Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Words on different pages
  1. Page 16 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 16 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Remedial construction activities were performed in the following order: • • • • • • • • Construction of the replacement drainage system and abandonment of the existing drainage basin; Excavation and removal of PCB-impacted soil ≥50 mg/kg; Excavation and removal of PCB-impacted soil >10 mg/kg; Removal of soil impacted by PCBs and other COC exceeding applicable remedial criteria; Excavation and on-Site consolidation of PCB-impacted soil ≤10 mg/kg; Site restoration with backfilling of excavation areas and compaction of clean backfill materials to restore excavation areas to proposed grades; Installation of Site fencing and grass pavers (a permeable plastic grid mat filled with sand and completed with grass turf) for an overflow parking area; and Performance of a post-remediation Site survey to document current site conditions and the location of installed structures. Other post-remediation activities, including performance of post-remediation groundwater monitoring, completion of a SLERA for the unnamed stream following termination of discharges from the settling basin to the stream, and EUR filings will be documented in separate submittals when those activities have been completed. A plan for post-remediation groundwater monitoring was submitted on July 9, 2021 and approved by the CT DEEP on July 27, 2021. A copy of the CT DEEP approval letter is provided in Appendix A. Monitoring wells have been installed and one quarterly round of groundwater monitoring has been completed. A Field Sampling Plan for the SLERA will be submitted to CT DEEP for review and comment. westonandsampson.com 1-6
  2. Page 17 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 17 of 2201 Berlin Settling Basin Remedial Action Report EVERSOURCE ENERGY 2.0 DESCRIPTION OF CONSTRUCTION ACTIVITIES Eversource selected Strategic Environmental Services, Inc. (SES) of Glastonbury, Connecticut, as the Site Contractor to execute the site remedial activities as described in the RAP and EPA Approval. Weston & Sampson performed remedial observation and verification sampling throughout remedial activities. PCB-related remedial activities began in December 2019 and were completed on September 7, 2021. The following sections detail the completed remedial activities. Progress photographs of the Site remediation and restoration are provided in Appendix B. 2.1 Permitting, Mobilization and Site Preparation Prior to mobilization to the Site, permits were obtained from the Town of Berlin to perform the remediation. A special permit for the excavation of soil and backfilling of the Site with clean materials, as well as for construction of the new drainage system, was obtained from the Planning and Zoning Commission. An additional permit was obtained from the IWWA for sediment and erosion controls, and for the construction of a new wetland area to replace removed/impacted wetlands that had formed within the settling basin. Work was performed in accordance with the requirements of those permits. Site mobilization and preparation occurred in November 2019. Site mobilization included the installation of temporary fencing to restrict access to the Site, signage, stormwater pollution prevention controls, erosion controls, a decontamination pad, and an anti-tracking pad. Erosion and sedimentation controls were deployed around designated work areas and the Site perimeter. Perimeter erosion and sedimentation controls included silt fence and straw wattles. Catch basin protection included inlet filter inserts. The erosion and sedimentation controls were designed and installed in accordance with the 2002 Connecticut Guidelines for Erosion and Sediment Control (DEP Bulletin 34) and permit conditions as required by the Town of Berlin IWWA. The controls were inspected and maintained by SES throughout construction. Some controls were removed following final stabilization of disturbed surfaces and demobilization of remedial equipment. 