the Town of Berlin Inland Wetlands and Watercourses Agency (IWWA) and Planning and Zoning Commission. westonandsampson.com 1-3
  4. Page 14 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 14 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Prior to construction of the settling basin, the Site was utilized as a training area that may have used PCB oil-containing equipment. Surficial soils within this area may have been impacted with PCBs due to use or storage of this equipment. However, because the highest concentrations of PCBs identified during Site investigations were typically found beneath the surficial materials and variably within the soil column, the primary source for PCBs and other COC impacts is believed to be from previously impacted fill materials used during regrading of this area. Placement and compaction of this fill would have resulted in the “lack of pattern” observed in the distribution of PCBs. The settling basin was subsequently constructed at the site and stormwater drainage pipes were installed from the asphalt-covered parking area located west of the basin. The parking area was used to store PCB-containing equipment and other materials, but no releases from storage operations were identified during Site investigations or the performance of remediation activities. 1.2 Remediation Areas Following the discovery of soil containing PCBs >1 mg/kg, several environmental investigations were performed from 2010 to 2018 to assess Site soils. These investigations were summarized in the RAP and were used to determine the areas to be remediated. Other COC were identified in these investigations, including extractable petroleum hydrocarbons (ETPH), semi-volatile organic compounds (SVOCs), and metals in soils and groundwater at concentrations exceeding numerical criteria established in the CT DEEP RSRs. Soil impacted with these COC were addressed during the performance of the PCB remedial actions. Three additional release areas requiring remediation were identified after remediation was initiated. These include: 1) The area where the new retention system (part of the replacement drainage system) was to be installed after the RAP was approved by EPA and prior to performing any construction at the site. Additional soil characterization was needed in this area because the original location of the retention basin, as indicated in the RAP, was determined to be unsuitable and needed to be relocated. A limited area of PCB impacts was identified at the southern extent of the planned excavation for the relocated retention system. Remediation was performed in this area to remove all PCB impacts >1 mg/kg, as it was located outside of the planned cap area. These areas are shown in Sampling Inset 4A in Figure 4. 2) An area of building debris was identified beneath the access drive during performance of remedial excavations. Some of these building materials were found to contain PCBs. A Notification of this previously unidentified condition was provided to EPA and CT DEEP and remedial actions for these materials were identified. This remediation area is shown in Figure 4 in excavation areas E28 and E29. 3) An area beneath the northern section of buried building debris where soils containing PCBs ≥50 mg/kg was discovered. A notification of this previously unidentified condition was provided to EPA and CT DEEP, and remedial actions were determined following investigations to define the horizontal and vertical extent of the impacts. PCB-impacted soils were found to extend down to the weathered bedrock surface but not into competent bedrock. Remedial actions included the installation of sheet piles, dewatering, and removal of soil and weathered bedrock. The Notifications and Modification Requests associated with these previously unidentified conditions are provided in Appendix A. This remediation area is shown in Figure 4 as excavation area E30. westonandsampson.com 1-4
  5. Page 15 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 15 of 2201 EVERSOURCE ENERGY 1.3 Berlin Settling Basin Remedial Action Report Sensitive Area Receptors The Site is located on the Eversource Berlin Campus, an approximately 111-acre parcel surrounded by residential and commercial properties. The closest residential property is located approximately 0.20 miles from the Site. Immediately west of the Site is an unnamed stream and wetlands. A search of the CT DEEP Natural Diversity Database for endangered, threatened, special concern species, and significant natural communities was performed prior to the sampling associated with the Screening-Level Environmental Risk Assessment (SLERA). No special concerns for the Site were identified, with the closest critical habitat located approximately 1,700 feet south of the Site. The Site is not located within an Aquifer Protection Zone for a public water supply or a CT DEEP-designated coastal boundary area. 1.4 Geology According to the “Bedrock Geological Map of Connecticut” (Rodgers, 1985), bedrock underlying the Site is identified as Portland Arkose, a reddish-brown to maroon micaceous sandstone and siltstone containing layers of red to black silty shale. Bedrock outcrops were not observed on Site, but bedrock was encountered at depths ranging from 28 to 30 feet below grade (ft bg) during excavation activities within the limits of the access road, as the bedrock surface elevation was not uniform. During excavation activities, the bedrock surface was scrapped with the excavator bucket to verify the bottom of excavation. According to the “Surficial Materials Map of Connecticut” (Stone et al., 1992), the surficial geology underlying the Site consists of thin glacial till (generally less than 10 to 15 feet thick) including areas of bedrock outcrops. This till is characterized as