2.2 PCB Remediation Soils containing PCBs >1 mg/kg were found during initial investigation activities within the settling basin area encompassing approximately 58,700 square feet (1.35 acres) from the ground surface to varying depths up to 9 ft bg. As discussed previously, two additional release areas were identified during remediation beneath the access drive abutting the remediation area. The EPA and CT DEEP were notified of these previously unidentified conditions and remediation was performed, as approved by the agencies. Soils were separated into three categories, soils containing PCBs (1) ≥50 mg/kg, (2) >10 mg/kg and <50 mg/kg, and (3) >1 mg/kg and ≤10 mg/kg. Soils containing PCBs ≥50 mg/kg were excavated first and disposed of separately from soils containing PCBs >10 mg/kg and <50 mg/kg. Soils containing PCBs >1 mg/kg and ≤10 mg/kg were consolidated and capped on-Site or transported offsite for disposal. The extent of the capped area was delineated by fencing, subject to filing of a Use Restriction and will be recorded with an Industrial/Commercial EUR that restricts excavation. Concrete encountered within excavations was disposed based on the presumption that it was impacted by the same concentration of PCBs as the soil from the excavation (e.g., concrete encountered within a >10 mg/kg to <50 mg/kg PCB-soil excavation was disposed of at an assumed concentration of >10 mg/kg to <50 mg/kg). Waste manifests for all PCB-impacted materials removed from the Site for off-site disposal are provided in Appendix D. westonandsampson.com 2-1
  3. Page 18 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 18 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Areas where initial verification samples were found to exceed applicable remedial standards were subsequently re-excavated and removed from the Site. Table 1 presents the analytical results for only final PCB-verification samples. Figure 4 shows the sample locations for only final verification. Laboratory analytical data reports are attached in Appendix C. 2.2.1 PCB-Containing Materials ≥50 mg/kg Three separate remedial excavations for soils containing PCBs ≥50 mg/kg were planned in the RAP. Three additional remedial areas were identified during remediation, as discussed in Section 1.2. The final surveyed extent of the excavations is shown in Figure 4. The excavation areas for PCBs ≥50 mg/kg were designated as A1, E1, E3, E4, E28, E29 and E30. The A1 excavation was performed in May 2020 and the E1, E3, and E4 excavations were performed during September 2020. Excavations E28, E29, and E30 were performed between September 2020 and March 2021. The remedial excavation in each area is summarized below: • • • • • A1 – This cell was added as part of remedial activities associated with construction of the retention basin (shown in Sample Inset 4A in Figure 4). The excavation was completed to the as-planned final excavation depth of 7 ft bg. Two of the 16 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected (CA1A, CA1B, and CA1C). Final soil sample verification results were non-detect or reported below 1 mg/kg. E1 – This cell was excavated to the as-planned final depth of 4 ft bg. Three of the 39 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected. Final verification soil samples were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E3 – This large cell was excavated to the as-planned final depth of 6 ft bg. Twenty-one of 177 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work and additional verification samples were collected. Final verification soil samples were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E4 – This cell was excavated to the as-planned final depth of 7 ft bg. Eleven of 68 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification soil samples were not detected or reported below 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E28, E29, and E30 – Located within an area originally planned for excavations to remediate soil with PCBs <10 mg/kg, debris impacted with PCBs (consisting of brick, black viscous (non-flowing) tar material, gray ash, metal, concrete masonry units, fragments of timber and plywood, ceramic tile, felt material and charred materials) was encountered in the excavations beneath the access road at E28 and E29 at depths up to 4 to 5 ft bg and at concentrations greater than 50 mg/kg. Following the removal of soil containing PCBs ≥50 mg/kg, further excavations within E28 and E29 were completed until all verification results were ≤10 mg/kg except for the northern sidewalls of both excavations and the eastern sidewall of E28. The concentration of PCBs in samples collected from the northern sidewalls and from the eastern sidewall of E28 were reported at <1 mg/kg. Following removal of the debris, underlying soil impacted with PCBs ≥50 mg/kg was identified at E30. Additional investigation activities were performed including EPA approved in-situ Subpart O soil boring samples, and remedial actions were designed. The procedures for removal of the debris and additional PCB-impacted soil were provided to EPA and CT westonandsampson.com 2-2