being predominantly loose to moderately compact, generally sandy, but commonly stony. Soils observed at the Site consist of reddish-brown silt with fine reddish-dark brown sand to 5 ft bg in the area surrounding the settling basin. Subsurface soil consists of reddish-dark brown silt with fine to coarse reddish-dark brown sand as depth increases. Traces of clay and gravel were present throughout the Site from 5 to 10 ft bg. Fragments of wood (timber and/or plywood) was encountered in certain borings. Based on the observed Site soils, it is believed that much of the soil in the area of the settling basin was imported as fill prior to development of the area as a pole-training facility. The area was subsequently regraded for construction of the settling basin and drainage piping. Accordingly, much of the soil in the area of the settling basin is fill that has been subsequently disturbed. 1.5 Groundwater Classification Groundwater beneath the Site is classified as GA by the CT DEEP, indicating that it is suitable for human consumption without treatment. The unnamed stream located approximately 70 feet southwest of the outlet from the settling basin is the closest surface water body at the Site. Based on previous site investigations, groundwater is generally observed in shallow overburden fill materials between approximately 6 and 18 ft bg. Groundwater flows in a south-southeasterly direction beneath the Site towards the unnamed stream. 1.6 Remedial Construction Activities Information from previous Site investigations was used by Weston & Sampson to prepare the RAP and contractor remedial documents. These documents include plans and specifications prepared in September 2019 following EPA modifications and approval of the RAP. westonandsampson.com 1-5
  6. Page 16 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 16 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Remedial construction activities were performed in the following order: • • • • • • • • Construction of the replacement drainage system and abandonment of the existing drainage basin; Excavation and removal of PCB-impacted soil ≥50 mg/kg; Excavation and removal of PCB-impacted soil >10 mg/kg; Removal of soil impacted by PCBs and other COC exceeding applicable remedial criteria; Excavation and on-Site consolidation of PCB-impacted soil ≤10 mg/kg; Site restoration with backfilling of excavation areas and compaction of clean backfill materials to restore excavation areas to proposed grades; Installation of Site fencing and grass pavers (a permeable plastic grid mat filled with sand and completed with grass turf) for an overflow parking area; and Performance of a post-remediation Site survey to document current site conditions and the location of installed structures. Other post-remediation activities, including performance of post-remediation groundwater monitoring, completion of a SLERA for the unnamed stream following termination of discharges from the settling basin to the stream, and EUR filings will be documented in separate submittals when those activities have been completed. A plan for post-remediation groundwater monitoring was submitted on July 9, 2021 and approved by the CT DEEP on July 27, 2021. A copy of the CT DEEP approval letter is provided in Appendix A. Monitoring wells have been installed and one quarterly round of groundwater monitoring has been completed. A Field Sampling Plan for the SLERA will be submitted to CT DEEP for review and comment. westonandsampson.com 1-6
  7. Page 17 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 17 of 2201 Berlin Settling Basin Remedial Action Report EVERSOURCE ENERGY 2.0 DESCRIPTION OF CONSTRUCTION ACTIVITIES Eversource selected Strategic Environmental Services, Inc. (SES) of Glastonbury, Connecticut, as the Site Contractor to execute the site remedial activities as described in the RAP and EPA Approval. Weston & Sampson performed remedial observation and verification sampling throughout remedial activities. PCB-related remedial activities began in December 2019 and were completed on September 7, 2021. The following sections detail the completed remedial activities. Progress photographs of the Site remediation and restoration are provided in Appendix B. 2.1 Permitting, Mobilization and Site Preparation Prior to mobilization to the Site, permits were obtained from the Town of Berlin to perform the remediation. A special permit for the excavation of soil and backfilling of the Site with clean materials, as well as for construction of the new drainage system, was obtained from the Planning and Zoning Commission. An additional permit was obtained from the IWWA for sediment and erosion controls, and for the construction of a new wetland area to replace removed/impacted wetlands that had formed within the settling basin. Work was performed in accordance with the requirements of those permits. Site mobilization and preparation occurred in November 2019. Site mobilization included the installation of temporary fencing to restrict access to the Site, signage, stormwater pollution prevention controls, erosion controls, a decontamination pad, and an anti-tracking pad. Erosion and sedimentation controls were deployed around designated work areas and the Site perimeter. Perimeter erosion and sedimentation controls included silt fence and straw wattles. Catch basin protection included inlet filter inserts. The erosion and sedimentation controls were designed and installed in accordance with the 2002 Connecticut Guidelines for Erosion and Sediment Control (DEP Bulletin 34) and permit conditions as required by the Town of Berlin IWWA. The controls were inspected and maintained by SES throughout construction. Some controls were removed following final stabilization of disturbed surfaces and demobilization of remedial equipment. 