  4. Page 19 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 19 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report DEEP as presented in Appendix A, with the final remedial actions performed according to those plans. Remediation of E30 (excavation extent depicted on Figure 4) included removal of soils containing PCBs ≥50 mg/kg within a footprint of approximately 36 by 36 feet that was excavated to the bedrock surface at depths ranging from 28 to 30 ft bg. Deeper excavation at E30 required the installation of sheet piles driven into weathered bedrock, groundwater dewatering and treatment of dewatered effluent via a groundwater treatment system that subsequently discharged to local sanitary sewer under an approved CT DEEP general permit. To allow for the installation of the sheet piles into soil containing ≤10 mg/kg total PCBs, two excavations (Sheet Pile Excavation A and Sheet Pile Excavation B) were performed prior to installing the sheet piles to depths ranging from 11 to 16 ft bg. Verification samples were collected from both excavations and the analytical results indicated PCBs in remaining soils were ≤ 10 mg/kg. No post excavation verification samples were collected within E30 as previously collected Subpart O in-situ data (see Appendix A) was used to verify excavation extents and the excavation was completed into weathered bedrock, where no PCBs were detected above 10 mg/kg. Verification samples for the A-cell excavation were collected until all sample results were ≤1 mg/kg total PCBs. Verification samples for E1, E3, and E4 excavations were collected until all results were <50 mg/kg, with subsequent remediation performed for soil with PCBs >10 mg/kg and <50 mg/kg. For some of the cells this required that the excavations be extended horizontally and vertically. Following removal of soils containing PCBs ≥50 mg/kg, additional excavation was performed to remove soils containing PCBs >1 mg/kg but <50 mg/kg (see Section 2.2.2). Soil from these excavations was live-loaded into tri-axle or trailer dump trucks for delivery to railcars in New Haven, Connecticut. The soils were then transported to the Chemical Waste Management landfill facility in Emelle, Alabama. A total of 3,578.07 tons of soils containing PCBs ≥50 mg/kg were disposed from the Site. 2.2.2 PCB-Containing Materials >10 mg/kg and <50 mg/kg Nine separate excavations for soils containing PCBs >10 mg/kg but <50 mg/kg were planned in the RAP. The final surveyed extent of the excavations is shown in Figure 4. These areas were designated as B1, B2, E6, E9, E11, E12, E14, E15 and E20. Excavation began in April 2020 and concluded in July 2020. The remedial excavation in each area is summarized below: • • • B1 – This cell was added as part of remedial construction activities and was completed to the as-planned final excavation depth of 14 ft bg. Two of the 23 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as area B1A. Final verification sample results were non-detect or reported below 1 mg/kg. B2 – This excavation was added as part of remedial construction activities and was planned to be performed to a total depth of 7 ft bg. The final excavation depth was between 7 and 8 ft bg. Two of the13 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as areas CB2A and CB2B. Final verification sample results were non-detect or reported below 1 mg/kg. E6 – This cell was excavated to the as-planned final depth of 6 ft bg. Seven of 95 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. westonandsampson.com 2-3
  5. Page 20 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 20 of 2201 EVERSOURCE ENERGY • • • • • • Berlin Settling Basin Remedial Action Report E9 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg and the remaining soils were consolidated and capped on-Site. E11 – Originally planned to be performed to a total depth of 5 ft bg, the final excavation depth of this cell was 6 ft bg. Eleven of 92 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E12 – This cell was excavated to the as-planned final depth of 3 to 6 ft bg. One of 106 initial verification sample results was >10 mg/kg. This area was removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E14 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth of this cell ranged from 2 to 3.5 ft bg. Ten of 125 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E15 – This cell was excavated to the as-planned final depth of 7 ft bg. Six of 91 initial verification sample results were 10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E20 – This cell was excavated to the as-planned final depth of 4 ft bg. All verification sample results were <10 mg/kg. These soils were consolidated and capped on-Site. Verification samples for B-cell excavations were collected until all results for PCBs in soil were ≤1 mg/kg. Verification samples for E-cell excavations were collected until all results were ≤10 mg/kg. For the B-cell and E-cell excavations, additional excavations were performed until the PCB-remedial goal was achieved. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 1. Laboratory analytical data reports are attached in Appendix C. Soils were loaded into trucks for off-site disposal at the Sunny Farms Landfill in Fostoria, Ohio. A total of 7,050.74 tons of soils were disposed from the Site. Handling and disposal of concrete encountered during these excavations is described in Section 2.3.2. 2.2.3 PCB-Containing Materials >1 mg/kg and ≤10 mg/kg Twenty-three separate excavations for soils with total PCB concentrations >1 mg/kg but ≤10 mg/kg were completed. The final surveyed extent of these areas is shown in Figure 4 and were designated as C1, C2, C3, C4, C5, C6, C7, E5, E7, E8, E10, E13, E16, E17, E18, E19, E21, E22, E23, E24, E25. E26 and E27. Excavation began in July 2020 and concluded in July 2021. The remedial excavation in each area is summarized below: • • C1 – This cell was added as part of remedial construction activities with a planned depth of 7 ft bg. The final excavation depth was between 7 and 8 ft bg. Four of 51 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C1A and C1B. For C1, C1A, and C1B, 49 of 59 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C2 – This cell was added as part of remedial construction activities with a planned excavation depth of 14 ft bg. The final excavation depth was between 14 and 15 ft bg. Two of 19 initial westonandsampson.com 2-4
  6. Page 21 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 21 of 2201 EVERSOURCE ENERGY • • • • • • • • • • • Berlin Settling Basin Remedial Action Report verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C2A and C2B. For C2, C2A, and C2B, 24 of 30 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C3 – This cell was added as part of remedial construction activities and was excavated to the planned final depth of 14 ft bg. All verification sample results were non-detect for PCBs. C4 – This cell was added as part of remedial construction activities with a planned excavated depth of 14 . The final excavation depth was between 14 and 15 ft bg. Two of 24 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C4A and C4B. For C4, C4A, and C4B, 32 of 39 verification sample results were non-detect for PCBs with the remainder detected <1 mg/kg. C5 – This cell was added as part of remedial construction activities and was excavated to the planned final depth of 14 ft bg. All verification sample results were non-detect for PCBs. C6 – This cell was added as part of remedial construction activities with a planned excavated depth of 10 ft bg. The final excavation depth was between 10 and 11 ft bg. Seven of 28 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as C6B through C6K. For C6 and C6B through C6K, 61 of 89 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C7 – This cell was added as part of remedial construction activities and was excavated to the as-planned final depth of 5 to of 15 ft bg. Three of 24 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as C7A through C7D. For C7 and C7A through C7D, 34 of 49 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. E5 – This cell was excavated to the as-planned final depth of 2 ft bg. Three of 26 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E7 – This cell was excavated to the as-planned final depth of 2 ft bg. One of 21 initial verification sample results was >10 mg/kg. This area was removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E8 – This cell was excavated to the as-planned final depth of 2 ft bg. Five of 30 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E10 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth of this cell was 2 to 4 ft bg. Five of 98 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E13 – This cell was excavated to the as-planned final depth of 2 ft bg. One of 61 initial verification sample results were >10 mg/kg. This area was removed during subsequent excavation work. Final verification soil sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E16 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth for this cell was from 2 to 4 ft bg. All verification sample results were <10 mg/kg and these soils were consolidated and capped on-Site. westonandsampson.com 2-5