2.2 PCB Remediation Soils containing PCBs >1 mg/kg were found during initial investigation activities within the settling basin area encompassing approximately 58,700 square feet (1.35 acres) from the ground surface to varying depths up to 9 ft bg. As discussed previously, two additional release areas were identified during remediation beneath the access drive abutting the remediation area. The EPA and CT DEEP were notified of these previously unidentified conditions and remediation was performed, as approved by the agencies. Soils were separated into three categories, soils containing PCBs (1) ≥50 mg/kg, (2) >10 mg/kg and <50 mg/kg, and (3) >1 mg/kg and ≤10 mg/kg. Soils containing PCBs ≥50 mg/kg were excavated first and disposed of separately from soils containing PCBs >10 mg/kg and <50 mg/kg. Soils containing PCBs >1 mg/kg and ≤10 mg/kg were consolidated and capped on-Site or transported offsite for disposal. The extent of the capped area was delineated by fencing, subject to filing of a Use Restriction and will be recorded with an Industrial/Commercial EUR that restricts excavation. Concrete encountered within excavations was disposed based on the presumption that it was impacted by the same concentration of PCBs as the soil from the excavation (e.g., concrete encountered within a >10 mg/kg to <50 mg/kg PCB-soil excavation was disposed of at an assumed concentration of >10 mg/kg to <50 mg/kg). Waste manifests for all PCB-impacted materials removed from the Site for off-site disposal are provided in Appendix D. westonandsampson.com 2-1
  8. Page 18 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 18 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Areas where initial verification samples were found to exceed applicable remedial standards were subsequently re-excavated and removed from the Site. Table 1 presents the analytical results for only final PCB-verification samples. Figure 4 shows the sample locations for only final verification. Laboratory analytical data reports are attached in Appendix C. 2.2.1 PCB-Containing Materials ≥50 mg/kg Three separate remedial excavations for soils containing PCBs ≥50 mg/kg were planned in the RAP. Three additional remedial areas were identified during remediation, as discussed in Section 1.2. The final surveyed extent of the excavations is shown in Figure 4. The excavation areas for PCBs ≥50 mg/kg were designated as A1, E1, E3, E4, E28, E29 and E30. The A1 excavation was performed in May 2020 and the E1, E3, and E4 excavations were performed during September 2020. Excavations E28, E29, and E30 were performed between September 2020 and March 2021. The remedial excavation in each area is summarized below: • • • • • A1 – This cell was added as part of remedial activities associated with construction of the retention basin (shown in Sample Inset 4A in Figure 4). The excavation was completed to the as-planned final excavation depth of 7 ft bg. Two of the 16 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected (CA1A, CA1B, and CA1C). Final soil sample verification results were non-detect or reported below 1 mg/kg. E1 – This cell was excavated to the as-planned final depth of 4 ft bg. Three of the 39 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected. Final verification soil samples were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E3 – This large cell was excavated to the as-planned final depth of 6 ft bg. Twenty-one of 177 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected. Final verification soil samples were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E4 – This cell was excavated to the as-planned final depth of 7 ft bg. Eleven of 68 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification soil samples were not detected or reported below 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E28, E29, and E30 – Located within an area originally planned for excavations to remediate soil with PCBs <10 mg/kg, debris impacted with PCBs (consisting of brick, black viscous (non-flowing) tar material, gray ash, metal, concrete masonry units, fragments of timber and plywood, ceramic tile, felt material and charred materials) was encountered in the excavations beneath the access road at E28 and E29 at depths up to 4 to 5 ft bg and at concentrations greater than 50 mg/kg. Following the removal of soil containing PCBs ≥50 mg/kg, further excavations within E28 and E29 were completed until all verification results were ≤10 mg/kg except for the northern sidewalls of both excavations and the eastern sidewall of E28. The concentration of PCBs in samples collected from the northern sidewalls and from the eastern sidewall of E28 were reported at <1 mg/kg. Following removal of the debris, underlying soil impacted with PCBs ≥50 mg/kg was identified at E30. Additional investigation activities were performed including EPA approved in-situ Subpart O soil boring samples, and remedial actions were designed. The procedures for removal of the debris and additional PCB-impacted soil were provided to EPA and CT westonandsampson.com 2-2
  9. Page 19 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 19 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report DEEP as presented in Appendix A, with the final remedial actions performed according to those plans. Remediation of E30 (excavation extent depicted on Figure 4) included removal of soils containing PCBs ≥50 mg/kg within a footprint of approximately 36 by 36 feet that was excavated to the bedrock surface at depths ranging from 28 to 30 ft bg. Deeper excavation at E30 required the installation of sheet piles driven into weathered bedrock, groundwater dewatering and treatment of dewatered effluent via a groundwater treatment system that subsequently discharged to local sanitary sewer under an approved CT DEEP general permit. To allow for the installation of the sheet piles into soil containing ≤10 mg/kg total PCBs, two excavations (Sheet Pile Excavation A and Sheet Pile Excavation B) were performed prior to installing the sheet piles to depths ranging from 11 to 16 ft bg. Verification samples were collected from both excavations and the analytical results indicated PCBs in remaining soils were ≤ 10 mg/kg. No post excavation verification samples were collected within E30 as previously collected Subpart O in-situ data (see Appendix A) was used to verify excavation extents and the excavation was completed into weathered bedrock, where no PCBs were detected above 10 mg/kg. Verification samples for the A-cell excavation were collected until all sample results were ≤1 mg/kg total PCBs. Verification samples for E1, E3, and E4 excavations were collected until all results were <50 mg/kg, with subsequent remediation performed for soil with PCBs >10 mg/kg and <50 mg/kg. For some of the cells this required that the excavations be extended horizontally and vertically. Following removal of soils containing PCBs ≥50 mg/kg, additional excavation was performed to remove soils containing PCBs >1 mg/kg but <50 mg/kg (see Section 2.2.2). Soil from these excavations was live-loaded into tri-axle or trailer dump trucks for delivery to railcars in New Haven, Connecticut. The soils were then transported to the Chemical Waste Management landfill facility in Emelle, Alabama. A total of 3,578.07 tons of soils containing PCBs ≥50 mg/kg were disposed from the Site. 2.2.2 PCB-Containing Materials >10 mg/kg and <50 mg/kg Nine separate excavations for soils containing PCBs >10 mg/kg but <50 mg/kg were planned in the RAP. The final surveyed extent of the excavations is shown in Figure 4. These areas were designated as B1, B2, E6, E9, E11, E12, E14, E15 and E20. Excavation began in April 2020 and concluded in July 2020. The remedial excavation in each area is summarized below: • • • B1 – This cell was added as part of remedial construction activities and was completed to the as-planned final excavation depth of 14 ft bg. Two of the 23 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as area B1A. Final verification sample results were non-detect or reported below 1 mg/kg. B2 – This excavation was added as part of remedial construction activities and was planned to be performed to a total depth of 7 ft bg. The final excavation depth was between 7 and 8 ft bg. Two of the13 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as areas CB2A and CB2B. Final verification sample results were non-detect or reported below 1 mg/kg. E6 – This cell was excavated to the as-planned final depth of 6 ft bg. Seven of 95 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. westonandsampson.com 2-3
  10. Page 20 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 20 of 2201 EVERSOURCE ENERGY • • • • • • Berlin Settling Basin Remedial Action Report E9 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg and the remaining soils were consolidated and capped on-Site. E11 – Originally planned to be performed to a total depth of 5 ft bg, the final excavation depth of this cell was 6 ft bg. Eleven of 92 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E12 – This cell was excavated to the as-planned final depth of 3 to 6 ft bg. One of 106 initial verification sample results was >10 mg/kg. This area was removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E14 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth of this cell ranged from 2 to 3.5 ft bg. Ten of 125 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E15 – This cell was excavated to the as-planned final depth of 7 ft bg. Six of 91 initial verification sample results were 10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E20 – This cell was excavated to the as-planned final depth of 4 ft bg. All verification sample results were <10 mg/kg. These soils were consolidated and capped on-Site. Verification samples for B-cell excavations were collected until all results for PCBs in soil were ≤1 mg/kg. Verification samples for E-cell excavations were collected until all results were ≤10 mg/kg. For the B-cell and E-cell excavations, additional excavations were performed until the PCB-remedial goal was achieved. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 1. Laboratory analytical data reports are attached in Appendix C. Soils were loaded into trucks for off-site disposal at the Sunny Farms Landfill in Fostoria, Ohio. A total of 7,050.74 tons of soils were disposed from the Site. Handling and disposal of concrete encountered during these excavations is described in Section 2.3.2. 2.2.3 PCB-Containing Materials >1 mg/kg and ≤10 mg/kg Twenty-three separate excavations for soils with total PCB concentrations >1 mg/kg but ≤10 mg/kg were completed. The final surveyed extent of these areas is shown in Figure 4 and were designated as C1, C2, C3, C4, C5, C6, C7, E5, E7, E8, E10, E13, E16, E17, E18, E19, E21, E22, E23, E24, E25. E26 and E27. Excavation began in July 2020 and concluded in July 2021. The remedial excavation in each area is summarized below: • • C1 – This cell was added as part of remedial construction activities with a planned depth of 7 ft bg. The final excavation depth was between 7 and 8 ft bg. Four of 51 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C1A and C1B. For C1, C1A, and C1B, 49 of 59 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C2 – This cell was added as part of remedial construction activities with a planned excavation depth of 14 ft bg. The final excavation depth was between 14 and 15 ft bg. Two of 19 initial westonandsampson.com 2-4

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)