  7. Page 22 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 22 of 2201 EVERSOURCE ENERGY • • • • • • • • • • • Berlin Settling Basin Remedial Action Report E17 – This cell was excavated to a final depth of 4 to 6 fbg. Deeper excavations at portions of E17, including the proposed 9-foot excavation depth located adjacent to the concrete box culvert and stream (shown in Figure 3) was originally planned under the RAP. Portions of E17 were initially outside of the proposed EUR boundary, where soil was required to be cleanup up to ≤1 mg/kg. The EUR boundary was later modified to encompass E17 which changed the cleanup goal to ≤10 mg/kg beneath a 4-foot thick, clean cap. This resulted in a shallower excavation to meet the higher cleanup standard. Four of 132 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg, except for eastern sidewall samples (those samples contained PCBs <1 mg/kg). Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E18 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg except for the eastern sidewall samples (those samples contained PCBs <1 mg/kg). These soils were consolidated and capped on-Site. E19 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg except for the eastern and southern sidewalls (those samples contained PCBs <1 mg/kg). These soils were consolidated and capped on-Site. E21 – Originally planned to be excavated to a total depth of 6 ft bg, the final excavation depth of this cell was 6 to 7 ft bg. Six of 45 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg, except for the northern and eastern sidewalls. Samples collected from the northern and eastern sidewalls contained PCBs <1 mg/kg. E22 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 5 ft bg. All verification sample results were <10 mg/kg and limited removal actions were completed during subsequent excavation work to allow for the establishment of a 4-foot thick, clean cap. E23 – This cell was excavated to the as-planned final depth of 4 ft bg. All verification sample results were <10 mg/kg and limited removal actions were completed during subsequent excavation work to allow for the establishment of a 4-foot thick, clean cap. E24 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 4 ft bg. Seventeen of 79 initial verification sample results were 10 >mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E25 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 4 to 5 ft bg. All verification sample results except for the northern sidewall were <10 mg/kg. All results for samples collected from the northern sidewall of the excavation were reported at concentrations <1 mg/kg. E26 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was from 2 to 2.5 ft bg. All verification sample results were <1 mg/kg. E27 – This cell was excavated to the as-planned final depth of 5 ft bg. All verification sample results except for the northern sidewall were <10 mg/kg. All results for samples collected from the northern sidewall of the excavation were reported at concentrations <1 mg/kg. SPLP PCB Analysis – To screen soil quality to the CT DEEP default total PCB Pollutant Mobility Criteria (0.5 micrograms per liter (ug/L)) for a GA Groundwater Classified Area (GA PMC), 67 soil samples were collected from soil remaining in place containing PCBs <10 westonandsampson.com 2-6
  8. Page 23 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 23 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report mg/kg. These samples were analyzed for leachable PCBs using SPLP testing. SPLP PCBs were detected slightly above the 0.5 ug/L criterion in 17 of the 67 soil samples. The remaining SPLP PCB results were non-detect (<0.5 ug/L). Compliance with the GA PMC will be demonstrated through groundwater monitoring in accordance with the RSRs (Section 22a133k-2(c)(5)(C)) as follows: o Soil polluted with PCBs within the remediation area is not required to be remediated to the applicable PMC, provided that at such release area: ▪ (i) Eighty (80) percent or more of the mass of the substances remaining at the release area has been subject to infiltration; ▪ (ii) Infiltration was not obstructed by anthropogenic features, for at least five (5) years; ▪ (iii) Groundwater monitoring complies with the requirements of section 22a133k-3(h)(1) of the RSRs; and ▪ (iv) The laboratory analytical results for all groundwater sample events collected as specified in section 22a-133k-3(h)(3) of the RSRs for a GA groundwater classified area are equal to or less than the groundwater protection criteria (GWPC) and the surface water protection criteria (SWPC). The site meets requirements (i) and (ii) above. In August 2021, seven groundwater-monitoring wells identified as MW-1S, MW-2S, MW-3S, MW-4S, MW-5S, MW-D and MW-BR (a bedrock well) were installed within the PCB-remediation area. On August 25 and 26, 2021, and November 16, 2021, the first and second quarters of compliance groundwater monitoring was completed in accordance with the CT DEEP approved (approved on July 27, 2021) Post Remediation Groundwater Plan, dated July 9, 2021, prepared by Weston & Sampson. The groundwater-analytical results for both sampling events indicated that PCBs were not detected in groundwater at concentrations above the reporting limit, ranging from 0.27 to 0.5 ug/L or the GWPC and SWPC of 0.5 ug/L. Two additional quarterly-monitoring events will be conducted in February 2022 and May 2022 to meet requirement (iii) above. It is anticipated that the groundwater results from the two remaining quarterly events will be consistent with the August and November 2021 evens, confirming that PCBs are not present in groundwater within the remediation area and therefore requirement (iv) above would be met. This would result in compliance with the GA PMC, such that further remediation of SPLP PCBs above 0.5 ug/L would not be required. Following completion of compliance-groundwater monitoring a report will be prepared and submitted to the CT DEEP under separate cover. Verification samples for the C-cells were collected until all total PCB results were ≤1 mg/kg. For the E-cell excavations, additional excavation was performed until the PCB remedial goal was achieved. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 1. Laboratory analytical data reports are attached in Appendix C. No material was stockpiled on-Site during excavation activities. Soil was managed within the excavation and graded to allow placement of a 4-foot thick, clean soil cap above remaining materials containing PCBs ≤10 mg/kg. 2.2.4 PCB-Containing Concrete Wastes Two concrete stormwater drainage pipes and structures (one at the southwestern portion of the basin and one at the northwestern portion of the basin) were addressed during remediation activities. westonandsampson.com 2-7
  9. Page 24 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 24 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report The southwestern concrete drainage pipes and associated structures (i.e., catch basins) that formerly discharged into the basin were encountered within the E-cell PCB-excavation areas and were removed (see Figure 4). This concrete was segregated from PCB-impacted soils and was sized (broken into smaller pieces) as needed prior to removal and transportation to the waste receiving facility. The concrete was disposed at the facility with its corresponding excavated soils. A total of 108.7 tons of waste concrete was disposed in this manner. The northwestern concrete drainage piping that formerly discharged into the basin from the parking lot, west of the basin was filled with flowable fill and abandoned in place. (see Figure 4). Prior to remediation, sampling of the catch basins connected to the drainage pipes and the concrete piping that was proposed to be abandoned in place during remediation was conducted as described in the April 30, 2019, email “Response to EPA verbal comments of April 18, 2019” in January 2020. PCBs were not detected in these concrete samples. Further details of the concrete sampling are presented in Appendix A (February 12, 2020, submittal to EPA – Required Submittal under PCB Cleanup and Risk-Based Disposal Approval under 40 CFR 761.61(a) and (c)). The concrete box culvert that runs under the access road depicted on Figure 4 was not encountered during excavation activities. The PCB-verification sidewall-soil sample results from the eastern-most extent of excavations E17, E28 and E21, located closest to the box culvert were either not detected or reported at concentrations <1 mg/kg. 2.2.5 Other Contaminants of Concern Excavation of soils containing other COC (i.e., ETPH, PAHs, and metals) greater than CT DEEP RSR Industrial/Commercial Direct Exposure Criteria (I/C DEC) and GA PMC were planned in the RAP. The final surveyed extent of these excavations is shown in Figure 4 and described below: • • • • • • • D1 – This cell was added as part of remedial construction activities for PAHs and was excavated to the as-planned final depth of 4 ft bg. All verification sample results were nondetect for PAHs. E8 – This cell was excavated to the as-planned final depth of 2 ft bg, for remediation of selected metals. All verification samples contained barium and cadmium at concentrations below the CT DEEP RSR criteria. The remaining metals results were non-detect. E11 – Originally planned to be excavated to a total depth of 5 ft bg for remediation of arsenic, the final excavation depth of this cell was 6 ft bg. All verification samples contained arsenic at concentrations below the CT DEEP RSR criteria. E13 – This cell was excavated to the as-planned final depth pf 2 ft bg for remediation of silver. Two of 6 verification samples contained silver at concentrations below the CT DEEP RSR criteria. The remaining silver results were non-detect. E14 – Originally planned to be excavated to a total depth of 2 ft bg for remediation of silver and PAHs, the final excavation depth of this cell was from 2 to 3.5 ft bg. Final verification samples contained PAHs at concentrations below the RSR I/C DEC and GB PMC. One of four of the final verification samples analyzed for silver, contained silver at a concentration below the CT DEEP RSR criteria. The remaining silver results were non-detect. E17 – This cell was excavated to a final depth of 4-6 ft bg for remediation of PAHs. Four of 7 verification samples contained PAHs at concentrations below the CT DEEP RSR criteria. The remaining PAH results were non-detect. E23 – This cell was excavated to the as-planned final depth of 4 ft bg for remediation of PAHs. Four of 5 verification samples contained PAHs at concentrations below the CT DEEP RSR criteria. The remaining PAH results were non-detect. westonandsampson.com 2-8
  10. Page 25 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 25 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Excavations were conducted until all verification sample results were below the I/C DEC and GA PMC. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 2. Laboratory analytical data reports are provided in Appendix C. Soils excavated for remediation of other COC were removed and disposed offsite with the PCB-impacted soil. The volume of COC-impacted soils removed was not accounted for separately from the PCB-impact soil. 2.3 Verification Sample Analysis As described in the Approved RAP, Verification samples were collected in accordance with 40 CFR Part 761Subpart O and analyzed for PCBs as Aroclors with Soxhlet extraction by EPA Methods 8082 and 3540 at Phoenix Environmental Laboratories in Manchester, Connecticut (a Connecticut Department of Public Health certified laboratory). Samples were collected at discrete sample locations from the upper three inches of soil when possible. However, for deeper excavations below the groundwater table, samples were collected using an excavator bucket as these excavations could not be entered safely. Quality Control and Quality Assurance (QA/QC) samples were analyzed by the laboratory and assessed for compliance by Weston & Sampson. Analytical data was generated following CT DEEP Reasonable Confidence Protocols (RCPs). All samples were submitted to the laboratory using standard chain of custody procedures. The laboratory case narratives and RCP check lists for each analytical report package were reviewed and no issues were found that would be expected to invalidate any of the confirmation data. 2.4 Grading of Remaining Impacted Soils and Backfilling Soils impacted with non-PCB compounds in excess of applicable RSR criteria were delineated during the Site investigation and removed during remediation. Soils impacted with PCB compounds >1 mg/kg and ≤10 mg/kg were graded and covered with clean fill to render them “inaccessible” (i.e., buried 4 ft bg), as stipulated in the RSRs. Clean backfill materials were used to establish final post-remediation grades. Backfill materials were determined to be “clean fill” (i.e., free of impacts) based upon review of analytical data for samples obtained from the backfill material (see Appendix G). Crushed stone was also used to backfill excavations and a letter from the suppling rock quarry indicates that the stone was generated by quarrying virgin rock and then sizing it according to the design specification (see Appendix G). Clean backfill materials were placed then compacted in place. Compaction testing data is attached in Appendix G. 2.5 Significant Environmental Hazard Abatement The original Significant Environmental Hazard (SEH) filing (September 2012) and CT DEEP acknowledgment are attached in Appendix H. In 2012, a chain-link fence was erected along the top of the bank around the entire settling basin and warning signage was posted in prominent locations along the fencing that identified the SEH Condition. In July 2014, when additional Site investigations changed the extent of the identified SEH Condition, the extent of the fencing was temporarily adjusted to enclose this area using snow fencing with warning signs. In September 2014 the temporary snow fencing was replaced with permanent chain link fence. In May 2015, additional sampling identified another SEH Condition in a densely wooded/vegetated area outside of the permanently fenced area. Eversource erected steel stake snow fencing with warning signs to prevent unauthorized access to this area. In November 2019, a temporary perimeter fence was installed during mobilization by the remedial contractor to maintain SEH mitigation measures during remediation. westonandsampson.com 2-9

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)